This document is an Addendum (No. 03) issued by New Smyrna Beach Utilities for RFQ 25-569, specifically addressing the renovation of the Central Office Building Women's Restroom. The addendum provides detailed clarifications and specifications for the remodeling project, including requirements for tile treatments, wall tile materials, sink types, emergency lighting, grab bars, door thresholds, and bathroom partitions. The project requires all elements to meet ADA Standards, with specific details such as using ceramic tile matching the floor, flush mounted oval sinks, solid plastic green partitions, and an American Standard wall-mounted porcelain sink with a touch-free Sloan faucet.

Key project parameters include demolition to be completed after hours or on weekends, retention of existing mirrors, and toilet seat cover dispensers to be removed and reinstalled by NSBU staff. The bathroom will feature 1-inch thick green partitions with Standard Privacy 55" doors and panels positioned 13.5" off the floor with overhead bracing. An aluminum door threshold with mill finish will be installed, and emergency light fixtures are required. Bidders are expected to acknowledge the addendum by returning a signed form with their proposal, indicating their understanding and agreement with the specified requirements for the women's restroom renovation.

View the file

Other files

File Type Posted
BID_TAB_25-569.pdf PDF
RFQ_25-569_Addendum_2.pdf PDF
Sign-In_Sheet_7-22-25.pdf PDF
RFQ_25-569_Addendum_1.pdf PDF
RFQ_25-569_Central_Office_Building_Women's_Restroom.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NEW SMYRNA BEACH UTILITIES

200 CANAL STREET

P.O. BOX 100

NEW SMYRNA BEACH, FL 32170-010

RFQ 25-569

Central Office Building Women’s Restroom

DATE: July 28, 2025

RE: RFQ No. 25-569 ADDENDUM NO. 03

To prospective vendors:

New Smyrna Beach Utilities is issuing the following addendum. As such it becomes an integral part of the proposal and must be acknowledged by the return of this signed form, with your proposal form, acknowledging receipt of the addendum.

BIDDER question is in black. UTILITIES responses are in red

1. Is the tile end treatment (Shluter- Jolly, Rondec, etc.) to be installed at outside and/or inside corners? No

2. Will the wall tile extend from floor to ceiling? If not, is a tile end treatment to be installed around perimeter? Wall tile will be the same height as it is now. Tile end treatment is to be installed.

3. Is the wall tile ceramic or porcelain? Ceramic that matches the floor tile.

4. Is there a door threshold that needs to be replaced? If so, what finish? Yes, aluminum, with mill finish.

5. Are Emergency light fixtures needed? Yes

6. Are grab bars needed? Yes

7. Is any signage needed? No

8. For the new sink do you want flush mounted oval sinks or undermounted sinks in the remodel?

Flush mounted oval sinks.

9. Could you please provide the partitions specifications? Material, color, water and moisture resistance, finish and other specifications if needed. Solid plastic (high density polyethylene)

NEW SMYRNA BEACH UTILITIES

200 CANAL STREET

P.O. BOX 100

NEW SMYRNA BEACH, FL 32170-010

RFQ 25-569

Central Office Building Women’s Restroom

1 inch thick, green (color sample to be provided before final approval), Standard Privacy 55” doors and panels, 13.5” off the floor with overhead bracing.

10. Do you want demolition completed during working hours? Demolition to be completed after hours or weekends.

11. Does everything in bathroom need to meet ADA Standards? Yes

12. Please provide specification/selection for the single lav/faucet within the ADA stall American

Standard wall mounted porcelain bathroom sink with Sloan Sf-2350 touch free faucet.

13. Are the existing toilet seat cover dispensers to be removed/replaced, remain in place, or outright removed? If scope is to replace, please provide information. Will be removed and reinstalled by NSBU staff.

14. Are the existing mirrors to be removed/replaced or remain in place? If scope is to replace, please provide specification. Remain in place.

Company_______________________________________

Title___________________________________________

Signature_______________________________________