RFQ 24_001 ADDENDUM 8.pdf
PDF 306 KB Posted
- Attached to
- RFQ 24-001 Water Tank Painting and Inspection
- Solicitation number
- PE-77111-NONST-2024-000000001
- Issued by
- Jasper County, Georgia
About this file
This document is an Addendum #8 to Request for Quotation (RFQ) 24-001 issued by the City of Commerce for the Bowden Street Tank Painting and Inspection project. The addendum addresses several questions from bidders, including whether a logo is required to match the existing one, if the City will pull water samples and pay for Bac-T testing, confirmation of site restoration requirements, details on past interior painting projects, availability of 110/220V power on site, and whether the tank needs to be painted on both the interior and exterior. The addendum also clarifies that no repairs should be included in the proposal, but can be added as additional costs if discovered. It also states that a NACE inspector must be provided by the contractor for periodic inspections as needed.
The document does not provide details on pricing terms, set-asides, incumbent contractors, funding sources, or other financial information. It focuses solely on clarifying technical requirements and addressing bidder questions for this specific project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Evaluation 24_001.pdf | ||
| RFQ 24_001 ADDENDUM 7.pdf | ||
| RFQ 24_001 Bowden St Tank.pdf | ||
| RFQ 24_001 ADDENDUM 5.pdf | ||
| NOIA.pdf | ||
| RFQ 24_001 ADDENDUM _4.pdf | ||
| RFQ 24_001 ADDENDUM _1.pdf | ||
| RFQ 24_001 ADDENDUM _2.pdf | ||
| RFQ 24_001 ADDENDUM _3.pdf | ||
| Tally Sheet 24_001.pdf | ||
| RFQ 24_001 ADDENDUM 6.pdf | ||
| 24_001 NOA.pdf | ||
| RFQ 24_001 ADDENDUM 9.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM #8
RFQ 24-001
Bowden Street Tank Painting and Inspection
This addendum is being issued to address questions submitted on RFQ 24-001
Q1. Does the city want a logo to be a part of the scope of work for this project? If so, is it to match the existing logo? How many sides?
A1. Match existing.
Q2. Will the city pull the water samples and pay for Bac-T?
A2. Yes
Q3. Please confirm seed and straw of the site will be acceptable for site restoration.
A3. Yes
Q4. Has the interior of the tank ever been brush sandblasted and overcoated? If so, how many coats?
Provide as much detail about past projects as possible.
A4. Unknown
Q5. Has the interior of the tank ever been painted with 100% solids epoxy? If so, what was the film thickness?
A. Unknown
Q6. Was there any paperwork or agenda passed out at the pre-bid meeting?
A6. No
Q7. Can you provide more information on the repairs that you want included in the proposal?
A7. No repairs should be included. Those will be additional as they are discovered. If you would like to go ahead and add them as an additional cost into the proposal it would be appreciated.
Q8. Can you tell me if the NACE inspector that the contractor is to provide is to be on site full-time or are they just to perform periodic inspections?
A8. Periodic as needed as determined by the inspector.
Q9. The documents state that we are to submit an original, copy and an electronic copy. Is the electronic copy to be provided on a thumb drive that we include in our proposal?
A9. Correct
Q10. Documents state that we are to submit a vendor master form. Where do we find this form?
A10. It can be found under the RFQ documents on our website.
Q11. Will 110/220-volt power be available at the site for use?
A11. Power is available.
Q12. Will the tank be painted on interior and exterior?
A12. The tank must be painted interior and exterior as specified.
Q13. Are there any specific paint or surface prep requirements for the painting? There are a wide range of options and availability for surface preparation and paint manufacturers that can greatly affect pricing and long-term performance.
A13. Please refer to Addendum #2
Q14. Where is the current Vendor Master Form requested in 1.12?
A14. https://commercega.gov/business/bid-opportunities under the Bowden Street Tank file
Q15. Will the current logo be replaced as was during the painting?
A15. The logo shall be replaced as is.
This addendum should be signed and returned with your proposal. Failure to do so may result in the proposal being non-responsive.
Christy Case Finance Director City of Commerce
Company Name __________________________________________________________
Authorized Representative _________________________________________________
File details come from the government source that posted it. Updated .