RFQ_CDS250400_Roof_Replacement_-_Ingram_2421_NW_20th_Street_-_Addendum_1.pdf

PDF 90 KB Posted

Attached to
Roof Replacement - Ingram 2421 NW 20th Street
Solicitation number
RFQ# CDS/250400
Issued by
Marion County, Orlando City, Florida

About this file

This document is Addendum #1 for the City of Ocala's Roof Replacement project for a residential property located at 2421 NW 20th Street, issued on February 17, 2025, under Solicitation Number RFQ# CDS/250400. The addendum provides specific clarifications and requirements for the roof replacement, including guidelines for the existing skylight, hurricane clip fasteners, and gutter installation. Key requirements include using new products and materials, ensuring fasteners are rated for the specific installation material, and installing gutters with concrete splash blocks across the front porch.

The addendum emphasizes that all installations or replacements must use new products or materials. Specific details include maintaining the current skylight (which is not leaking but can be replaced if necessary), using fasteners appropriate to the installation surface (wood or masonry) with minimum embedment according to manufacturer specifications, and installing up to 30 feet of gutter with two downspouts across the front porch. Each downspout must have a concrete splash block, ensuring proper water drainage and protection for the property.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum # 1

Date: February 17, 2025 To: All bidders From: Louis Joseph, Buyer Solicitation Number: RFQ# CDS/250400 Solicitation Title: Roof Replacement - Ingram

SOLICITATION ADDITIONS, CLARIFICATIONS, AND CORRECTIONS

NOTE: ALL INSTALLATIONS OR REPLACEMENTS MUST INCLUDE NEW PRODUCTS

OR MATERIALS.

ITEM 1 - Roof

1. Skylight shall remain. The Skylight is currently not leaking but can be replaced if necessary.

2. The Fasteners for the hurricane clips shall be rated for the material to which it will be installed. (Wood or Masonry) minimum embedment shall be according to manufacturer specification.

3. The Gutter must have downspout/s. All downspouts shall have a concrete splash block. The Contractor shall assume gutter to be installed across the entire front porch (up to 30’ of gutter and two downspouts.

SOLICITATION ADDITIONS, CLARIFICATIONS, AND CORRECTIONS
ITEM 1 - Roof