RFP Q&A Template All Questions&Answers.xlsx

XLSX spreadsheet 33 KB Posted

Attached to
Real Estate ServicesBid Documents
Solicitation number
RFP 27-87884
Issued by
Marion County, Indiana

About this file

This is a Question & Answer document for RFP 27-87884 issued by the Indiana Department of Administration, addressing inquiries regarding comprehensive real estate services including Tenant Representation/Acquisition Services, Project Management Services, Maintenance Ticket Administration Services, and Facility Management Services, and Disposition Services. The solicitation established a proposal submission deadline of November 19, 2026, at 3:00 PM ET, with a pre-proposal conference held on October 28, 2026, and a written question submission deadline of October 30, 2026. The State indicated that responses to written questions would be posted by November 13, 2026, with proposal discussions and clarifications targeted for December 2, 2026, oral presentations if necessary for December 14, 2026, and Best and Final Offers if necessary for December 21, 2026. Award Recommendation is expected in January 2027, with the contract term set at five years from execution with renewal options subject to Commissioner and State Budget Director approval. The four service categories are evaluated, scored, ranked, and awarded independently, allowing respondents to propose on one, multiple, or all categories, and enabling the State to make separate awards to different contractors for different categories.

Pricing requirements emphasize that all quoted prices must be all-inclusive with no additional costs accepted by the State. Tenant Representation Services are compensation-structured with a baseline 4% commission on direct landlord transactions with rentable square footage caps and a 1% administrative fee on net Master Agreement purchases. Disposition Services use a commission rate on gross sale proceeds plus itemized transactional expenses with no guaranteed transaction volume established. Maintenance Ticket Administration requires pricing for an online platform/licensing fee and per-hour helpdesk manager support with estimated annual ticket volume of approximately 4,000 across 350 facilities. The solicitation establishes subcontracting goals of 3% for Indiana Veteran Owned Small Businesses (IVOSB) and 10% for the Indiana Small Business Program (INSBP), with IVOSB and INSBP certifications requiring separate State certifications by the proposal due date. Respondents may claim a 5% Buy Indiana Initiative preference if certified and meeting state presence requirements. No incumbent system information or guaranteed transaction minimums are provided; respondents must base pricing on published examples and unit measures without assuming minimum workload guarantees.

View the file

Other files

File Type Posted
RFP 27-87884 Addendum.docx DOCX document
Att D - Cost Proposal.xlsx XLSX spreadsheet
Pre-Proposal Conference Template.pptx PPTX presentation
RFP Main Document.docx DOCX document
Att M - Artificial Intelligence - Technical Proposal Questions.docx DOCX document
Att A - IVOSB Commitment Form (1).docx DOCX document
Att B3 - IOT-SaaS (1).docx DOCX document
Att G - Q&A Template (1).xlsx XLSX spreadsheet
Att E - Business Proposal (1).docx DOCX document
Att J - Attestation Form (2).docx DOCX document
Att A1 - INSBP Commitment Form (2).docx DOCX document
Att B - Sample Contract (3).docx DOCX document
Att K - SOW Template (2).docx DOCX document
RFP Boilerplate (2).docx DOCX document
Att H - Reference Check Form (1).docx DOCX document
Att F - Technical Proposal (2).docx DOCX document
Att B2 - IOT-PaaS (1).docx DOCX document
Att I - Pre-Proposal Network Form (1).docx DOCX document
Att D - Cost Proposal (2).xlsx XLSX spreadsheet
Att L - Infrastructure Overview.docx DOCX document
Att B1 - IOT-IaaS (1).docx DOCX document
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question & Inquiry Form

Question and Answer Template
Attachment G
RFP 27-87884
Please submit your questions in the form below (blue shaded area) by the date specified in RFP Section 1.23
Click the dropdown in the RFP Document Column to select topic.
No.RFP DocumentSection NumberPageTopicQuestionAnswers
1RFP 1.23n/aProposal due date and second round of questionsWould the State consider extending the proposal due date by at least two weeks (to December 4 or later) and allowing a second round of written questions? Respondents' technical, enterprise technology, and legal teams need the State's answers to the questions below before they can complete Attachments J, L, and M.Please see posted addendum for due date extension
2Attachment A IVOSB Commitment2.12Total Bid Amount cell referenceAttachment A (Section 2.1) cites Attachment D, Total Cost cell E5, for the Total Bid Amount. Attachment D (Cost Proposal tab, note in B10) cites cell E22 for figuring the commitment percentage. Which cell governs subcontract percentages?For the 5 year total bid amount, use the Total Cost tab, cell E5, as expressly referenced in Attachment A S2.1. Attachment D also contains a 5 year total on the Cost Proposal tab E22.
3Attachment A IVOSB Commitment2.02Subcontracting goals and third-party fundsDo the subcontracting goals apply to funds paid by third-party commissions, or only to funds spent by the State?The commitment percentages are calculated against the Total Bid Amount identified in the required commitment forms and Attachment D, not against a separtely defined measure of State cash expenditures. Third party commisssions are not expressly excluded from the calculation.
4Attachment A IVOSB Commitment2.02Subcontracting goals when bidding some categoriesThe subcontracting goals are 3% for Indiana Veteran Owned Small Businesses and 10% for Indiana Small Businesses, measured against the Total Bid Amount. The four Service Categories are scored and awarded separately. If a respondent bids more than one category but not all four (for example, Categories 1, 2, and 4): (a) is each goal measured against the combined Total Bid Amount for the categories bid, with one commitment for the whole proposal, or must each goal be met separately within each category? (b) If the respondent is awarded fewer categories than it bid on, does the commitment change to match the categories awarded?Respondents may bid on one or more categories, each category is independently evaluated and may be independently awarded. Attachments A and A1 require commitments calculated against the total bid amount submitted in attachment D.
5Attachment A IVOSB Commitment2.0 (and Attachment A1)2One subcontractor counting toward both goalsAttachments A and A1 set separate subcontracting goals: 3% for Indiana Veteran Owned Small Businesses and 10% for Indiana Small Businesses. If one subcontractor holds both certifications, can the same subcontract dollars count toward both goals, or must each goal be met with separate dollars?The IVOSB and INSBP are separate certification and scoring programs.
6Attachment B Sample Contract52 (Liquidated Damages); Compliance Requirements (IV&V)15, 19Liquidated damages and IV&V oversightParagraph 52 of the sample contract provides for liquidated damages, and the IV&V provisions state that, for contracts entered into after June 30, 2026, the IV&V Team serves as an approving authority and no payment is issued without its approval. How will completion deadlines and liquidated damages amounts be set for these services? Does the State expect to deploy IV&V oversight on this contract, and if so, which deliverables require IV&V approval before payment?The sample contract provisions apply as written.
7Attachment D Cost Proposal TemplateCost Proposal tab, row 18n/aFacility Management line itemThe Cost Proposal tab includes a Facility Management line described as "Overseeing the physical maintenance and upkeep of facilities throughout the State approximately 350 facilities." Facility Management is not one of the Service Categories in Attachment K. Is Facility Management a desired service under this contract? Does it mean hands-on work at approximately 350 facilities? If it is desired, respondents would need significant additional detail on the State's service requirements to scope and price it.The State will send an addendum. Facility management is desired under this contract and willl be the responsibility of the Contractor.
8Attachment D Cost Proposal TemplateCost Proposal tab, note B7n/aEstimated hours not shownThe Cost Proposal tab refers to estimated units of measure (UOMs) in Column C, but no estimated hours are shown. Will estimated hours be provided? Attachment D states that estimated units of meas are for evaluation purposes only.No minimum or guaranteed annual hours is established by the pricing schedule.
9Attachment D Cost Proposal TemplateCost Proposal tab, note B7n/aPer Hour UOM statementPlease clarify this statement: "The total Cost Per Year for Per Hour UOM is the Per Hour UOM rate."For an item measured by Per Hour, the quoted unit price is an hourly rate.
10Attachment D Cost Proposal TemplateCost Proposal tab, row 14; Brokerage Commission tabn/aHourly rate for tenant representationWhy does the Cost Proposal tab include a cell for an hourly rate for tenant representation if tenant brokerage services are to be compensated through commissions at no cost to the State, as described on the Brokerage Commission tab?These services are typically performed for a commission percentage, not an hourly fee. The state will send an addedum. Tenant Representation hourly rate tabs will be removed.
11Attachment D Cost Proposal TemplateCost Proposal tabn/aMultiple hourly rates per serviceRespondents anticipate multiple personnel in each category (for example, a range of personnel providing Project Management services). How should multiple hourly rates for each service be accounted for?Submit the rates in the prescribed Attachment D fields. The published workbook does not prvide separate labor-grade rates for every professional classification.
12Attachment D Cost Proposal TemplateCost Proposal tabn/aSubcontractor pricingWhere is subcontractor pricing to be provided? All quoted prices must be all inclusive.Subcontractor participation and amounts must be identified in the applicable commitment forms and supporting letters.
13Attachment D Cost Proposal TemplateCost Proposal and Total Cost tabsn/aWhich tabs to complete if not bidding all categoriesPrices are required for all components per the instructions. If a respondent does not intend to bid every Service Category, which tabs and lines should it complete?A respondent may bid on one, multiple, or all categories.
14Attachment D Cost Proposal TemplateTotal Cost tab; RFP 3.2n/aCost scoring across different sets of categoriesThe RFP states that the four Service Categories are evaluated and awarded separately. Attachment D provides one Total Bid Amount for the whole workbook, and the cost score is based on the lowest Total Bid Amount. Respondents that bid fewer categories will have a far lower Total Bid Amount than those that bid more. How will cost be scored when respondents bid on different categories? (a) Will cost be scored separately for each category, using only the Attachment D lines that belong to that category? (b) If not, how will the State compare a respondent that bids two categories to one that bids three or four?Each service category is evaluated, scored, ranked, and awarded indepently.
15Attachment D Cost Proposal TemplateBrokerage Commission tab, cell O24n/aModel 2 square footage bandModel 2 applies the 5,000-9,999 SF band to the 4,567 SF Lake County lease (cell O24). Was this intended? The Lake County sample fall within 0-4, 999SF band, not the 5,000-9,999 band.The State will send an addendum, and the cell will reflect the correct 0-4999 equation.
16Attachment D Cost Proposal TemplateBrokerage Commission tab, State Rebate columnsn/aRebate structurePlease clarify the rebate structure envisioned under this contract. Attachment D applies a rebate only in certain instances. On what basis is it calculated? Respondents shall provide the proposed rebate or commission share through the brokerage commissions tab, using the two published maodels and sample transactions. Commission return requirements are also specified in Attachment F S1.4 and Attachment K.No alternative rebate basis is established by this response.
17Attachment D Cost Proposal TemplateSurplus Disposition tab, B5n/aHow the disposition commission is paidThe Surplus Disposition tab describes the commission as payable "out of the sale proceeds at closing" and also as payable "through a buyer's premium." Please confirm which applies. (a) Seller pays: the commission is deducted from the sale proceeds at closing, so the State receives the sale price minus the commission (for example, on a $100,000 sale with a 5% commission, the broker receives $5,000 and the State receives $95,000). (b) Buyer pays on top: the buyer pays the sale price plus a 5% buyer's premium, so the State receives the full $100,000. Please also confirm which sale methods this applies to. Dispostion compensation is proposed in the Surplus Dispostion tabe as a vendor commission percentage together with the listed transactional expenses.The tab states the disposition services are to be provided at no cost the the State. Respondents shall price using those fields.
18Attachment D Cost Proposal TemplateSurplus Disposition tabn/aBuyer's broker compensationPlease confirm that any compensation for a buyer's broker on dispositions will be paid separately by the State and not deducted from the proposed commission in Attachment D.The solicitation does not provide a separately reimbursable buyer-broker commission field. Respondents must account for their proposed brokerage arrangements within the published disposition commission and expense pricing structure.
19Attachment D Cost Proposal TemplateSurplus Disposition tab, rows 24-30n/aSurvey costsCosts such as survey are typically borne by the buyer. Would the State consider excluding survey costs from the calculations in Attachment D?The Surplus Dispostion tab includes specfic survey/update cost entry, as well as appraisal, advertising and other transactional expenses.
20Attachment E Business Proposal TemplateGeneraln/aReturn format for Attachments E and FFor the Business and Technical Proposals (Attachments E and F), are respondents required to return these exact forms (typing into the blue shaded areas)? Resumes and graphical content such as flow charts and org charts will be harder to read inside the template. May respondents duplicate the State's required template in a desktop publishing program to make drafting and review easier?Respondents shall complete Attachments E and F in their prescribed formats and submit the required proposal material as directed in RFP section two.
21Attachment E Business Proposal TemplateGeneraln/aOne version of Attachments E and FDo respondents return one version of Attachments E and F regardless of how many of the Service Categories they are bidding on?Yes, respondents submit one version of attachment E and F regardless of what categories are being bid.
22Attachment E Business Proposal Template14.011Evidence of Financial ResponsibilityDoes Section 14.0, Evidence of Financial Responsibility, apply to this contract? Provide evidence of financial responsibility requested by Business Proposal and RFP.Yes this applies, please complete in the Business Proposal.
23Attachment F Technical Proposal Template1.41RSF caps and return methodsSection 1.4 refers to surplus commission value beyond the "RSF caps." What is meant by "RSF caps"? What is the cap on the commission the contractor may keep? Who chooses which of the four return methods is used, the State or the contractor?The commission return and RSF cap obligations are state in the Tenant Representative scope and Attachment F S1.4. Surplus amounts must be returned through one of the four state methods and within applicable timeframes.
24Attachment F Technical Proposal Template1.51Definition of "in-house" and "limited agency"Please define "in-house" and "limited agency" in this context. The contractor and its agents may not have an ownership interest in State leased properties.In-house or limited agency requires written State approval.
25Attachment F Technical Proposal Template2 (intro)2Scope of Operations and Maintenance sectionPlease clarify what element of the scope of work Section 2, Operations and Maintenance, applies to. What types of services are contemplated? For example, is 2.1 related to lease actions or something else? Is Section 2 related to Maintenance Ticket Administration Services or something else? Is Section 2 applicable if a respondent is not bidding on Maintenance Ticket Administration Services?Attachment F Section 2 concerns operations and maintenance coordination, including ticket administration, technology, helpdesk coverage, escalation, and procurement coordination. Section 2 does not need to be responded to if respondent is not bidding on Maintenance Ticket Adminstrate Services.
26Attachment F Technical Proposal Template2.32Helpdesk business hoursSection 2.3 lists Standard Business Hours as Monday through Friday from 8:30 AM to 2:00 PM and Emergency Monitoring Hours from 2:00 PM to 8:30 AM daily. Please confirm the intended hours, including whether standard business hours end at 2:00 PM.Active helpdesk processing and routing hours are Monday - Friday, 8:30am to 2:00pm. Emergency tickets must be continuously monitered for active response from 2:00pm to 8:30 am daily.
27Attachment F Technical Proposal Template2.42Reference to county staffSection 2.4 refers to county staff. Should we assume this is a typo and should read State?The requirements to notify and coordinate with central office and agency contacts, including county staff as applicable, is part of the ticket escalation obligation when a contractor does not respond with the required completion time.
28Attachment F Technical Proposal Template2.52Meaning of QPAWhat is meant by "QPA" in Section 2.5?Quantity Purchase Agreement.
29RFP 1.51Pre-proposal conference materialsPlease provide any recordings, transcripts, or presentation materials shared during the pre-proposal conference.The state does not provide any recordings or transcrips however the presentation materials will be shared in the event packet once questions and answers are posted.
30Attachment J Attestation Form3.0; RFP 3.2.43Substantial Indiana Economic Impact registrySubstantial Indiana Economic Impact (Attachment J, page 3): does the State keep a registry of this information anywhere? How is a firm to know whether it is in the top 500 companies (adjusted) for the listed categories?The current registry can be found on our website. https://www.in.gov/idoa/procurement/supplier-resource-center/programs-and-preferences/buy-indiana
31Attachment J Attestation Form3.0; RFP 3.2.43-4Documenting Buy Indiana eligibilitySection 3.2.4 awards Buy Indiana points to respondents "qualifying, and documenting per Attachment J." Attachment J says points are awarded only if the certification is finalized in the Buy Indiana registry at submission. For a respondent that meets the Substantial Indiana Economic Impact criterion but is not yet listed, is there another way to document eligibility, or must the registry designation be final by the due date?Must be final by the proposal due date. See addendum for extended bid due date.
32Attachment J Attestation FormRFP 3.2.4 and 3.2.63-4Buy Indiana and INSBP pointsSection 3.2.4 awards up to 5 points for Buy Indiana and Section 3.2.6 awards up to 5 points for the Indiana Small Business Program (INSBP) commitment. Section 3.2.6 states that INSBP points cannot be combined with Buy Indiana points. Please confirm that the two are alternatives, so that a firm that qualifies for the 5 Buy Indiana points receives the full 5 points for this scoring category and does not need to submit Attachment A1.Correct, you can either receive five points or Buy Indiana or five points for INSBP.
33Attachment K Statement of Work1.4.211Appraisal requirementIs it the State's expectation, or a statutory requirement, that each sale will require an appraisal to be provided by the contractor, or by a third party?The Surplus Disposition pricing sheet includes an appraisal expense. Respondents shall price the listed expense.
34Attachment K Statement of Work1.4.312Required disposition processPlease clarify the State's required disposition process. For example, is an appraisal required before sale? Are sealed bids required? Can properties be marketed without a specific price, or does the State require an asking price for every property?Respondents shall describe their public bidding, sealed bid, and RFP experience and proposed disposition process, including marketing and transaction methods.
35Attachment K Statement of WorkVI.C18Administrative FeePlease elaborate on the Administrative Fee. Does the 1% fee apply to landlord-paid commissions and buyer's premiums, or only to amounts the State pays? We assume it is net of any amounts rebated. Is that correct? Attachment D identifies the evaluated price components.No additional administrative fee is authorized outside the published pricing schedule. Prices must be all inclusive.
36Attachment K Statement of Work1.37Maintenance Ticket Administration ServicesWhat platform is the State currently using for this service?RFP requires a robust electronic maintenance ticket platform but does not identify a required incumbent software product. Respondents shall propose a solution satisfying the technical and operational requirements.
37Attachment K Statement of WorkGeneraln/aRequest for lease dataWould the State please provide a list of leases by agency, with address, square footage, spend, and expiration dates?The solicitation establishes the services to be provided but doesn not attach a complet lease by lease portfolio export. Respondents shall base their proposals on the published scope and available information.
38Attachment K Statement of WorkGeneraln/aRequest for surplus property listWould the State please provide a listing of surplus property?A current parcel by parcel surplus property inventory is not included in the RFP. Respondents shall propose the statewide disposition capability requested in the Statement of Work.
39Attachment K Statement of WorkGeneraln/aRequest for existing KPIsWould the State please provide any existing KPIs on the current contract?Performance obligations are those in attachments K and F. The RFP does not incorporate a separate historical incumbent KPI report.
40Attachment K Statement of WorkGeneraln/aAnnual transaction volumeWhat is the average transaction volume per year (for example, the number of leases and sales)?No guaranteed annual transaction count is established. Respondents shall price the published examples and unit measures without assuming a guaranteed minimum workload.
41Attachment K Statement of WorkGeneraln/aCompleted tenant representation assignmentsCan the State please provide a list of completed tenant representation assignments over the last 24 months?The solicitation does not include a complete historical list of completed tenant representation assignments. Respondents shall demonstrate capability to perform the state Category 1 services.
42AI Technical Proposal QuestionsVendor Development During Implementation and Support1Meaning of "developers"What does "developers" refer to in this section?References to developers concern potential property of development alternatives evaluated in the State's market research and solication process. The contractor remains subject to State approval and conflict of interest restrictions.
43Infrastructure OverviewIntroductory note; 1.01-2Hosting requirements for a commercial ticketing platformAttachment L applies if solution hosting is in scope and requires cloud-based offerings to be within a State-owned cloud tenant, with alternatives considered if they demonstrate significant value. For Maintenance Ticket Administration Services, if a respondent proposes a commercial, vendor-hosted ticketing platform, does the State-owned cloud tenant requirement apply? If not, which hosting solution category in Attachment L should the respondent address?If solution hosting is in scope, attachment L applies. State owned cloud tenancy is preferred and cloud offerings must satisfy the state IOT policy requirements. External hosting requires the specified exception justification.
44Attachment A1 INSBP Commitment2.0; RFP 3.2.62INSBP certification timing and pending applicationsAttachment A1 requires each proposed subcontractor to be INSBP-certified and listed on or before the proposal due date of November 19, 2026. The INSBP began accepting applications on October 1, 2026, and the RFP was issued on October 14, 2026. That leaves about seven weeks from program launch to the due date for a firm to apply, be reviewed, and be certified. We also understand the State plans to publish its list of certified firms on November 15, four days before proposals are due, so respondents cannot identify certified firms in time to arrange commitments. As written, the requirement may be impossible for most small businesses to meet, which could limit meaningful INSBP participation. Proposed INSBP subcontractors must be certified on or before the proposed due date. A pending application does not satisfy the published certification requirements.

Please clarify:

How many firms are currently INSBP-certified, and what is the typical processing time for a complete application? Will the State commit to certify, by the due date, any firm that applies by a stated date?

May a respondent count a subcontractor whose complete application is pending on the due date, with proof of submission attached?

Would the State extend the due date, or accept INSBP certification letters after the due date and before award, so firms that applied in good faith are not excluded?The program is new and this information is not available at this time. However to accommodate application processing the proposal due date will be extended for two weeks and the addendum will is posted.
45Attachment E Business Proposal Template1.2313Award Timing (RFP Boilerplate)The Award Recommendation target date is listed as January 2027[ Can the State confirm whether this date is firm, and what factors (e.g., BAFO rounds, oral presentations) are most likely to shift this timeline?The solicitation establishes the proposed deadline and evaluation process, but does not guarantee a specific contract award date. The goal through presentations, contract negotiations, etc is to have the contract live early in 2027.
46Attachment E Business Proposal Template1.2112IVOSB List (RFP Boilerplate)Can the State provide (or confirm the current link to) the complete, up-to-date list of IDOA-certified Indiana Veteran Owned Small Businesses (IVOSBs) relevant to real estate, facilities, construction, and brokerage services, so Respondents can engage in good-faith outreach prior to proposal submission?IVOSB firms must appear on the State's certified IVOSB listing by the proposal due date. Include the certification letter and required commitment documentation.
47Attachment E Business Proposal Template3.2.619IVOSB Scoring (RFP Boilerplate)Please confirm whether the 3% IVOSB participation goal is calculated against the Total Bid Amount across all four Service Categories combined, or independently per Service Category if a Respondent proposes on a subset of categories.The IVOSB participation is against all four service categories independently. Please submit the form for each category with the total bid amount on the form for that category.
48Attachment E Business Proposal Template3.2.619INSBP List (RFP Boilerplate)Similarly, can the State provide the current list of certified Indiana Small Business Program (INSBP) firms applicable to this scope?Due to the program being new there is currently not a list IDOA can provide.
49Attachment K Statement of Work1.1N/APortfolio SizeThe Annual Report lists a statewide leased portfolio totaling 2,604,272 total square feet and $44,309,115.36 in aggregate annual rent across 92 counties. Could the State provide an Excel spreadsheet that details the leased portfolio and confirms the total number of discrete, active lease transactions (as opposed to square footage) currently under management?Please reference the IDOA website for a list of the State leases.
50Attachment K Statement of WorkN/A17958Lease Expiration VolumeBased on the lease schedule provided, numerous leases expire in 2025 and 2026 (e.g., multiple Department of Child Services and FSSA/DFR leases expiring 01/31/2026, 04/30/2026, 05/31/2026). Can the State provide (in Excel) a consolidated count of leases expiring in each of the next five years to help Respondents size staffing for renewal/relocation workload?The RFP requires lease expiration monitoring but does not publish a year by year lease expiration schedule. Respondents shall plan to meet the advanced notification and renewal requirements.
51Attachment K Statement of Work1.1N/AAnnual Transaction VolumeWhat is the average number of new leases, renewals, expansions, and terminations executed annually across the State's portfolio over the past 3 years?On average the number of transactions is between 30 and 40 per year.
52Attachment K Statement of Work1.1.13N/ARSF CapsCan the State provide the specific rentable-square-footage (RSF) commission caps/schedule referenced in the Technical Proposal (Attachment F, Section 1) so Respondents can accurately model compensation?The square footage bands and corresponding models are in the Brokerage Commission tab. Attachment F Section 1.4 governs surplus commission returns beyond applicable RSF caps.
53Attachment K Statement of Work1.4.1N/ANear-Term Disposition PipelineCan the State identify specific properties currently classified as surplus or underutilized that are anticipated for disposition within the next 12 months?No committed near term disposition inventory is listed in the attachments. Respondents shall address the range of property types and disposition strategies in Category 4.
54Attachment K Statement of Work1.4.1N/ANear-Term Disposition PipelineCan the State identify specific properties currently classified as surplus or underutilized that are anticipated for disposition within the next 12 months?The solicitation does not identify a guaranteed near term surplus property pipline or committed transaction schedule.
55Attachment K Statement of Work1.4.1N/ALong-Term Disposition PipelineCan the State provide a longer-term (1–5 year) forward-looking list or estimate of properties anticipated to become surplus, including any properties tied to upcoming lease expirations where the State owns the underlying asset?No guaranteed long term pipeline is provided. Respondents shall demonstrate capacity to market and transact properties statewide and requested.
56Attachment K Statement of Work1.4.1N/AHistorical Disposition VolumeWhat is the average number of disposition transactions (sales, auctions, sealed bids) completed annually over the past 3–5 years, and their aggregate value?The RFP does not provide a verified annual historical disposition count. The published model properties are evaluation examples, not guarantees.
57Attachment F Technical Proposal Template1.4.1N/AProperty TypesOf the anticipated disposition pipeline, what proportion is commercial, residential, agricultural, or "uneconomic remnant" parcels, consistent with the marketing-strategy breakdown requested in Attachment F, Section 4?There are no guarantees of numbers of dispositon properties that are commercial, residential, agricultural or uneconomic remnant parcels.
58Attachment K Statement of Work1.2N/APM Project VolumeWhat is the average number of concurrent construction/build-out and move projects the Contractor should expect to manage annually across the portfolio?No minimum annual project management count is guaranteed. Respondents shall price the published Project Manager hourly component and describe the requested project capability.
59Attachment K Statement of Work1.2.2N/ATypical Project SizeCan the State characterize typical project scope and budget ranges (e.g., tenant improvement build-outs, full relocations) so Respondents can appropriately staff project managers?The solicitation does not specify on typical projects size a guaranteed workload assumptions. Respondents shall address the full project management scope and staffing requirements.
60Attachment K Statement of Work1.37 of 19Maintenance Ticket PlatformDoes the State currently use a maintenance ticket electronic platform? If so, what is the platform (brand, version)? The RFP specifies required ticketing functionality rather than a mandated product.Respondents shall include the platform/licensing annaul fee and helpdesk hourly rate.
61Regarding, "The Respondent shall actively monitor open maintenance tickets through completion". Are thereQuestion not fully asked.
62Attachment K Statement of Work1.37 of 19Maintenance Ticket PlatformDoes the State currently have an asset management tool that it uses for assets within owned and leased spaces? If so, what is the tool (brand, version)?Respondents shall explain their proposed integration and data handling approach to extent required by attachment F, L, and the applicable IOT terms. No specific incumbent platform integration is identified as mandatory by product name.
63Attachment D Cost Proposal TemplateMaintenance Ticket Platform / Help Desk ManagerThe scope and ticket volume suggest that more than one FTE will be needed to provide this scope of work based on the requirement and estimated ticket volume. How will the State evaluate estimated levels of effort for this work?Helpdesk personnel must provide the processing, routing and emergency monitoring coverage stated in attachment F, section 2.3. Respondents shall price the helpdesk manager hourly rate in attachment D.
64Attachment D Cost Proposal TemplateFacilities ManagementThe pricing file includes "Facilities Management" as an hourly service for bidders to price. However, there is no scope of work for bidders to understand the breadth of this requirement. Will the State provide more detail on what its expectations are for facilities management?Category 3 covers maintenance ticket administration, tracking, coordination, escalation and the supporting platform.
65Attachment D Cost Proposal TemplateFacilities ManagementThe pricing line item for "facilities management" indicates that it is supposed to cover 350 facilities. Collectively, what is the total sq. ft. of these facilities?The State will send an addendum.
66Attachment D Cost Proposal TemplateFacilities ManagementProviding facilities management for 350 facilities reasonably will require several FTEs. How will the State apply one hourly fee for this service?State will send an addendum.
67Attachment D Cost Proposal TemplateFacilities ManagementIf the State is interested in including facilities management or property management in this procurement, will the State consider alternate pricing that accommodates different facilities environments, whole or partial scopes (engineering, janitorial, landscaping, etc.) and cost / sq. ft. pricing?The State will send an addendum.
68Attachment D Cost Proposal TemplateFacilities ManagementThe pricing file includes a note that says, "Listed prices must be all-inclusive. No additional costs will be accepted by the State." Will the State elaborate on this requirement in the context of facilities management? What responsibilities does the State expect to be included in this hourly rate?State will provide an addendum. This is removed from the cost proposal but still needed to be provided by the contractor who will bill as needed vs commit to an hourly rate.
69AI Technical Proposal QuestionsAtt MN/AAI Technical Proposal QuestionsPlease confirm whether a response to the AI Technical Proposal Questions is mandatory for all proposers and whether it is scored as part of the Technical Proposal. Please also confirm whether a proposer may use AI-enabled tools in delivering the services, and whether the State requires disclosure of that use and approval before it begins.Attachment F requires disclosure of AI/ML use, including risk classification, date provenance, and alignment with State AI governance standards. Respondents must complete the applicable AI technical questions and attestation.
70Infrastructure OverviewAtt LN/AState Infrastructure and HostingDoes the State require a proposer's systems and data to be hosted in State-managed infrastructure or an approved cloud environment? Please identify any State systems that a proposer's platforms must integrate with and the integration method required. If hosting in in the scope, attachment L governs proposed infrastructure.The State owned cloud tenant is preferred; exception based vendor hosting must satisfy the justification and security requirements.
71Attachment B1 IOT - IaaSB.1, B.2, B.3N/AApplicability of Cloud Additional TermsAttachments B.1, B.2 and B.3 do not contain a scope or applicability clause. Please confirm which attachment, if any, applies to the Services in this RFP. Please also confirm whether the terms apply only where the selected firm provides cloud services to the State, or also where the firm uses third-party cloud or software platforms to deliver real estate services. If they apply to a hybrid solution, please identify which attachment governs.Attachments B1, B2, and B3 apply to corresponding laaS, PaaS, and SaaS engagements where those services are part of the proposed solution.
72Attachment B1 IOT - IaaSB.1–B.3, §11 and §3N/AData Center Audit and HostingSection 11 requires an annual independent data center audit (SOC 2 or an IOT-approved equivalent) and permits State audits of each data center. May a proposer satisfy this through the SOC 2 Type II reports of its third-party hosting providers, and may State audit rights be exercised through those reports rather than on-site? Section 3 requires data at rest in U.S. data centers. Please confirm this applies to third-party platforms used by the selected firm.The applicable IOT terms require security controls, data protection, incident reporting audit related obligations. The proposed hosting approach must comply with the relevant attachment L and B1/B2/B3 requirements.
73Attachment K Statement of Work1.37 of 19Systems of Record and Software CostPlease confirm which platforms the selected firm must use for lease administration, maintenance ticketing and asset management. Please also confirm whether the State will provide access to its existing systems or the proposer is expected to supply its own, and, if the latter, whether the cost is to be included in the proposed fees in Attachment D.The RFP does not identify an incumbent system of record whos license is supplied at no cost to respondents. Include proposed platform/licensing fees in attachment D and address State data ownership and transition obligations.
74Attachment F Technical Proposal TemplateAtt FN/ATechnology Narrative FormatAre there page or format limits for the technology portions of the Technical Proposal? Please confirm whether technology, AI and infrastructure responses are scored in a separate section or within the overall Technical Proposal.Complete the infrastructure overview and applicable technical proposal responses in the designated format, explaining the proposed hosting and security approach where relevant.
75Attachment B1 IOT - IaaSB.1–B.3, §4(b), §4(c), §5(b)N/ABreach Notification and CostsSection 4 requires notice no later than 2 days "after it occurs." Please confirm whether the period runs from occurrence or discovery. Please also confirm whether the Data Breach definition applies only to Encrypted Data, and whether the costs under §5(b) are subject to a cap.The applicable IOT additional terms govern security incident and data breach notification, data protection and related contractor obligations.
76Attachment B1 IOT - IaaSB.1–B.3, §8 and §17N/ABackground Checks and SubcontractorsSection 8 requires an FBI Identity History Summary Check for employees, with restrictions that apply to subcontractors. Do these apply to subcontractor and sub-tier staff, including on-site vendors? May equivalent state or commercial background checks be used? Please also confirm whether §17 covers third-party software vendors and cloud providers, and what level of disclosure is required.Please submit comments, questions, and red lines in your attachment B sample contract in you submission. The states legal team will review this during the evaluation.
77Attachment B1 IOT - IaaSB.1–B.3N/AReferenced Documents and InsuranceThe exhibits reference the SLA, the Statement of Work, the Information Security Framework and IOT-CS-SEC-010. Please make these available before proposals are due, and confirm whether the versions are fixed at contract signing. Please also identify the insurance coverage and limits required, including cyber liability and professional liability, because the exhibits don't address insurance.These are available in the bid package in Attachment B- Sample Contract. For the cyber liability and professional liability insurance please add questions or red lines for our legal team to review.
78Attachment B3 IOT - SaaSB.3, §19N/AAccessibilitySection 19 requires compliance with Section 508. Please confirm the conformance level expected and whether it applies to third-party tools used to deliver the Services.Accessibility requirements apply as stated in the solicitation and applicable State technology standards.
79Attachment K Statement of WorkService Categories / AwardsPlease confirm that respondents may submit a proposal for only Service Category 3 (Maintenance Ticket Administration) without proposing on the other service categories, and that such a proposal will be evaluated independently.Each of the categories is evaluated, scored, ranked an awarded independently.
80Attachment K Statement of WorkMaintenance Ticket Administration / TechnologyDoes the State require an existing commercial maintenance ticketing platform, or may the respondent propose a configurable or custom-developed solution? Please identify any mandatory integrations or licensing requirements.The State does not require an exisitng commericial maintenance ticketing platform. The respondent may propose a configurable or custom-developed solution.
81Attachment K Statement of WorkMaintenance Ticket Administration / ScopeIs the Category 3 contractor responsible only for maintenance request administration and coordination, or must it also provide physical maintenance labor, repairs, or subcontracted trades?Contractor is only responsible for maintenace request administration and coordination.
82Attachment K Statement of WorkMaintenance Ticket Administration / Current SystemWhat system currently manages maintenance tickets? Will the State provide access to existing data, interfaces, and historical records, and is migration included in the Category 3 scope?The State can provide access to existing data, interfaces, and historical records. MIgration is not included in the Category 3 scope.
83Attachment K Statement of WorkMaintenance Ticket Administration / VolumesIs the estimated volume of approximately 4,000 tickets annually across 350 facilities based on historical actuals? Please provide historical ticket volumes by priority, location, and category, if available.The estimated amount of tickets is based off of the past three years history of actual tickets.
84Attachment F Technical Proposal TemplateQualifications / SubcontractorsMay a prime respondent rely on a named subcontractor’s facilities management or maintenance administration experience to meet Category 3 qualifications and evaluation criteria? If so, what evidence is required?Subcontractors must be identified and documented as required by Business Proposal, Attachment J and the applicable participation forms. State consent is required before subcontracting under the sample contract.
85Attachment K Statement of WorkService Categories / AwardsDoes the State anticipate making a separate contract award for each service category, and could more than one contractor be awarded Category 3? Separate catogory awards are permitted.Each of the four service categories is evaluated, scored, ranked and awarded independently. A respondent may propose on one, several or all categories.
86Attachment K Statement of WorkMaintenance Ticket Administration / StaffingAre dedicated full-time staff, on-site personnel, specified business hours, after-hours coverage, or response-time service levels required for Category 3? Respondents shall propose adequate for the published help desk and emergency monitoring requirements.The RFP does not prescribe and fixed number of FTE's for category 3.
87Attachment K Statement of WorkMaintenance Ticket Administration / ResponsibilitiesWho is responsible for selecting, contracting with, and paying landlords or maintenance vendors that perform the actual repairs?The Category 3 contractor is responsible for the ticket administration obligations in state of work, including tracking, routing, coordination, and escalation. The scope does not make the contractor responsible for self performing all physical repairs.
88Attachment D Cost Proposal TemplateCategory 3 PricingFor a proposal limited to Category 3, should the respondent complete only the applicable Category 3 pricing fields? Is pricing intended to be fixed-fee, per-ticket, labor-rate, or another structure?Price the annual maintenance ticke platform/licensing fee and per hour maintenance ticket plalform/helpdesk manager component in the designated attachment D cells. Prices must be all inclusive.
89Attachment E Business Proposal TemplateFinancial StabilityFor a newer business without two years of audited financial statements or a Dun & Bradstreet report, what alternative financial documentation will the State accept?Financial responsibility must be demonstrated through the business proposal documentation.
90Attachment A IVOSB CommitmentVeteran-Owned Business ParticipationDoes federal SBA VetCert SDVOSB certification satisfy the Indiana Veteran Owned Small Business participation requirement, or must a subcontractor hold a separate Indiana certification?No, there is no reciprocity from the federal certification. Must have separate Indiana certification.
91
92
93
94
95
96
97
98
99
100
Attachment A IVOSB Commitment
Attachment A1 INSBP Commitment
Attachment B Sample Contract
Attachment B1 IOT - IaaS
Attachment B2 IOT - PaaS
Attachment B3 IOT - SaaS
Attachment D Cost Proposal Template
Attachment E Business Proposal Template
Attachment F Technical Proposal Template
Attachment H Reference Form
Attachment I Pre-Proposal Network Opportunities Form
Attachment J Attestation Form
Attachment K Statement of Work
AI Technical Proposal Questions
Infrastructure Overview