Professional Building Architectural and Engineering Services MATOC-IDIQ
Solicitation number
ISD_365048_DA
Issued by

About this file

This document is a Qualifications Based Selection (QBS) solicitation for Professional Building Architectural and Engineering Services issued by Fermi Forward Discovery Group, LLC for the U.S. Department of Energy's Fermi National Accelerator Laboratory. The solicitation seeks architectural and engineering firms to provide professional services through a Multiple Award Task Order Contract (MATOC) Indefinite Delivery/Indefinite Quantity (IDIQ) contract, with services spanning five project categories: Planning/Studies/Reports, Repair/Maintenance/Alterations, Interior Design/Furniture, New Building/Major Alteration, and Building Code/Life Safety.

Key requirements include submitting qualifications by May 16, 2025 at 5:00 PM CST, with a two-year base contract and two one-year option periods. Offerors must provide detailed submissions including a statement of interest, project approach narrative, key personnel resumes, and explanatory narratives for a Project Manager and Project Architect/Designer. Evaluation will focus on responsiveness to requirements, qualifications of key personnel, prior work experience at Fermilab and other DOE National Labs, and office location. The contract will use firm fixed-price task orders primarily for projects at the Fermilab site in Batavia, Illinois, with services ranging from small maintenance tasks to major building renovations and new construction projects.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Managed by Fermi Forward Discovery Group, LLC for the U.S. Department of Energy Office of Science www.fnal.gov 1

Qualifications Based Selection (QBS)

ISD_365048_DA

Architectural/Engineering Services

MATOC-IDIQ

Professional Building Architectural and Engineering Services (ISD-

ENG)

ISD Project Number 14-1-48

Managed by Fermi Forward Discovery Group, LLC for the U.S. Department of Energy Office of Science www.fnal.gov 2

The following requirements must be adhered to for the Offeror’s submission of qualifications to Fermi Forward Discovery Group, LLC (FermiForward) in support of this specific requirement.

1.0 INVITATION TO SUBMIT PROPOSAL

You are invited to submit qualifications for the items specified in this Qualification Based Selection (QBS), in accordance with the provisions contained herein and the terms and conditions.

All questions concerning this QBS should be submitted in writing and directed to the Procurement Specialist listed below.

Procurement Specialist: Danielle Amico Phone: 630-840-3207 Email: damico@fnal.gov

Fermi Forward Discovery Group, LLC Procurement Department Kirk Road & Wilson Street Batavia, IL 60510-0500

2.0 QUALIFICATIONS DUE DATE

The offeror’s qualifications are to be emailed to the Procurement Specialist (damico@fnal.gov) no later than 5:00 PM CST on May 16, 2025. Partial or incomplete qualifications will not be considered.

FermiForward requires a minimum acceptance of ninety (90) calendar days for acceptance of qualifications and proposals. An offeror allowing less than Fermilab’s minimum acceptance period may be rejected.

FermiForward reserves the right to cancel this Solicitation at any time without incurring any liability or damages associated with such cancellation.

3.0 PRE-QUALIFICATION MEETING

A virtual pre-qualification meeting is scheduled for Thursday, April 17, 2025 at 10:30am CT via Microsoft Teams. Meeting login instructions will be sent separately via email. The meeting provides an opportunity to discuss and clarify the QBS. However, nothing said or represented in the meeting shall be deemed to modify QBS requirements unless followed by a written amendment. Offerors are requested to submit questions relative to the QBS in advance of the meeting so the Procurement Specialist may prepare responses. Offerors’ participation at this meeting is strongly recommended.

Anyone planning to attend the virtual pre-qualification meeting must contact the Procurement Specialist (damico@fnal.gov) prior to Thursday, April 17, 2025 to obtain meeting login information.

4.0 EXPLANATION OR INTERPRETATION OF QBS DOCUMENTS

The prospective offeror should examine and review the solicitation with care. Any prospective offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing to the Procurement Specialist listed above by 3:00 P.M. CT, Tuesday, April 29, 2025. Any communication about this project with any other person will be viewed as an undermining of the source selection process, and the Offeror may be disqualified on that basis. Oral explanations or instructions mailto:damico@fnal.gov mailto:damico@fnal.gov mailto:damico@fnal.gov

Managed by Fermi Forward Discovery Group, LLC for the U.S. Department of Energy Office of Science www.fnal.gov 3 given before the award of a subcontract will not be binding. Any information given to a prospective offeror concerning a solicitation will be furnished promptly to all other prospective offerors as an amendment to the solicitation if that information is necessary for submitting qualifications or if the lack of it would be prejudicial to other prospective offerors.

5.0 AMENDMENT OF SOLICITATION

FermiForward may, by amendment, modify any provision or part of this QBS at any time before the award of any resultant subcontract. All terms and conditions that are not modified remain unchanged.

An Offeror shall acknowledge receipt of any amendments to this QBS. Failure to acknowledge may result in the disqualification of an Offeror’s proposal. The acknowledgment shall be provided by returning the Amendment with a signature on the acknowledgment signature line.

6.0 INTRODUCTION/PURPOSE

Department of Energy’s (DOE) Fermi National Accelerator Laboratory (FNAL) is America’s premier particle physics and accelerator laboratory that strives to solve the mysteries of matter, energy, space, and time for the benefit for all. Located in Batavia, Illinois, it is managed by the Fermi Forward Discovery Group, LLC (FermiForward) for the U.S. Department of Energy Office of Science.

FermiForward’s Infrastructure Services Division – Engineering Department (ISD-ENG) is responsible for managing a wide variety of alterations, repairs, and new construction projects. This solicitation relates to professional Architectural and Engineering services and is anticipated to include but not be limited to smaller tasks for studies, repair and alteration, interiors, new construction (including underground work), and building code and life safety.

This is a Qualifications Based Selection (QBS) for a MATOC IDIQ for a pool of consultants to become pre-qualified to provide professional Architectural and Engineering services. Prequalified firms will be asked to respond with specific project proposals for requested task orders, and under those task orders the architect/engineering (A/E) subcontractors shall furnish the personnel, facilities, equipment, materials, and supplies necessary to perform the requested scope.

7.0 QUALIFICATION BASED SELECTION OF A/E SUBCONTRACTORS

Qualifications are requested for the selected offeror to provide services that will include all normal and customary professional services required of a qualified, licensed architect/engineering firm and its in-house or sub-tier subcontractors to support the performance of planning, master planning, and program support; A/E investigative and design services including development of construction documents;

construction support for projects consisting of primarily building alterations, repair, comprehensive interior design, new construction, building code and life safety as described in Section 15.0 – CATEGORIES OF PROJECTS. It is the intent of FermiForward to award IDIQ Subcontracts to at least one firm for each of the Categories of Projects.

See Section 16.0 QUALIFICATION SUBMITTAL REQUIREMENTS for further information on Qualifications.

In responding to this QBS, the offeror will choose which categories of work they believe themselves to be qualified for and wish to be evaluated. YOU MAY IDENTIFY MORE THAN ONE

CATEGORY. QUALIFICATIONS MUST BE DEMONSTRATED INDIVIDUALLY FOR EACH

CATEGORY SELECTED.

Managed by Fermi Forward Discovery Group, LLC for the U.S. Department of Energy Office of Science www.fnal.gov 4

The selected subcontractor(s) and its sub-tier subcontractors will complete various tasks in accordance with FermiForward’s requirements as well as applicable portions of the DOE policies and State of Illinois codes, ordinances, and regulations as incorporated into contract No. 89243024CSC000002 between the DOE and FermiForward.

The Qualified Subcontractor shall furnish the personnel, facilities, equipment, materials, travel, and supplies necessary to perform various services from within the Categories of Projects listed in Section 15.0, when requested by FermiForward Procurement Department. The Subcontractor shall perform all tasks in-house or use a team of sub-tier subcontractors approved by FermiForward.

The awarded subcontractor will provide professional A/E services, including all normal and customary professional A/E services per the Illinois Architecture, Professional Engineering, and Structural Engineering Practice Act required of a qualified, professionally licensed A/E and its sub-tier subcontractors. The awarded subcontractor shall complete the various services outlined in each individual Task Order, which will include additional details regarding the scope of work, schedule, and budget requirements of each task.

As projects for services are identified, the firms in the corresponding category will be asked to submit pricing breakdowns for a specific scope of services on a rotating basis within the category. FermiForward will then provide any refinements to clarify the scope of services, negotiate manhours and overall fee with the firm based on their proposal. If concurrence cannot be achieved for applicable scope and fee, the next firm in the rotation under the category will be asked to submit a fee proposal. FermiForward reserves the right to issue a subcontract for similar services through use of other procurement vehicles.

FermiForward will procure these services using 40 U.S.C 11, Selection of Architects and Engineers (hereinafter referred to as the “Brooks Act”) and FAR subpart 36.6 A-E selection procedures.

8.0 SUB-TIER SUBCONTRACTORS, OUTSIDE ASSOCIATES, AND

CONSULTANTS

Any sub-tier subcontractors and outside associates or consultants required by the Subcontractor in connection with the services covered by a Task Order issued under the Subcontract will be limited to individuals or firms that were specifically identified and agreed to with FermiForward during Subcontract and/or Task Order negotiations. The Subcontractor shall obtain the FermiForward Procurement Specialist’s consent before making any substitution for these sub-tier subcontractors, associates, or consultants after the Initial Subcontract or Task Order award.

The Subcontractor, with each Task Order proposal, must provide one-time fully loaded direct rates for new sub-tier subcontractors that will be used in proposing the FFP for the Task Order. FFP shall include any proposed travel, materials, and subcontracted costs.

As part of a Task Order proposal submittal, the Subcontractor must include a list of proposed sub-tier subcontractors and associated costs and milestones

9.0 TASK ORDERS

Task orders for A/E professional services will be awarded on a firm fixed price (FFP) basis. The number of tasks to be negotiated will depend upon the availability of funding. This subcontract does not provide for a minimum or maximum number of task orders. The A/E professional services associated with this subcontract will be primarily for operations located at the Fermilab site in Batavia, Illinois.

Managed by Fermi Forward Discovery Group, LLC for the U.S. Department of Energy Office of Science www.fnal.gov 5

The Subcontractor will submit a proposal in response to a request by FermiForward, which will include the Subcontractor’s proposed FFP for each task, the hours by labor category, materials, the scope of the task, a list of proposed deliverables, date of review submittals, and the completion date for the task.

The Subcontractor shall prepare and provide to FermiForward, at the times specified in the task order or at such other times as FermiForward shall designate, certain deliverables that include, but are not limited to: calculations, plans in Autodesk AutoCAD Civil3D, technical specifications in MS Word format, and other deliverables that will be specifically enumerated in the RFP for a task order (hereinafter, collectively "Deliverables").

10.0 FERMIFORWARD RESPONSIBILITIES

FermiForward will be responsible for the development of the general terms and conditions of the construction documents:

1. FermiForward will provide the technical requirements for each project including the capacities and characteristics of existing utilities and services. The subcontractor will be required to coordinate closely with FermiForward in all phases of design to ensure compatibility with the technical requirements;

2. FermiForward shall have the final decision to allow connections to existing electrical, mechanical, and process water services;

3. FermiForward will submit all required permit applications required by local, state, or federal agencies. (Note: The subcontractor shall provide information or supporting documentation required for the completion of these permit applications);

4. FermiForward will provide available subsurface investigation reports and existing drawings, calculations, and specifications;

5. FermiForward will provide reviews during the development of the project. These reviews are to assess compatibility with existing site systems and conformance with the technical requirements of the project. These reviews will not replace the subcontractor’s responsibility to perform their own review and verification of the work performed by the subcontractor in accordance with their quality assurance/quality control (QA/QC) program. FermiForward reviews assume no professional liability for the performance of the engineered work; and

6. FermiForward will provide all Fermilab-specific training at no cost to the subcontractor.

11.0 RISK MANAGEMENT

Risk mitigation strategies approved by FermiForward shall be incorporated into the A/E design.

The completed designs shall be clear, definite, comprehensive, and developed to appropriate scales of detail to be conducive to the SOW for each task order. The A/E firm is responsible for performing the work in accordance with professional standard practices and FermiForward requirements identified herein.

The Subcontractor shall ensure that architects or engineers registered to practice in the state of Illinois shall prepare or review and approve the design of architectural, structural, mechanical, electrical, civil, or other engineering features of the work.

12.0 QUALITY REQUIREMENTS

The Subcontractor is responsible for the professional quality, technical accuracy, and the coordination of all designs, drawings, specifications, and other services furnished under this subcontract.

Managed by Fermi Forward Discovery Group, LLC for the U.S. Department of Energy Office of Science www.fnal.gov 6

The Subcontractor shall perform its services in accordance with the standards of care and diligence normally practiced by recognized firms in performing services of a similar nature.

The Subcontractor shall, without additional compensation, correct or revise any errors or deficiencies in its designs, drawings, specifications, and other services.

The Subcontractor shall submit a Corporate Quality Control Plan that details the means and methods the Subcontractor will use to ensure the work meets an acceptable quality level. The Subcontractor may be required to submit a task-specific Quality Control Plan for each Task Order awarded under this Subcontract.

All work under Task Orders shall include the appropriate levels of “Value Engineering” and “Quality Control” to ensure that the final product is in compliance with the applicable codes and standards and conforms to the technical requirements of the project. The Subcontractor will be responsible for the coordination of the design and all quality assurance of work produced by the Subcontractor and its sub-tier subcontractors.

Deliverables such as samples, reports, spreadsheets, sketches, photographs, cost estimates, plans, and specifications in support of field changes or contract modifications, validating conformance to plans and specifications and drawings shall be provided in accordance with the schedule and delivery dates set by the task order. The deliverables shall be reviewed, verified, and approved by the Subcontractor in accordance with their QA/QC program prior to transmitting deliverables to FermiForward.

13.0 HEALTH AND SAFETY

At Fermilab, environmental protection and safety are of the highest importance. FermiForward’s policy is to protect the environment and the safety and health of all persons, including FermiForward employees, Subcontractor employees, scientific visitors, and visiting members of the public, from accident or injury while they are present on the Fermilab site or other location managed by FermiForward. Nothing shall have a higher priority.

Subcontractor employees performing fieldwork (e.g., inspections) on the Fermilab site shall perform such work in compliance with DOE 10 CFR 851 Worker Safety and Health Program (WSHP) under an FermiForward approved contractor WSHP or adoption of the FermiForward DOE approved WSHP. The Subcontractor shall prepare a Job Safety Analysis (JSA) using the hazard analysis form in Fermilab Environment, Safety and Health Manual (FESHM) 7010 and submit for FermiForward review and approval covering its fieldwork. Any Subcontractor employees who will perform the fieldwork shall complete the FermiForward Subcontractor Safety Orientation training. Questions related to the JSA process can be addressed during the Subcontractor Safety Orientation.

Those Subcontractor employees performing fieldwork may also be required by FermiForward to attend other safety training for specific hazards encountered during the work.

Subcontractor designs shall support compliance with DOE 10 CFR 851: Worker Safety and Health Program, the FESHM, and the Fermilab Radiological Control Manual (FRCM). FESHM and FRCM contains FermiForward’s policies and procedures designed to manage ES&H hazards in accordance with the requirements of the Work Smart set of ES&H standards attached to the DOE contract.

14.0 PERIOD OF PERFORMANCE

The period of performance for each IDIQ subcontract will be a two (2) year base subcontract with two (2) one-year option periods.

Managed by Fermi Forward Discovery Group, LLC for the U.S. Department of Energy Office of Science www.fnal.gov 7

15.0 CATEGORIES OF PROJECTS

For purposes of allowing offerors to focus on their firms’ strengths and to allow the requesting department to request follow-up on proposals from firms more specifically qualified for the projects, the broad category of architectural/engineering work has been sub-grouped into the following categories:

15.1 Planning, Studies, Reports

Tasks in this category will include planning, programing, needs analysis, condition assessments, research, project definitions reports, cost estimates, code analysis, schedules, sustainability studies, and similar reports and studies. Deliverables may include but not be limited to drawings, graphics, sketches, and charts to support the task. Projects may be multi-disciplined or specialized. Existing conditions documentation may be required. Presentation documents may be included.

Photography, renderings, and sketching/drawings may be required to support the work. Class 3, 4 or 5 cost estimates may be included. Planning project budgets including construction costs, professional service, and recommended contingencies for each component may be included.

Problem solving may be an integral component.

15.2 Repair, Maintenance, and Alterations

Tasks in this category will generally be small projects in support of maintaining the lab infrastructure. Work will include analysis and problem solving. Projects may be multi-disciplined or specialized. In most cases, a Construction Documents package will be required for competitive fixed-price procurement and includes, but is not limited to, drawings, specifications, a Class 1 estimate, and a Statement of Work. In some cases, Construction Documents will be prepared for Time and Materials procurement and require the documentation of existing conditions for repair, maintenance, or alternation scopes of work.

15.3 Interior Design, Furniture, and Furnishings

Tasks in this category will cover a wide range of projects, from minor space modifications to full reconfiguration and modernization of departments and divisions. Projects may be multi-disciplined or specialized. Projects may be comprehensive covering planning, design, and construction administration or may be for specific phases. Renderings may be included. Construction Document packages or individual components may be required, including detailed drawings, specifications, Class 1 cost estimates, schedules, and a Statement of Work, all prepared for competitive fixed price procurement. Furniture and furnishings will generally be from the GSA schedule and will require layouts, specifications, and vendor proposals. Maintaining existing building standards may be required.

15.4 New Building or Major Alteration

Tasks in this category will cover a wide range of projects from major space alterations/modernization to new buildings or additions. Tasks may include programming/concept design, schematic design, design development, construction documents, bidding/negotiation, construction administration, and/or closeout as defined by the Task. Presentation drawings may be included. Project will be multi-disciplined. Construction Document Packages or individual components for competitive fixed price procurement may be required and include detailed drawings, specifications, schedules, Class 1 cost estimates, and a Statement of Work.

15.5 Building Code and Life Safety

Tasks in this category will provide multi-disciplinary building and safety services and will cover plan review and analysis of projects, inspections, and investigations, as well as incidental services that the professionals providing those services may logically or justifiably perform to determine conformance to the International Building Code, The Architectural Barriers Act (ABA), the

Managed by Fermi Forward Discovery Group, LLC for the U.S. Department of Energy Office of Science www.fnal.gov 8

Fermilab Environment, Safety and Health Manual (FESHM) for building construction, and OSHA 1910 and 1926. Tasks may involve requests for opinions on code or regulation sections, reports and documentation, and field evaluation. Tasks may include isolated components or full building or major renovations. Authorized Use and Possession (AUP) inspections for Code compliance and safety may be included. Interpretations of Code sections may be included.

16.0 QUALIFICATION SUBMITTAL REQUIREMENTS

Offerors must provide satisfactory evidence of its ability to manage and coordinate the types of activities described in this Solicitation and to produce the specified services on time. As a part of the Solicitation Response above, Offerors shall demonstrate their qualifications and experience with the submittal of the following resumes of key individuals, relevant projects completed, and the number of professional services and support staff at each office. Succinct responses free from excess marketing materials are preferred and will score higher. A stand-alone Qualifications Submittal shall be submitted for each Category of Projects the Offeror is applying for.

16.1 Statement of Interest

A statement of interest cover letter (one page maximum) with the following information:

a. Identify the Category of Projects for which the Offeror wishes to be considered.

b. The firm’s primary point of contact for this work.

c. The location of the offeror’s office(s) that will provide the services. Local Offices to the Chicagoland area will score higher than out-of-state offices.

d. If an offeror submits Solicitation Responses for services in multiple categories, then a separate Response must be submitted responding to the requirements listed.

16.2 Narrative and Company Information

A discussion in narrative form (1-page per category max.) of a successful project approach for each of the categories requested. Provide in the narrative at least one relatively recent example of how the approach was applied to a representative project for each category. Discuss the approach for maintaining the scope, schedule, and budget through all phases of design and construction. The Narrative should emphasize the firms’ strengths in the Category, and the project approach shall briefly explain the general workflow approach of the firm.

The narrative shall also describe the firm’s Quality Control and Quality Assurance process, with a brief example of where its effectiveness was evident. Identify how QAQC is performed for each project. Submit a Corporate Quality Control Plan that details the means and methods the subcontractor will use to ensure the work meets an acceptable quality level.

As applicable to the Category of Projects, address methodology for developing alternatives, evaluating alternatives, and selecting the most feasible alternate conceptual design, with an emphasis on how the firm develops cost estimates for budgeting that is based on a less-than complete design. Any tools employed for analysis or cost estimates should be identified in the narrative.

16.3 Key Personnel

Offeror shall demonstrate relevant qualifications and experience, including resumes of key individuals, relevant projects completed, and the number of professional services and support staff at each office. The following positions are considered Key Positions:

Managed by Fermi Forward Discovery Group, LLC for the U.S. Department of Energy Office of Science www.fnal.gov 9

A Project Manager and Project Architect/Designer shall be provided for each task. Submit resumes (1-page max.) and a two-page (maximum) explanatory narrative on the person highlighting any important or unique experience or training that the person brings to the role, and any additional information asked in the requirements listed below.

16.3.1 Project Manager

Minimum 10 years professional experience, registration as a professional Architect or Engineer in the State of Illinois is a plus. Project management, design, bidding, and construction administration experience as demonstrated by similar work experience as identified in the Category of Projects. Experience with Federal Projects (2-minimum) in a significant role is a plus. Knowledge of Engineering and typical permitting practices in the Northeastern Illinois area, demonstrated by experience with industrial site development or other significant site development is a minimum requirement, and shall be noted on the resume, with at least three noted on the explanatory narrative.

Designate only one Project Manager for the firm, who will serve as the primary point of contact for contracting and all correspondence with the firm. The Project Manager may also serve as the Project Architect in one category.

16.3.2 Project Architect/Designer

A Project architect/designer shall be designated for each category of project that the firm seeks consideration for. The persons designated shall have as minimum qualifications (except as noted below) an Architectural or Interior Design degree with 5-years’ experience in projects relevant to the Category and reflected in the resume. The explanatory narrative should emphasize three

(3) specific examples of relatively recent projects that the Project Architect played a significant role that demonstrate development of initial design alternatives, concept designs and final plans and specifications, and estimates of construction cost.

Identify one Project Architect per category. The firm may utilize the same person for more than one category if their range of education, training and experience supports more than one category. When a single person is designated for more than one category, an explanatory narrative for each category is still required.

16.3.3 ICC Certified Building Official, Plan Examiner, or Code Enforcement A single person shall be designated to oversee all work for Category of Projects 15.5 Building Code & Life Safety. The person designated shall be certified by ICC for Building Official, Plan Examiner, or Code Enforcement or provide relevant equivalent qualifications with 5 years of experience in projects relevant to the Category and reflected in the resume. The explanatory narrative should emphasize three (3) specific examples of relatively recent projects this person played a significant role. This person will be considered the Project Architect/Designer for Building Code & Life Safety Category of Projects.

17.0 QUALIFICATION EVALUATION CRITERIA

The evaluation team will make the selection of one or more offerors (if any) to subcontract with FermiForward on the basis of demonstrated competence and qualifications, and subject to the negotiation of a fair and reasonable pricing arrangement.

Request for Qualifications responses must not include any information regarding the offeror’s fees, pricing, or other compensation.

Firm submittals will be evaluated by category based on the following, in order of priority:

Managed by Fermi Forward Discovery Group, LLC for the U.S. Department of Energy Office of Science www.fnal.gov 10

• Responsiveness of the resume of the Project Manager to the outlined requirements.

• Responsiveness of the explanatory narrative for the Project Manager to the outlined requirements.

• Responsiveness of the Resume of the Project Architect/Designer to the outlined requirements.

• Responsiveness of the explanatory narrative for the Project Architect/Designer to the outlined requirements.

• Responsiveness of the Resume of the ICC Certified Building Official, Plan Examiner, or Code Enforcement to the outlined requirements (if applicable).

• Responsiveness of the explanatory narrative for the ICC Certified Building Official, Plan Examiner, or Code Enforcement to the outlined requirements (if applicable).

• Responsiveness of the Offeror’s Project Approach and to QA/QC to the outlined requirements.

• Responsiveness of the Offeror’s cover letter to the outlined requirements.

• Prior history of work at Fermilab, if any, as reflected in the required narratives and resumes to the outlined requirements.

• Prior History of work at other DOE National Labs, as reflected in the required narratives and resumes.

• Location of the primary office out of which the majority of the work will be performed, with offices in the Chicagoland area and proximal to Fermilab scoring higher.

18.0 LATE SUBMISSION

Proposals received by FermiForward after the Submittal Date and Time indicated may not be considered.

The Respondent assumes the risk of the method of dispatch chosen.

19.0 OFFEROR’S MODIFICATION AND WITHDRAWAL OF

QUALIFICATIONS

The offeror may submit modifications to its qualifications at any time before the solicitation closing date and time and may submit modifications in response to an amendment, or to correct a mistake at any time before award.

Qualifications may be withdrawn at any time before the submission deadline. Withdrawals are effective upon receipt of notice by the Procurement Specialist.

20.0 INSURANCE

Certificates of insurance of the types and in the amounts in accordance the Clause 15 in FermiForward General Terms and Conditions for Services and Insurance Requirements for Architect and Engineer Subcontracts will be required of the successful offeror before physical work at the site commences.

All policies, except for Worker’s Compensation and Professional Liability, shall provide by appropriate language that Fermi Forward Discovery Group, LLC, the University of Chicago, Universities Research Association, Inc., and the United States Government are additional insureds for all coverages, including but not limited to completed operations. The certificates shall state that waiver of subrogation by all insurers, Managed by Fermi Forward Discovery Group, LLC for the U.S. Department of Energy Office of Science www.fnal.gov 11 including workers’ compensation, is granted in favor of the additional insureds as required by written contract, that the insurance afforded by such policies is primary insurance, and that all rights of the insurer for contribution from other insurers are waived.

21.0 EXCEPTIONS AND DEVIATIONS

Offerors taking exceptions, deviations, or conditional assumptions must identify and explain each exception/deviation, or conditional assumption taken with sufficient amplification and justification to permit evaluation(s). Such exceptions, deviations, or conditional assumptions will not themselves automatically cause a proposal to be deemed unacceptable to FermiForward. However, a large number of exceptions or one or more significant exceptions not providing benefit to FermiForward may result in the rejection of your proposal as unacceptable.

22.0 INCORPORATED DOCUMENTATION

• Fermi Forward Discovery Group’s A/E Consultant Handbook

• Fermi Forward Discovery Group’s Design Guides

• Fermi Forward Discovery Group’s CAD Standards

• Fermi Forward Discovery Group’s Building Information Modeling (BIM) Guide

• Fermi Forward Discovery Group’s Graphic Standards at Fermilab

• Fermilab Environment, Safety and Health Manual

• Fermilab Radiological Control Manual (FRCM)

• DOE Order 413.3B, Program and Project Management for the Acquisition of Capital Assets

• Guiding Principles for Sustainable Federal Buildings and Associated Instructions by the

Council on Environmental Quality

• Fermilab Environment, Safety and Health Manual

To access these guides, please follow the links below:

Engineering guides and standards | Infrastructure Services (fnal.gov) Fermilab Environment, Safety and Health Manual (FESHM) | Environment, Safety and Health (fnal.gov) Fermilab Radiological Control Manual (FRCM) | Environment, Safety and Health (fnal.gov)

23.0 EXHIBITS

• Exhibit A - Fermi Forward Discovery Group, LLC General Terms and Conditions for Services (1/2025)

• Exhibit B - Fermi Forward Discovery Group, LLC Insurance Requirements for Architect & Engineer Subcontracts (1/2025)

• Exhibit C – Statement of Work entitled “Architectural/Engineering Services MATOC-IDIQ” dated 3/24/2025

• Exhibit D – Proposal Certifications, Form PUR-466 (Rev. 1)

• Exhibit E – SARC - Subcontractor Annual Representations & Certifications (Rev. 4)

• Exhibit F – Summary of Required Solicitation Documents https://fess.fnal.gov/engineering-guides-standards/ https://eshq.fnal.gov/manuals/feshm/ https://eshq.fnal.gov/manuals/feshm/ https://eshq.fnal.gov/manuals/frcm/

1.0 INVITATION TO SUBMIT PROPOSAL
2.0 QUALIFICATIONS DUE DATE
3.0 PRE-QUALIFICATION MEETING
4.0 EXPLANATION OR INTERPRETATION OF QBS DOCUMENTS
5.0 AMENDMENT OF SOLICITATION
6.0 INTRODUCTION/PURPOSE
7.0 QUALIFICATION BASED SELECTION OF A/E SUBCONTRACTORS
8.0 SUB-TIER SUBCONTRACTORS, OUTSIDE ASSOCIATES, AND CONSULTANTS
9.0 TASK ORDERS
10.0 FERMIFORWARD RESPONSIBILITIES
11.0 RISK MANAGEMENT
12.0 QUALITY REQUIREMENTS
13.0 HEALTH AND SAFETY
14.0 PERIOD OF PERFORMANCE
15.0 CATEGORIES OF PROJECTS
15.1 Planning, Studies, Reports
15.2 Repair, Maintenance, and Alterations
15.3 Interior Design, Furniture, and Furnishings
15.4 New Building or Major Alteration
15.5 Building Code and Life Safety
16.0 QUALIFICATION SUBMITTAL REQUIREMENTS
16.1 Statement of Interest
16.2 Narrative and Company Information
16.3 Key Personnel
16.3.1 Project Manager
16.3.2 Project Architect/Designer
16.3.3 ICC Certified Building Official, Plan Examiner, or Code Enforcement
17.0 QUALIFICATION EVALUATION CRITERIA
18.0 LATE SUBMISSION
19.0 OFFEROR’S MODIFICATION AND WITHDRAWAL OF QUALIFICATIONS
20.0 INSURANCE
21.0 EXCEPTIONS AND DEVIATIONS
22.0 INCORPORATED DOCUMENTATION
23.0 EXHIBITS

File details come from the government source that posted it. Updated .