RFP_PR9169___Attachment_E__Qualifications_and_Technical_Requirements_Fill_in_Form_Final.xls

XLS spreadsheet 55 KB Posted

Attached to
Microgrid Energy Storage System
Solicitation number
PR9169
Issued by
Florida

About this file

This is a Qualifications and Technical Requirements Fill-in Form (Attachment E) for RFP PR9169 issued by Orlando Utilities Commission (OUC) for a Microgrid Energy Storage System. The project requires qualified suppliers to provide a grid-forming energy storage system with a capacity of 250 kW capable of operating for 1-2 hours, to be co-located with DC Fast Charging infrastructure for electric vehicles. The system must function in grid-connected mode to support grid services including peak shaving, solar smoothing, and Volt/VAR regulation, and must operate independently during outages to maintain microgrid support. Respondents must demonstrate five contiguous years of experience in successful delivery—including procurement, design, installation, and support—of grid-forming energy storage systems of 250 kW/500 kWh capacity or greater, with required project references for similar systems.

The form requires comprehensive submissions addressing company background, personnel qualifications, safety records, insurance compliance, and technical specifications for major equipment including battery, inverter, energy management system, and automatic transfer switch manufacturers. Bidders must provide OSHA incidence, frequency, and severity rates for the past three years, current workers' compensation experience modification ratings, proof of Florida business licensing, and evidence of proper insurance meeting OUC minimum requirements. Additionally, respondents must confirm the capability to dispatch on-site field service representatives to Orlando within 48 hours of notification and maintain 24/7/365 emergency technical support. The form requires submission of three customer references with detailed project descriptions and contact information, and bidders must indicate compliance with Federal funding requirements outlined in the RFP's Attachment D, providing examples of previous customers who successfully obtained federal funding for similar hardware solutions.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Information

RFP PR9169 - Microgrid Energy Storage System
Attachment E - Qualifications and Technical Requirements Fill in Form
Note: Please make sure to complete all sheets (General Info., Technical Details, and Subcontractor).
Required/Compliance Forms
1Form Enclosed (YES or NO) & Exceptions Taken (YES or NO)
2ADDENDUMS Acknowledgement Form Enclosed (YES or NO)
3PUBLIC ENTITY CRIMES FORM Enclosed (YES or NO)
3.1Entity Crimes Noted (YES or NO)
4Disputes Disclosure Form Enclosed (YES or NO)
4.1Disputes Noted (YES or NO)
5Form W-9 Enclosed (YES or NO)
Company Background Data
6Cover Letter Enclosed (YES or NO)
7Name of Firm
8Name of Parent Company
9Complete Business Address
10Is the address above your remittance address? If No, enter address
11State of Incorporation
12Primary Contact Name
13Email Address
14Office Phone Number
15Mobile Phone Number
16Telefax Number
17Name and Title of Officer(s) Authorized to commit and bind the Firm to Contracts.
18Telephone Number
19E-mail Address
20Number of Employees
21Number of Locations
22Nearest Branch Office or Service Location which will adminster the services:
23Primary Servicing Office location
24Number of years in business under Present Company Name
25Business License Number
26Dunn & Bradstreet Number (D&B)
27Provide a brief history of your company (Can be provided in the proposal, just list page #)
Organization Chart, Qualifications and Training
28Do employees have the appropriate trade qualifications, certifications and training for the work to be performed? (Yes or No)
29Please identify trade qualifications and any certifications
30Submit a resume of applicable experience, accreditation & qualifications for key personnel that will be working on this project.
31A detailed organization chart for the team that would be working on this project depicting your company’s management, operations, maintenance, and administrative support structure.
Project Details
32List the types of services your company provides (provide brochure if available).
33Provide a narrative describing your firm’s capabilities in regard to the scope of work/services being requested in the RFP. Include the overall approach and specific methodology to provide the specified goods or services.
34Provide a narrative describing your firm’s capabilities regarding quality control and assurance on work completed for similar goods or services offered.
35Does your Company have at least Five (5) contiguous years of experience in successful delivery (procurement, design, installation, and support) of grid forming energy storage systems of 250 kW/500 kWh capacity or greater? (Yes of N0)

Must submit project references for similar systems.

Personnel Hiring, Training & Incentive Practices/Programs
36Please indicate below if your firm conducts the following screening and testing:
36aPre-Employment Drug & Alcohol Screening? (Yes or No)
36bWorkers Compensation History Review? (Yes or No)
36cDriver License Verification (Yes or No)
36dPre-employment Physical Exam (Yes or No)
36ePre-Employment Criminal Background Checks? (Yes or No)
36fDoes your company have a Training Program for your employees. (Yes or No)
36gIf yes to the item 21f, provide an outline or attach a copy of the program.
36hDoes your company have employee incentive programs to reward safety, productivity, quality, performance, and/or longevity? (Yes or No)
Safety Programs & Record
37The awarded Supplier shall be properly insured in accordance with the Minimum specified OUC insurance requirements outlined in the General Conditions included in the RFP Package. Provide a sample copy of your company’s current insurance certificate. If you do not already meet the OUC requirements, you will have to obtain proper insurance if selected for award. (Yes or No)
38Company’s Workman’s Comp Exp Mod rating for the last 3 years2025:
2024:
2023:
39Indicate your company’s OSHA Incidence Rate for the last 3 years.2025:
2024:
2023:
40Indicate your company’s OSHA Frequency Rate for the last 3 years.2025:
2024:
2023:
41Indicate your company’s OSHA Severity Rate for the last 3 years2025:
2024:
2023:
42Does your company have a Formal Health & Safety Program? If yes, provide a copy of your company’s Formal Health & Safety Program. (Yes or No)
43Does your company complete a Hazard Identification, Assessment and Control process prior to starting work? (Yes or No)
44Does the company have emergency response and first aid plans related to the work activities, when working in remote locations and working alone? (Yes or No)
License/ Insurance
45The awarded Supplier shall be properly insured in accordance with the Minimum specified OUC insurance requirements outlined in the General Conditions included in the RFP Package. Provide a sample copy of your company’s current insurance certificate. Sample of applicable Insurance Certificates are Enclosed (Yes or No)
46Copy of Florida Business License is Enclosed. (YES or NO)
47Firm is properly licensed in the State of Florida. (YES or NO)
Compliance/Legal
48Is your firm currently involved in any unsettled litigation? (YES or NO) If yes, provide an explanation.
49If response is yes to item 37 above, please provide details. Otherwise indicate N/A in the space provided.
50Has your company ever had a contract terminated? (YES or NO)
51If response is yes to item 38 above, provide the name of the company, date, and reason for termination. Otherwise Indicate as N/A.
52Has your company ever been in a lawsuit where the company or one of its employees was accused of a wrongdoing? (YES or NO)
53If response is yes to item 39 above, provide name of plaintiff, when the event occurred, and reasons. Otherwise indicate as N/A.
54Does your company have a program to ensure that all Federal, State and local regulations are followed in the handling, storage and disposal of hazardous material? (YES or NO)
55If response is yes to item 40 above, please describe program. Otherwise Indicate as N/A.
56Has your firm ever been issued a warning or violation by a regulatory agency for noncompliance with Federal or State regulations? (YES OR NO) If yes, provide the date(s) and description of the violation.
57If response is yes to the item 41 above, provide explanation. Otherwise indicate as N/A.
58Does your firm have a Drug Free Work Place Policy? (Yes or No)
59If response is yes to item 42 above, please describe or include a copy of your firms Drug Free Work Place Policy. Otherwise indicate as N/A.
Other/Additional Information
60Does your company have repair and support facilities located in the South Eastern United States? (YES or NO)
61If repair and support facilities are not company owned, does company have certified representatives? (YES or NO) Please indicate the name(s) of these representatives.
62Does your company have spare parts inventory warehouse(s) located within the Continental United States? (YES or NO)
63Does your company have the capability to contact and dispatch on-site field service representative(s) to Orlando, Florida within 48-hours of notification? (YES or NO)
64Does your company have a 24/7/365 Emergency contact for remote technical support? (YES or NO)
65Does your solution comply with Federal Funding requirements listed in Attachment D? (YES or NO)
66Provide examples where previous customers successfully received federal funding related to the proposed hardware
67Have you completed all sheets of this workbook (General Information, Technical Details and Subcontractors)? (Yes or N0)
References
Reference 1
Name of Customer
Project Name/Location
Date Completed
Customer Contact Name
Customer Contact Phone Number
Customer Contact Email Address
Dates of Contract TermStart: End:
Narrative Description of project and work specifically performed by the Respondent :
Reference 2
Name of Customer
Project Name/Location
Date Completed
Customer Contact Name
Customer Contact Phone Number
Customer Contact Email Address
Dates of Contract TermStart: End:
Narrative Description of project and work specifically performed by the Respondent :
Reference 3
Name of Customer
Project Name/Location
Date Completed
Customer Contact Name
Customer Contact Phone Number
Customer Contact Email Address
Dates of Contract TermStart: End:
Narrative Description of project and work specifically performed by the Respondent :

Technical Detail Form

RFP PR9169 - Microgrid Energy Storage System
Grid Forming Energy Storage System (ESS) Specification for Major Equipment
Technical Detail Form
ParameterUnitsOEM/Vendor Response
1System Manufacturer-
2System Make/Model-
3Battery Manufacturer-
4EMS Vendor-
5Inverter Manufacturer-
6ATS Manufacturer (if applicable)-
7ATS Communication Protocol(s) (if applicable)-
8DC Rated nominal voltageVdc
9AC Rated nominal voltageVac
10Rated frequencyHz
11Nominal PowerkW
12Nominal Reactive PowerkVAR
13Power Factor-
14Round Trip Efficiency%
15Discharge time (at full power)Hours
16Charge Time (at full power)Hours
17Peak Aux Power LoadkW
18Energy Capacity @ BOLkWh
19Energy Capacity @ EOLkWh
20Liquidated Damage for not achieving Power Output Guarantee$/kWe
21Total WeightLbs
22Footprint DimensionsL x W x H
23Life Expectancy
24List routine maintenance

requirements requiring replacement of components

Subcontractors

RFP PR9169 - Microgrid Energy Storage System
Subcontractors
The bidder shall submit the following information on their proposal to allow for a complete technical analysis of the proposal. The required information below is basic and additional information may be requested by OUC. Unless otherwise stated, it is assumed that the bidder will meet all specification requirements as the data listed below does not relieve the bidder of their responsibility for meeting such requirements as referenced in the solicitation documents.
TYPE OF WORKSUBCONTRACTORS/SUPPLIERS NAMEEstimated Percentage of ContractHow many projects has your firm completed with this subcontractor for the type of work indicated?How long has the Subcontracor been in business perfroming the type of services being indicated.

File details come from the government source that posted it. Updated .