About this file
Addendum No. 2 to RFQ 26-273, issued by New Smyrna Beach Utilities on April 2, 2026, modifies the annual roof preventative maintenance and inspection (PMI) contract for the municipality's utility facilities. The addendum makes two substantive changes: it removes Lift Station 59 from the scope of work, reducing the contract from 26 sites to 25 sites, and it addresses access constraints for the four electrical substations (Airport Substation at 2029 Turnbull Bay Road, Field Street Substation at 1101 Field Street, School Way Substation at 4025 Saxon Drive, and Smyrna Substation at 3131 SR 44). Due to safety requirements at these substations, the municipality was unable to permit in-person roof inspections beyond drive-by observations; therefore, photographic documentation of each electrical substation roof has been provided as referenced during the mandatory site visit held on March 13, 2026.
All prospective vendors must acknowledge receipt of this addendum by signing and returning the acknowledgment form with their proposal submission. The addendum becomes an integral part of the RFQ and contract documents, and bidder compliance is required for proposal consideration. The quotation deadline remains Thursday, March 26, 2026, at 2:30 p.m., with submissions accepted via VendorLink or email to Lauren Wright, Purchasing Agent, at lwright@nsbufl.com or 386-424-3016. The contract term is one year with the utility commission retaining renewal rights for up to three additional one-year periods based on mutual agreement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ_26-273_Addendum_2.pdf | ||
| Signed_Site_Visit_Sheets_from_3-27-26.pdf | ||
| RFQ_26-273_Addendum_1.pdf | ||
| RFQ_Roof_26-273.pdf | ||
| Roof_Route.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NEW SMYRNA BEACH UTILITIES
200 CANAL STREET
P.O. BOX 100
NEW SMYRNA BEACH, FL 32170-010
RFQ 26-273
Annual Contract Roof PMI
DATE: April 2, 2026
RE: RFQ No. 26-273 ADDENDUM NO. 02
To prospective vendors:
New Smyrna Beach Utilities is issuing the following addendum. As such it becomes an integral part of the proposal and must be acknowledged by the return of this signed form, with your proposal form, acknowledging receipt of the addendum.
BIDDER question is in black. UTILITIES responses are in bold and italic.
1. New Smyrna Beach Utilities has decided not to include Lift Station 59 in the annual roof PMI Contract.
2. Due to the safety requirements at the 4 Electrical Substations we were not able to have you view them in person other than driving by them but we have attached photos of each of the roofs in this addendum as we stated during the mandatory site visit.
Company_______________________________________
Title___________________________________________
Signature_______________________________________
Airport Substation
2029 Turnbull Bay Rd
Field Street Substation
1101 Field St
School Way Substation
4025 Saxon Dr.
Smyrna Substation
3131 SR 44
| 1. New Smyrna Beach Utilities has decided not to include Lift Station 59 in the annual roof PMI Contract. |
| 2. Due to the safety requirements at the 4 Electrical Substations we were not able to have you view them in person other than driving by them but we have attached photos of each of the roofs in this addendum as we stated during the mandatory site visit. |