RFQ-22-32 Addendum 1 - Pre-proposal Zoom link.pdf
PDF 127 KB Posted
- Attached to
- Southeast Wellfield Project, Phase 1; West Polk Lower Floridan Aquifer Project, Phase 1 - CMAR
- Solicitation number
- RFP-00080
- Issued by
- Polk County, Woodlawn Beach CDP, Florida
About this file
This document is an addendum to a Request for Qualifications (RFQ) issued by the City of Winter Haven, on behalf of the Polk Regional Water Cooperative, for the Southeast Wellfield Project, Phase 1 and the West Polk Lower Floridan Aquifer Project, Phase 1 - Construction Manager at Risk. The addendum changes the mandatory in-person pre-proposal meeting scheduled for April 12 to a voluntary meeting with both in-person and virtual Zoom options available. All other terms and conditions of the RFQ remain the same.
The RFQ is seeking qualifications for a Construction Manager at Risk for the two water infrastructure projects in Polk County and the City of Winter Haven. Information on how to obtain the full RFQ document is provided. Electronic submissions are not accepted, and paper copies must be mailed per the instructions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ-22-32 Addendum 2.pdf | ||
| F1012225435_RFQ2232LegalAdvertisement.pdf | ||
| RFQ-22-32 Addendum 3 - Pre-Proposal materials.pdf | ||
| RFQ-22-32 Addendum 4.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HAVEN
The Chain of Lakes City
Office of Procurement
April 6, 2022
Addendum 1
RFQ-22-32
The Request for Qualifications, RFQ-22-32 (Southeast Welfield Project, Phase I and West Polk Lower Floridan Aquifer Project, Phase 1 Construction Manager – At Risk, Polk Regional Water Cooperative) is hereby amended by this Addendum Number One by clarification of the following:
In an effort to mitigate potential difficulties for interested firms as well as bearing in mind the current market conditions, the mandatory, in-person, pre-proposal meeting scheduled for April 12 at 10:00 a.m. will be changed to a voluntary meeting with both in-person and Zoom options available. Please use the attached link to attend virtually:
https://us02web.zoom.us/j/81676816231?pwd=bFJrTi9hSnVCMUs5eFF1d0xxZXdRdz09
All other terms and conditions remain the same.
Sincerely, CITY OF WINTER HAVEN
Bethany Owen Bethany Owen Procurement Manager https://us02web.zoom.us/j/81676816231?pwd=bFJrTi9hSnVCMUs5eFF1d0xxZXdRdz09
File details come from the government source that posted it. Updated .