RFP -W91QF523R0001 -.pdf
PDF 1 MB Posted
- Solicitation number
- W91QF523R0001
About this file
This is a solicitation for a non-personal services contract to provide maintenance and inspection services for fire protection systems at Fort Lee, Virginia. Required services include inspection, testing, maintenance and repair of fire alarm, fire sprinklers, and other fire protection systems. The contractor must provide all necessary labor, equipment, supplies, transportation and materials. The contract type is firm-fixed-price. The opportunity is set aside for 8(a) small businesses. The performance work statement outlines minimum standards, and the buildings list may fluctuate during the contract period. Responses are due no later than December 16, 2022 at 3:00 PM EST to the contracting officer at the Mission and Installation Contracting Command, Fort Lee.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W91QF523R0001 06-Dec-2022
b. TELEPHONE NUMBER
804-734-4800
8. OFFER DUE DATE/LOCAL TIME
03:00 PM 16 Dec 2022
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W91QF59. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
MYRISHA L MULLEN
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
0011674184
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
MICC FORT LEE
1830 QUARTERMASTER ROAD, BLDG 7124
FORT LEE VA 23801 1606
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE W26ADZ 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
W6CP USAG FT LEE
XR W6CP USAG
WHSE T6208
1816 SHOP RD
FORT LEE VA 23801-1503
TEL: 2569552468 FAX:
804 734 4633FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
X 8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$16,500,000
NAICS:
238220
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF254
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W91QF523R0001
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Fire Detection and Alarm System ITM Task
FFP
NET AMT
0001AA 295 Each Annl Fire Detect/Alarm ITM Tasks
FFP
Annl Fire Detect/Alarm ITM Tasks FOB: Destination
PURCHASE REQUEST NUMBER: 0011674184
PSC CD: 4540
0001AB 148 Each 2 Yr Fire Detect/Alarm ITM Tasks
FFP
2 Yr Fire Detect/Alarm ITM Tasks FOB: Destination
0001AC 60 Each 5 Yr Fire Detect/Alarm ITM Tasks
FFP
5 Yr Fire Detect/Alarm ITM Tasks FOB: Destination
0001AD 19 Each 10 Yr Fire Detect/Alarm ITM Task
FFP
10 Yr Fire Detect/Alarm ITM Task FOB: Destination
0001AE 10 Each 20 Yr Fire Detect/Alarm ITM Task
FFP
20 Yr Fire Detect/Alarm ITM Task FOB: Destination
Wet Pipe Sprinkler Systems ITM Tasks
0002AA 189 Each Annl Wet Pipe Sprinkler ITM Tasks
FFP
Annl Wet Pipe Sprinkler ITM Tasks FOB: Destination
0002AB 95 Each 2 Yr Wet Pipe Sprinkler ITM Tasks
FFP
2 Yr Wet Pipe Sprinkler ITM Tasks FOB: Destination
0002AC 38 Each 5 Yr Wet Pipe Sprinkler ITM Tasks
FFP
5 Yr Wet Pipe Sprinkler ITM Tasks FOB: Destination
0002AD 19 Each 10 Yr Wet Pipe Sprinkler ITM Task
FFP
10 Yr Wet Pipe Sprinkler ITM Task FOB: Destination
0002AE 10 Each 20 Yr Wet Pipe Sprinkler ITM Task
FFP
20 Yr Wet Pipe Sprinkler ITM Task FOB: Destination
0002AF 4 Each 50 Yr Wet Pipe Sprinkler ITM Task
FFP
50 Yr Wet Pipe Sprinkler ITM Task FOB: Destination
Dry Pipe Sprinkler Systems ITM Tasks
0003AA 34 Each Annl Dry Pipe Sprinkler ITM Tasks
FFP
Annl Dry Pipe Sprinkler ITM Tasks FOB: Destination
0003AB 17 Each 2 Yr Dry Pipe Sprinkler ITM Tasks
FFP
2 Yr Dry Pipe Sprinkler ITM Tasks FOB: Destination
0003AC 7 Each 5 Yr Dry Pipe Sprinkler ITM Tasks
FFP
5 Yr Dry Pipe Sprinkler ITM Tasks FOB: Destination
0003AD 4 Each 10 Yr Dry Pipe Sprinkler ITM Task
FFP
10 Yr Dry Pipe Sprinkler ITM Task FOB: Destination
0003AE 2 Each 20 Yr Dry Pipe Sprinkler ITM Task
FFP
20 Yr Dry Pipe Sprinkler ITM Task FOB: Destination
0003AF 1 Each 50 Yr Dry Pipe Sprinkler ITM Task
FFP
50 Yr Dry Pipe Sprinkler ITM Task FOB: Destination
Pre-Action Automatic Sprinkler Systems
Pre-Action Automatic Sprinkler Systems ITM Tasks
0004AA 13 Each Annl Pre-Action Automatic Sprinkl
FFP
Annl Pre-Action Automatic Sprinkl FOB: Destination
0004AB 7 Each 2 Yr Pre-Action Automatic Sprinkl
FFP
2 Yr Pre-Action Automatic Sprinkl FOB: Destination
0004AC 14 Each 5 Yr Pre-Action Automatic Sprinkl
FFP
5 Yr Pre-Action Automatic Sprinkl FOB: Destination
0004AD 3 Each 10 Yr Pre-Action Automatic Sprink
FFP
10 Yr Pre-Action Automatic Sprink FOB: Destination
0004AE 1 Each 20 Yr Pre-Action Automatic Sprink
FFP
20 Yr Pre-Action Automatic Sprink FOB: Destination
0004AF 1 Each 50 Yr Pre-Action Automatic Sprink
FFP
50 Yr Pre-Action Automatic Sprink FOB: Destination
Standpipe Sprinkler Systems ITM Tasks
Standpipe Sprinkler Systems ITM Tasks
0005AA 12 Each Semi Annl Standpipe Sprinkler ITM
FFP
Semi Annl Standpipe Sprinkler ITM FOB: Destination
0005AB 6 Each 2 Yr Standpipe Sprinkler ITM Task
FFP
2 Yr Standpipe Sprinkler ITM Task FOB: Destination
0005AC 3 Each 5 Yr Standpipe Sprinkler ITM Task
FFP
5 Yr Standpipe Sprinkler ITM Task FOB: Destination
Fire Pumps ITM Tasks
0006AA 15 Each Mthly Fire Pumps ITM Tasks
FFP
Mthly Fire Pumps ITM Tasks FOB: Destination
0006AB 8 Each 2 Yr-Fire Pumps ITM Tasks
FFP
2 Yr-Fire Pumps ITM Tasks FOB: Destination
0006AC 3 Each 5 Yr-Fire Pumps ITM Tasks
FFP
5 Yr-Fire Pumps ITM Tasks FOB: Destination
Backflow Prevention Devices ITM Tasks
0007AA 169 Each Annual - Backflow Prevention ITM Task
FFP
Annual - Backflow Prevention ITM Task FOB: Destination
0007AB 34 Each 5 Yr-Backflow Prevention ITM Task
FFP
5 Yr-Backflow Prevention ITM Task FOB: Destination
Service Calls (Labor only)
0008AA 30 Each Urgent Service Calls
FFP
Urgent Service Calls FOB: Destination
0008AB 30 Each Routine Service Calls
FFP
Routine Service Calls FOB: Destination
0009 1 Job Parts
FFP
Parts FOB: Destination
0010 5 Each Reviews, Design and Specs Req
FFP
Reviews, Design and Specs Req FOB: Destination
0011 1 Each Annual CMRA Reporting
FFP
Annual CMRA Reporting FOB: Destination
0012 28 Each Quarterly - Joint Commission
FFP
Quarterly - Joint Commission FOB: Destination
0013 12 Each Mthly -Repair and Maintenance
FFP
Mthly -Repair and Maintenance FOB: Destination
Insp/Repair of Wet Chemical Systems
Insp/Repair of Wet Chemical Systems
0014AA 248 Each Mthly-Semi-Annl Insp/Rpr Wet Chem
FFP
Mthly-Semi-Annl Insp/Rpr Wet Chem FOB: Destination
0014AB 11 Each Mthly-5-12 Year Insp/Rpr Wet Chem
FFP
Mthly-5-12 Year Insp/Rpr Wet Chem FOB: Destination
Insp/Repair of Dry Chemical Systems
Insp/Repair of Dry Chemical Systems
0015AA 3 Each Semi-Annl Insp/Rpr Dry Chem Sys
FFP
Semi-Annl Insp/Rpr Dry Chem Sys FOB: Destination
0015AB 1 Each 5-12 Year Insp/Rpr Dry Chem Sys
FFP
5-12 Year Insp/Rpr Dry Chem Sys FOB: Destination
0016 44 Each Qtly Insp/ Maintenance Hood Wash
FFP
Qtly Insp/ Maintenance Hood Wash FOB: Destination
Insp/Repair of Clean Agent Systems
Insp/Repair of Clean Agent Systems
0017AA 5 Each Annl Insp/Rpr Clean Agent
FFP
Annl Insp/Rpr Clean Agent FOB: Destination
0017AB 3 Each 2 Yr Insp/Rpr Clean Agent
FFP
2 Yr Insp/Rpr Clean Agent FOB: Destination
0017AC 1 Each 5 Yr Insp/Rpr Clean Agent
FFP
5 Yr Insp/Rpr Clean Agent FOB: Destination
Mass Notification System
Mass Notification System
0018AA 146 Each Annl Mass Notification System ITM
FFP
Annl Mass Notification System ITM FOB: Destination
0018AB 73 Each 2 Yr Mass Notification System ITM
FFP
2 Yr Mass Notification System ITM FOB: Destination
Nitrogen Generation Systems
Nitrogen Generation Systems
0019AA 2 Each Monthly Nitro Gen Sys ITM Task
FFP
Monthly Nitro Gen Sys ITM Task FOB: Destination
0019AB 2 Each Annl Nitro Gen Sys ITM Task
FFP
Annl Nitro Gen Sys ITM Task FOB: Destination
0019AC 2 Each 2 Yr Nitro Gen Sys ITM Task
FFP
2 Yr Nitro Gen Sys ITM Task FOB: Destination
0019AD 2 Each 5 Yr Nitro Gen Sys ITM Task
FFP
5 Yr Nitro Gen Sys ITM Task FOB: Destination
Central Control Unit Maintenance
Central Control Unit Maintenance
0020AA 104 Each Weekly Central Cont Unit ITM Task
FFP
Weekly Central Cont Unit ITM Task FOB: Destination
0020AB 24 Each Monthly Central Cont Unit ITM Tas
FFP
Monthly Central Cont Unit ITM Tas FOB: Destination
0020AC 8 Each Quartly Central Cont Unit ITM Tas
FFP
Quartly Central Cont Unit ITM Tas FOB: Destination
0020AD 2 Each Yearly Central Cont Unit ITM Tas
FFP
Yearly Central Cont Unit ITM Tas FOB: Destination
Communications Network Maintenace
Communications Network Maintenace
0021AA 104 Each Weekly Comm Net Maint ITM Task
FFP
Weekly Comm Net Maint ITM Task FOB: Destination
0021AB 24 Each Monthly Comm Net Maint ITM Task
FFP
Monthly Comm Net Maint ITM Task FOB: Destination
0021AC 8 Each Quartly Comm Net Maint ITM Task
FFP
Quartly Comm Net Maint ITM Task FOB: Destination
0021AD 4 Each Semi Annl Comm Net Maint ITM Task
FFP
Semi Annl Comm Net Maint ITM Task FOB: Destination
0022 192 Each Monthly Fire Pump Run
FFP
Monthly Fire Pump Run FOB: Destination
0023 52 Each Weekly Diesel Fire Pump
FFP
Weekly Diesel Fire Pump
OPTION Fire Detection and Alarm System ITM Task
Fire Detection and Alarm System ITM Tasks
1001AA 295 Each OPTION Annl Fire Detect/Alarm ITM Tasks
FFP
Annl Fire Detect/Alarm ITM Tasks FOB: Destination
1001AB 148 Each OPTION 2 Yr Fire Detect/Alarm ITM Tasks
FFP
2 Yr Fire Detect/Alarm ITM Tasks FOB: Destination
1001AC 60 Each OPTION 5 Yr Fire Detect/Alarm ITM Tasks
FFP
5 Yr Fire Detect/Alarm ITM Tasks FOB: Destination
1001AD 19 Each OPTION 10 Yr Fire Detect/Alarm ITM Task
FFP
10 Yr Fire Detect/Alarm ITM Task FOB: Destination
1001AE 10 Each OPTION 20 Yr Fire Detect/Alarm ITM Task
FFP
20 Yr Fire Detect/Alarm ITM Task FOB: Destination
OPTION Wet Pipe Sprinkler Systems ITM Tasks
1002AA 189 Each OPTION Annl Wet Pipe Sprinkler ITM Tasks
FFP
Annl Wet Pipe Sprinkler ITM Tasks FOB: Destination
1002AB 95 Each OPTION 2 Yr Wet Pipe Sprinkler ITM Tasks
FFP
2 Yr Wet Pipe Sprinkler ITM Tasks FOB: Destination
1002AC 38 Each OPTION 5 Yr Wet Pipe Sprinkler ITM Tasks
FFP
5 Yr Wet Pipe Sprinkler ITM Tasks FOB: Destination
1002AD 19 Each OPTION 10 Yr Wet Pipe Sprinkler ITM Task
FFP
10 Yr Wet Pipe Sprinkler ITM Task FOB: Destination
1002AE 10 Each OPTION 20 Yr Wet Pipe Sprinkler ITM Task
FFP
20 Yr Wet Pipe Sprinkler ITM Task FOB: Destination
1002AF 4 Each OPTION 50 Yr Wet Pipe Sprinkler ITM Task
FFP
50 Yr Wet Pipe Sprinkler ITM Task FOB: Destination
OPTION Dry Pipe Sprinkler Systems ITM Tasks
1003AA 34 Each OPTION Annl Dry Pipe Sprinkler ITM Tasks
FFP
Annl Dry Pipe Sprinkler ITM Tasks FOB: Destination
1003AB 17 Each OPTION 2 Yr Dry Pipe Sprinkler ITM Tasks
FFP
2 Yr Dry Pipe Sprinkler ITM Tasks FOB: Destination
1003AC 7 Each OPTION 5 Yr Dry Pipe Sprinkler ITM Tasks
FFP
5 Yr Dry Pipe Sprinkler ITM Tasks FOB: Destination
1003AD 4 Each OPTION 10 Yr Dry Pipe Sprinkler ITM Task
FFP
10 Yr Dry Pipe Sprinkler ITM Task FOB: Destination
1003AE 2 Each OPTION 20 Yr Dry Pipe Sprinkler ITM Task
FFP
20 Yr Dry Pipe Sprinkler ITM Task FOB: Destination
1003AF 1 Each OPTION 50 Yr Dry Pipe Sprinkler ITM Task
FFP
50 Yr Dry Pipe Sprinkler ITM Task FOB: Destination
OPTION Pre-Action Automatic Sprinkler Systems I
1004AA 13 Each OPTION Annl Pre-Action Automatic Sprinkl
FFP
Annl Pre-Action Automatic Sprinkl FOB: Destination
1004AB 7 Each OPTION 2 Yr Pre-Action Automatic Sprinkl
FFP
2 Yr Pre-Action Automatic Sprinkl FOB: Destination
1004AC 14 Each OPTION 5 Yr Pre-Action Automatic Sprinkl
FFP
5 Yr Pre-Action Automatic Sprinkl FOB: Destination
1004AD 3 Each OPTION 10 Yr Pre-Action Automatic Sprink
FFP
10 Yr Pre-Action Automatic Sprink FOB: Destination
1004AE 1 Each OPTION 20 Yr Pre-Action Automatic Sprink
FFP
20 Yr Pre-Action Automatic Sprink FOB: Destination
1004AF 1 Each OPTION 50 Yr Pre-Action Automatic Sprink
FFP
50 Yr Pre-Action Automatic Sprink FOB: Destination
OPTION Standpipe Sprinkler Systems ITM Tasks
1005AA 12 Each OPTION Semi Annl Standpipe Sprinkler ITM
FFP
Semi Annl Standpipe Sprinkler ITM FOB: Destination
1005AB 6 Each OPTION 2 Yr Standpipe Sprinkler ITM Task
FFP
2 Yr Standpipe Sprinkler ITM Task FOB: Destination
1005AC 3 Each OPTION 5 Yr Standpipe Sprinkler ITM Task
FFP
5 Yr Standpipe Sprinkler ITM Task FOB: Destination
OPTION Fire Pumps ITM Tasks
1006AA 15 Each OPTION Mthly Fire Pumps ITM Tasks
FFP
Mthly Fire Pumps ITM Tasks FOB: Destination
1006AB 8 Each OPTION 2 Yr-Fire Pumps ITM Tasks
FFP
2 Yr-Fire Pumps ITM Tasks FOB: Destination
1006AC 3 Each OPTION 5 Yr-Fire Pumps ITM Tasks
FFP
5 Yr-Fire Pumps ITM Tasks FOB: Destination
OPTION Backflow Prevention Devices ITM Tasks
1007AA 169 Each OPTION Annual - Backflow Prevention ITM Task
FFP
Annual - Backflow Prevention ITM Task FOB: Destination
1007AB 34 Each OPTION 5 Yr-Backflow Prevention ITM Task
FFP
5 Yr-Backflow Prevention ITM Task FOB: Destination
OPTION Service Calls (Labor Only)
1008AA 30 Each OPTION Urgent Service Calls
FFP
Urgent Service Calls FOB: Destination
1008AB 30 Each OPTION Routine Service Calls
FFP
Routine Service Calls FOB: Destination
1009 1 Job OPTION Parts
FFP
Parts FOB: Destination
1010 5 Each OPTION Reviews, Design and Specs Req
FFP
Reviews, Design and Specs Req FOB: Destination
1011 1 Each OPTION Annual CMRA Reporting
FFP
Annual CMRA Reporting FOB: Destination
1012 28 Each OPTION Quarterly - Joint Commission
FFP
Quarterly - Joint Commission FOB: Destination
1013 12 Each OPTION Mthly -Repair and Maintenance
FFP
Mthly -Repair and Maintenance FOB: Destination
OPTION Insp/Repair of Wet Chemical Systems
1014AA 248 Each OPTION Mthly-Semi-Annl Insp/Rpr Wet Chem
FFP
Mthly-Semi-Annl Insp/Rpr Wet Chem FOB: Destination
1014AB 11 Each OPTION Mthly-5-12 Year Insp/Rpr Wet Chem
FFP
Mthly-5-12 Year Insp/Rpr Wet Chem FOB: Destination
OPTION Insp/Repair of Dry Chemical Systems
1015AA 3 Each OPTION Semi-Annl Insp/Rpr Dry Chem Sys
FFP
Semi-Annl Insp/Rpr Dry Chem Sys FOB: Destination
1015AB 1 Each OPTION 5-12 Year Insp/Rpr Dry Chem Sys
FFP
5-12 Year Insp/Rpr Dry Chem Sys FOB: Destination
1016 44 Each OPTION Qtly Insp/ Maintenance Hood Wash
FFP
Qtly Insp/ Maintenance Hood Wash FOB: Destination
OPTION Insp/Repair of Clean Agent Systems
1017AA 5 Each OPTION Annl Insp/Rpr Clean Agent
FFP
Annl Insp/Rpr Clean Agent FOB: Destination
1017AB 3 Each OPTION 2 Yr Insp/Rpr Clean Agent
FFP
2 Yr Insp/Rpr Clean Agent FOB: Destination
1017AC 1 Each OPTION 5 Yr Insp/Rpr Clean Agent
FFP
5 Yr Insp/Rpr Clean Agent FOB: Destination
OPTION Mass Notification Systems
Mass Notification Systems
1018AA 146 Each OPTION Annl Mass Notification System ITM
FFP
Annl Mass Notification System ITM FOB: Destination
1018AB 73 Each OPTION 2 Yr Mass Notification System ITM
FFP
2 Yr Mass Notification System ITM FOB: Destination
OPTION Nitrogen Generation Systems
1019AA 2 Each OPTION Monthly Nitro Gen Sys ITM Task
FFP
Monthly Nitro Gen Sys ITM Task FOB: Destination
1019AB 2 Each OPTION Annl Nitro Gen Sys ITM Task
FFP
Annl Nitro Gen Sys ITM Task FOB: Destination
1019AC 2 Each OPTION 2 Yr Nitro Gen Sys ITM Task
FFP
2 Yr Nitro Gen Sys ITM Task FOB: Destination
1019AD 2 Each OPTION 5 Yr Nitro Gen Sys ITM Task
FFP
5 Yr Nitro Gen Sys ITM Task FOB: Destination
OPTION Central Control Unit Maintenance
1020AA 104 Each OPTION Weekly Central Cont Unit ITM Task
FFP
Weekly Central Cont Unit ITM Task FOB: Destination
1020AB 24 Each OPTION Monthly Central Cont Unit ITM Tas
FFP
Monthly Central Cont Unit ITM Tas FOB: Destination
1020AC 8 Each OPTION Quartly Central Cont Unit ITM Tas
FFP
Quartly Central Cont Unit ITM Tas FOB: Destination
1020AD 2 Each OPTION Yearly Central Cont Unit ITM Tas
FFP
Yearly Central Cont Unit ITM Tas FOB: Destination
OPTION Communications Network Maintenace
1021AA 104 Each OPTION Weekly Comm Net Maint ITM Task
FFP
Weekly Comm Net Maint ITM Task FOB: Destination
1021AB 24 Each OPTION Monthly Comm Net Maint ITM Task
FFP
Monthly Comm Net Maint ITM Task FOB: Destination
1021AC 8 Each OPTION Quartly Comm Net Maint ITM Task
FFP
Quartly Comm Net Maint ITM Task FOB: Destination
1021AD 4 Each OPTION Semi Annl Comm Net Maint ITM Task
FFP
Semi Annl Comm Net Maint ITM Task FOB: Destination
1022 192 Each OPTION Monthly Fire Pump Run
FFP
1023 52 Each OPTION Weekly Diesel Fire Pump
FFP
OPTION Fire Detection and Alarm System ITM Task
2001AA 295 Each OPTION Annl Fire Detect/Alarm ITM Tasks
FFP
Annl Fire Detect/Alarm ITM Tasks FOB: Destination
2001AB 148 Each OPTION 2 Yr Fire Detect/Alarm ITM Tasks
FFP
2 Yr Fire Detect/Alarm ITM Tasks FOB: Destination
2001AC 60 Each OPTION 5 Yr Fire Detect/Alarm ITM Tasks
FFP
5 Yr Fire Detect/Alarm ITM Tasks FOB: Destination
2001AD 19 Each OPTION 10 Yr Fire Detect/Alarm ITM Task
FFP
10 Yr Fire Detect/Alarm ITM Task FOB: Destination
2001AE 10 Each OPTION 20 Yr Fire Detect/Alarm ITM Task
FFP
20 Yr Fire Detect/Alarm ITM Task FOB: Destination
OPTION Wet Pipe Sprinkler Systems ITM Tasks
2002AA 189 Each OPTION Annl Wet Pipe Sprinkler ITM Tasks
FFP
Annl Wet Pipe Sprinkler ITM Tasks FOB: Destination
2002AB 95 Each OPTION 2 Yr Wet Pipe Sprinkler ITM Tasks
FFP
2 Yr Wet Pipe Sprinkler ITM Tasks FOB: Destination
2002AC 38 Each OPTION 5 Yr Wet Pipe Sprinkler ITM Tasks
FFP
5 Yr Wet Pipe Sprinkler ITM Tasks FOB: Destination
2002AD 19 Each OPTION 10 Yr Wet Pipe Sprinkler ITM Task
FFP
10 Yr Wet Pipe Sprinkler ITM Task FOB: Destination
2002AE 10 Each OPTION 20 Yr Wet Pipe Sprinkler ITM Task
FFP
20 Yr Wet Pipe Sprinkler ITM Task FOB: Destination
2002AF 4 Each OPTION 50 Yr Wet Pipe Sprinkler ITM Task
FFP
50 Yr Wet Pipe Sprinkler ITM Task FOB: Destination
OPTION Dry Pipe Sprinkler Systems ITM Tasks
2003AA 34 Each OPTION Annl Dry Pipe Sprinkler ITM Tasks
FFP
Annl Dry Pipe Sprinkler ITM Tasks FOB: Destination
2003AB 17 Each OPTION 2 Yr Dry Pipe Sprinkler ITM Tasks
FFP
2 Yr Dry Pipe Sprinkler ITM Tasks FOB: Destination
2003AC 7 Each OPTION 5 Yr Dry Pipe Sprinkler ITM Tasks
FFP
5 Yr Dry Pipe Sprinkler ITM Tasks FOB: Destination
2003AD 4 Each OPTION 10 Yr Dry Pipe Sprinkler ITM Task
FFP
10 Yr Dry Pipe Sprinkler ITM Task FOB: Destination
2003AE 2 Each OPTION 20 Yr Dry Pipe Sprinkler ITM Task
FFP
20 Yr Dry Pipe Sprinkler ITM Task FOB: Destination
2003AF 1 Each OPTION 50 Yr Dry Pipe Sprinkler ITM Task
FFP
50 Yr Dry Pipe Sprinkler ITM Task FOB: Destination
OPTION Pre-Action Automatic Sprinkler Systems I
2004AA 13 Each OPTION Annl Pre-Action Automatic Sprinkl
FFP
Annl Pre-Action Automatic Sprinkl FOB: Destination
2004AB 7 Each OPTION 2 Yr Pre-Action Automatic Sprinkl
FFP
2 Yr Pre-Action Automatic Sprinkl FOB: Destination
2004AC 14 Each OPTION 5 Yr Pre-Action Automatic Sprinkl
FFP
5 Yr Pre-Action Automatic Sprinkl FOB: Destination
2004AD 3 Each OPTION 10 Yr Pre-Action Automatic Sprink
FFP
10 Yr Pre-Action Automatic Sprink FOB: Destination
2004AE 1 Each OPTION 20 Yr Pre-Action Automatic Sprink
FFP
20 Yr Pre-Action Automatic Sprink FOB: Destination
2004AF 1 Each OPTION 50 Yr Pre-Action Automatic Sprink
FFP
50 Yr Pre-Action Automatic Sprink FOB: Destination
OPTION Standpipe Sprinkler Systems ITM Tasks
2005AA 12 Each OPTION Semi Annl Standpipe Sprinkler ITM
FFP
Semi Annl Standpipe Sprinkler ITM FOB: Destination
2005AB 6 Each OPTION 2 Yr Standpipe Sprinkler ITM Task
FFP
2 Yr Standpipe Sprinkler ITM Task FOB: Destination
2005AC 3 Each OPTION 5 Yr Standpipe Sprinkler ITM Task
FFP
5 Yr Standpipe Sprinkler ITM Task FOB: Destination
OPTION Fire Pumps ITM Tasks
2006AA 15 Each OPTION Mthly Fire Pumps ITM Tasks
FFP
Mthly Fire Pumps ITM Tasks FOB: Destination
2006AB 8 Each OPTION 2 Yr-Fire Pumps ITM Tasks
FFP
2 Yr-Fire Pumps ITM Tasks FOB: Destination
2006AC 3 Each OPTION 5 Yr-Fire Pumps ITM Tasks
FFP
5 Yr-Fire Pumps ITM Tasks FOB: Destination
OPTION Backflow Prevention Devices ITM Tasks
2007AA 169 Each OPTION Annual - Backflow Prevention ITM Task
FFP
Annual - Backflow Prevention ITM Task FOB: Destination
2007AB 34 Each OPTION 5 Yr-Backflow Prevention ITM Task
FFP
5 Yr-Backflow Prevention ITM Task FOB: Destination
OPTION Service Calls (Labor Calls)
Service Calls (Labor Calls)
2008AA 30 Each OPTION Urgent Service Calls
FFP
Urgent Service Calls FOB: Destination
2008AB 30 Each OPTION Routine Service Calls
FFP
Routine Service Calls FOB: Destination
2009 1 Job OPTION Parts
FFP
Parts FOB: Destination
2010 5 Each OPTION Reviews, Design and Specs Req
FFP
Reviews, Design and Specs Req FOB: Destination
2011 1 Each OPTION Annual CMRA Reporting
FFP
Annual CMRA Reporting FOB: Destination
2012 28 Each OPTION Quarterly - Joint Commission
FFP
Quarterly - Joint Commission FOB: Destination
2013 12 Each OPTION Mthly -Repair and Maintenance
FFP
Mthly -Repair and Maintenance FOB: Destination
OPTION Insp/Repair of Wet Chemical Systems
2014AA 248 Each OPTION Mthly-Semi-Annl Insp/Rpr Wet Chem
FFP
Mthly-Semi-Annl Insp/Rpr Wet Chem FOB: Destination
2014AB 11 Each OPTION Mthly-5-12 Year Insp/Rpr Wet Chem
FFP
Mthly-5-12 Year Insp/Rpr Wet Chem FOB: Destination
OPTION Insp/Repair of Dry Chemical Systems
2015AA 3 Each OPTION Semi-Annl Insp/Rpr Dry Chem Sys
FFP
Semi-Annl Insp/Rpr Dry Chem Sys FOB: Destination
2015AB 1 Each OPTION 5-12 Year Insp/Rpr Dry Chem Sys
FFP
5-12 Year Insp/Rpr Dry Chem Sys FOB: Destination
2016 44 Each OPTION Qtly Insp/ Maintenance Hood Wash
FFP
Qtly Insp/ Maintenance Hood Wash FOB: Destination
OPTION Insp/Repair of Clean Agent Systems
2017AA 5 Each OPTION Annl Insp/Rpr Clean Agent
FFP
Annl Insp/Rpr Clean Agent FOB: Destination
2017AB 3 Each OPTION 2 Yr Insp/Rpr Clean Agent
FFP
2 Yr Insp/Rpr Clean Agent FOB: Destination
2017AC 1 Each OPTION 5 Yr Insp/Rpr Clean Agent
FFP
5 Yr Insp/Rpr Clean Agent FOB: Destination
OPTION Mass Notification Systems
2018AA 146 Each OPTION Annl Mass Notification System ITM
FFP
Annl Mass Notification System ITM FOB: Destination
2018AB 73 Each OPTION 2 Yr Mass Notification System ITM
FFP
2 Yr Mass Notification System ITM FOB: Destination
OPTION Nitrogen Generation Systems
2019AA 2 Each OPTION Monthly Nitro Gen Sys ITM Task
FFP
Monthly Nitro Gen Sys ITM Task FOB: Destination
2019AB 2 Each OPTION Annl Nitro Gen Sys ITM Task
FFP
Annl Nitro Gen Sys ITM Task FOB: Destination
2019AC 2 Each OPTION 2 Yr Nitro Gen Sys ITM Task
FFP
2 Yr Nitro Gen Sys ITM Task FOB: Destination
2019AD 2 Each OPTION 5 Yr Nitro Gen Sys ITM Task
FFP
5 Yr Nitro Gen Sys ITM Task FOB: Destination
OPTION Central Control Unit Maintenance
2020AA 104 Each OPTION Weekly Central Cont Unit ITM Task
FFP
Weekly Central Cont Unit ITM Task FOB: Destination
2020AB 24 Each OPTION Monthly Central Cont Unit ITM Tas
FFP
Monthly Central Cont Unit ITM Tas FOB: Destination
2020AC 8 Each OPTION Quartly Central Cont Unit ITM Tas
FFP
Quartly Central Cont Unit ITM Tas FOB: Destination
2020AD 2 Each OPTION Yearly Central Cont Unit ITM Tas
FFP
Yearly Central Cont Unit ITM Tas FOB: Destination
OPTION Communications Network Maintenace
2021AA 104 Each OPTION Weekly Comm Net Maint ITM Task
FFP
Weekly Comm Net Maint ITM Task FOB: Destination
2021AB 24 Each OPTION Monthly Comm Net Maint ITM Task
FFP
Monthly Comm Net Maint ITM Task FOB: Destination
2021AC 8 Each OPTION Quartly Comm Net Maint ITM Task
FFP
Quartly Comm Net Maint ITM Task FOB: Destination
2021AD 4 Each OPTION Semi Annl Comm Net Maint ITM Task
FFP
Semi Annl Comm Net Maint ITM Task FOB: Destination
2022 192 Each OPTION Monthly Fire Pump Run
FFP
2023 52 Each OPTION Weekly Diesel Fire Pump
FFP
OPTION Fire Detection and Alarm System ITM Task
3001AA 295 Each OPTION Annl Fire Detect/Alarm ITM Tasks
FFP
Annl Fire Detect/Alarm ITM Tasks FOB: Destination
3001AB 148 Each OPTION 2 Yr Fire Detect/Alarm ITM Tasks
FFP
2 Yr Fire Detect/Alarm ITM Tasks FOB: Destination
3001AC 60 Each OPTION 5 Yr Fire Detect/Alarm ITM Tasks
FFP
5 Yr Fire Detect/Alarm ITM Tasks FOB: Destination
3001AD 19 Each OPTION 10 Yr Fire Detect/Alarm ITM Task
FFP
10 Yr Fire Detect/Alarm ITM Task FOB: Destination
3001AE 10 Each OPTION 20 Yr Fire Detect/Alarm ITM Task
FFP
20 Yr Fire Detect/Alarm ITM Task FOB: Destination
OPTION Wet Pipe Sprinkler Systems ITM Tasks
3002AA 189 Each OPTION Annl Wet Pipe Sprinkler ITM Tasks
FFP
Annl Wet Pipe Sprinkler ITM Tasks FOB: Destination
3002AB 95 Each OPTION 2 Yr Wet Pipe Sprinkler ITM Tasks
FFP
2 Yr Wet Pipe Sprinkler ITM Tasks FOB: Destination
3002AC 38 Each OPTION 5 Yr Wet Pipe Sprinkler ITM Tasks
FFP
5 Yr Wet Pipe Sprinkler ITM Tasks FOB: Destination
3002AD 19 Each OPTION 10 Yr Wet Pipe Sprinkler ITM Task
FFP
10 Yr Wet Pipe Sprinkler ITM Task FOB: Destination
3002AE 10 Each OPTION 20 Yr Wet Pipe Sprinkler ITM Task
FFP
20 Yr Wet Pipe Sprinkler ITM Task FOB: Destination
3002AF 4 Each OPTION 50 Yr Wet Pipe Sprinkler ITM Task
FFP
50 Yr Wet Pipe Sprinkler ITM Task FOB: Destination
OPTION Dry Pipe Sprinkler Systems ITM Tasks
3003AA 34 Each OPTION Annl Dry Pipe Sprinkler ITM Tasks
FFP
Annl Dry Pipe Sprinkler ITM Tasks FOB: Destination
3003AB 17 Each OPTION 2 Yr Dry Pipe Sprinkler ITM Tasks
FFP
2 Yr Dry Pipe Sprinkler ITM Tasks FOB: Destination
3003AC 7 Each OPTION 5 Yr Dry Pipe Sprinkler ITM Tasks
FFP
5 Yr Dry Pipe Sprinkler ITM Tasks FOB: Destination
3003AD 4 Each OPTION 10 Yr Dry Pipe Sprinkler ITM Task
FFP
10 Yr Dry Pipe Sprinkler ITM Task FOB: Destination
3003AE 2 Each OPTION 20 Yr Dry Pipe Sprinkler ITM Task
FFP
20 Yr Dry Pipe Sprinkler ITM Task FOB: Destination
3003AF 1 Each OPTION 50 Yr Dry Pipe Sprinkler ITM Task
FFP
50 Yr Dry Pipe Sprinkler ITM Task FOB: Destination
OPTION Pre-Action Automatic Sprinkler Systems I
3004AA 13 Each OPTION Annl Pre-Action Automatic Sprinkl
FFP
Annl Pre-Action Automatic Sprinkl FOB: Destination
3004AB 7 Each OPTION 2 Yr Pre-Action Automatic Sprinkl
FFP
2 Yr Pre-Action Automatic Sprinkl FOB: Destination
3004AC 14 Each OPTION 5 Yr Pre-Action Automatic Sprinkl
FFP
5 Yr Pre-Action Automatic Sprinkl FOB: Destination
3004AD 3 Each OPTION 10 Yr Pre-Action Automatic Sprink
FFP
10 Yr Pre-Action Automatic Sprink FOB: Destination
3004AE 1 Each OPTION 20 Yr Pre-Action Automatic Sprink
FFP
20 Yr Pre-Action Automatic Sprink FOB: Destination
3004AF 1 Each OPTION 50 Yr Pre-Action Automatic Sprink
FFP
50 Yr Pre-Action Automatic Sprink FOB: Destination
OPTION Standpipe Sprinkler Systems ITM Tasks
3005AA 12 Each OPTION Semi Annl Standpipe Sprinkler ITM
FFP
Semi Annl Standpipe Sprinkler ITM FOB: Destination
3005AB 6 Each OPTION 2 Yr Standpipe Sprinkler ITM Task
FFP
2 Yr Standpipe Sprinkler ITM Task FOB: Destination
3005AC 3 Each OPTION 5 Yr Standpipe Sprinkler ITM Task
FFP
5 Yr Standpipe Sprinkler ITM Task FOB: Destination
OPTION Fire Pumps ITM Tasks
3006AA 15 Each OPTION Mthly Fire Pumps ITM Tasks
FFP
Mthly Fire Pumps ITM Tasks FOB: Destination
3006AB 8 Each 2 Yr-Fire Pumps ITM Tasks
FFP
2 Yr-Fire Pumps ITM Tasks FOB: Destination
3006AC 3 Each 5 Yr-Fire Pumps ITM Tasks
FFP
5 Yr-Fire Pumps ITM Tasks FOB: Destination
OPTION Backflow Prevention Devices ITM Tasks
3007AA 169 Each Annual - Backflow Prevention ITM Task
FFP
Annual - Backflow Prevention ITM Task FOB: Destination
3007AB 34 Each 5 Yr-Backflow Prevention ITM Task
FFP
5 Yr-Backflow Prevention ITM Task FOB: Destination
OPTION Service Calls (Labor Only)
3008AA 30 Each OPTION Urgent Service Calls
FFP
Urgent Service Calls FOB: Destination
3008AB 30 Each OPTION Routine Service Calls
FFP
Routine Service Calls FOB: Destination
3009 1 Job OPTION Parts
FFP
Parts FOB: Destination
3010 5 Each OPTION Reviews, Design and Specs Req
FFP
Reviews, Design and Specs Req FOB: Destination
3011 1 Each OPTION Annual CMRA Reporting
FFP
Annual CMRA Reporting FOB: Destination
3012 28 Each OPTION Quarterly - Joint Commission
FFP
Quarterly - Joint Commission FOB: Destination
3013 12 Each OPTION Mthly -Repair and Maintenance
FFP
Mthly -Repair and Maintenance FOB: Destination
OPTION Insp/Repair of Wet Chemical Systems
3014AA 248 Each OPTION Mthly-Semi-Annl Insp/Rpr Wet Chem
FFP
Mthly-Semi-Annl Insp/Rpr Wet Chem FOB: Destination
3014AB 11 Each OPTION Mthly-5-12 Year Insp/Rpr Wet Chem
FFP
Mthly-5-12 Year Insp/Rpr Wet Chem FOB: Destination
OPTION Insp/Repair of Dry Chemical Systems
3015AA 3 Each OPTION Semi-Annl Insp/Rpr Dry Chem Sys
FFP
Semi-Annl Insp/Rpr Dry Chem Sys FOB: Destination
3015AB 1 Each OPTION 5-12 Year Insp/Rpr Dry Chem Sys
FFP
5-12 Year Insp/Rpr Dry Chem Sys FOB: Destination
3016 44 Each OPTION Qtly Insp/ Maintenance Hood Wash
FFP
Qtly Insp/ Maintenance Hood Wash FOB: Destination
OPTION Insp/Repair of Clean Agent Systems
3017AA 5 Each OPTION Annl Insp/Rpr Clean Agent
FFP
Annl Insp/Rpr Clean Agent FOB: Destination
3017AB 3 Each OPTION 2 Yr Insp/Rpr Clean Agent
FFP
2 Yr Insp/Rpr Clean Agent FOB: Destination
3017AC 1 Each OPTION 5 Yr Insp/Rpr Clean Agent
FFP
5 Yr Insp/Rpr Clean Agent FOB: Destination
OPTION Mass Notification Systems
3018AA 146 Each OPTION Annl Mass Notification System ITM
FFP
Annl Mass Notification System ITM FOB: Destination
3018AB 73 Each OPTION 2 Yr Mass Notification System ITM
FFP
2 Yr Mass Notification System ITM FOB: Destination
OPTION Nitrogen Generation Systems
3019AA 2 Each OPTION Monthly Nitro Gen Sys ITM Task
FFP
Monthly Nitro Gen Sys ITM Task FOB: Destination
3019AB 2 Each OPTION Annl Nitro Gen Sys ITM Task
FFP
Annl Nitro Gen Sys ITM Task FOB: Destination
3019AC 2 Each OPTION 2 Yr Nitro Gen Sys ITM Task
FFP
2 Yr Nitro Gen Sys ITM Task FOB: Destination
3019AD 2 Each OPTION 5 Yr Nitro Gen Sys ITM Task
FFP
5 Yr Nitro Gen Sys ITM Task FOB: Destination
OPTION Central Control Unit Maintenance
3020AA 104 Each OPTION Weekly Central Cont Unit ITM Task
FFP
Weekly Central Cont Unit ITM Task FOB: Destination
3020AB 24 Each OPTION Monthly Central Cont Unit ITM Tas
FFP
Monthly Central Cont Unit ITM Tas FOB: Destination
3020AC 8 Each OPTION Quartly Central Cont Unit ITM Tas
FFP
Quartly Central Cont Unit ITM Tas FOB: Destination
3020AD 2 Each OPTION Yearly Central Cont Unit ITM Tas
FFP
Yearly Central Cont Unit ITM Tas FOB: Destination
OPTION Communications Network Maintenace
3021AA 104 Each OPTION Weekly Comm Net Maint ITM Task
FFP
Weekly Comm Net Maint ITM Task FOB: Destination
3021AB 24 Each OPTION Monthly Comm Net Maint ITM Task
FFP
Monthly Comm Net Maint ITM Task FOB: Destination
3021AC 4 Each OPTION Semi Annl Comm Net Maint ITM Task
FFP
Semi Annl Comm Net Maint ITM Task FOB: Destination
3021AD 8 Each OPTION Quartly Comm Net Maint ITM Task
FFP
Quartly Comm Net Maint ITM Task FOB: Destination
3022 192 Each OPTION Monthly Fire Pump Run
FFP
3023 52 Each OPTION Weekly Diesel Fire Pump
FFP
OPTION Fire Detection and Alarm System ITM Task
4001AA 295 Each OPTION Annl Fire Detect/Alarm ITM Tasks
FFP
Annl Fire Detect/Alarm ITM Tasks FOB: Destination
4001AB 148 Each OPTION 2 Yr Fire Detect/Alarm ITM Tasks
FFP
2 Yr Fire Detect/Alarm ITM Tasks FOB: Destination
4001AC 60 Each OPTION 5 Yr Fire Detect/Alarm ITM Tasks
FFP
5 Yr Fire Detect/Alarm ITM Tasks FOB: Destination
4001AD 19 Each OPTION 10 Yr Fire Detect/Alarm ITM Task
FFP
10 Yr Fire Detect/Alarm ITM Task FOB: Destination
4001AE 10 Each OPTION 20 Yr Fire Detect/Alarm ITM Task
FFP
20 Yr Fire Detect/Alarm ITM Task FOB: Destination
OPTION Wet Pipe Sprinkler Systems ITM Tasks
4002AA 189 Each OPTION Annl Wet Pipe Sprinkler ITM Tasks
FFP
Annl Wet Pipe Sprinkler ITM Tasks FOB: Destination
4002AB 95 Each OPTION 2 Yr Wet Pipe Sprinkler ITM Tasks
FFP
2 Yr Wet Pipe Sprinkler ITM Tasks FOB: Destination
4002AC 38 Each OPTION 5 Yr Wet Pipe Sprinkler ITM Tasks
FFP
5 Yr Wet Pipe Sprinkler ITM Tasks FOB: Destination
4002AD 19 Each OPTION 10 Yr Wet Pipe Sprinkler ITM Task
FFP
10 Yr Wet Pipe Sprinkler ITM Task FOB: Destination
4002AE 10 Each OPTION 20 Yr Wet Pipe Sprinkler ITM Task
FFP
20 Yr Wet Pipe Sprinkler ITM Task FOB: Destination
4002AF 4 Each OPTION 50 Yr Wet Pipe Sprinkler ITM Task
FFP
50 Yr Wet Pipe Sprinkler ITM Task FOB: Destination
OPTION Dry Pipe Sprinkler Systems ITM Tasks
4003AA 34 Each OPTION Annl Dry Pipe Sprinkler ITM Tasks
FFP
Annl Dry Pipe Sprinkler ITM Tasks FOB: Destination
4003AB 17 Each OPTION 2 Yr Dry Pipe Sprinkler ITM Tasks
FFP
2 Yr Dry Pipe Sprinkler ITM Tasks FOB: Destination
4003AC 7 Each OPTION 5 Yr Dry Pipe Sprinkler ITM Tasks
FFP
5 Yr Dry Pipe Sprinkler ITM Tasks FOB: Destination
4003AD 4 Each OPTION 10 Yr Dry Pipe Sprinkler ITM Task
FFP
10 Yr Dry Pipe Sprinkler ITM Task FOB: Destination
4003AE 2 Each OPTION 20 Yr Dry Pipe Sprinkler ITM Task
FFP
20 Yr Dry Pipe Sprinkler ITM Task FOB: Destination
4003AF 1 Each OPTION 50 Yr Dry Pipe Sprinkler ITM Task
FFP
50 Yr Dry Pipe Sprinkler ITM Task FOB: Destination
OPTION Pre-Action Automatic Sprinkler Systems I
4004AA 13 Each OPTION Annl Pre-Action Automatic Sprinkl
FFP
Annl Pre-Action Automatic Sprinkl FOB: Destination
4004AB 7 Each OPTION 2 Yr Pre-Action Automatic Sprinkl
FFP
2 Yr Pre-Action Automatic Sprinkl FOB: Destination
4004AC 14 Each OPTION 5 Yr Pre-Action Automatic Sprinkl
FFP
5 Yr Pre-Action Automatic Sprinkl FOB: Destination
4004AD 3 Each OPTION 10 Yr Pre-Action Automatic Sprink
10 Yr
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .