This is a price proposal form for RFQ ELE/260651 issued by the City of Ocala Electric Utility in Florida for grinder pump installation and force main connection services. The project requires installation of a complete 1 HP grinder pump station with plumbing services to connect the Shaw Substation control house to the City's newly installed sewer force main system, located approximately 80 feet from the substation's existing sewer lateral. The scope of work includes all materials, labor, permitting costs, power connections, and associated piping necessary to deliver a functional wastewater connection supporting the conversion from the control house's existing drain field to the new sewer system. A non-mandatory pre-bid meeting is scheduled for April 29, 2026, at 9:00 AM at Shaw Substation, 3650 SW 42nd Street, Ocala, FL 34474. Bidders must be licensed as a Plumbing Contractor in the State of Florida and possess a minimum of five years' experience installing grinder pump systems and force main piping.
The price proposal uses lump sum pricing for the primary installation work, with bidders required to enter their total bid amount in the designated field. An optional line item is available for abandonment and full removal of the existing septic tank, including extraction, disposal, hauling of debris, backfilling, and final grading, though this is not mandatory for submission of a responsive proposal. Award will be issued based solely on the pricing of Item #1, the grinder pump installation and force main connection work. The form provides separate sections for renewal pricing and optional term pricing, though specific contract term lengths and renewal options are not detailed in this exhibit.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 REVISED Exhibit B - PRICE PROPOSAL CONTRACT# ELE/260651
| Bidder name | Bidder Location |
| ENTER COMPANY NAME HERE | ENTER OFFICE LOCATION HERE |
| LUMP SUM PRICING | |||||
| ITEM | DESCRIPTION | UOM | QTY | UNIT COST | EXTENDED COST |
| 1 | Installation of a 1 HP grinder pump station and plumbing services to connect the Shaw Substation control house to the City’s sewer force main system. Price includes all materials, labor, and permitting costs, per Exhibit A – Scope of Work. | LS | 1 | $ - 0 | |
| TOTAL LUMP SUM PRICING - ENTER THIS DOLLAR AMOUNT IN ProRFx as total bid amount | $ - 0 |
| RENEWAL PRICING | |||||
| ITEM | DESCRIPTION | UOM | QTY | UNIT COST | EXTENDED COST |
| 1 | $ - 0 | ||||
| TOTAL CONTRACT TERM PRICING | $ - 0 |
| OPTIONAL TERM PRICING | |||||
| ITEM | DESCRIPTION | UOM | QTY | UNIT COST | EXTENDED COST |
| 1 | $ - 0 | ||||
| TOTAL CONTRACT TERM PRICING | $ - 0 |
| TOTAL BID (Grand total of all line items excluding optional item pricing) | $ - 0 | ||||
| OPTIONAL LINE ITEM - This line item is optional and is not mandatory for bidders to provide pricing in order to submit a responsive proposal. | |||||
| ITEM | DESCRIPTION | UOM | QTY | UNIT COST | EXTENDED COST |
| 2 | Abandonment and full removal of the existing septic tank. This includes extraction and disposal of the existing tank, hauling away all associated debris, backfilling the excavation, and final grading of the disturbed area. | LS | 1 | ||
| TOTAL LUMP SUM PRICING FOR OPTIONAL BID ITEM | $ - 0 |
NOTE - Award will be issued based on Item #1 pricing image1.png