RFP -W91QF523R0001 -.pdf

PDF 1 MB Posted

Attached to
Maintenance and Inspection of Fire Protection Systems
Solicitation number
W91QF523R0001
Issued by

About this file

This is a solicitation for a non-personal services contract to provide maintenance and inspection services for fire protection systems at Fort Lee, Virginia. Required services include inspection, testing, maintenance and repair of fire alarm, fire sprinklers, and other fire protection systems. The contractor must provide all necessary labor, equipment, supplies, transportation and materials. The contract type is firm-fixed-price. The opportunity is set aside for 8(a) small businesses. The performance work statement outlines minimum standards, and the buildings list may fluctuate during the contract period. Responses are due no later than December 16, 2022 at 3:00 PM EST to the contracting officer at the Mission and Installation Contracting Command, Fort Lee.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W91QF523R0001 06-Dec-2022

b. TELEPHONE NUMBER

804-734-4800

8. OFFER DUE DATE/LOCAL TIME

03:00 PM 16 Dec 2022

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W91QF59. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

MYRISHA L MULLEN

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

0011674184

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESS

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

MICC FORT LEE

1830 QUARTERMASTER ROAD, BLDG 7124

FORT LEE VA 23801 1606

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE W26ADZ 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

W6CP USAG FT LEE

XR W6CP USAG

WHSE T6208

1816 SHOP RD

FORT LEE VA 23801-1503

TEL: 2569552468 FAX:

804 734 4633FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

X 8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$16,500,000

NAICS:

238220

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF254

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W91QF523R0001

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Fire Detection and Alarm System ITM Task

FFP

NET AMT

0001AA 295 Each Annl Fire Detect/Alarm ITM Tasks

FFP

Annl Fire Detect/Alarm ITM Tasks FOB: Destination

PURCHASE REQUEST NUMBER: 0011674184

PSC CD: 4540

0001AB 148 Each 2 Yr Fire Detect/Alarm ITM Tasks

FFP

2 Yr Fire Detect/Alarm ITM Tasks FOB: Destination

0001AC 60 Each 5 Yr Fire Detect/Alarm ITM Tasks

FFP

5 Yr Fire Detect/Alarm ITM Tasks FOB: Destination

0001AD 19 Each 10 Yr Fire Detect/Alarm ITM Task

FFP

10 Yr Fire Detect/Alarm ITM Task FOB: Destination

0001AE 10 Each 20 Yr Fire Detect/Alarm ITM Task

FFP

20 Yr Fire Detect/Alarm ITM Task FOB: Destination

Wet Pipe Sprinkler Systems ITM Tasks

0002AA 189 Each Annl Wet Pipe Sprinkler ITM Tasks

FFP

Annl Wet Pipe Sprinkler ITM Tasks FOB: Destination

0002AB 95 Each 2 Yr Wet Pipe Sprinkler ITM Tasks

FFP

2 Yr Wet Pipe Sprinkler ITM Tasks FOB: Destination

0002AC 38 Each 5 Yr Wet Pipe Sprinkler ITM Tasks

FFP

5 Yr Wet Pipe Sprinkler ITM Tasks FOB: Destination

0002AD 19 Each 10 Yr Wet Pipe Sprinkler ITM Task

FFP

10 Yr Wet Pipe Sprinkler ITM Task FOB: Destination

0002AE 10 Each 20 Yr Wet Pipe Sprinkler ITM Task

FFP

20 Yr Wet Pipe Sprinkler ITM Task FOB: Destination

0002AF 4 Each 50 Yr Wet Pipe Sprinkler ITM Task

FFP

50 Yr Wet Pipe Sprinkler ITM Task FOB: Destination

Dry Pipe Sprinkler Systems ITM Tasks

0003AA 34 Each Annl Dry Pipe Sprinkler ITM Tasks

FFP

Annl Dry Pipe Sprinkler ITM Tasks FOB: Destination

0003AB 17 Each 2 Yr Dry Pipe Sprinkler ITM Tasks

FFP

2 Yr Dry Pipe Sprinkler ITM Tasks FOB: Destination

0003AC 7 Each 5 Yr Dry Pipe Sprinkler ITM Tasks

FFP

5 Yr Dry Pipe Sprinkler ITM Tasks FOB: Destination

0003AD 4 Each 10 Yr Dry Pipe Sprinkler ITM Task

FFP

10 Yr Dry Pipe Sprinkler ITM Task FOB: Destination

0003AE 2 Each 20 Yr Dry Pipe Sprinkler ITM Task

FFP

20 Yr Dry Pipe Sprinkler ITM Task FOB: Destination

0003AF 1 Each 50 Yr Dry Pipe Sprinkler ITM Task

FFP

50 Yr Dry Pipe Sprinkler ITM Task FOB: Destination

Pre-Action Automatic Sprinkler Systems

Pre-Action Automatic Sprinkler Systems ITM Tasks

0004AA 13 Each Annl Pre-Action Automatic Sprinkl

FFP

Annl Pre-Action Automatic Sprinkl FOB: Destination

0004AB 7 Each 2 Yr Pre-Action Automatic Sprinkl

FFP

2 Yr Pre-Action Automatic Sprinkl FOB: Destination

0004AC 14 Each 5 Yr Pre-Action Automatic Sprinkl

FFP

5 Yr Pre-Action Automatic Sprinkl FOB: Destination

0004AD 3 Each 10 Yr Pre-Action Automatic Sprink

FFP

10 Yr Pre-Action Automatic Sprink FOB: Destination

0004AE 1 Each 20 Yr Pre-Action Automatic Sprink

FFP

20 Yr Pre-Action Automatic Sprink FOB: Destination

0004AF 1 Each 50 Yr Pre-Action Automatic Sprink

FFP

50 Yr Pre-Action Automatic Sprink FOB: Destination

Standpipe Sprinkler Systems ITM Tasks

Standpipe Sprinkler Systems ITM Tasks

0005AA 12 Each Semi Annl Standpipe Sprinkler ITM

FFP

Semi Annl Standpipe Sprinkler ITM FOB: Destination

0005AB 6 Each 2 Yr Standpipe Sprinkler ITM Task

FFP

2 Yr Standpipe Sprinkler ITM Task FOB: Destination

0005AC 3 Each 5 Yr Standpipe Sprinkler ITM Task

FFP

5 Yr Standpipe Sprinkler ITM Task FOB: Destination

Fire Pumps ITM Tasks

0006AA 15 Each Mthly Fire Pumps ITM Tasks

FFP

Mthly Fire Pumps ITM Tasks FOB: Destination

0006AB 8 Each 2 Yr-Fire Pumps ITM Tasks

FFP

2 Yr-Fire Pumps ITM Tasks FOB: Destination

0006AC 3 Each 5 Yr-Fire Pumps ITM Tasks

FFP

5 Yr-Fire Pumps ITM Tasks FOB: Destination

Backflow Prevention Devices ITM Tasks

0007AA 169 Each Annual - Backflow Prevention ITM Task

FFP

Annual - Backflow Prevention ITM Task FOB: Destination

0007AB 34 Each 5 Yr-Backflow Prevention ITM Task

FFP

5 Yr-Backflow Prevention ITM Task FOB: Destination

Service Calls (Labor only)

0008AA 30 Each Urgent Service Calls

FFP

Urgent Service Calls FOB: Destination

0008AB 30 Each Routine Service Calls

FFP

Routine Service Calls FOB: Destination

0009 1 Job Parts

FFP

Parts FOB: Destination

0010 5 Each Reviews, Design and Specs Req

FFP

Reviews, Design and Specs Req FOB: Destination

0011 1 Each Annual CMRA Reporting

FFP

Annual CMRA Reporting FOB: Destination

0012 28 Each Quarterly - Joint Commission

FFP

Quarterly - Joint Commission FOB: Destination

0013 12 Each Mthly -Repair and Maintenance

FFP

Mthly -Repair and Maintenance FOB: Destination

Insp/Repair of Wet Chemical Systems

Insp/Repair of Wet Chemical Systems

0014AA 248 Each Mthly-Semi-Annl Insp/Rpr Wet Chem

FFP

Mthly-Semi-Annl Insp/Rpr Wet Chem FOB: Destination

0014AB 11 Each Mthly-5-12 Year Insp/Rpr Wet Chem

FFP

Mthly-5-12 Year Insp/Rpr Wet Chem FOB: Destination

Insp/Repair of Dry Chemical Systems

Insp/Repair of Dry Chemical Systems

0015AA 3 Each Semi-Annl Insp/Rpr Dry Chem Sys

FFP

Semi-Annl Insp/Rpr Dry Chem Sys FOB: Destination

0015AB 1 Each 5-12 Year Insp/Rpr Dry Chem Sys

FFP

5-12 Year Insp/Rpr Dry Chem Sys FOB: Destination

0016 44 Each Qtly Insp/ Maintenance Hood Wash

FFP

Qtly Insp/ Maintenance Hood Wash FOB: Destination

Insp/Repair of Clean Agent Systems

Insp/Repair of Clean Agent Systems

0017AA 5 Each Annl Insp/Rpr Clean Agent

FFP

Annl Insp/Rpr Clean Agent FOB: Destination

0017AB 3 Each 2 Yr Insp/Rpr Clean Agent

FFP

2 Yr Insp/Rpr Clean Agent FOB: Destination

0017AC 1 Each 5 Yr Insp/Rpr Clean Agent

FFP

5 Yr Insp/Rpr Clean Agent FOB: Destination

Mass Notification System

Mass Notification System

0018AA 146 Each Annl Mass Notification System ITM

FFP

Annl Mass Notification System ITM FOB: Destination

0018AB 73 Each 2 Yr Mass Notification System ITM

FFP

2 Yr Mass Notification System ITM FOB: Destination

Nitrogen Generation Systems

Nitrogen Generation Systems

0019AA 2 Each Monthly Nitro Gen Sys ITM Task

FFP

Monthly Nitro Gen Sys ITM Task FOB: Destination

0019AB 2 Each Annl Nitro Gen Sys ITM Task

FFP

Annl Nitro Gen Sys ITM Task FOB: Destination

0019AC 2 Each 2 Yr Nitro Gen Sys ITM Task

FFP

2 Yr Nitro Gen Sys ITM Task FOB: Destination

0019AD 2 Each 5 Yr Nitro Gen Sys ITM Task

FFP

5 Yr Nitro Gen Sys ITM Task FOB: Destination

Central Control Unit Maintenance

Central Control Unit Maintenance

0020AA 104 Each Weekly Central Cont Unit ITM Task

FFP

Weekly Central Cont Unit ITM Task FOB: Destination

0020AB 24 Each Monthly Central Cont Unit ITM Tas

FFP

Monthly Central Cont Unit ITM Tas FOB: Destination

0020AC 8 Each Quartly Central Cont Unit ITM Tas

FFP

Quartly Central Cont Unit ITM Tas FOB: Destination

0020AD 2 Each Yearly Central Cont Unit ITM Tas

FFP

Yearly Central Cont Unit ITM Tas FOB: Destination

Communications Network Maintenace

Communications Network Maintenace

0021AA 104 Each Weekly Comm Net Maint ITM Task

FFP

Weekly Comm Net Maint ITM Task FOB: Destination

0021AB 24 Each Monthly Comm Net Maint ITM Task

FFP

Monthly Comm Net Maint ITM Task FOB: Destination

0021AC 8 Each Quartly Comm Net Maint ITM Task

FFP

Quartly Comm Net Maint ITM Task FOB: Destination

0021AD 4 Each Semi Annl Comm Net Maint ITM Task

FFP

Semi Annl Comm Net Maint ITM Task FOB: Destination

0022 192 Each Monthly Fire Pump Run

FFP

Monthly Fire Pump Run FOB: Destination

0023 52 Each Weekly Diesel Fire Pump

FFP

Weekly Diesel Fire Pump

OPTION Fire Detection and Alarm System ITM Task

Fire Detection and Alarm System ITM Tasks

1001AA 295 Each OPTION Annl Fire Detect/Alarm ITM Tasks

FFP

Annl Fire Detect/Alarm ITM Tasks FOB: Destination

1001AB 148 Each OPTION 2 Yr Fire Detect/Alarm ITM Tasks

FFP

2 Yr Fire Detect/Alarm ITM Tasks FOB: Destination

1001AC 60 Each OPTION 5 Yr Fire Detect/Alarm ITM Tasks

FFP

5 Yr Fire Detect/Alarm ITM Tasks FOB: Destination

1001AD 19 Each OPTION 10 Yr Fire Detect/Alarm ITM Task

FFP

10 Yr Fire Detect/Alarm ITM Task FOB: Destination

1001AE 10 Each OPTION 20 Yr Fire Detect/Alarm ITM Task

FFP

20 Yr Fire Detect/Alarm ITM Task FOB: Destination

OPTION Wet Pipe Sprinkler Systems ITM Tasks

1002AA 189 Each OPTION Annl Wet Pipe Sprinkler ITM Tasks

FFP

Annl Wet Pipe Sprinkler ITM Tasks FOB: Destination

1002AB 95 Each OPTION 2 Yr Wet Pipe Sprinkler ITM Tasks

FFP

2 Yr Wet Pipe Sprinkler ITM Tasks FOB: Destination

1002AC 38 Each OPTION 5 Yr Wet Pipe Sprinkler ITM Tasks

FFP

5 Yr Wet Pipe Sprinkler ITM Tasks FOB: Destination

1002AD 19 Each OPTION 10 Yr Wet Pipe Sprinkler ITM Task

FFP

10 Yr Wet Pipe Sprinkler ITM Task FOB: Destination

1002AE 10 Each OPTION 20 Yr Wet Pipe Sprinkler ITM Task

FFP

20 Yr Wet Pipe Sprinkler ITM Task FOB: Destination

1002AF 4 Each OPTION 50 Yr Wet Pipe Sprinkler ITM Task

FFP

50 Yr Wet Pipe Sprinkler ITM Task FOB: Destination

OPTION Dry Pipe Sprinkler Systems ITM Tasks

1003AA 34 Each OPTION Annl Dry Pipe Sprinkler ITM Tasks

FFP

Annl Dry Pipe Sprinkler ITM Tasks FOB: Destination

1003AB 17 Each OPTION 2 Yr Dry Pipe Sprinkler ITM Tasks

FFP

2 Yr Dry Pipe Sprinkler ITM Tasks FOB: Destination

1003AC 7 Each OPTION 5 Yr Dry Pipe Sprinkler ITM Tasks

FFP

5 Yr Dry Pipe Sprinkler ITM Tasks FOB: Destination

1003AD 4 Each OPTION 10 Yr Dry Pipe Sprinkler ITM Task

FFP

10 Yr Dry Pipe Sprinkler ITM Task FOB: Destination

1003AE 2 Each OPTION 20 Yr Dry Pipe Sprinkler ITM Task

FFP

20 Yr Dry Pipe Sprinkler ITM Task FOB: Destination

1003AF 1 Each OPTION 50 Yr Dry Pipe Sprinkler ITM Task

FFP

50 Yr Dry Pipe Sprinkler ITM Task FOB: Destination

OPTION Pre-Action Automatic Sprinkler Systems I

1004AA 13 Each OPTION Annl Pre-Action Automatic Sprinkl

FFP

Annl Pre-Action Automatic Sprinkl FOB: Destination

1004AB 7 Each OPTION 2 Yr Pre-Action Automatic Sprinkl

FFP

2 Yr Pre-Action Automatic Sprinkl FOB: Destination

1004AC 14 Each OPTION 5 Yr Pre-Action Automatic Sprinkl

FFP

5 Yr Pre-Action Automatic Sprinkl FOB: Destination

1004AD 3 Each OPTION 10 Yr Pre-Action Automatic Sprink

FFP

10 Yr Pre-Action Automatic Sprink FOB: Destination

1004AE 1 Each OPTION 20 Yr Pre-Action Automatic Sprink

FFP

20 Yr Pre-Action Automatic Sprink FOB: Destination

1004AF 1 Each OPTION 50 Yr Pre-Action Automatic Sprink

FFP

50 Yr Pre-Action Automatic Sprink FOB: Destination

OPTION Standpipe Sprinkler Systems ITM Tasks

1005AA 12 Each OPTION Semi Annl Standpipe Sprinkler ITM

FFP

Semi Annl Standpipe Sprinkler ITM FOB: Destination

1005AB 6 Each OPTION 2 Yr Standpipe Sprinkler ITM Task

FFP

2 Yr Standpipe Sprinkler ITM Task FOB: Destination

1005AC 3 Each OPTION 5 Yr Standpipe Sprinkler ITM Task

FFP

5 Yr Standpipe Sprinkler ITM Task FOB: Destination

OPTION Fire Pumps ITM Tasks

1006AA 15 Each OPTION Mthly Fire Pumps ITM Tasks

FFP

Mthly Fire Pumps ITM Tasks FOB: Destination

1006AB 8 Each OPTION 2 Yr-Fire Pumps ITM Tasks

FFP

2 Yr-Fire Pumps ITM Tasks FOB: Destination

1006AC 3 Each OPTION 5 Yr-Fire Pumps ITM Tasks

FFP

5 Yr-Fire Pumps ITM Tasks FOB: Destination

OPTION Backflow Prevention Devices ITM Tasks

1007AA 169 Each OPTION Annual - Backflow Prevention ITM Task

FFP

Annual - Backflow Prevention ITM Task FOB: Destination

1007AB 34 Each OPTION 5 Yr-Backflow Prevention ITM Task

FFP

5 Yr-Backflow Prevention ITM Task FOB: Destination

OPTION Service Calls (Labor Only)

1008AA 30 Each OPTION Urgent Service Calls

FFP

Urgent Service Calls FOB: Destination

1008AB 30 Each OPTION Routine Service Calls

FFP

Routine Service Calls FOB: Destination

1009 1 Job OPTION Parts

FFP

Parts FOB: Destination

1010 5 Each OPTION Reviews, Design and Specs Req

FFP

Reviews, Design and Specs Req FOB: Destination

1011 1 Each OPTION Annual CMRA Reporting

FFP

Annual CMRA Reporting FOB: Destination

1012 28 Each OPTION Quarterly - Joint Commission

FFP

Quarterly - Joint Commission FOB: Destination

1013 12 Each OPTION Mthly -Repair and Maintenance

FFP

Mthly -Repair and Maintenance FOB: Destination

OPTION Insp/Repair of Wet Chemical Systems

1014AA 248 Each OPTION Mthly-Semi-Annl Insp/Rpr Wet Chem

FFP

Mthly-Semi-Annl Insp/Rpr Wet Chem FOB: Destination

1014AB 11 Each OPTION Mthly-5-12 Year Insp/Rpr Wet Chem

FFP

Mthly-5-12 Year Insp/Rpr Wet Chem FOB: Destination

OPTION Insp/Repair of Dry Chemical Systems

1015AA 3 Each OPTION Semi-Annl Insp/Rpr Dry Chem Sys

FFP

Semi-Annl Insp/Rpr Dry Chem Sys FOB: Destination

1015AB 1 Each OPTION 5-12 Year Insp/Rpr Dry Chem Sys

FFP

5-12 Year Insp/Rpr Dry Chem Sys FOB: Destination

1016 44 Each OPTION Qtly Insp/ Maintenance Hood Wash

FFP

Qtly Insp/ Maintenance Hood Wash FOB: Destination

OPTION Insp/Repair of Clean Agent Systems

1017AA 5 Each OPTION Annl Insp/Rpr Clean Agent

FFP

Annl Insp/Rpr Clean Agent FOB: Destination

1017AB 3 Each OPTION 2 Yr Insp/Rpr Clean Agent

FFP

2 Yr Insp/Rpr Clean Agent FOB: Destination

1017AC 1 Each OPTION 5 Yr Insp/Rpr Clean Agent

FFP

5 Yr Insp/Rpr Clean Agent FOB: Destination

OPTION Mass Notification Systems

Mass Notification Systems

1018AA 146 Each OPTION Annl Mass Notification System ITM

FFP

Annl Mass Notification System ITM FOB: Destination

1018AB 73 Each OPTION 2 Yr Mass Notification System ITM

FFP

2 Yr Mass Notification System ITM FOB: Destination

OPTION Nitrogen Generation Systems

1019AA 2 Each OPTION Monthly Nitro Gen Sys ITM Task

FFP

Monthly Nitro Gen Sys ITM Task FOB: Destination

1019AB 2 Each OPTION Annl Nitro Gen Sys ITM Task

FFP

Annl Nitro Gen Sys ITM Task FOB: Destination

1019AC 2 Each OPTION 2 Yr Nitro Gen Sys ITM Task

FFP

2 Yr Nitro Gen Sys ITM Task FOB: Destination

1019AD 2 Each OPTION 5 Yr Nitro Gen Sys ITM Task

FFP

5 Yr Nitro Gen Sys ITM Task FOB: Destination

OPTION Central Control Unit Maintenance

1020AA 104 Each OPTION Weekly Central Cont Unit ITM Task

FFP

Weekly Central Cont Unit ITM Task FOB: Destination

1020AB 24 Each OPTION Monthly Central Cont Unit ITM Tas

FFP

Monthly Central Cont Unit ITM Tas FOB: Destination

1020AC 8 Each OPTION Quartly Central Cont Unit ITM Tas

FFP

Quartly Central Cont Unit ITM Tas FOB: Destination

1020AD 2 Each OPTION Yearly Central Cont Unit ITM Tas

FFP

Yearly Central Cont Unit ITM Tas FOB: Destination

OPTION Communications Network Maintenace

1021AA 104 Each OPTION Weekly Comm Net Maint ITM Task

FFP

Weekly Comm Net Maint ITM Task FOB: Destination

1021AB 24 Each OPTION Monthly Comm Net Maint ITM Task

FFP

Monthly Comm Net Maint ITM Task FOB: Destination

1021AC 8 Each OPTION Quartly Comm Net Maint ITM Task

FFP

Quartly Comm Net Maint ITM Task FOB: Destination

1021AD 4 Each OPTION Semi Annl Comm Net Maint ITM Task

FFP

Semi Annl Comm Net Maint ITM Task FOB: Destination

1022 192 Each OPTION Monthly Fire Pump Run

FFP

1023 52 Each OPTION Weekly Diesel Fire Pump

FFP

OPTION Fire Detection and Alarm System ITM Task

2001AA 295 Each OPTION Annl Fire Detect/Alarm ITM Tasks

FFP

Annl Fire Detect/Alarm ITM Tasks FOB: Destination

2001AB 148 Each OPTION 2 Yr Fire Detect/Alarm ITM Tasks

FFP

2 Yr Fire Detect/Alarm ITM Tasks FOB: Destination

2001AC 60 Each OPTION 5 Yr Fire Detect/Alarm ITM Tasks

FFP

5 Yr Fire Detect/Alarm ITM Tasks FOB: Destination

2001AD 19 Each OPTION 10 Yr Fire Detect/Alarm ITM Task

FFP

10 Yr Fire Detect/Alarm ITM Task FOB: Destination

2001AE 10 Each OPTION 20 Yr Fire Detect/Alarm ITM Task

FFP

20 Yr Fire Detect/Alarm ITM Task FOB: Destination

OPTION Wet Pipe Sprinkler Systems ITM Tasks

2002AA 189 Each OPTION Annl Wet Pipe Sprinkler ITM Tasks

FFP

Annl Wet Pipe Sprinkler ITM Tasks FOB: Destination

2002AB 95 Each OPTION 2 Yr Wet Pipe Sprinkler ITM Tasks

FFP

2 Yr Wet Pipe Sprinkler ITM Tasks FOB: Destination

2002AC 38 Each OPTION 5 Yr Wet Pipe Sprinkler ITM Tasks

FFP

5 Yr Wet Pipe Sprinkler ITM Tasks FOB: Destination

2002AD 19 Each OPTION 10 Yr Wet Pipe Sprinkler ITM Task

FFP

10 Yr Wet Pipe Sprinkler ITM Task FOB: Destination

2002AE 10 Each OPTION 20 Yr Wet Pipe Sprinkler ITM Task

FFP

20 Yr Wet Pipe Sprinkler ITM Task FOB: Destination

2002AF 4 Each OPTION 50 Yr Wet Pipe Sprinkler ITM Task

FFP

50 Yr Wet Pipe Sprinkler ITM Task FOB: Destination

OPTION Dry Pipe Sprinkler Systems ITM Tasks

2003AA 34 Each OPTION Annl Dry Pipe Sprinkler ITM Tasks

FFP

Annl Dry Pipe Sprinkler ITM Tasks FOB: Destination

2003AB 17 Each OPTION 2 Yr Dry Pipe Sprinkler ITM Tasks

FFP

2 Yr Dry Pipe Sprinkler ITM Tasks FOB: Destination

2003AC 7 Each OPTION 5 Yr Dry Pipe Sprinkler ITM Tasks

FFP

5 Yr Dry Pipe Sprinkler ITM Tasks FOB: Destination

2003AD 4 Each OPTION 10 Yr Dry Pipe Sprinkler ITM Task

FFP

10 Yr Dry Pipe Sprinkler ITM Task FOB: Destination

2003AE 2 Each OPTION 20 Yr Dry Pipe Sprinkler ITM Task

FFP

20 Yr Dry Pipe Sprinkler ITM Task FOB: Destination

2003AF 1 Each OPTION 50 Yr Dry Pipe Sprinkler ITM Task

FFP

50 Yr Dry Pipe Sprinkler ITM Task FOB: Destination

OPTION Pre-Action Automatic Sprinkler Systems I

2004AA 13 Each OPTION Annl Pre-Action Automatic Sprinkl

FFP

Annl Pre-Action Automatic Sprinkl FOB: Destination

2004AB 7 Each OPTION 2 Yr Pre-Action Automatic Sprinkl

FFP

2 Yr Pre-Action Automatic Sprinkl FOB: Destination

2004AC 14 Each OPTION 5 Yr Pre-Action Automatic Sprinkl

FFP

5 Yr Pre-Action Automatic Sprinkl FOB: Destination

2004AD 3 Each OPTION 10 Yr Pre-Action Automatic Sprink

FFP

10 Yr Pre-Action Automatic Sprink FOB: Destination

2004AE 1 Each OPTION 20 Yr Pre-Action Automatic Sprink

FFP

20 Yr Pre-Action Automatic Sprink FOB: Destination

2004AF 1 Each OPTION 50 Yr Pre-Action Automatic Sprink

FFP

50 Yr Pre-Action Automatic Sprink FOB: Destination

OPTION Standpipe Sprinkler Systems ITM Tasks

2005AA 12 Each OPTION Semi Annl Standpipe Sprinkler ITM

FFP

Semi Annl Standpipe Sprinkler ITM FOB: Destination

2005AB 6 Each OPTION 2 Yr Standpipe Sprinkler ITM Task

FFP

2 Yr Standpipe Sprinkler ITM Task FOB: Destination

2005AC 3 Each OPTION 5 Yr Standpipe Sprinkler ITM Task

FFP

5 Yr Standpipe Sprinkler ITM Task FOB: Destination

OPTION Fire Pumps ITM Tasks

2006AA 15 Each OPTION Mthly Fire Pumps ITM Tasks

FFP

Mthly Fire Pumps ITM Tasks FOB: Destination

2006AB 8 Each OPTION 2 Yr-Fire Pumps ITM Tasks

FFP

2 Yr-Fire Pumps ITM Tasks FOB: Destination

2006AC 3 Each OPTION 5 Yr-Fire Pumps ITM Tasks

FFP

5 Yr-Fire Pumps ITM Tasks FOB: Destination

OPTION Backflow Prevention Devices ITM Tasks

2007AA 169 Each OPTION Annual - Backflow Prevention ITM Task

FFP

Annual - Backflow Prevention ITM Task FOB: Destination

2007AB 34 Each OPTION 5 Yr-Backflow Prevention ITM Task

FFP

5 Yr-Backflow Prevention ITM Task FOB: Destination

OPTION Service Calls (Labor Calls)

Service Calls (Labor Calls)

2008AA 30 Each OPTION Urgent Service Calls

FFP

Urgent Service Calls FOB: Destination

2008AB 30 Each OPTION Routine Service Calls

FFP

Routine Service Calls FOB: Destination

2009 1 Job OPTION Parts

FFP

Parts FOB: Destination

2010 5 Each OPTION Reviews, Design and Specs Req

FFP

Reviews, Design and Specs Req FOB: Destination

2011 1 Each OPTION Annual CMRA Reporting

FFP

Annual CMRA Reporting FOB: Destination

2012 28 Each OPTION Quarterly - Joint Commission

FFP

Quarterly - Joint Commission FOB: Destination

2013 12 Each OPTION Mthly -Repair and Maintenance

FFP

Mthly -Repair and Maintenance FOB: Destination

OPTION Insp/Repair of Wet Chemical Systems

2014AA 248 Each OPTION Mthly-Semi-Annl Insp/Rpr Wet Chem

FFP

Mthly-Semi-Annl Insp/Rpr Wet Chem FOB: Destination

2014AB 11 Each OPTION Mthly-5-12 Year Insp/Rpr Wet Chem

FFP

Mthly-5-12 Year Insp/Rpr Wet Chem FOB: Destination

OPTION Insp/Repair of Dry Chemical Systems

2015AA 3 Each OPTION Semi-Annl Insp/Rpr Dry Chem Sys

FFP

Semi-Annl Insp/Rpr Dry Chem Sys FOB: Destination

2015AB 1 Each OPTION 5-12 Year Insp/Rpr Dry Chem Sys

FFP

5-12 Year Insp/Rpr Dry Chem Sys FOB: Destination

2016 44 Each OPTION Qtly Insp/ Maintenance Hood Wash

FFP

Qtly Insp/ Maintenance Hood Wash FOB: Destination

OPTION Insp/Repair of Clean Agent Systems

2017AA 5 Each OPTION Annl Insp/Rpr Clean Agent

FFP

Annl Insp/Rpr Clean Agent FOB: Destination

2017AB 3 Each OPTION 2 Yr Insp/Rpr Clean Agent

FFP

2 Yr Insp/Rpr Clean Agent FOB: Destination

2017AC 1 Each OPTION 5 Yr Insp/Rpr Clean Agent

FFP

5 Yr Insp/Rpr Clean Agent FOB: Destination

OPTION Mass Notification Systems

2018AA 146 Each OPTION Annl Mass Notification System ITM

FFP

Annl Mass Notification System ITM FOB: Destination

2018AB 73 Each OPTION 2 Yr Mass Notification System ITM

FFP

2 Yr Mass Notification System ITM FOB: Destination

OPTION Nitrogen Generation Systems

2019AA 2 Each OPTION Monthly Nitro Gen Sys ITM Task

FFP

Monthly Nitro Gen Sys ITM Task FOB: Destination

2019AB 2 Each OPTION Annl Nitro Gen Sys ITM Task

FFP

Annl Nitro Gen Sys ITM Task FOB: Destination

2019AC 2 Each OPTION 2 Yr Nitro Gen Sys ITM Task

FFP

2 Yr Nitro Gen Sys ITM Task FOB: Destination

2019AD 2 Each OPTION 5 Yr Nitro Gen Sys ITM Task

FFP

5 Yr Nitro Gen Sys ITM Task FOB: Destination

OPTION Central Control Unit Maintenance

2020AA 104 Each OPTION Weekly Central Cont Unit ITM Task

FFP

Weekly Central Cont Unit ITM Task FOB: Destination

2020AB 24 Each OPTION Monthly Central Cont Unit ITM Tas

FFP

Monthly Central Cont Unit ITM Tas FOB: Destination

2020AC 8 Each OPTION Quartly Central Cont Unit ITM Tas

FFP

Quartly Central Cont Unit ITM Tas FOB: Destination

2020AD 2 Each OPTION Yearly Central Cont Unit ITM Tas

FFP

Yearly Central Cont Unit ITM Tas FOB: Destination

OPTION Communications Network Maintenace

2021AA 104 Each OPTION Weekly Comm Net Maint ITM Task

FFP

Weekly Comm Net Maint ITM Task FOB: Destination

2021AB 24 Each OPTION Monthly Comm Net Maint ITM Task

FFP

Monthly Comm Net Maint ITM Task FOB: Destination

2021AC 8 Each OPTION Quartly Comm Net Maint ITM Task

FFP

Quartly Comm Net Maint ITM Task FOB: Destination

2021AD 4 Each OPTION Semi Annl Comm Net Maint ITM Task

FFP

Semi Annl Comm Net Maint ITM Task FOB: Destination

2022 192 Each OPTION Monthly Fire Pump Run

FFP

2023 52 Each OPTION Weekly Diesel Fire Pump

FFP

OPTION Fire Detection and Alarm System ITM Task

3001AA 295 Each OPTION Annl Fire Detect/Alarm ITM Tasks

FFP

Annl Fire Detect/Alarm ITM Tasks FOB: Destination

3001AB 148 Each OPTION 2 Yr Fire Detect/Alarm ITM Tasks

FFP

2 Yr Fire Detect/Alarm ITM Tasks FOB: Destination

3001AC 60 Each OPTION 5 Yr Fire Detect/Alarm ITM Tasks

FFP

5 Yr Fire Detect/Alarm ITM Tasks FOB: Destination

3001AD 19 Each OPTION 10 Yr Fire Detect/Alarm ITM Task

FFP

10 Yr Fire Detect/Alarm ITM Task FOB: Destination

3001AE 10 Each OPTION 20 Yr Fire Detect/Alarm ITM Task

FFP

20 Yr Fire Detect/Alarm ITM Task FOB: Destination

OPTION Wet Pipe Sprinkler Systems ITM Tasks

3002AA 189 Each OPTION Annl Wet Pipe Sprinkler ITM Tasks

FFP

Annl Wet Pipe Sprinkler ITM Tasks FOB: Destination

3002AB 95 Each OPTION 2 Yr Wet Pipe Sprinkler ITM Tasks

FFP

2 Yr Wet Pipe Sprinkler ITM Tasks FOB: Destination

3002AC 38 Each OPTION 5 Yr Wet Pipe Sprinkler ITM Tasks

FFP

5 Yr Wet Pipe Sprinkler ITM Tasks FOB: Destination

3002AD 19 Each OPTION 10 Yr Wet Pipe Sprinkler ITM Task

FFP

10 Yr Wet Pipe Sprinkler ITM Task FOB: Destination

3002AE 10 Each OPTION 20 Yr Wet Pipe Sprinkler ITM Task

FFP

20 Yr Wet Pipe Sprinkler ITM Task FOB: Destination

3002AF 4 Each OPTION 50 Yr Wet Pipe Sprinkler ITM Task

FFP

50 Yr Wet Pipe Sprinkler ITM Task FOB: Destination

OPTION Dry Pipe Sprinkler Systems ITM Tasks

3003AA 34 Each OPTION Annl Dry Pipe Sprinkler ITM Tasks

FFP

Annl Dry Pipe Sprinkler ITM Tasks FOB: Destination

3003AB 17 Each OPTION 2 Yr Dry Pipe Sprinkler ITM Tasks

FFP

2 Yr Dry Pipe Sprinkler ITM Tasks FOB: Destination

3003AC 7 Each OPTION 5 Yr Dry Pipe Sprinkler ITM Tasks

FFP

5 Yr Dry Pipe Sprinkler ITM Tasks FOB: Destination

3003AD 4 Each OPTION 10 Yr Dry Pipe Sprinkler ITM Task

FFP

10 Yr Dry Pipe Sprinkler ITM Task FOB: Destination

3003AE 2 Each OPTION 20 Yr Dry Pipe Sprinkler ITM Task

FFP

20 Yr Dry Pipe Sprinkler ITM Task FOB: Destination

3003AF 1 Each OPTION 50 Yr Dry Pipe Sprinkler ITM Task

FFP

50 Yr Dry Pipe Sprinkler ITM Task FOB: Destination

OPTION Pre-Action Automatic Sprinkler Systems I

3004AA 13 Each OPTION Annl Pre-Action Automatic Sprinkl

FFP

Annl Pre-Action Automatic Sprinkl FOB: Destination

3004AB 7 Each OPTION 2 Yr Pre-Action Automatic Sprinkl

FFP

2 Yr Pre-Action Automatic Sprinkl FOB: Destination

3004AC 14 Each OPTION 5 Yr Pre-Action Automatic Sprinkl

FFP

5 Yr Pre-Action Automatic Sprinkl FOB: Destination

3004AD 3 Each OPTION 10 Yr Pre-Action Automatic Sprink

FFP

10 Yr Pre-Action Automatic Sprink FOB: Destination

3004AE 1 Each OPTION 20 Yr Pre-Action Automatic Sprink

FFP

20 Yr Pre-Action Automatic Sprink FOB: Destination

3004AF 1 Each OPTION 50 Yr Pre-Action Automatic Sprink

FFP

50 Yr Pre-Action Automatic Sprink FOB: Destination

OPTION Standpipe Sprinkler Systems ITM Tasks

3005AA 12 Each OPTION Semi Annl Standpipe Sprinkler ITM

FFP

Semi Annl Standpipe Sprinkler ITM FOB: Destination

3005AB 6 Each OPTION 2 Yr Standpipe Sprinkler ITM Task

FFP

2 Yr Standpipe Sprinkler ITM Task FOB: Destination

3005AC 3 Each OPTION 5 Yr Standpipe Sprinkler ITM Task

FFP

5 Yr Standpipe Sprinkler ITM Task FOB: Destination

OPTION Fire Pumps ITM Tasks

3006AA 15 Each OPTION Mthly Fire Pumps ITM Tasks

FFP

Mthly Fire Pumps ITM Tasks FOB: Destination

3006AB 8 Each 2 Yr-Fire Pumps ITM Tasks

FFP

2 Yr-Fire Pumps ITM Tasks FOB: Destination

3006AC 3 Each 5 Yr-Fire Pumps ITM Tasks

FFP

5 Yr-Fire Pumps ITM Tasks FOB: Destination

OPTION Backflow Prevention Devices ITM Tasks

3007AA 169 Each Annual - Backflow Prevention ITM Task

FFP

Annual - Backflow Prevention ITM Task FOB: Destination

3007AB 34 Each 5 Yr-Backflow Prevention ITM Task

FFP

5 Yr-Backflow Prevention ITM Task FOB: Destination

OPTION Service Calls (Labor Only)

3008AA 30 Each OPTION Urgent Service Calls

FFP

Urgent Service Calls FOB: Destination

3008AB 30 Each OPTION Routine Service Calls

FFP

Routine Service Calls FOB: Destination

3009 1 Job OPTION Parts

FFP

Parts FOB: Destination

3010 5 Each OPTION Reviews, Design and Specs Req

FFP

Reviews, Design and Specs Req FOB: Destination

3011 1 Each OPTION Annual CMRA Reporting

FFP

Annual CMRA Reporting FOB: Destination

3012 28 Each OPTION Quarterly - Joint Commission

FFP

Quarterly - Joint Commission FOB: Destination

3013 12 Each OPTION Mthly -Repair and Maintenance

FFP

Mthly -Repair and Maintenance FOB: Destination

OPTION Insp/Repair of Wet Chemical Systems

3014AA 248 Each OPTION Mthly-Semi-Annl Insp/Rpr Wet Chem

FFP

Mthly-Semi-Annl Insp/Rpr Wet Chem FOB: Destination

3014AB 11 Each OPTION Mthly-5-12 Year Insp/Rpr Wet Chem

FFP

Mthly-5-12 Year Insp/Rpr Wet Chem FOB: Destination

OPTION Insp/Repair of Dry Chemical Systems

3015AA 3 Each OPTION Semi-Annl Insp/Rpr Dry Chem Sys

FFP

Semi-Annl Insp/Rpr Dry Chem Sys FOB: Destination

3015AB 1 Each OPTION 5-12 Year Insp/Rpr Dry Chem Sys

FFP

5-12 Year Insp/Rpr Dry Chem Sys FOB: Destination

3016 44 Each OPTION Qtly Insp/ Maintenance Hood Wash

FFP

Qtly Insp/ Maintenance Hood Wash FOB: Destination

OPTION Insp/Repair of Clean Agent Systems

3017AA 5 Each OPTION Annl Insp/Rpr Clean Agent

FFP

Annl Insp/Rpr Clean Agent FOB: Destination

3017AB 3 Each OPTION 2 Yr Insp/Rpr Clean Agent

FFP

2 Yr Insp/Rpr Clean Agent FOB: Destination

3017AC 1 Each OPTION 5 Yr Insp/Rpr Clean Agent

FFP

5 Yr Insp/Rpr Clean Agent FOB: Destination

OPTION Mass Notification Systems

3018AA 146 Each OPTION Annl Mass Notification System ITM

FFP

Annl Mass Notification System ITM FOB: Destination

3018AB 73 Each OPTION 2 Yr Mass Notification System ITM

FFP

2 Yr Mass Notification System ITM FOB: Destination

OPTION Nitrogen Generation Systems

3019AA 2 Each OPTION Monthly Nitro Gen Sys ITM Task

FFP

Monthly Nitro Gen Sys ITM Task FOB: Destination

3019AB 2 Each OPTION Annl Nitro Gen Sys ITM Task

FFP

Annl Nitro Gen Sys ITM Task FOB: Destination

3019AC 2 Each OPTION 2 Yr Nitro Gen Sys ITM Task

FFP

2 Yr Nitro Gen Sys ITM Task FOB: Destination

3019AD 2 Each OPTION 5 Yr Nitro Gen Sys ITM Task

FFP

5 Yr Nitro Gen Sys ITM Task FOB: Destination

OPTION Central Control Unit Maintenance

3020AA 104 Each OPTION Weekly Central Cont Unit ITM Task

FFP

Weekly Central Cont Unit ITM Task FOB: Destination

3020AB 24 Each OPTION Monthly Central Cont Unit ITM Tas

FFP

Monthly Central Cont Unit ITM Tas FOB: Destination

3020AC 8 Each OPTION Quartly Central Cont Unit ITM Tas

FFP

Quartly Central Cont Unit ITM Tas FOB: Destination

3020AD 2 Each OPTION Yearly Central Cont Unit ITM Tas

FFP

Yearly Central Cont Unit ITM Tas FOB: Destination

OPTION Communications Network Maintenace

3021AA 104 Each OPTION Weekly Comm Net Maint ITM Task

FFP

Weekly Comm Net Maint ITM Task FOB: Destination

3021AB 24 Each OPTION Monthly Comm Net Maint ITM Task

FFP

Monthly Comm Net Maint ITM Task FOB: Destination

3021AC 4 Each OPTION Semi Annl Comm Net Maint ITM Task

FFP

Semi Annl Comm Net Maint ITM Task FOB: Destination

3021AD 8 Each OPTION Quartly Comm Net Maint ITM Task

FFP

Quartly Comm Net Maint ITM Task FOB: Destination

3022 192 Each OPTION Monthly Fire Pump Run

FFP

3023 52 Each OPTION Weekly Diesel Fire Pump

FFP

OPTION Fire Detection and Alarm System ITM Task

4001AA 295 Each OPTION Annl Fire Detect/Alarm ITM Tasks

FFP

Annl Fire Detect/Alarm ITM Tasks FOB: Destination

4001AB 148 Each OPTION 2 Yr Fire Detect/Alarm ITM Tasks

FFP

2 Yr Fire Detect/Alarm ITM Tasks FOB: Destination

4001AC 60 Each OPTION 5 Yr Fire Detect/Alarm ITM Tasks

FFP

5 Yr Fire Detect/Alarm ITM Tasks FOB: Destination

4001AD 19 Each OPTION 10 Yr Fire Detect/Alarm ITM Task

FFP

10 Yr Fire Detect/Alarm ITM Task FOB: Destination

4001AE 10 Each OPTION 20 Yr Fire Detect/Alarm ITM Task

FFP

20 Yr Fire Detect/Alarm ITM Task FOB: Destination

OPTION Wet Pipe Sprinkler Systems ITM Tasks

4002AA 189 Each OPTION Annl Wet Pipe Sprinkler ITM Tasks

FFP

Annl Wet Pipe Sprinkler ITM Tasks FOB: Destination

4002AB 95 Each OPTION 2 Yr Wet Pipe Sprinkler ITM Tasks

FFP

2 Yr Wet Pipe Sprinkler ITM Tasks FOB: Destination

4002AC 38 Each OPTION 5 Yr Wet Pipe Sprinkler ITM Tasks

FFP

5 Yr Wet Pipe Sprinkler ITM Tasks FOB: Destination

4002AD 19 Each OPTION 10 Yr Wet Pipe Sprinkler ITM Task

FFP

10 Yr Wet Pipe Sprinkler ITM Task FOB: Destination

4002AE 10 Each OPTION 20 Yr Wet Pipe Sprinkler ITM Task

FFP

20 Yr Wet Pipe Sprinkler ITM Task FOB: Destination

4002AF 4 Each OPTION 50 Yr Wet Pipe Sprinkler ITM Task

FFP

50 Yr Wet Pipe Sprinkler ITM Task FOB: Destination

OPTION Dry Pipe Sprinkler Systems ITM Tasks

4003AA 34 Each OPTION Annl Dry Pipe Sprinkler ITM Tasks

FFP

Annl Dry Pipe Sprinkler ITM Tasks FOB: Destination

4003AB 17 Each OPTION 2 Yr Dry Pipe Sprinkler ITM Tasks

FFP

2 Yr Dry Pipe Sprinkler ITM Tasks FOB: Destination

4003AC 7 Each OPTION 5 Yr Dry Pipe Sprinkler ITM Tasks

FFP

5 Yr Dry Pipe Sprinkler ITM Tasks FOB: Destination

4003AD 4 Each OPTION 10 Yr Dry Pipe Sprinkler ITM Task

FFP

10 Yr Dry Pipe Sprinkler ITM Task FOB: Destination

4003AE 2 Each OPTION 20 Yr Dry Pipe Sprinkler ITM Task

FFP

20 Yr Dry Pipe Sprinkler ITM Task FOB: Destination

4003AF 1 Each OPTION 50 Yr Dry Pipe Sprinkler ITM Task

FFP

50 Yr Dry Pipe Sprinkler ITM Task FOB: Destination

OPTION Pre-Action Automatic Sprinkler Systems I

4004AA 13 Each OPTION Annl Pre-Action Automatic Sprinkl

FFP

Annl Pre-Action Automatic Sprinkl FOB: Destination

4004AB 7 Each OPTION 2 Yr Pre-Action Automatic Sprinkl

FFP

2 Yr Pre-Action Automatic Sprinkl FOB: Destination

4004AC 14 Each OPTION 5 Yr Pre-Action Automatic Sprinkl

FFP

5 Yr Pre-Action Automatic Sprinkl FOB: Destination

4004AD 3 Each OPTION 10 Yr Pre-Action Automatic Sprink

10 Yr

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .