RFP N0025322R0023.pdf
PDF 620 KB Posted
- Solicitation number
- N0025322R0023
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N0025322R0023-0011.pdf | ||
| N0025322R0023-0010.pdf | ||
| N0025322R0023-0009.pdf | ||
| N0025322R0023-0008.pdf | ||
| N0025322R0023-0007.pdf | ||
| Attachment 2 NAVSEA 4340-2_GFI List (4-6-22).pdf | ||
| N0025322R0023-0006.pdf | ||
| N0025322R0023-0005.pdf | ||
| Attachment 4 Past Performance References (2-2-22).docx | DOCX document | |
| N0025322R0023-0004.pdf | ||
| Attachment 3 Pricing (2-2-22).xlsx | XLSX spreadsheet | |
| N0025322R0023-0003.pdf | ||
| N0025322R0023-0002.pdf | ||
| N0025322R0023-0001.pdf | ||
| CDRL A002 Failure Analysis Report (9-15-21).pdf | ||
| Attachment 3 Section B (9-15-21).xlsx | XLSX spreadsheet | |
| Attachment 2 NAVSEA 4340-2_GFI List.pdf | ||
| Attachment 1 Drawings (Placeholder).docx | DOCX document | |
| CDRL A001 Test Report (9-15-21).pdf | ||
| Attachment 4 Past Performance References (9-15-21).docx | DOCX document |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 11:00 AM local time 08 Nov 2021
X
A X B X C X D
EX
X
G F 57 - 75
76 - 86 X H 87 - 92 julie.thomas@navy.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
DO-C9E 1 92
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N00253 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 0 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
Julie.Thomas@navy.mil conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
JULIE THOMAS 360-315-3390
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 4
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
5 - 15
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
17 - 20 21 - 23
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 24 - 35 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 36 - 37 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
38 - 55
PART II - CONTRACT CLAUSES
NAVAL UNDERSEA WARFARE CENTER
ATTN: JULIE THOMAS
JULIE.THOMAS@NAVY.MIL
610 DOWELL STREET, BLDG 206
KEYPORT WA 98345
360-315-3390
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
08 Oct 2021
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N0025322R0023
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 3 Each First Article, 8290040
FFP
Bag Assembly, Cold Gas in accordance with NAVSEA Drawing 8290040 Rev D;
associated drawings 8290018 Rev A, 8290019 Rev B, & 8290346 Rev A;
8290021 Rev D, and Section C, Statement of Work. These units include Strap, Bag in accordance with NAVSEA Drawing 8290021 Rev D for first article testing.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
PSC CD: 1355
MAX
NET AMT
UNIT UNIT PRICE MAX AMOUNT
0002 233 Each Production, 8290040
FFP
Bag Assembly, Cold Gas in accordance with NAVSEA Drawing 8290040 Rev D;
associated drawings 8290018 Rev A, 8290019 Rev B, & 8290346 Rev A;
8290021 Rev D, and Section C, Statement of Work. These units include Strap, Bag in accordance with NAVSEA Drawing 8290021 Rev D for first article testing.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
UNIT UNIT PRICE MAX AMOUNT
0003 328 Each Production, 8290021
FFP
Strap, Bag in accordance with NAVSEA Drawing 8290021 Rev D and Section C, Statement of Work.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
UNIT UNIT PRICE MAX AMOUNT
0004 1 Lot Contract Data Requirements Lists (CDRLs)
FFP
Exhibit A A001 Test/Inspection Report A002 Failure Analysis & Corrective Action Report
Section C - Descriptions and Specifications
STATEMENT OF WORK
A. The Contractor shall participate in the virtual post-award meeting, which will occur within 30 days after award of the contract; see C-242-H002, Post Award Meeting (NAVSEA)(OCT 2018). The Technical Point of Contact (TPOC) will coordinate the post-award meeting.
B. The Government may require a Contractor Site Preaward Survey per Federal Acquisition Regulations 9.106, Preaward Surveys, if the Offeror’s and/or Manufacturer’s capabilities are unknown to the Naval Undersea Warfare Center, Division Keyport.
C. This requirement includes units to support the United States Navy (USN) and Foreign
Military Sales (FMS). The “Max Quantity” reflects the total anticipated quantity the Government may order to support the USN and FMS for a 5-year period.
D. Performance under this contract requires the Contractor to adhere to Operations Security
(OPSEC) requirements. Explanation of these requirements is detailed in the Operations Security Guide for Defense Contractors, at http://www.navsea.navy.mil/Home/WarfareCenters/NUWCKeyport/Resources.aspx; click on the OPSEC Guide for Defense Contractors on the right-hand side.
E. The following requirements apply to all First Article CLINs:
1. The Contractor shall inspect and test all first article units.
2. The Government must approve the First Article units before manufacturing of the production units commences.
3. Bag and label First Articles as such. The Contractor shall mark the label with the manufacturer, nomenclature, part number, CAGE code, and contract number.
F. The following requirement applies to drawings 8290040 (CLINs 0001 & 0002) and 8290021 (CLINs 0001, 0002 & 0003):
1. The Contractor shall provide the test data sheets for the applicable drawings per the
Contract Data Requirements List (CDRL) A001, Test/Inspection Report.
G. The following requirement applies to drawing 8290346 Rev A (CLINs 0001 & 0002):
1. Contractor shall use part number B51967 per requirements specified in Note 1.
Deviation of material is not permitted without prior approval from the In-Service
Engineering Agency via the Naval Undersea Warfare Center Division Keyport Contracting Officer.
H. The following requirement applies to drawing 8290021 Rev D (CLINs 0001, 0002 & 0003):
1. Contractor shall provide test results per Note 6, Static Tensile Load Test, in accordance with CDRL A001, Test/Inspection Report.
I. The following requirements apply to all CLINs:
1. The Contractor shall manufacture, inspect, test and deliver all items identified in Section B Contract Line Item Numbers (CLINs) in accordance with the cited drawings, associated drawings, standards, and specifications, and the requirements identified in this Statement of Work (SOW).
2. Contractor shall use DD Form 1694, Request for Variance, to resolve variance or tolerance request for waiver.
3. Contractor shall provide the tracking number of each shipment the TPOC identified in G-
242-H001, Government Contract Administration Points of Contact and Responsibilities (NAVSEA)(OCT 2018) within 24-hours of shipment.
4. The Contractor shall inspect and test First Article units at source. A Government representative may be present. The Contractor shall provide notice of the testing date, time, and location to the TPOC per clause 52.209-3, First Article Approval – Contractor Testing – Alternate I.
5. Inspection and Acceptance at Destination. The Government reserves the right to complete inspection at destination.
a. Each unit is subject to inspection in accordance with drawings and American National Standards Institute / American Society for Quality Control (ANSI/ASQC) Z1.4-2008. The Acceptable Quality Limits (AQLs) are:
Critical (CR) = 0.065 Major (MA) = 1.0 Minor (MI) = 2.5
b. Dimensional Inspection (IC): The Government will perform a material dimension inspection for compliance with the drawing requirements at destination. This applies to all first article units and random selection of up to 10% of the first two deliveries of production units. Allow 45 days for IC inspection.
c. End-User Inspection (IU): The Government will perform a form, fit, and function test at destination. This applies to all first article units and random production units.
Allow 45 days for IU inspection.
d. If any unit fails IC inspection, the Government will reject all units, and return the units to the manufacturer for failure analysis and resolution. The Contractor shall submit a proposal for resolution requirements, test reports, and an updated delivery schedule per CDRL A002, Failure Analysis and Corrective Action Report.
e. The Test/Inspection Report, CDRL A001, shall be submitted with all unit deliveries, by serial number, for acceptance or rejection per the requirements herein.
6. Substitution of materials is not authorized without prior written Government approval.
7. Contractor shall provide a Certificate of Conformance (COC) with each delivery, for each part number in accordance with drawing specifications. The COC shall comply with clause 52.246-15, Certificate of Conformance. Contractor shall provide the material certifications with the COCs.
8. The Contractor shall mark the label with manufacturer, nomenclature, part number, CAGE code, and contract number.
9. The Contractor shall contact the TPOC for serial number assignment. The TPOC’s contact information will be provided in Section G upon contract award.
10. Contractor shall package material in accordance with best commercial practices to ensure no damage to parts.
11. Early and partial deliveries are acceptable.
12. Required delivery schedule: See clause 52.211-8, Time of Delivery, in Section F.
(End of Statement of Work)
CLAUSES INCORPORATED BY FULL TEXT
C-202-H001 ADDITIONAL DEFINITIONS–BASIC (NAVSEA) (OCT 2018)
(a) Department - means the Department of the Navy.
(b) Commander, Naval Sea Systems Command - means the Commander of the Naval Sea Systems Command of the Department of the Navy or his duly appointed successor.
(c) References to The Federal Acquisition Regulation (FAR) - All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.
(d) National Stock Numbers - Whenever the term Federal Item Identification Number and its acronym FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number (NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:
(1) National Item Identification Number (NIIN). The number assigned to each approved Item Identification under the Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification Bureau (NCB) Code. The remaining positions consist of a seven digit non-significant number.
(2) National Stock Number (NSN). The National Stock Number (NSN) for an item of supply consists of the applicable four-position Federal Supply Class (FSC) plus the applicable nine-position NIIN assigned to the item of supply.
(End of text)
C-204-H001 USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES (NAVSEA)
(OCT 2018)
(a) NAVSEA may use a file room management support contractor, hereinafter referred to as "the support contractor", to manage its file room, in which all official contract files, including the official file supporting this procurement, are retained. These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as “protected information”. File room management services consist of any of the following: secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paper-based or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.
(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file room management services are acquired will contain a requirement that:
(1) The support contractor not disclose any information;
(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;
(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,
(4) In addition to any other rights the contractor may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed protected information, for the unauthorized duplication, release, or disclosure of such protected information.
(c) Execution of this contract by the contractor is considered consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file room management support contractor for the limited purpose of executing its file room support contract responsibilities.
(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Contractors should enter into separate non-disclosure agreements with the file room contractor. Contact the Procuring Contracting Officer for contractor specifics. However, any such agreement will not be considered a prerequisite before information submitted is stored in the file room or otherwise encumber the government.
C-209-H001 FIRST ARTICLE (CONTRACTOR TESTING) (NAVSEA) (OCT 2018)
(a) The First Article shall conform in every respect to the requirements of this contract. The First Article shall be manufactured with tools, materials, and methods which are the same as the tools, material and methods which will be used to manufacture the production units. All items delivered under the contract shall be manufactured under the same conditions and quality established by the First Article. Any changes to tools, material, or methods after the first article approval shall be documented by the contractor and approved by the Contracting Officer before they are used.
(b) The Contractor shall make a record of all data obtained during such tests in a form similar to the guidance provided in MIL-HDBK-831A.
(c) Pursuant to paragraph (e) of the clause entitled "First Article Approval--Contractor Testing" (FAR 52.209-3), the First Article shall not be delivered as part of the production quantity.
C-211-H017 UPDATING SPECIFICATIONS AND STANDARDS (NAVSEA) (DEC 2018)
The contractor may request that this contract be updated to include the current version of the applicable specification or standard if the update does not affect the form, fit or function of any deliverable item or increase the cost/price of the item to the Government. The contractor should submit update requests to the Procuring Contracting Officer with copies to the Administrative Contracting Officer and cognizant program office representative for approval. The contractor shall perform the contract in accordance with the existing specifications and standards until notified of approval/disapproval of its request to update by the Procuring Contracting Officer. Any approved alternate specifications or standards will be incorporated into the contract.
C-211-H018 APPROVAL BY THE GOVERNMENT (NAVSEA) (JAN 2019)
Approval by the Government as required under this contract and applicable specifications shall not relieve the Contractor of its obligation to comply with the specifications and with all other requirements of the contract, nor shall it impose upon the Government any liability it would not have had in the absence of such approval.
C-215-H002 CONTRACTOR PROPOSAL (NAVSEA) (OCT 2018)
(a) Performance of this contract by the Contractor shall be conducted and performed in accordance with the detailed obligations to which the Contractor committed itself in Proposal [ * ] dated [ * ] in response to Solicitation No.
N0025322R0023.
(b) The technical volume(s) of the Contractor's proposal is(are) hereby incorporated by reference and made subject to the "Order of Precedence" (FAR 52.215-8) clause of this contract. Under the "Order of Precedence" clause, the technical volume(s) of the Contractor's proposal referenced herein is (are) hereby designated as item (f) of the clause, following "the specifications" in the order of precedence.
*To be identified upon contract award.
C-227-H006 DATA REQUIREMENTS (NAVSEA) (OCT 2018)
The data to be furnished hereunder shall be prepared in accordance with the Contract Data Requirements List, DD Form 1423, Exhibit(s) A001 and A002, attached hereto.
(End of Text)
C-233-H001 DOCUMENTATION OF REQUESTS FOR EQUITABLE ADJUSTMENT--BASIC (NAVSEA) (OCT 2018)
(a) For the purposes of this special contract requirement, the term "change" includes not only a change that is made pursuant to a written order designated as a "change order" but also (1) an engineering change proposed by the Government or by the Contractor and (2) any act or omission to act on the part of the Government in respect of which a request is made for equitable adjustment.
(b) Whenever the Contractor requests or proposes an equitable adjustment of $100,000 or more per vessel in respect to a change made pursuant to a written order designated as a "change order" or in respect to a proposed engineering change and whenever the Contractor requests an equitable adjustment in any amount in respect to any other act or omission to act on the part of the Government, the proposal supporting such request shall contain the following information for each individual item or element of the request:
(1) A description (i) of the work required by the contract before the change, which has been deleted by the change, and (ii) of the work deleted by the change which already has been completed. The description is to include a list of components, equipment, and other identifiable property involved. Also, the status of manufacture, procurement, or installation of such property is to be indicated. Separate description is to be furnished for design and production work.
Items of raw material, purchased parts, components and other identifiable hardware, which are made excess by the change and which are not to be retained by the Contractor, are to be listed for later disposition;
(2) Description of work necessary to undo work already completed which has been deleted by the change;
(3) Description of work not required by the terms hereof before the change, which is substituted or added by the change. A list of components and equipment (not bulk materials or items) involved should be included. Separate descriptions are to be furnished for design work and production work;
(4) Description of interference and inefficiencies in performing the change;
(5) Description of each element of disruption and exactly how work has been, or will be disrupted:
(i) The calendar period of time during which disruption occurred, or will occur;
(ii) Area(s) aboard the vessel where disruption occurred, or will occur;
(iii) Trade(s) disrupted, with a breakdown of manhours for each trade;
(iv) Scheduling of trades before, during, and after period of disruption;
(v) Description of measures taken to lessen the disruptive effect of the change;
(6) Delay in delivery attributable solely to the change;
(7) Other work attributable to the change;
(8) Supplementing the foregoing, a narrative statement of the direct "causal" relationship between any alleged Government act or omission and the claimed consequences therefor, cross-referenced to the detailed information provided as required above; and
(9) A statement setting forth a comparative enumeration of the amounts "budgeted" for the cost elements, including the material costs, labor hours and pertinent indirect costs, estimated by the Contractor in preparing its initial and ultimate proposal(s) for this contract, and the amounts claimed to have been incurred and/or projected to be incurred corresponding to each such "budgeted cost" elements.
(c) Each proposal in excess of $100,000 submitted in support of a claim for equitable adjustment under any requirement of this contract shall, in addition to the information required by paragraph (b) hereof, contain such information as the Contracting Officer may require with respect to each individual claim item.
(d) It is recognized that individual claims for equitable adjustment may not include all of the factors listed in paragraph
(b) above. Accordingly, the Contractor is required to set forth in its proposal information only with respect to those factors which are comprehended in the individual claim for equitable adjustment. In any event, the information furnished hereunder shall be in sufficient detail to permit the Contracting Officer to cross-reference the claimed increased costs, or delay in delivery, or both, as appropriate, submitted pursuant to paragraph (c) of this requirement, with the information submitted pursuant to paragraph (b) hereof.
C-242-H001 EXPEDITING CONTRACT CLOSEOUT (NAVSEA) (OCT 2018)
(a) As part of the negotiated fixed price or total estimated amount of this contract, both the Government and the Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $1,000 or less at the time of final contract closeout. The term "residual dollar amount" shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party may be considered to the extent permitted by law.
(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.
C-242-H002 POST AWARD MEETNG (NAVSEA) (OCT 2018)
(a) A post-award meeting with the successful offeror will be conducted within 30 days after award of the contract.
The meeting will be held at the address below:
Conference Call-In Number / Participant Code: Provided to Contractor within 20 days after contract award
(b) The contractor will be given 10 working days notice prior to the date of the meeting by the Contracting Officer.
(c) The requirement for a post-award meeting shall in no event constitute grounds for excusable delay by the contractor in performance of any provisions in the contract.
(d) The post-award meeting will include, but is not limited to, the establishment of work level points of contact, determining the administration strategy, roles and responsibilities, and ensure prompt payment and close out.
Specific topics shall be mutually agreed to prior to the meeting.
C-243-H003 CONFIGURATION MANAGEMENT (NAVSEA) (JAN 2019)
(a) Baseline Definition - All contractual documentation in effect at the time of contract award shall constitute the Contract Baseline, which shall be considered incorporated in the baseline documentation.
(b) General Requirement - (1) The Contractor shall maintain a Configuration Control Program to assure that all detail level work being performed under this contract is in compliance with appropriate baseline documentation.
The Contractor shall prepare a Configuration Management Plan in accordance with the requirements of the contract.
If required, the Contractor’s Configuration Management Plan shall be submitted through the appropriate Contract Data Requirements List (CDRL) for approval by the Government.
(2) Whenever a situation arises wherein the Contractor cannot comply with a baseline document, or whenever intent of such documentation is significantly changed by detail level documentation, the Contractor shall submit change documents to modify the baseline to resolve the conflict or to allow non-compliance. Whenever the cost of implementing a proposed change is less than the threshold requiring certified cost or pricing data, the
Contractor shall provide such detail of related costs as to allow the Government to determine an equitable adjustment for the change document submission. Whenever the contract cost changes by an amount greater than the threshold requiring certified cost or pricing data, the Contractor shall complete such cost and pricing data as the Contracting Officer shall require detailing all related costs, and attach it to the change document. Requirements for cost and pricing data shall be determined by the gross amount of the change unless otherwise directed by the Contracting Officer. Change documentation shall be submitted to the Contracting Officer in accordance with the appropriate CDRL, and as described in paragraphs (c) through (f) below.
(c) Engineering Change Proposals (ECPs) - ECPs shall be prepared in accordance with the approved configuration management plan and the requirements of the contract. DI-SESS-80639D approved 7 April 2015, EIA-649-1 of Nov 2014 and MIL-HDBK-61A of 7 Feb 2001 apply. An ECP shall be submitted whenever the detail level physical configuration, material quality, operational or functional performance of equipment or installed systems will not be in compliance with baseline design-related documents (Specifications, Contract Drawings, etc.), and a change to the baseline document is considered an appropriate means of resolving a design-related issue. The contractor shall develop documentation in sufficient detail to enable Government review and evaluation of the merits of the proposed change, including cost and scheduling impact, ship class impact if applicable, and consequences if disapproved. List all existing drawings and technical manuals impacted by the change, including a brief narrative explanation of needed changes to incorporate the ECP if approved. Provide weight and moment data incidental to the change, if applicable. The Contractor shall also prepare applicable baseline document insert sheets, with specific word changes or proposed re-write, to facilitate baseline documentation changes.
(d) Non-Engineering Change Proposals (NECPs) – An NECP shall be submitted whenever necessary to document administrative, procedural, scheduling, or documentation changes that do not directly impact the physical configuration of the equipment. The NECP shall explain the nature of the problem, identify the applicable baseline document (i.e., Contract Data Requirement List (CDRL), Contract Clause, etc.) and provide a detailed explanation justifying the proposed course of action desired to resolve the problem. Insert sheets for applicable documents shall also be attached to facilitate change action in the event the NECP is approved.
(e) Deviations/Waivers - In the event that a baseline design-related document requirement cannot be met, and a change to the baseline document is considered inappropriate, the Contractor shall submit a Request for Variance.
The explanation of "Need for Deviation/Waiver" in the DD1694 shall provide detailed justification and consequences of approval, to include technical details explaining the degree of non-compliance and the effect on ship equipment or system operation.
(f) Equitable Adjustments for Change Documentation Preparations - For its effort expended in preparing ECPs, NECPs, and Deviations/Waivers, the Contractor shall receive equitable adjustment under the following circumstances:
(1) In the event the Contractor, on its own initiative, and without written request from the Contracting Officer, develops a change document that is later disapproved by the Government, the Contractor shall bear the cost of this effort.
(2) To avoid such loss, and at its option, the Contractor may submit a "preliminary" document that outlines intent, but without detailed supporting documentation and request the Contracting Officer's approval for expenditure of effort to complete the detailed supporting documentation. In the event the Contracting Officer denies this request, the Contractor will bear the cost of development of the "preliminary" document, and shall make no further effort to complete detailed supporting documentation.
(3) In the event the Contracting Officer approves the Contractor's request to develop supporting documentation, the Contractor shall be equitably compensated for its effort for both the "preliminary" and "final" documentation, regardless of whether or not the change document is later approved.
(4) In the event the Contracting Officer requests in writing that the Contractor develop change documentation, the effort expended by the Contractor in developing such documentation shall be subject to equitable adjustment, regardless of whether or not the change document is later approved.
(5) In the event the Contractor, on its own initiative, and without written request from the Government, develops a change document that is later approved by the Contracting Officer, the cost of developing such documentation shall be subject to equitable adjustment.
(6) Failure to agree to such equitable adjustment in contract price shall constitute a dispute, and shall be adjudicated in accordance with the requirements of the clause entitled "Disputes" (FAR 52.233-1).
(g) Any cost reduction proposal submitted pursuant to the clause entitled "Value Engineering" (FAR 52.248-1) shall be submitted as a Value Engineering Change Proposal (VECP). The Contractor shall follow the VECP preparation requirements of FAR 52.248-1(c) and any additional guidance provided by the Contracting Officer.
C-245-H005 INFORMATION AND DATA FURNISHED BY THE GOVERNMENT--ALTERNATE I
(NAVSEA) (MAY 2019)
(a) Contract Specifications, Drawings and Data. The Government will furnish, if not included as an attachment to the contract, any unique contract specifications or other design or alteration data cited or referenced in Section C.
(b) Government Furnished Information (GFI). GFI is defined as that information essential for the installation, test, operation, and interface support of all Government Furnished Material identified in an attachment in Section J. The Government shall furnish only the GFI identified in an attachment in Section J. The GFI furnished to the contractor need not be in any particular format. Further, the Government reserves the right to revise the listing of GFI as follows:
(1) The Contracting Officer may at any time by written order:
(i) delete, supersede, or revise, in whole or in part, data identified in an attachment in Section J; or
(ii) add items of data or information to the attachment identified in Section J; or
(iii) establish or revise due dates for items of data or information in the attachment identified in Section J.
(2) If any action taken by the Contracting Officer pursuant to subparagraph (1) immediately above causes an increase or decrease in the costs of, or the time required for, performance of any part of the work under this contract, the contractor may be entitled to an equitable adjustment in the contract amount and delivery schedule in accordance with the procedures provided for in the "CHANGES" clause of this contract.
(c) Except for the Government information and data specified by paragraphs (a) and (b) above, the Government will not be obligated to furnish the Contractor any specification, standard, drawing, technical documentation, or other publication, notwithstanding anything to the contrary in the contract specifications, the GFI identified in an attachment in Section J, the clause of this contract entitled "Government Property" (FAR 52.245-1) or "Government Property Installation Operation Services" (FAR 52.245-2), as applicable, or any other term or condition of this contract. Such referenced documentation may be obtained:
(1) From the ASSIST database via the internet at https://assist.dla.mil/online/start/; or
(2) By submitting a request to the
Department of Defense Single Stock Point (DoDSSP)
Building 4, Section D
700 Robbins Avenue Philadelphia, Pennsylvania 19111-5094 Telephone (215) 697-6396 Facsimile (215) 697-9398.
Commercial specifications and standards, which may be referenced in the contract specification or any sub-tier specification or standard, are not available from Government sources and should be obtained from the publishers.
C-246-H002 GOVERNMENT USE OF CONTRACTOR’S INSPECTION EQUIPMENT (NAVSEA) (OCT 2018)
The contractor's gages, measuring, and testing devices shall be made available to the Government when required to determine contractor conformance with contract requirements. If conditions warrant, the contractor’s personnel shall be made available for operation of such devices and for verification of their accuracy and condition.
Section D - Packaging and Marking
D-211-H001 PACKAGING OF DATA (NAVSEA) (OCT 2018)
Data to be delivered by Integrated Digital Environment (IDE) or other electronic media shall be as specified in the contract.
All unclassified data to be shipped shall be prepared for shipment in accordance with best commercial practice.
Classified reports, data, and documentation shall be prepared for shipment in accordance with National Industrial Security Program Operating Manual (NISPOM), DOD 5220.22-M dated 28 February 2006 incorporating Change 2 dated 18 May 2016.
D-247-H001 ADDITIONAL MARKING REQUIREMENTS FOR FMS ITEMS (NAVSEA) (OCT 2018)
(a) The following identifying marks shall appear on the outside of each box, parcel and/or crate and all shipping papers included in each shipment:
NAVY
FMS CASE To be identified in each delivery order containing FMS REQUISITION NO. To be identified in each delivery order containing FMS ITEM DESCRIPTION To be identified in each delivery order containing FMS
If a consolidated shipment of several items in one container is forwarded, add to the above information
"CONSOLIDATED SHIPMENT, CONTAINS ____ ITEMS".
(b) The inscription "UNITED STATES OF AMERICA" shall be affixed in a suitable size indelible stencil, label or printed form on all external shipping containers or the exterior surface of uncrated items.
(c) All invoices, correspondence, reports and other documents shall be identified with the appropriate FMS case designator, requisition number(s), and item description(s).
D-247-W001 PROHIBITED PACKING MATERIALS (NAVSEA) (OCT 2018)
The use of asbestos, excelsior, newspaper or shredded paper (all types including waxed paper, computer paper and similar hygroscopic or non-neutral material) is prohibited. In addition, the use of yellow wrapping or packaging material is prohibited except where used for the containment of radioactive material. Loose fill polystyrene is prohibited for shipboard use.
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Origin Contractor Destination Government 0002 Origin Contractor Destination Government 0003 Origin Contractor Destination Government 0004 Destination Government Destination Government
CLAUSES INCORPORATED BY REFERENCE
52.246-2 Inspection Of Supplies--Fixed Price AUG 1996 52.246-15 Certificate of Conformance APR 1984 52.246-16 Responsibility For Supplies APR 1984
52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)
(a) The Contractor shall comply with the higher-level quality standard(s) listed below.
ISO 9001:2015
(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph
(a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require--
(i) Control of such things as design, work operations, in-process control, testing, and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
E-246-H013 INSPECTION AND ACCEPTANCE OF DATA (NAVSEA) (OCT 2018)
Inspection and acceptance of all data shall be as specified on the attached Contract Data Requirements List(s), DD Form 1423.
E-246-H016 INSPECTION AND ACCEPTANCE OF F.O.B. DESTINATION DELIVERIES (NAVSEA)
(OCT 2018)
Item(s) 0001 through 0004 - Inspection and acceptance shall be made at destination by a representative of the Government.
E-246-H020 QUALITY MANAGEMENT SYSTEM REQUIREMENTS (NAVSEA) (OCT 2018)
The Contractor shall provide and maintain a quality management system that, as a minimum, adheres to the requirements of ASQ/ANSI/ISO 9001:2015 “Quality Management Systems – Requirements” and supplemental requirements imposed by this contract. The quality management system procedures, planning, and all other documentation and data that comprise the quality management system shall be made available to the Government for review. Existing quality documents that meet the requirements of this contract may continue to be used. The Government may perform any necessary inspections, verifications, and evaluations to ascertain conformance to requirements and the adequacy of the implementing procedures. The Contractor shall flow down such standards, as applicable, to lower-tier subcontractors under instances covered in FAR 52.246-11(b) or at the direction of the Contracting Officer. The Government reserves the right to disapprove the quality management system or portions thereof when it fails to meet the contractual requirements.
E-246-H022 INSPECTION AND TEST RECORDS (NAVSEA) (JAN 2019)
Inspection and test records shall, as a minimum, indicate the nature of the observations, number of observations made, and the number and type of deficiencies found. Data included in inspection and test records shall be complete and accurate, and shall be used for trend analysis and to assess corrective action and effectiveness. The data shall, on request, be identified and made available for on-site review by the Contracting Officer or designated Government representative.
E-246-W002 CERTIFICATE OF COMPLIANCE (NAVSEA) (OCT 2018)
(a) A certification of material shall be provided by the Contractor, one (1) copy to accompany the shipment (in the packing list envelope) and (l) copy mailed to arrive at time of receipt of the shipment. Mark all certificates to the attention of Code 00Q.
(b) The certificate shall state compliance of material with drawing specification and contract/order requirements. The certificate shall as a minimum state the company name, contract/order number, drawing or specification number, and date. The certificate shall state, above the signature of a legally authorized representative of the company, the following:
This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section 1001.
(c) Failure to provide certification at the time of shipment may result in material being rejected and returned at the contractor's expense.
(d) The certificate shall read as follows:
I certify that on ______ [insert date], the ____ [insert Contractor’s name] furnished the supplies called for by the Order/Contract No._____ via ____ [Carrier] on ________ [identify the bill of lading or shipping document] in accordance with all applicable requirements. I further certify that the supplies or services are of the quality specified and conform in all respects with the contract requirements, including specifications, drawings, preservation, packaging, packing, marking requirements, and physical item identification (part number), and are in the quantity shown on this document.
Date of Execution: ________________________________ Signature: _______________________________________ Typed Name: ____________________________________ Title: ___________________________________________
E-246-W003 INSPECTION STANDARDS (NAVSEA) (OCT 2018)
Acceptance inspection of lots or batches will be in accordance with American National Standard ANSI/ASQ Z1.4-2003. Unless otherwise specified, attributes, which if defective would prohibit or reduce the usability of the product for its intended purpose, will be inspected at an acceptable quality level (AQL) of 1.0. Attributes which do not materially reduce the usability of the product will be inspected at an AQL of 2.5. Any attributes classified as critical on the technical documentation will be inspected on each unit of product submitted. The right is reserved to reject any unit of product found nonconforming during inspection whether that unit of product forms a part of a sample or not, and whether the lot or batch as a whole is accepted or rejected.
E-246-W007 NOTIFICATION OF INSPECTION OR TEST (NAVSEA) (OCT 2018)
The Contractor agrees to notify the Technical Point of Contact (TPOC) identified in G-242-H001, Government Contract Administration Points of Contact & Responsibilities, in writing, when the material will be inspected and/or tested. A minimum of 30 calendar days is required to arrange such a visit.
Section F - Deliveries or Performance
NOTE F.1
The Delivery Date periods identified in “Delivery Information” will be adjusted based on the actual date of contract award. The intent is to include a 5-year ordering period.
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 20-FEB-2022 TO
19-FEB-2027
N/A NAVAL UNDERSEA WARFARE CENTER
RECEIVING OFFICER
ATTN: DIVISION KEYPORT SUPPLY
OFFICER
BLDG 893
610 DOWELL STREET
KEYPORT WA 98345-7610
360 396-2760
N00253
0002 POP 20-FEB-2022 TO
19-FEB-2027
N/A NAVAL UNDERSEA WARFARE CENTER
CONTRACTING OFFICER
SEE CONTRACT DATA REQUIREMENTS
LIST
VARIOUS WA 98345
360-315-2215
0003 POP 20-FEB-2022 TO
N/A NAVAL UNDERSEA WARFARE CENTER
RECEIVING OFFICER
ATTN: DIVISION KEYPORT SUPPLY
OFFICER
BLDG 893
610 DOWELL STREET
KEYPORT WA 98345-7610
360 396-2760
0004 POP 20-FEB-2022 TO
N/A NAVAL UNDERSEA WARFARE CENTER
CONTRACTING OFFICER
SEE CONTRACT DATA REQUIREMENTS
LIST
VARIOUS WA 98345
360-315-2215
52.211-17 Delivery of Excess Quantities SEP 1989 52.242-15 Stop-Work Order AUG 1989 52.242-17 Government Delay Of Work APR 1984 52.247-34 F.O.B. Destination NOV 1991
F-242-H001 CONTRACTOR NOTICE REGARDING LATE DELIVERY (NAVSEA) (OCT 2018)
In the event the contractor anticipates or encounters difficulty in complying with the contract delivery schedule or date, the contractor shall immediately notify, in writing, the Contracting Officer and the cognizant Contract Administration Services Office, if assigned. The notice shall give the pertinent details; however, such notice shall not constitute a waiver by the Government of any contract delivery schedule, or of any rights or remedies provided by law or under this contract.
52.211-8 TIME OF DELIVERY (JUN 1997)
(a) The Government requires delivery to be made according to the following schedule:
REQUIRED DELIVERY SCHEDULE
(a) The Government requires delivery to be made according to the following schedule:
REQUIRED DELIVERY SCHEDULE
Item No. Quantity Within Days
0001 3 each 120 days after delivery order award 0002 Per Order each 90 days after first article acceptance 0003 Per Order each 90 days after first article acceptance 0004 1 Lot Per Exhibit A
The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.
OFFEROR'S PROPOSED DELIVERY SCHEDULE
Item No. Quantity Within Days 0001 3 each
0002 Per Order each
0003 Per Order each
0004 1 Lot
(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the Contractor's date of receipt of the contract or notice of award by adding (1) five calendar days for delivery of the award through the ordinary mails, or (2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term "working day" excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.
F-247-H001 DELIVERY OF DATA (NAVSEA) (OCT 2018)
All data to be furnished under this contract shall be delivered prepaid to the destination(s) and at the time(s) specified on the Contract Data Requirements List(s), DD Form 1423.
(End of Text)
Section G - Contract Administration Data
252.204-7006 Billing Instructions OCT 2005 252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
DEC 2018
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)
(a) Definitions. As used in this clause—
“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232- 7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall—
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items—
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
INVOICE & RECEIVING REPORT (COMBO) SOURCE/DESTINATION
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
N/A
(iii) For customary…