Amendment No. 1 Drawings 6.17.25.pdf
PDF 6 MB Posted
- Solicitation number
- RFP367004KMW
About this file
These are amendment drawings for the Kautz Road Construction Entrance Alterations project at Fermi National Accelerator Laboratory, dated June 17, 2025. The detailed engineering plans cover roadway modifications spanning approximately 29,000 linear feet, with specific design elements including pavement widening, mill and overlay, aggregate shoulder installation, and utility protection pad details. The project involves road reconstruction from stations 300+00 to 329+89, with key features such as new construction entrances, guardhouse details, communication/electrical plans, erosion control measures, and landscape integration.
The drawings provide comprehensive technical specifications for road alterations, including precise grade transitions, curve radii, construction limits, and utility relocations. Notable elements include proposed 28-foot road width, multiple entrance modifications, integration with existing wetlands, installation of safety bollards, and utility protection measures. The project is being executed by Discovery Group, LLC under the Fermi Forward initiative, with engineering plans prepared by Bowman Consulting and stamped by licensed professional engineers from the State of Illinois, with plan sheets covering roadway plans, communication details, access details, and various technical specifications.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCALE:
PROJECT NO.
SHEET NO.
DESIGNED
DRAWN
CHECKED
APPROVED
CONCEPT
DISCIPLINE
REVIEW
ENG. REVIEWED
ISD APPROVED
SUBMITTED
A/E CONSULTANT DATE FERMI LAB DATE
PROJECT NAME.
SHEET NAME:
REVISIONS
REV. DESCRIPTION DATE
REVISION NO.FIMS. NO.
(e d ti m e M
O N
D D
Y Y
Y Y
H
:M M a m
/p m
(g e tv a r, d w g p re fi x
(g e tv a r, d w g n a m e
WILSON ST.
RING RD.
HWY. 56
BUTTERFIELD RD.
T O I
N T E
R S
T A T E I -8
F
A R
N S
W O
R T
H
CONSTRUCTION
KAUTZ RD.
ENTRANCE
R O
AD
B
K
IR
K R
D
PINE ST.
ENTRANCE
AREA
MAIN
INJECTOR
MAIN
K A
U T
Z R
D
PIN
E S
T. (
OUT)
PINE ST. (IN) LABORATORY
AREA
HOLTER RD
CENTRAL
WILSON ST.
ENTRANCE
BURLIN
GTON N
ORTHERN R
.R.
BATAVIA RD.
RECEIVING
ENTRANCE
BATAVIA RD.
E L
G
IN
J
O L
IE
T E
A S
T E
R N R .R
C O
M M
O N
W E
A L T
H E
D
IS
O N P
O W
E R L
IN
E S
R O
A D C
BATAVIA RD.
S W
E N S O
N
D-0 F A
R M R
D
F E
L D
O T T R
D
CDF
R O
A D D
E O
L A R
D
TO RT. 59
FERMILAB
VILLAGE
TO HW
Y 59
T
LOCKED
GATE
RAILYARD
STORAGE
WILSON ST.
HW
Y 38 RO
O
SEVELT RD.
CAMPUS
MUON
INDIAN CREEK ROAD
DI
SC
O
VE
RY
R
D.
P
IP
I I
C .C
F E Y N
M A N
FIXED TARGET AREA
NEUTRINO AREA
PROTON AREA
AREA
INDUSTRIAL
EOLA RD. ENTRANCE
KAUTZ ROAD CONSTRUCTION ENTRANCE ALTERATIONS
3-2-213Project No.
IS
S
U E
F O
R B
ID
COVER SHEET
ISSUE FOR BID0
PLANS
COMMUNICATION/ELECTRICAL
77-79
DETAILS
COMMUNICATION/ELECTRICAL
72-76
CROSS SECTIONS62-71
ACCESS DETAILS
PROPOSED COLLAR AND FIELD
PROPOSED GATE59-60
GUARDHOUSE DETAILS56-58
FERMILAB DETAILS55
IDOT DETAILS46-54
UTILITY PROTECTION PAD45
LANDSCAPE PLANS39-44
EROSION CONTROL PLANS33-38
EROSION CONTROL DETAILS32
EROSION CONTROL NOTES31
MARKING PLANS
SIGNING AND PAVEMENT
23-30
MOT PLAN - BUTTERFIELD RD22
DRAINAGE PLANS19-21
ROADWAY PLANS12-18
REMOVAL PLANS8-11
BENCHMARKS
ALIGNMENTS, TIES AND
PAVEMENT DETAIL6
TYPICAL SECTIONS3-5
GENERAL NOTES2
GENERAL
Sheet TitleSheet Number
DRAWING SHEETS
R.11E
R.11E
T .3
N
T .3
N
702+12.19
IMPROVEMENT BEGINS
INDIAN CREEK ROAD
110+40.07
IMPROVEMENT BEGINS
BUTTERFIELD ROAD
723+02.03
IMPROVEMENT ENDS
INDIAN CREEK ROAD
329+89.16
IMPROVEMENT ENDS
KAUTZ ROAD
116+62.45
IMPROVEMENT ENDS
BUTTERFIELD ROAD
LOCATION MAP
VICINITY MAP
PROJECT NORTH
S
W E
J a n u a ry
300+00
IMPROVEMENT BEGINS
KAUTZ ROAD
PROJECT LOCATION
AP
2/14/2025
OAR
DO
www.bowman.com
312-614-0360
Chicago, Illinois 60603
10 S. LaSalle Street, Suite 2110
KAUTZ ROAD ALTERATIONS
704685
KAUTZ ROAD ALTERATIONS
3-2-213
DISCOVERY GROUP, LLC
FERMI FORWARD
4.28.2025
M a rc h
APPLIES TO SHEETS: 1-71
LICENSED PROFESSIONAL ENGINEER,
STATE OF ILLINOIS, EXPIRES 11/30/2025
3.7.2025
APPLIES TO SHEETS: 72-79
LICENSED PROFESSIONAL ENGINEER,
EXPIRES
M ay
, 2
5.5.20255.5.2025
LICENSED
STATE OF
A
D D
E N
D U
M
Ju ne
7, ryanj Line ryanj Text Box
1 ADDENDUM 1 6/17/2025
ryanj Cloud ryanj Polygon ryanj Text Box ryanj Text Box
NN
C O
M M
C O
M M
C O
M M
C O
M M
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
GATE & FENCE (SEE DETAILS)
PROP. ACCESS
(TO BE REMOVED)
GATE & FENCE
EXIST. ACCESS
318'R 85'R
PR. KAUTZ RD �
500'R
'-14.00OFF
STA 303+11
'14.00OFF
STA 303+11
'-14.00OFF
STA 301+35
'17.53OFF
STA 301+35
'-14.00OFF
STA 300+95
LIMITS OF CONSTRUCTION
(SEE IDOT HWY STD. 606001)
CURB & GUTTER, TYPE B-6.12
COMBINATION CONCRETE
TYPE B-6.12 (SEE IDOT HWY STD. 606001)
COMBINATION CONCRETE CURB & GUTTER,
5' X 10' RIPRAP
R 200'
3-2-203 DRAWINGS)
W/ TRANSFORMER (SEE EXISTING
EXISTING COMED POWER POLE
R 55' R 344' R 650'
AND DISCONNECT
EXISTING FERMI METERING POLE WITH STREET LIGHT
ELECTRIC
EXISTING COMED
PAD. (TO BE REROUTED TO RELOCATED IT CABINET - BY OTHERS)
EXISTING (2) 1" RIGID STEEL COMM CONDUIT TO EX
KAUTZ RD
DETERMINED IN THE FIELD.
FINAL LOCATION TO BE
RELOCATED IT CABINET.
LIMITS OF CONSTRUCTION
301+00 301+50 302+00 302+50 303+00 303+50 304+00 304+50 305+00
740 740
742 742
744 744
746 746
748 748
750 750
752 752
754 754
.6
E
L
.0
V P
I
.0
E
L
.0
V
P I
-0.11% -2.10%
-2.67% -0.11%
.6
.0
V P
C
.9
.5
V
T
'150.00L =
75.38K =
.1
.9
.8
.8
.7
.7
.6
.2
.5
'65.00L =
25.43K =
EXISTING GRADE
PROPOSED GRADE
.9
.5
.2
.9
.8
.9
.8
.5
.9
IS
S
U E
F O
R B
ID
---- 0
P R
O J E
C T
N O
R T
H
S
W
E
F e b ru a ry
SCALE:
REVISIONS
DESCRIPTIONSDATEREV.
DESIGNED
DRAWN
CHECKED
APPROVED
CONCEPT
DISCIPLINE REVIEW
ENG. REVIEWED
FESS APPROVED
SUBMITTED
A/E CONSULTANT DATE FERMI LAB DATE
PROJECT NO.
SHEET NO.
REVISION NO.FIMS NO.DISCOVERY GROUP, LLC
FERMI FORWARD
AP
2/14/2025
OAR
DO
www.bowman.com
312-614-0360
Chicago, Illinois 60603
10 S. LaSalle Street, Suite 2110
KAUTZ ROAD ALTERATIONS
704685
KAUTZ ROAD ALTERATIONS
3-2-213
PAVEMENT TRANSITION
LEGEND
PAVEMENT WIDENING
PAVEMENT MILL AND OVERLAY, 214"
AGGREGATE WEDGE SHOULDER, TYPE B
PAVEMENT MILL, 2" AND OVERLAY, 61
4"
GRAVEL
TOPSOIL AND SEEDING
PAVEMENT (GRAVEL ALTERNATE)
M A T C
H L
IN
E S
T A T
IO
N
.9
S E
E S
H E
E T
M A T C
H L
IN
E S
T A T
IO
N
S E
E S
H E
E T
ROADWAY PLANS
NOTES:
CONTROL MEASURE.
C&G AND 2' AGGREGATE SHOULDER FOR PERMANENT EROSION
TYPE B-6.12 ENDS AT STA. 303+10.81. PLACE RIPRAP BETWEEN
THE COMBINATION CONCRETE CURB AND GUTTER (C&G),4.
FOR SPLICING OF POWER AND COMMUNICATIONS.
THE PROPOSED CONDUITS TO TIE TO EXISTING HANDHOLE3.
GATE AND FENCE.
EXISTING GATE AND PLACEMENT OF THE PROPOSED
SEE ACCESS GATE DETAILS FOR REMOVAL OF THE2.
OF PROTECTION PAD PLACEMENT.
SEE UTILITY PROTECTION PAD DETAILS FOR LOCATION1.
0 30
SCALE IN FEET
60 90
M a rc h
M ay
, 2
A
D D
E N
D U
M
Ju ne
7, ryanj Text Box
1 6/17/25 ADDENDUM 1
ryanj Snapshot ryanj Cloud ryanj Line
Line
NN
305+00 310+00306 307 308 309 311 312 313
PROP. LIGHT
SEE DETAILS.
(3) FIXED 11 GAUGE STEEL SAFETY BOLLARDS.
PROP. LIGHT
PROP. LIGHT
PROP. KAUTZ RD �
(SEE DETAILS)
PROP. GUARDHOUSE
'14.00OFF
STA 308+14
'51.31OFF
STA 308+53
'14.06OFF
STA 313+21
CONCRETE BARRIER
FREE-STANDING
CONCRETE BARRIER
FREE-STANDING
'50.74OFF
STA 309+62
'50.75OFF
STA 309+29
'91.42OFF
STA 309+34
'38.58OFF
STA 312+44
'54.32OFF
STA 312+52
50'R
40'R
40'R
10'R
45'R
45'R
20'R 10'R
200'R
50'R
20'R
10'R
45'R
'104.43OFF
STA 309+04 '91.30OFF
STA 311+44
'104.30OFF
STA 311+47
'163.27OFF
STA 311+82
'32.73OFF
STA 313+01
'62.22OFF
STA 312+99
'104.24OFF
STA 312+54
'104.26OFF
STA 312+28
'110.84OFF
STA 312+18
'170.82OFF
STA 311+97
LIMITS OF CONSTRUCTION
LIMITS OF CONSTRUCTION
LIMITS OF CONSTRUCTION
'82.89OFF
STA 310+12
'82.82OFF
STA 311+42
MONITORING WELL
EX. GROUNDWATER
KAUTZ RD
(SEE LANDSCAPE PLANS)
TOPSOIL AND SEEDING
RESTORE GRAVEL PATH WITH
'230.27OFF
STA 311+80
'223.78OFF
STA 311+93
TO FIELD ACCESS DETAIL.
FIELD ACCESS. REFER
R20'
SEE NOTE 3
305+00 305+50 306+00 306+50 307+00 307+50 308+00 308+50 309+00 309+50 310+00 310+50 311+00 311+50 312+00 312+50 313+00 313+50 314+00
730 730
732 732
734 734
736 736
738 738
740 740
742 742
744 744
746 746
748 748
750 750
.0
.0
V P
I
.5
E
L
.0
V
P I
.3
E
L
.0
V
P I
.6
E
L
.0
V
P I
+3.7 2% -3.36%
-2.10%
-0.72% -3.36%
-0.72%
+3.7 2%
-0.59%
.1
.0
V
.0
.0
V
.3
.0
V
.2
.5
V
.1
.0
V
.3
.0
V P
C
.2
.5
V
.5
.0
V
'230.00L =
'100.00L =
'220.00L =
51.76K =
14.11K =
79.34K =
.5
.5
.4
.5
.1
.7
.3
.0
.0
.5
.5
.0
.7
.0
.6
.9
.5
.3
.5
'75.00L =
54.30K =
EXISTING GRADE
PROPOSED GRADE
.9
.8
.6
.8
.5
.2
.9
.9
.0
.4
.2
.9
.5
.9
.6
.6
.8
.8
.0
IS
S
U E
F O
R B
ID
---- 0
P R
O J E
C T
N O
R T
H
S
W
E
F e b ru a ry
SCALE:
REVISIONS
DESCRIPTIONSDATEREV.
DESIGNED
DRAWN
CHECKED
APPROVED
CONCEPT
DISCIPLINE REVIEW
ENG. REVIEWED
FESS APPROVED
SUBMITTED
A/E CONSULTANT DATE FERMI LAB DATE
PROJECT NO.
SHEET NO.
REVISION NO.FIMS NO.DISCOVERY GROUP, LLC
FERMI FORWARD
AP
2/14/2025
OAR
DO
www.bowman.com
312-614-0360
Chicago, Illinois 60603
10 S. LaSalle Street, Suite 2110
KAUTZ ROAD ALTERATIONS
704685
KAUTZ ROAD ALTERATIONS
3-2-213
PAVEMENT TRANSITION
LEGEND
PAVEMENT WIDENING
PAVEMENT MILL AND OVERLAY, 214"
AGGREGATE WEDGE SHOULDER, TYPE B
PAVEMENT MILL, 2" AND OVERLAY, 61
4"
GRAVEL
TOPSOIL AND SEEDING
PAVEMENT (GRAVEL ALTERNATE)
M A
T C
H L
IN
E
S T
A T
IO
N
S
E E
S H
E E
T
M A
T C
H L
IN
E
S T
A T
IO
N
S
E E
S H
E E
T
ROADWAY PLANS
WIDENING. SEE CONTRACT SPECIFICATIONS.
EAST OF DELINEATION LINE IS A SITE ACCESS ALTERNATE, GRAVEL3.
SEE CROSS SECTIONS FOR GRADING DETAILS.2.
OF PROTECTION PAD PLACEMENT.
SEE UTILITY PROTECTION PAD DETAILS FOR LOCATION1.
NOTES:
0 30
SCALE IN FEET
60 90
M a rc h
M ay
, 2
A
D D
E N
D U
M
Ju ne
7, ryanj Text Box
1 6/17/25 ADDENDUM 1
ryanj Snapshot ryanj Cloud ryanj Line
PAVEMENT TRANSITION
LEGEND
PAVEMENT WIDENING
PAVEMENT MILL AND OVERLAY, 2
4"
AGGREGATE WEDGE SHOULDER, TYPE B
PAVEMENT MILL, 2" AND OVERLAY, 6
4"
GRAVEL
TOPSOIL AND SEEDING
PAVEMENT (GRAVEL ALTERNATE)
NN
315+00 320+00314 316 317 318 319 321 322
C O
M M
S U
B S T A
T
IO
N
R
IP
R A P
R
IP
R A P
C O
M M
EX. WETLANDS
EX. WETLANDS
5' DRIVEWAY APRON
5' DRIVEWAY APRON
PROPOSED KAUTZ RD �
EX. WETLANDS
EX. WETLANDS
LIMITS OF CONSTRUCTION
LIMITS OF CONSTRUCTION
KAUTZ RD
314+00 314+50 315+00 315+50 316+00 316+50 317+00 317+50 318+00 318+50 319+00 319+50 320+00 320+50 321+00 321+50 322+00 322+50 323+00
730 730
732 732
734 734
736 736
738 738
740 740
742 742
744 744
.2
.0
V
P I
.3
E
L
.0
V
P I
.5
E
L
.0
V
P I
-0.06% -0.89%-0.59%
-0.89%
-0.06%
+0.47%
.2
.5
V
.8
.5
V
.5
.5
V P
C
.4
.0
V
.9
.0
V
.2
.5
V
.0
.0
V
'75.00L =
'220.00L =
89.37K =
161.52K =
.5
.0
.7
.4
.2
.2
.2
.1
.7
.3
.0
.8
.8
.0
.2
.4
.7
.9
.1
'220.00L =
'75.00L = '220.00L =
79.34K =
140.09K = 161.52K =
EXISTING GRADE
PROPOSED GRADE
.0
.5
.1
.7
.7
.8
.7
.4
.0
.8
.5
.3
.4
.4
.2
.2
.8
.2
.3
IS
S
U E
F O
R B
ID
---- 0
P R
O J E
C T
N O
R T
H
S
W
E
F e b ru a ry
SCALE:
REVISIONS
DESCRIPTIONSDATEREV.
DESIGNED
DRAWN
CHECKED
APPROVED
CONCEPT
DISCIPLINE REVIEW
ENG. REVIEWED
FESS APPROVED
SUBMITTED
A/E CONSULTANT DATE FERMI LAB DATE
PROJECT NO.
SHEET NO.
REVISION NO.FIMS NO.DISCOVERY GROUP, LLC
FERMI FORWARD
AP
2/14/2025
OAR
DO
www.bowman.com
312-614-0360
Chicago, Illinois 60603
10 S. LaSalle Street, Suite 2110
KAUTZ ROAD ALTERATIONS
704685
KAUTZ ROAD ALTERATIONS
3-2-213
M A T C
H L
IN
E S
T A T
IO
N
S E
E S
H E
E T
M A T C
H L
IN
E S
T A T
IO
N
S E
E S
H E
E T
ROADWAY PLANS
SEE DRAINAGE PLANS FOR EXISTING AND PROPOSED DRAINAGE.2.
OF PROTECTION PAD PLACEMENT.
SEE UTILITY PROTECTION PAD DETAILS FOR LOCATION1.
NOTES:
0 30
SCALE IN FEET
60 90
M a rc h
M ay
, 2
A
D D
E N
D U
M
Ju ne
7, ryanj Text Box
1 6/17/25 ADDENDUM 1
ryanj Snapshot ryanj Cloud ryanj Line
PAVEMENT TRANSITION
LEGEND
PAVEMENT WIDENING
PAVEMENT MILL AND OVERLAY, 2
4"
AGGREGATE WEDGE SHOULDER, TYPE B
PAVEMENT MILL, 2" AND OVERLAY, 6
4"
GRAVEL
TOPSOIL AND SEEDING
PAVEMENT (GRAVEL ALTERNATE)
323+00 323+50 324+00 324+50 325+00 325+50 326+00 326+50 327+00 327+50 328+00 328+50 329+00
730 730
732 732
734 734
736 736
738 738
740 740
742 742
744 744
746 746
748 748
750 750
.0
.0
V
I
.2
E
L
.0
V
.1
E
L
.0
V
+0.47% -0.64%
-0.64%
+0.51%
+0.51%
+0.89%
.8
.5
V
.7
.5
V
.4
.5
V
.0
.2
V
.3
.5
V
.2
.7
V
67.73K =
64.98K =
.1
.4
.6
.8
.8
.5
.3
.4
.7
.9
.3
.7
.2
'75.00L =
'37.50L =
67.73K =
101.04K =
PROPOSED GRADE
EXISTING GRADE
.3
.4
.9
.2
.3
.1
.0
.2
.4
.6
.0
.4
.1
IS
S
U E
F O
R B
ID
---- 0
P R
O J E
C T
N O
R T
H
S
W
E
F e b ru a ry
SCALE:
REVISIONS
DESCRIPTIONSDATEREV.
DESIGNED
DRAWN
CHECKED
APPROVED
CONCEPT
DISCIPLINE REVIEW
ENG. REVIEWED
FESS APPROVED
SUBMITTED
A/E CONSULTANT DATE FERMI LAB DATE
PROJECT NO.
SHEET NO.
REVISION NO.FIMS NO.DISCOVERY GROUP, LLC
FERMI FORWARD
AP
2/14/2025
OAR
DO
www.bowman.com
312-614-0360
Chicago, Illinois 60603
10 S. LaSalle Street, Suite 2110
KAUTZ ROAD ALTERATIONS
704685
KAUTZ ROAD ALTERATIONS
3-2-213
NN
325+00323 324 326
C O
M M
RIPRAP
C O
M M
PROPOSED KAUTZ �
R=35' R=30'
28'
28'
28'
'-0.00OFF
STA 324+96
'-0.00OFF
STA 325+76
'43.85OFF
STA 326+09 '45.40OFF
STA 326+28
'14.00OFF
STA 326+58
'14.00OFF
STA 327+96
'-14.00OFF
STA 327+96
'-14.00OFF
STA 328+91
265'R
LIMITS OF CONSTRUCTION
LIMITS OF CONSTRUCTION
LIM
ITS O
F CO
NSTRUCTIO
N
PR. KAUTZ RD
LIM
ITS O
F CO
NSTRUCTIO
N
EX. WETLANDS
EX. WETLANDS
LIMITS OF CONSTRUCTION
KAUTZ RD
M A
T C
H L
IN
E
S T
A T
IO
N
S
E E
S H
E E
T
M
AT
CHLI
NE
ST
AT
IO
N
9+ (S
EE
S
HEE
T
ROADWAY PLANS
TO BORING DATA.
FROM STA. 325+96 TO STA. 329+89 IS 4" ACCORDING
TO STA. 325+96 IS 2". THE PAVEMENT THICKNESS
THE EXISTING PAVEMENT THICKNESS FROM STA. 300+003.
STA. 324+96 TO STA. 325+76.
SEE TRANSITION DETAIL FOR PAVEMENT TRANSITION FROM2.
OF PROTECTION PAD PLACEMENT.
SEE UTILITY PROTECTION PAD DETAILS FOR LOCATION1.
NOTES:
0 30
SCALE IN FEET
60 90
M a rc h
M ay
, 2
A
D D
E N
D U
M
Ju ne
7, ryanj Text Box
1 6/17/25 ADDENDUM 1
ryanj Snapshot ryanj Cloud ryanj Line
AP
2/14/2025
OAR
DO
www.bowman.com
312-614-0360
Chicago, Illinois 60603
10 S. LaSalle Street, Suite 2110
KAUTZ ROAD ALTERATIONS
704685
KAUTZ ROAD ALTERATIONS
3-2-213
IS
S
U E
F O
R B
ID
---- 0
P R
O J E
C T
N O
R T
H
S
W
E
F e b ru a ry
SCALE:
REVISIONS
DESCRIPTIONSDATEREV.
DESIGNED
DRAWN
CHECKED
APPROVED
CONCEPT
DISCIPLINE REVIEW
ENG. REVIEWED
FESS APPROVED
SUBMITTED
A/E CONSULTANT DATE FERMI LAB DATE
PROJECT NO.
SHEET NO.
REVISION NO.FIMS NO.DISCOVERY GROUP, LLC
FERMI FORWARD
DETAILS
UTILITY PROTECTION PAD
THE UTILITY PROTECTION PAD SHALL BE INSTALLED.
THE UTILITY DATA MATRIX. UPON EXPOSING THE UTILITIES
EXISTING UTILITIES PER THE LOCATIONS IDENTIFIED ON
1. SUBCONTRACTOR TO VACUUM EXCAVATE AND EXPOSE
NOTES:
M a rc h
M ay
, 2
A
D D
E N
D U
M
Ju ne
7, ryanj Text Box
1 6/17/25 ADDENDUM 1
ryanj Snapshot ryanj Cloud ryanj Line
File details come from the government source that posted it. Updated .