Price Proposal Form_v4.pdf

PDF 337 KB Posted

Attached to
RFP#367004 - Kautz Road Construction Entrance Alterations
Solicitation number
RFP367004KMW
Issued by

About this file

This Price Proposal Form is for the Kautz Road Construction Entrance Alterations project (Project 3-2-213) at Fermi National Accelerator Laboratory. The document provides a detailed unit price sheet for six base work sections covering road construction, alterations, and infrastructure improvements. The work sections include roadway segments from IDOT IL-56, Kautz Road South and North, Security & Site Access Area, Indian Creek Road, and electrical and fiber infrastructure installations.

The proposal requires bidders to provide unit pricing for a comprehensive range of construction activities, including earth excavation, topsoil placement, seeding, erosion control, pavement removal and installation, concrete work, traffic markings, electrical conduit and cable installations, site lighting, and various specialized infrastructure elements. The proposal allows for a 90-day acceptance period and is structured to enable precise progress payments and change order evaluations through itemized unit pricing. The project involves multiple distinct work sections with specific station limits, suggesting a complex, phased road and infrastructure improvement initiative for the Fermi National Accelerator Laboratory.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR PROPOSAL NO. [367004]

PRICE PROPOSAL FORM

March 17, 2025

Revised June 17, 2025 Revised June 23, 2025

PROJECT: KAUTZ ROAD CONSTRUCTION ENTRANCE ALTERATIONS, PROJECT 3-2-213

In accordance with the Request for Proposal dated March 17, 2025, the undersigned hereby proposes to furnish all labor, equipment, materials, transportation, overhead, bonding costs, insurance, safety oversight, QC oversight, supervision and perform all work necessary for subject project in strict accordance with the Specifications, Drawings, and other solicitation documents, for the sum of:

See attached drawings for delineation limits of each base work section. All work within the section limits shall be included in the base work price for that section.

Unit pricing shall be provided for each Base Work Section on the forms provided such that each unit price multiplied by the corresponding number of units sums to the Base Work Section price provided. Unit pricing shall only apply for confirmation of progress payments and evaluation of change orders. Quantities per unit are only a general guide and are not intended to define the full scope of work. All progress payments shall include a breakdown of the work performed per each Base Work Section.

This proposal may be accepted for a period of ninety (90) days after the opening date unless the offeror specifies a longer acceptance period than Fermilab’s minimum requirement.

Company Name

Signature

Name & Title of Individual

Date

UNIT PRICE SHEET

BASE WORK SECTION 1: IDOT IL-56, Sta. 110+40 to Sta. 116+62, Sta. 300+00 to Sta. 300+75

Item

Description Unit Estimated Quantity

Unit Price Total

1 Earth Excavation CY 199 $ $ 2 Topsoil Excavation & Placement CY 22 $ $ 3 Seeding, Class 4 Acre 0.20 $ $ 4 Erosion Control Blanket SY 968 $ $ 5 Temporary Erosion Control Seeding Pound 40 $ $ 6 Temporary Ditch Checks Foot 50 $ $ 7 Perimeter Erosion Barrier Foot 652 $ $ 8 Temporary Erosion Control Blanket SY 968 $ $ 9 Stone Riprap, Class A4 SY 24 $ $

10 Filter Fabric SY 24 $ $ 11 Aggregate Subgrade Improvement, 12” SY 826 $ $ 12 Bituminous Materials (Tack Coat) Pound 550 $ $ 13 Longitudinal Joint Sealant Foot 623 $ $ 14 Hot-Mix Asphalt Surface Removal – Butt Join SY 176 $ $ 15 Hot-Mix Asphalt Binder Course, IL-19.0, N5 Ton 337 $ $ 16 Hot-Mix Asphalt Surface Course,IL-9.5, Mix “D”, N50 Ton 113 $ $

17 Pavement Removal SY 251 $ $ 18 Saw Cuts Foot 623 $ $ 19 Aggregate Shoulders, Type B CY 33 $ $ 20 Pine Culvert Removal Foot 70 $ $ 21 Precast Reinforced Concrete Flared End

Sections, 18” Each 2 $ $

22 Combination Concrete Curb & Gutter, Type B-6.12

Foot 184 $ $

23 Mobilization L Sum 1 $ $ 24 Short Term Pavement Marking Removal SF 1475 $ $ 25 Temporary Pavement Marking, Line 4”, Type IV Tape Foot 1475 $ $

26 Temporary Concrete Barrier Foot 625 $ $ 27 Impact Attenuators, Temporary

(Fully Redirective, Narrow), Test Level 3 Each 1 $ $

28 Sign Panel – Type 1 SF 37 $ $ 29 Thermoplastic Pavement Marking –

Letters & Symbols

SF 21 $ $

30 Thermoplastic Pavement Marking – Line 4” Foot 878 $ $ 31 Thermoplastic Pavement Marking – Line 6” Foot 275 $ $ 32 Thermoplastic Pavement Marking – Line 8” Foot 100 $ $ 33 Thermoplastic Pavement Marking – Line 24” Foot 52 $ $ 34 Pipe Culverts, Class A, Type 1, 18” Foot 90 $ $ 35 Traffic Control & Protection (Special) L Sum 1 $ $ 36 Temporary Information Signing SF 36 $ $ 37 Metal Post Foot 50 $ $ 38 Remove Ex. 15” CMP (±50’) & FES (2) L Sum 1 $ $

39 Combination Concrete Curb & Gutter, Type M-4.12

Foot 115 $ $

Base Work Section 1 Total: $______________________________

BASE WORK SECTION 2: Kautz Road South, Sta. 300+75 to Sta. 308+14 Item

Description Unit Estimated

Quantity Unit Price Total

1 Topsoil Excavation & Placement CY 397 $ $ 2 Stone Riprap, Class A4 SY 15 $ $ 3 Filter Fabric SY 15 $ $ 4 Bituminous Materials (Tack Coat) Pound 484 $ $ 5 Pavement Removal SY 31 $ $ 6 Saw Cuts Foot 1270 $ $ 7 Precast Reinforced Concrete Flared End

Sections, 18” Each 2 $ $

8 Pipe Culverts, Class A, Type 1, 18” Foot 90 $ $ 9 Combination Concrete Curb & Gutter, Type B-6.12 Foot 459 $ $

10 Mobilization L Sum 1 $ $ 11 Temporary Concrete Barrier Foot 138 XXXXX XXXXX 12 Sign Panel – Type 1 SF 5 $ $ 13 Thermoplastic Pavement Marking – Line 4” Foot 8301 $ $ 14 Thermoplastic Pavement Marking – Line 12” Foot 362 $ $ 15 Utility Concrete Protection Pad SY 52 XXXXX XXXXX 16 Aggregate Subgrade Improvement, 18” + NX-850 Geogrid

SY 864 $ $

17 Selective Clearing Acre 2 $ $ 18 Remove & Replace Chainlink Gate & Fence L Sum 1 $ $ 19 Hot-Mix Asphalt Forti-Fi Binder Course, IL-19.0, N70

Ton 463 $ $

20 Hot-Mix Asphalt Forti-Fi Surface Course, IL-9.5, Mix “D”, N50

Ton 261 $ $

21 Concrete Truck Washout Each 1 $ $ 22 Metal Post Foot 9 $ $ 23 Field Access Gate L Sum 1 $ $ 24 Relocate Concrete Barrier to Railhead L Sum 1 $ $ 25 Remove Existing Concrete Pad &

Remove/Abandon Conduit L Sum 1 $ $

26 Perimeter Erosion Barrier Foot 1343 $ $ 27 Seeding, Class 4 Acre 0.40 $ $ 28 Mulch, Method 2 Acre 0.40 $ $ 29 Aggregate Wedge Shoulder, Type B Tons 23 $ $ 30 Hot-Mix Asphalt Surface Removal, 2” SY 1468 $ $

Base Work Section 2 Total: $______________________________

BASE WORK SECTION 3: Security & Site Access Area, Sta. 308+14 to Sta. 313+21

Item

Description Unit Estimated Quantity

Unit Price Total

1 Tree Removal ACRE 0.51 $ $ 2 Earth Excavation CY 1359 $ $ 3 Topsoil Excavation & Placement CY 174 $ $ 4 Seeding, Class 4 Acre 0.6 $ $ 5 Mulch, Method 2 Acre 0.3 $ $ 6 Bituminous Materials (Tack Coat) Pound 1306 $ $ 7 Saw Cuts Foot 56 $ $ 8 Mobilization L Sum 1 $ $ 9 Temporary Concrete Barrier Foot 150 $ $

10 Sign Panel – Type 1 SF 81 $ $ 11 Thermoplastic Pavement Marking – Line 4” Foot 3501 $ $ 12 Thermoplastic Pavement Marking – Line 12” Foot 720 $ $ 13 Guardhouse Concrete, including pad, walk, curb, bollards

SY 52 $ $

14 Aggregate Subgrade Improvement, 18” + NX-850 Geogrid

SY 5520 $ $

15 Guardhouse L Sum 1 $ $ 16 Selective Clearing Acre 2 $ $ 17 Hot-Mix Asphalt Forti-Fi Binder Course, IL-19.0, N70

Ton 1237 $ $

18 Hot-Mix Asphalt Forti-Fi Surface Course, IL-9.5, Mix “D”, N50

Ton 733 $ $

19 Aggregate Surface Course (Gravel) SY 105 $ $ 20 Metal Post Foot 149 $ $ 21 Bollards for Monitoring Well EA 3 $ $ 22 Removal of Gravel Access Road SY 315 $ $ 23 Remove Ex. Guardhouse, Pad & Utilities;

Deliver Guardhouse to Railhead

LS 1 $ $

24 Perimeter Erosion Barrier Foot 1577 $ $ 25 Aggregate Wedge Shoulder, Type B Tons 36 $ $ 26 Hot-Mix Asphalt Surface Removal, 2” SY 311 $ $ 27 Pavement Removal SY 1201 $ $

Base Work Section 3 Total: $______________________________

BASE WORK SECTION 3, DEDUCTIVE ALTERNATE #1:

Furnish & install aggregate surface course to Queueing & Turn-Around Areas, in lieu of HMA surface, per detail on Sheet 6 and plan on Sheet 14.

Item

Description Unit Estimated Quantity

Unit Price Total

1 Tree Removal ACRE 0.51 $ $ 2 Earth Excavation CY 1359 $ $ 3 Topsoil Excavation & Placement CY 174 $ $ 4 Seeding, Class 4 Acre 0.6 $ $ 5 Mulch, Method 2 Acre 0.3 $ $

6** Bituminous Materials (Tack Coat) Pound 550 $ $ 7 Saw Cuts Foot 56 $ $ 8 Mobilization L Sum 1 $ $ 9 Temporary Concrete Barrier Foot 150 $ $

10 Sign Panel – Type 1 SF 81 $ $ 11** Thermoplastic Pavement Marking – Line 4” Foot 2824 $ $ 12** Thermoplastic Pavement Marking – Line 12” Foot 592 $ $

13 Guardhouse Concrete, including pad, walk, curb, bollards

SY 52 $ $

14 Aggregate Subgrade Improvement, 18” + NX-850 Geogrid

SY 5520 $ $

15 Guardhouse L Sum 1 $ $ 16 Selective Clearing Acre 2 $ $

17** Hot-Mix Asphalt Forti-Fi Binder Course, IL-19.0, N70

Ton 484 $ $

18** Hot-Mix Asphalt Forti-Fi Surface Course, IL-9.5, Mix “D”, N50

Ton 309 $ $

19** Aggregate Surface Course (Gravel) SY 3464 $ $ 20 Metal Post Foot 149 $ $ 21 Bollards for Monitoring Well EA 3 $ $ 22 Removal of Gravel Access Road SY 315 $ $ 23 Remove Ex. Guardhouse, Pad & Utilities;

Deliver Guardhouse to Railhead

LS 1 $ $

24 Perimeter Erosion Barrier Foot 1577 $ $ 25 Aggregate Wedge Shoulder, Type B Tons 36 $ $ 26 Hot-Mix Asphalt Surface Removal, 2” SY 311 $ $ 27 Pavement Removal SY 1201 $ $

** Indicates revision to base quantity for alternate

Base Work Section 3 Total: $______________________________

BASE WORK SECTION 4: Kautz Road North, Sta. 313+21 to Sta. 329+78 Item

Description Unit Estimated

Quantity Unit Price Total

1 Earth Excavation CY 290 $ $ 2 Topsoil Excavation & Placement CY 171 $ $ 3 Seeding, Class 4 Acre 0.80 $ $ 4 Mulch, Method 2 Acre 0.40 $ $ 5 Erosion Control Blanket SY 3450 $ $ 6 Perimeter Erosion Barrier Foot 3105 $ $ 7 Stone Riprap, Class A4 SY 15 $ $ 8 Filter Fabric SY 15 $ $ 9 Bituminous Materials (Tack Coat) Pound 1282 $ $

10 Hot-Mix Asphalt Surface Removal – Butt Joint

SY 201 $ $

11 Hot-Mix Asphalt Surface Removal, 2” SY 2590 $ $ 12 Hot-Mix Asphalt Surface Removal, 2-¼” SY 1184 $ $ 13 Aggregate Wedge Shoulder, Type B Ton 49 $ $ 14 Pipe Culvert Removal Foot 37 $ $ 15 Precast Reinforced Concrete Flared End

Sections, 18” Each 2 $ $

16 Miscellaneous Concrete (Headwall) CY 0.60 $ $ 17 Mobilization L Sum 1 $ $ 18 Sign Panel – Type 1 SF 13 $ $ 19 Thermoplastic Pavement Marking – Line 4” Foot 6412 $ $ 20 Aggregate Subgrade Improvement, 18”

+ NX-850 Geogrid

SY 2454 $ $

21 Hot-Mix Asphalt Forti-Fi Binder Course, IL-19.0, N70

Ton 1016 $ $

22 Hot-Mix Asphalt Forti-Fi Surface Course, IL-9.5, Mix “D”, N50

Ton 719 $ $

23 Pipe Culverts, Class A, Type 1, 18” Foot 37 $ $ 24 Metal Post Foot 27 $ $

Base Work Section 4 Total: $______________________________

BASE WORK SECTION 5: Indian Creek Road, Sta. 329+78 to Sta. 329+89, Sta. 702+12 to Sta. 723+02 Item

Description Unit Estimated

Quantity Unit Price Total

1 Topsoil Excavation & Placement CY 171 $ $ 2 Seeding, Class 4 Acre 0.90 $ $ 3 Mulch, Method 2 Acre 0.50 $ $ 4 Erosion Control Blanket SY 4030 $ $ 5 Perimeter Erosion Barrier Foot 3627 $ $ 6 Bituminous Materials (Tack Coat) Pound 1177 $ $ 7 Hot-Mix Asphalt Surface Removal, 2-¼” SY 5170 $ $ 8 Class D Patches, Type IV, 4” SY 253 $ $ 9 Aggregate Shoulders, Type B CY 6 $ $

10 Aggregate Wedge Shoulder, Type B Ton 25 $ $ 11 Concrete Collar CY 5 $ $ 12 Steel Plate Beam Guardrail, Type A, 9’ Posts Foot 25 $ $ 13 Mobilization L Sum 1 $ $ 14 Sign Panel – Type 1 SF 17 $ $ 15 Aggregate Subgrade Improvement, 18” + NX-850 Geogrid

SY 64 $ $

16 Hot-Mix Asphalt Forti-Fi Binder Course, IL-19.0, N70

Ton 15 $ $

17 Hot-Mix Asphalt Forti-Fi Surface Course, IL-9.5, Mix “D”, N50

Ton 660 $ $

18 Metal Post Foot 27 $ $

Base Work Section 5 Total: $______________________________

BASE WORK SECTION 6: Electrical & Fiber Item

Description Unit Estimated

Quantity Unit Price Total

1 24” x 36” x 24” Polymer Concrete Tier 22 Handhole

Each 2 $ $

2 24ct Fiber, Dielectric Design, OS2, Single Mode, Gel Free, Non-Armored (inc. pull through duct, terminations, testing, etc.)

Foot 2600 $ $

3 10G Stranded Wire Foot 2600 $ $ 4 HDPE 1.5” Duct Foot 509 $ $ 5 1” Empty Conduit to Light Posts for Future

Communications Foot 500 $ $

6 CAT-6 Cable in 1” Conduit Foot 600 7 24” x 12” Handholes Each 4 $ $ 8 Cable ID 20 – ¾” Conduit with (2) #12 AWG

& #12 AWG Ground Foot 60 $ $

9 Cable ID 30 – ¾” Conduit with (2) #10 AWG & #10 AWG Ground

Foot 1200 $ $

10 Cable ID 100 – 1-1/4” Conduit with (3) #3 AWG & #8 AWG Ground

Foot 25 $ $

11 Cable ID 125 – 1-1/4” Conduit with (3) #1 AWG & #6 AWG Ground

Foot 20 $ $

12 Cable ID 150 – 2” Conduit with (3) #1/0 AWG & #6 AWG Ground

Foot 350 $ $

13 PP-KRGA1 Panel (240V/120V, 1PH, 4Wire) L Sum 1 $ $ 14 #1 Camlock Generator Connector (100A, 240V, 3Ph) L Sum 1 $ $

15 #2 Manual Transfer Switch MTS-KRGA1 (100A, 240V, 3Ph)

L Sum 1 $ $

16 Lighting Conduit and Conductors Foot 600 $ $ 17 Site Lighting (Inc. Foundations, Poles, Fixtures) Each 9 $ $

18 100A, 240V, 1Ph, with 60A Main Circuit Breaker (Guardhouse)

L Sum 1 $ $

19 Mounting Rack Structure L Sum 1 $ $

Base Work Section 6 Total: $______________________________