This is an Amendment to Solicitation/Modification of Contract (Standard Form 30) issued by the Department of Veterans Affairs Network Contracting Office 23 in Coralville, Iowa for RFQ 36C26326Q0906. The amendment consists of industry questions and answers clarifying the scope of work for electrical equipment testing and maintenance services.
Key scope clarifications include: full electrical testing of liquid transformers per VHA Directive 1025 is required; primary injection testing only (not secondary) applies to low-voltage circuit breakers rated 225A and above; no load testing is required for generators and generators are not included in the contract; working hours include days, evenings, and weekends; and all testing must comply with the latest ANSI/NETA MTS, NFPA 70B, and VHA Directive 1028 standards. The contract covers 16 primary switches and 16 electronic protective relays. Grounding defect corrections and supplemental grounding electrode installation will be handled as additional work outside the base contract scope. The Government retains responsibility for utility shutdown coordination. Testing of relays associated with main feeder breakers (MV breakers) is required, as is grounding system testing limited to facility grounding electrode systems and major equipment grounding connections. The Government will not provide previous bid tabulations, incumbent contractor information, existing drawings, equipment lists, or ground resistance test reports—offerors must rely on their own industry knowledge and experience to develop their quotes.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
01 04 N/A
0001 07-07-2026 636-26-3-8895-0020 N/A
36C263
DEPARTMENT OF VETERANS AFFAIRS
NETWORK CONTRACTING OFFICE 23
1303 5TH STREET, SUITE 300
CORALVILLE IA 52241
36C263
DEPARTMENT OF VETERANS AFFAIRS
NETWORK CONTRACTING OFFICE 23
1303 5TH STREET, SUITE 300
CORALVILLE IA 52241
To all Offerors/Bidders 36C26326Q0906
X
X X
636-3660162-8895-855100-2543-0400555X9
X 01
This RFQ Amendment lists Questions asked by Industry and the Answsers. See below.
Joseph Bennett
Contract Officer
VA-VHA-RPOC-2024-0088
RFQ 36C26326Q0906 0001
Questions and Answers:
1. Please confirm the required scope for liquid transformers. Is the scope limited to inspection, cleaning, and oil sample testing only, or is full electrical testing required per ANSI/NETA MTS and VHA Directive 1028?
Answer: Yes, full testing is required per Directive 1025.
2. VHA Directive 1028 mentions primary injection testing for LV circuit breakers rated 225A and above. Does this requirement apply to this contract, or is secondary injection testing acceptable/required for the LV circuit breakers?
Answer: Yes, Primary Only.
3. For generator load testing, please confirm whether DVA requires real load testing or load bank testing.
Answer: No load testing.
4. If load bank testing is required, please provide the generator ratings, required load percentages, test duration, and confirm whether the Contractor is responsible for providing all load bank equipment, cables, and accessories.
Answer: N/A.
5. Please confirm whether generators are required under this contract. If yes, please provide the quantity.
Answer: No.
6. Please confirm the allowable working hours for this project, including whether after-hours, weekend, or holiday work is required or permitted.
Answer: Days, evenings and weekends.
7. The project execution date is expected to be right after bid award. Please confirm the required period of performance for this contract, including the anticipated start date and completion duration.
Answer: Please see Instructions to Offerors, paragraph 2.
8. Please provide previous bid tabulation, previous award information, incumbent contractor name, and previous contract value, if available.
Answer: This will not be made available. Offerors are expected to use their experience and knowledge of the industry to assemble their own quote for the work required.
9. Are accessory devices such as CTs, PTs, meters, control switches, indicating lights, and similar equipment required to be tested under this solicitation? If yes, please provide the quantities, voltage levels, and required test procedures.
10. Please confirm the quantity of Primary Switch.
Answer: 16.
11. Please confirm the quantity of protective relays and their types (electronic or electromechanical relay).
Answer: 16 electronic.
12. Please confirm whether all testing shall be performed in accordance with the latest ANSI/NETA MTS, NFPA 70B, and VHA Directive 1028 standard.
Answer: Yes.
13. Please confirm whether DVA will provide existing reports, drawings, equipment lists, and one-line diagrams prior to proposal submission.
Answer: What is included in the solicitation is all that will be provided.
14. Please confirm whether shutdown coordination with the utility is the contractor's responsibility or if it is GOV's.
Answer: Government’s responsibility.
15. Please confirm whether infrared scanning, torque checks, cleaning, lubrication, and visual/mechanical inspections are required for all listed equipment.
16. Grounding Defect Corrections: The SOW states to “correct defects” identified during grounding inspection. Can the Government clarify what the contractor's responsibility is and whether corrective repairs are included in the base scope or handled as additional work? If it is included in the base contract, can you provide a cap for that scope in this solicitation?
Answer: Will be handled as additional work.
17. Supplemental Grounding Electrode Installation: Can the Government confirm whether installation of supplemental grounding electrodes is part of the base scope or additional work if testing conditions cannot be met? If it is included in the base contract, can you provide a cap for that scope in this solicitation?
Answer: Will be handled as additional work.
18. For the small bolt-in molded-case circuit breakers installed in panelboards (typically 100A and smaller), does the VA require each breaker to be physically removed from the panelboard as part of the maintenance scope, or is testing and maintenance in the installed position acceptable where permitted by the manufacturer and NETA MTS.
19. Please clarify the extent of the grounding system testing required.
a. Is the intent limited to testing the facility grounding electrode system(s) and major equipment grounding connections?
b. Are existing grounding system drawings, ground grid layouts, and previous ground resistance test reports available?
20. For LV breakers, is secondary injection testing for all electronic LV trip units satisfactory?
Can we exclude primary injection testing?
Answer: No. (See Question 2).
21. The Attachment A. Table of Equipment To Be Inspected mentions Main Feeder Breakers
(MV Breakers). Do the relays associated with them also need to be tested?