RFQ-22-32 Addendum 3 - Pre-Proposal materials.pdf
PDF 4 MB Posted
- Attached to
- Southeast Wellfield Project, Phase 1; West Polk Lower Floridan Aquifer Project, Phase 1 - CMAR
- Solicitation number
- RFP-00080
- Issued by
- Polk County, Woodlawn Beach CDP, Florida
About this file
This document is an addendum to the Request for Qualifications (RFQ) issued by the City of Winter Haven on behalf of the Polk Regional Water Cooperative (PRWC) for the Southeast Wellfield Project, Phase 1 and the West Polk Lower Floridan Aquifer Project, Phase 1 Construction Manager-at-Risk (CMAR). The RFQ seeks qualifications from firms to provide CMAR services for these two major water infrastructure projects. The Southeast Wellfield Project will include a 5 MGD reverse osmosis (RO) treatment facility, 12.5 MGD of transmission pipeline, and supporting wells and infrastructure. The West Polk Lower Floridan Aquifer Project will include a 2.5 MGD RO facility and 10 MGD of transmission pipeline. Proposals are due by 5:00 PM on April 29, 2022, and must be submitted in hard copy. The RFQ sets forth detailed requirements for the proposer's qualifications, experience, personnel, and technical resources, as well as bonding and insurance requirements. The CMAR contracts are expected to be awarded by the PRWC upon review of the submitted proposals.
The RFQ specifies that the CMAR must be a Florida-licensed general contractor that has been in business for at least 10 years. The CMAR must also meet minimum experience requirements related to CMAR services for public utility projects, RO treatment facilities, wellfields, and pipelines. Pricing terms are not requested in the RFQ, which is focused on qualifications rather than compensation. Funding for the projects will come from the PRWC member governments and may involve state and federal grants or loans.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ-22-32 Addendum 2.pdf | ||
| RFQ-22-32 Addendum 1 - Pre-proposal Zoom link.pdf | ||
| F1012225435_RFQ2232LegalAdvertisement.pdf | ||
| RFQ-22-32 Addendum 4.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Office of Procurement
April 13, 2022
Addendum 3
The Request for Qualifications, RFQ-22-32 (Southeast Wellfield Project, Phase I and West Polk Lower Floridan Aquifer Project, Phase 1 Construction Manager – At Risk, Polk Regional Water Cooperative) is hereby amended by this Addendum Number Three through the following questions and answers:
Question 1: Will the slideshow and sign in sheet from the Pre-Proposal meeting be available?
Answer 1: Yes – all Pre-Proposal meeting materials and sign-in sheet are included with this, Addendum 3. Zoom attendees that “signed in” on the chat feature are not included in this sign-in sheet due to an oversight in the Zoom settings. Online attendees are asked to follow up with an email to procurement@mywinterhaven.com listing their name, firm’s name, and email address for inclusion in a future addenda.
All other terms and conditions remain the same.
Sincerely, CITY OF WINTER HAVEN
Bethany Owen
Procurement Manager
Attachments: Pre-Proposal presentations In person sign-in sheet mailto:procurement@mywinterhaven.com
City of Winter Haven RFQ 22-32 Polk Regional Water Cooperative
Construction Manager – At Risk Southeast Wellfield Project
West Polk Lower Floridan Aquifer Project Pre-Proposal Meeting
Polk County Utilities Building 1011 Jim Keene Boulvard
Winter Haven, Florida 33880 April 12, 2022, 10:00 A.M.
Today’s Agenda Introductions
Procurement requirements
Project overview/location General background
Southeast Wellfield Project
West Polk LFA Project
CMAR scope of services
Compliance with funding agreements
Owner direct purchase provision
General Questions/comments
Introductions
• City Procurement Team:
• Bethany Owen, Procurement Manager
• Gary Hubbard, Department Director - Winter Haven Water
• Drew Crawford, Assistant City Attorney
• PRWC Project Management:
• Mark Addison, Polk County Utilities
• Tom Mattiacci, City of Lakeland
• Mary Thomas, Team One
Ground Rule Topic No. 1:
Questions During this Pre-Proposal Meeting
• Questions can be asked at today’s meeting.
• A summary of questions asked and answers given in today’s session will be distributed to interested parties as an addendum to RFQ 22-32.
• All questions asked today about the content of a proposal or the procedure for submitting a proposal will be answered in writing as an addendum.
Ground Rule Topic No. 2:
The Text of RFQ 22-32 Controls Today’s Presentation and Meeting
• This is a voluntary pre-proposal meeting (See Addendum No. 1)
• The presentations at Today’s Meeting are not intended to be inconsistent with the text of RFQ 22- 32, the attachments to the RFQ or the written addenda
• If you hear anything you think is in conflict with something in RFQ 22-32, ask for clarification in a formal question
Formal Questions
• Submit questions by email to:
procurement@mywinterhaven.com
• Deadline:
On or Before 5:00 P.M., Tuesday, April 19, 2022
• Late questions may not be answered
• Timely received questions will be referred to technical professionals or legal counsel as necessary to provide answer mailto:procurement@mywinterhaven.com
Procurement Requirements City of Winter Haven RFQ 22-32
Deadline for Submitting Proposals
On or before:
5:00 P.M., Friday, April 29, 2022
How to Submit a Proposal
• Address for submissions:
Procurement Manager, City of Winter Haven, City Hall, 451 3rd Street NW, Winter Haven, Florida 33881
• Proposal packages can be mailed, delivered by express courier (i.e., FedEx), or hand delivered
• Hand delivered proposal packages will only be accepted at the Reception Desk at City Hall, 451 3rd Street NW, Winter Haven, Florida 33881
Hand Deliveries
Proposal Contents: Preliminaries
• Cover Page; Corporate Information and Invoicing
Sheet; IRS Form W-9
Proposal Contents: Preliminaries
• On the Corporate Information and Invoicing Sheet:
the COMPANY NAME of the Proposer must MATCH the legal name assigned by the IRS to the Taxpayer Identification Number (“TIN”)
Proposal Contents: Joint Ventures
• If the Proposer is a Joint Venture or an arrangement of two firms:
• Provide a written explanation of how the work will be divided in Tab 1 of the proposal (See RFQ 22-32 at Page 14)
• Provide the Joint Venture Agreement or Prime/Subcontractor Contract in Tab 1 of the Proposal.
• The Prime Contractor / Qualifying Vendor should fill out the Cover Page, Corporate Information and Invoicing Sheet and Form W-9
Proposal Contents: Key Highlights Basic Qualifications:
• Prime Contractor, as well as each member of a Joint Venture, must be a Florida-Licensed General Contractor
• Prime Contractor must have been in business under the same EIN/TIN for 10 years or more
• Prime Contractor must obtain a Polk County Business Tax Receipt before award can be made
• Incorporated Contractors must be Florida businesses or have permission to transact business in Florida from the Division of Corporations
Tab 1:
• Incorporation Documentation: Certificate of Good Standing from Home State of Incorporation
• Registration Documentation: Florida requires “Foreign”/Out-of-State companies to obtain a “Certificate of Authority from the Division of Corporations See §§ 605.0902(1), 607.1501(1), Fla.
Stat. (2021)
• Payment of Local Business Tax: See https://www.polktaxes.com/services/local-business-taxes/ for more information
• Proof of Florida General Contractor Licensure https://www.polktaxes.com/services/local-business-taxes/
“CCNA”: Tabs 2 and 4 do not seek information regarding Proposer “compensation”
• Tab 2 requests explanations of “approaches to be used” by the Proposer for certain elements of determining the cost of the work / price of the work for the PRWC
• Tab 4 requests an explanation of the “strategy and approach to the project” related to cost controls for items outside of the cost of the work such as CMAR fees and bond fees
Tab 3: Experience, Expertise, Personnel, Technical Resources:
Minimum Experience Required:
1. 5 consecutive years of CMAR services in public utility projects
2. CMAR experience with RO treatment facilities, wellfields, and major pipelines (up to 48”)
3. CMAR for a public water treatment plant within last 10 years
Resources:
Minimum Experience Required (Cont’d):
4. Prior Experience With “Qualified Projects” 5, 6 and 7. Project Manager, Project Superintendent and Project Scheduler must meet minimum experience requirements. See RFQ 22- 32 at Page 13
Resources:
Provide at least 3, and no more than 5 examples of “Qualified Projects” completed within the last 10 years
• A “Qualified Project” is one similar in size and scope to the SEW and WPLFA projects (water treatment facility of 5 MGD or larger, construction cost equal to or exceeding $10,000,000, and advanced treatment tech), including RO.
Resources:
Addendum No. 2: “Qualified Projects” can be design-builds or progressive design-builds that are relevant to the Proposer’s ability to provide CMAR-type services
Note: Project Experience Must Still Show that Proposer and Project Personnel Meet Minimum Amount of Experience Requirements
Tab 6: Surveys of Past Performance:
Include a client survey for each project used to illustrate the Proposer’s Experience, Expertise, Personnel and Technical Resources
Refer to Exhibit “D” to RFQ 22-32 for Instructions on How to Prepare and Send Client Surveys
Tab 7: Bonding and Insurability
• Non-standard request
• Certificate of Bonding from Bonding Company in the amounts necessary for SEW and WPLFA Projects:
• SEW: $254,814,000.00
• WPLFA: $97,614,000.00
• Certificate of Insurability from Insurance Company showing ability to provide insurance for SEW and WPLFA projects and contractual insurances. See RFQ 22-32 at 43-48.
Tab 7: Bonding and Insurability
• Place original certificates in sealed envelope and include envelope with Proposal Package
• Include a statement in Tab 7 of the Proposal that “the necessary certificates are enclosed with the paper copy of [the] submission.” RFQ 22-32 at Page 17.
Proposal Contents: Packages
• 1 paper original proposal
• Cover Page, Corporate Information and Invoicing Sheet;
IRS Form W-9
• Detailed Responses to Tabs 1 through 7
• Certification of Drug Free Workplace
• Affidavit Certification Immigration Laws
• Noncollusion Affidavit of Prime Bidder
• 10 paper copies of proposal
• 1 electronic Adobe PDF copy of proposal (on a
Microsoft Windows compatible flash drive)
• Sealed envelope with original bonding and insurability letters (Tab 7)
Tips Do:
• File your proposal package early
• Generate detailed responses to Tabs 1 through 7 within page limits
• Follow the text of RFQ 22-32 Don’t:
• Forget to include proof of Florida licensure in
Tab 1
• Forget to include the sealed envelope with original bonding and insurability letters in the proposal package
Ex Parte Communications
• This solicitation prohibits unsolicited communications originating by a Proposer to any of the following:
• The City, including City Officers, City
Commissioners and the City Manager; and
• The PRWC, including its member governments and officers, the PRWC Board of Directors, Project Board Members, Project Participants, the PRWC Executive Director and the PRWC Project Manager
Legal Compliance
• By submitting a proposal, a Proposer is affirming that it:
• Has complied with Florida’s “Public Entity Crimes” statute and is eligible to transact business with a public entity; See F.S. § 287.133
• Has complied with Florida’s “Discriminatory Vendor” statute and is eligible to submit proposals to a public entity or qualifying local government; See F.S.
§ 287.134
• Is not a “Scrutinized Company” and is not presently engaged in a boycott of Israel; See F.S. § 287.135; and
• Agrees to use E-Verify; See F.S. § 448.095
Thank You Pre-Proposal Meeting Polk Regional Water Cooperative SEW and WPLFA Projects April 12, 2022
Pre-bid Meeting SE and WP WPF and Transmission CMAR
April 12, 2022
Agenda
• Program overview
• General background
• Southeast LFA WPF highlights
• West Polk LFA WPF highlights
• CMAR scope of services
• Compliance and funding agreements
• Owner-direct purchase provision
• Question/comments
Program Overview
• Polk Regional Water Cooperative (PRWC) made up of 15 municipalities plus Polk County.
• As part of the Central Florida Water Initiative, anticipating limitations on traditional, upper Floridan supplies.
• Must develop at least 20 MGD in new water supplies to meet demands through 2045.
• Two projects identified by members to meet demands:
• Southeast Wellfield/Water Production
Facility/Transmission and
• West Polk Wellfield/Water Production
Facility/Transmission.
2025 Demonstrated Demands – 78.6 MGD
2045 AWS Need–
21.4 MGD
Available Water
Needed Water
Program Overview
• 2 reverse osmosis treatment plants
• Transmission pipeline
• Lower Floridan raw water wells
• UC or LFA Injection wells Southeast
5 MGD
West Polk
2.5 MGD
Southeast Overview
• 5 MGD RO Facility – Phase 1
• (12.5 MGD buildout)
• 12.5 MGD transmission – Phase 1
• ~66 miles of finished transmission
• 2 booster stations*
• 2 new raw water wells
• ~10 miles raw water pipeline
• 1 deep injection well
*Change from PDR
• Phase 1 Plant Capacity: 5 MGD
• Phase 1 Transmission Capacity: 12.5 MGD
• Buildout: 12.5 MGD
• Members Served
• Auburndale*
• Bartow
• Davenport
• Dundee
• Haines City
• Lake Alfred
• Polk County
• Winter Haven
West Polk Overview
• 2.5 MGD RO Facility – Phase 1
• (10 MGD buildout)
• 10 MGD transmission – Phase 1
• <1 mile finished transmission
• 4 raw water wells
• 2 under this contract
• ~5 miles raw water transmission
• 1 deep injection well
West Polk – Phasing
• Phase 1 Plant Capacity: 2.5 MGD
• Phase 1 Transmission Capacity: 10 MGD
• Buildout: 10 MGD
West Polk Overview
• Members Served
• Bartow*
• Lakeland
• Polk City
• Polk County
Southeast Highlights
Source Water and Concentrate
• Raw water alignment extends south to existing EW-1.
• 4 total wells; only 2 are proposed under this contract.
• Injection well to be located on plant site.
SE LFA WPF
Hwy 630
Site Plan
Maintenance Building
Clarifiers
Bioscrubber s
• Co-located with fire station
• Site elevations range from
109 ft to over 135 ft
• Will be environmental considerations
Ground strorage
Concentrate Treatment
RO
Process
Stormwater
Fire Station
Injection Well
• 1 injection well required for 5 MGD Phase 1
• Depth to be determined with exploratory well:
• LFA Zone II, below USDW or
• Upper Cretaceous
Process Flow Diagram
• RO Process Assumptions:
• Conventional 2-stage RO system
• Brine treatment required to avoid injection precipitation
See Figure 5.1 of SE PDR
Transmission
Haines City 2.42
Dundee 0.47
PCU-
CRUSA
0.84
Davenport 1.06
PCU ERUSA
0.62Bartow
0.72
Lake Wales 0.73
Lakeland 6.31
PCU
SWRUSA
1.54
Auburndale 1.75
PCU-
NERUSA
8.64
Mulberry 0.29
PCU –
NWRUSA
0.98 Polk City
0.013
Eagl e
Lake 0.86
Lake Alfred 0.43
Winter Haven 1.52
Lake Hamilton
0.5
PCU
SERUS
A 0.12
Total Demand 21.43 MGD
M
M
West Polk
(10 MGD)
SE LFA
(12.5 MGD)
M
PRWC Transmission Line
Member Distribution Line
PRWC Booster Station and Meter
Meter Interconnect (Water Wheeling)
Meter to Member GSR
Meter to Multi Member GSR
PRWC AWS Project
Virtual Piping
Recharge Offset
Member Service Area/ Anticipated AWS Demand
LEGEND
M
Mulberry 0.37
• 66 miles transmission pipeline
• Designed for 12.5 MGD buildout
Schedule
• April 1, 2022 - 60% design kickoff
• April, 2023 - initiate 90% design
• November, 2023 – initiate 100% design
• July, 2024 – commence construction
• Injection well is an early item
• October 2026 – substantial completion
West Polk Highlights
Source Water and Concentrate
• Raw water alignment extends west and east of plant
• 4 total wells; only 2 are proposed under this contract
• Injection well to be located on plant site
WPLFA WPF – Site Plan
Operations Building
Clarifiers
Gypsum reactor and dewatering
Bioscrubbers
• Adjacent to residential
• Buffer to be maintained for existing UFA maintenance
Maintenance Building
Process Flow Diagram
• RO Process Assumptions:
• Conventional 2-stage RO system
• Brine treatment required to avoid injection precipitation
See Figure 5.1 of WP PDR
• Finished water to TBW WTP
• TBW WTP to distribution and
PRWC members
• No ground storage tanks
• No high service pumps
Haines City 2.42
Dundee 0.47
PCU-
CRUSA
0.84
Davenport 1.06
PCU ERUSA
0.62Bartow
0.72
Lake Wales 0.73
Lakeland 6.31
PCU
SWRUSA
1.54
Auburndale 1.75
PCU-
NERUSA
8.64
Mulberry 0.29
PCU –
NWRUSA
0.98 Polk City
0.013
Eagl e
Lake 0.86
Lake Alfred 0.43
Winter Haven 1.52
Lake Hamilton
0.5
PCU
SERUS
A 0.12
Total Demand 21.43 MGD
M
M
West Polk
(10 MGD)
SE LFA
(12.5 MGD)
M
PRWC Transmission Line
Member Distribution Line
PRWC Booster Station and Meter
Meter Interconnect (Water Wheeling)
Meter to Member GSR
Meter to Multi Member GSR
PRWC AWS Project
Virtual Piping
Recharge Offset
Member Service Area/ Anticipated AWS Demand
LEGEND
M
Mulberry 0.37
Tentative Schedule
• KATIE INSERT COST DETAILS HERE
• October 1, 2022 - 60% design kickoff
• July, 2025 – commence construction
• October, 2027 – substantial completion
CMAR Scope
• Preconstruction-phase services
• Construction-phase services
Funding and Financing
• Sources:
• WIFIA Loan
• SRF Loan
• State Grants
• Federal Grants
• Compliance:
• Brooks Act
• Davis Bacon
• American Iron and Steel
• Buy American
Other Considerations
• ODP will be considered for equipment and/or materials
• Owner may consider OMAR process during design phase
H
| RFQ-22-32 Addendum 3 - Pre-Proposal materials |
| RFQ-22-32 Pre-Proposal Presentations |
| RFQ-22-32 Pre-Proposal Presentation - Part 1 |
| City of Winter Haven RFQ 22-32� Polk Regional Water Cooperative Construction Manager – At Risk �Southeast Wellfield Project�West Polk Lower Floridan Aquifer Project |
| Today’s Agenda |
| Introductions |
| Ground Rule Topic No. 1:�Questions During this Pre-Proposal Meeting |
| Ground Rule Topic No. 2:�The Text of RFQ 22-32�Controls Today’s Presentation and Meeting |
| Formal Questions |
| Procurement Requirements |
| Deadline for Submitting Proposals |
| How to Submit a Proposal |
| Hand Deliveries |
| Proposal Contents: Preliminaries |
| Proposal Contents: Preliminaries |
| Proposal Contents: Joint Ventures |
| Proposal Contents: Key Highlights |
| Proposal Contents: Key Highlights |
| Proposal Contents: Key Highlights |
| Proposal Contents: Key Highlights |
| Proposal Contents: Key Highlights |
| Proposal Contents: Key Highlights |
| Proposal Contents: Key Highlights |
| Proposal Contents: Key Highlights |
| Proposal Contents: Key Highlights |
| Proposal Contents: Key Highlights |
| Proposal Contents: Packages |
| Tips |
| Ex Parte Communications |
| Legal Compliance |
| Thank You |
| RFQ-22-32 Pre-Proposal Presentation - Part 2 |
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
| Slide Number 9 |
| Slide Number 10 |
| Slide Number 11 |
| Slide Number 12 |
| Slide Number 13 |
| Slide Number 14 |
| Slide Number 15 |
| Slide Number 16 |
| Slide Number 17 |
| Schedule |
| Slide Number 19 |
| Slide Number 20 |
| WPLFA WPF – Site Plan |
| Process Flow Diagram |
| Slide Number 23 |
| Tentative Schedule |
| Slide Number 25 |
| Slide Number 26 |
| Slide Number 27 |
RFQ-22-32 Pre-proposal sign in sheet-live mtg