About this file
This is a Price Schedule attachment (Attachment B) for RFP PR9169 submitted to the Orlando Utilities Commission for a Grid Forming Energy Storage System capable of 250 kW generation for 1-2 hours of duration. The system will be co-located with DC Fast Charging infrastructure for electric vehicles and must support grid services including peak shaving, solar smoothing, and Volt/VAR regulation during normal operations, while providing grid-forming capability to support EV charging during outages. The turn-key system is to be delivered FOB to 3800 Gardenia Ave, Orlando, FL 32839, with an estimated lead time specified in weeks from purchase order issuance.
The price schedule requires suppliers to provide a total base bid for the complete turn-key Grid Forming Energy Storage System, which includes fourteen integrated components ranging from engineering and design through operations and maintenance manuals and a standard five-year warranty with technical field assistance. Optional line items available for separate pricing include an Automatic Transfer Switch, additional testing and commissioning for the ATS, recommended spare parts, extended warranty options covering 10, 15, and 20-year periods, and annual maintenance services. Suppliers must clearly delineate which components are included in their base bid and identify the pricing for any optional items selected.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| RFP PR9169 - Microgrid Energy Storage System | |||
| Attachment B Price Schedule | |||
| Supplier Name: | |||
| Grid Forming Energy Storage System | |||
| Line Item | Description | Price | |
| 1 | Turn-Key Grid Forming Energy Storage System | ||
| Included | The following are considered part of the turn-key ESS |
(line item pricing optional)
| YES | NO | |||
| 1.1 | Engineering & Design | $ | ||
| 1.2 | Aux Transformers | $ | ||
| 1.3 | Inverters | $ | ||
| 1.4 | Energy Storage System Equipment & Enclosure | $ | ||
| 1.5 | Power Distribution | $ | ||
| 1.6 | ESS Controller | $ | ||
| 1.7 | External SCADA/EMS Connectivity | $ | ||
| 1.8 | Fire Alarm & Suppression System | $ | ||
| 1.9 | Air Conditioning | $ | ||
| 1.10 | System Enclosure | $ | ||
| 1.11 | Surge Protection | $ | ||
| 1.12 | Freight (FOB Destination - 3800 Gardenia Ave, Orlando, FL 32839) | $ | ||
| 1.13 | Final Testing, Startup, Commissioning, and Training | $ | ||
| 1.14 | Operations and Maintenance Manuals | $ | ||
| 1.15 | Standard 5 Year Warranty to include Technical Field Assistance | $ | ||
| Total Base Bid: | $ |
| Optional Line Items | ||
| 2 | Automatic Transfer Switch | $ |
| 3 | Final Testing, Startup,and Commissioning for ATS | $ |
| 4 | Recommended Spare Parts List Total Cost | $ |
| 5 | Optional Extened Warranty (10 Yr Total) | $ |
| 6 | Optional Extened Warranty (15 Yr Total) | $ |
| 7 | Optional Extened Warranty (20 Yr Total) | $ |
| 8 | Optional Annual Maintenance | $ |
| Estimated Lead Time from PO issue date: | # Weeks: |