N0025322R0023-0007.pdf

PDF 166 KB Posted

Attached to
MK96 Mod 2, Cold Gas Fleet Exercise Section, Bag Assembly
Solicitation number
N0025322R0023
Issued by

View the file

Other files

File Type Posted
N0025322R0023-0011.pdf PDF
N0025322R0023-0010.pdf PDF
N0025322R0023-0009.pdf PDF
N0025322R0023-0008.pdf PDF
Attachment 2 NAVSEA 4340-2_GFI List (4-6-22).pdf PDF
N0025322R0023-0006.pdf PDF
N0025322R0023-0005.pdf PDF
Attachment 4 Past Performance References (2-2-22).docx DOCX document
N0025322R0023-0004.pdf PDF
Attachment 3 Pricing (2-2-22).xlsx XLSX spreadsheet
N0025322R0023-0003.pdf PDF
N0025322R0023-0002.pdf PDF
N0025322R0023-0001.pdf PDF
RFP N0025322R0023.pdf PDF
CDRL A002 Failure Analysis Report (9-15-21).pdf PDF
Attachment 3 Section B (9-15-21).xlsx XLSX spreadsheet
Attachment 2 NAVSEA 4340-2_GFI List.pdf PDF
Attachment 1 Drawings (Placeholder).docx DOCX document
CDRL A001 Test Report (9-15-21).pdf PDF
Attachment 4 Past Performance References (9-15-21).docx DOCX document
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to: 1) respond to industry questions; 2) replace draw ing 8290040 Rev D w ith 8290040 Rev D (Redline for NOR 54_ECP-K_22023-001) in Attachment (1); 3) update Attachment (2), Government Furnished Information, to reflect the draw ing change;

and 4) extend the closing date as show n herein.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 06-Apr-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0025322R0023

X 9B. DATED (SEE ITEM 11)

08-Oct-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

06-Apr-2022

CODE

NAVAL UNDERSEA WARFARE CENTER

ATTN: JULIE THOMAS

JULIE.THOMAS@NAVY.MIL

610 DOWELL STREET, BLDG 206

KEYPORT WA 98345

N00253 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N0025322R0023

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SUMMARY OF CHANGES (REVISED)

The following have been added by full text:

QUESTIONS & ANSWERS (9 - 13)

Question 9: What is the overall bag thickness? We have identified the strap thickness, but could not find the bag thickness on the drawings.

Answer 9: The overall bag thickness is 40 to 50 mils. See the redlined drawing 8290040 and NOR 54/ECP-K/22023-001 provided with this amendment; specifically, refer to the change to the CAGE Code for Item No. 1, polyurethane. Use of this supplier’s product, or another supplier’s product that meets the specifications contained in the cited Part or Ident No. #L1336DEP Orange, meets the overall bag thickness requirement.

Question 10: Can the Government provide a picture of the bag corners?

Answer 10: A picture of the bag corners is not available. However, see the redlined drawing 8290040 and NOR 54/ECP-K/22023-001 provided with this amendment. The Government believes the desired information is contained therein.

Question 11: Can you provide any additional clarification on the corners?

Answer 11: The Company who submitted this question did not respond to the Government’s request for specificity regarding the additional information requested.

Therefore, the Government is unable to answer this question.

Question 12: We are planning on having ISO 9001 certification by the end of the year. Is that acceptable?

Answer 12: Per Section L, Factor 1 Technical, Subfactor 1b Technical Quality, “Offeror must provide evidence of internal quality management plan or process that is ISO 9001:2015 or comparable, including oversight of subcontractors and material acquisition.

Provide a copy of its current ISO 9001:2015, or comparable, certification.” In order to provide a copy of a current certification, the Offeror must have a current/active ISO 9001:2015, or comparable, certification at the time of proposal submission.

Question 13: Please provide more details on bonding the edges and corners; we need to see detail on how those ends are put together.

Answer 13: See the redlined drawing 8290040 and NOR 54/ECP-K/22023-001 provided with this amendment. Drawing Note 12, which is unaffected by redlines, already provides direction on the processes to use for joining the bag material together at the

N0025322R0023 seams. As indicated, the bond area markings in the section views on sheet 3 indicate areas of seam overlap where these processes are to be applied. The corners of the bag are considered seams, so the direction per Note 12 applies. Thus, the corners shall be bonded (crimped) together by heat or plastic weld.

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 08-Apr-2022 01:00 PM to 22-Apr-2022 01:00 PM.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Exhibit A01 A001 Test & Inspection

Report (CDRL)

1 15-SEP-2021

Exhibit A02 A002 Failure Analysis & Corrective Action Report

1 15-SEP-2021

Attachment 1 Drawings (Placeholder) 1 15-SEP-2021 Attachment 2 NAVSEA Form 4340/2

Government Furnished Information List

1 15-SEP-2021

Attachment 3 Pricing 2 02-FEB-2022 Attachment 4 Past Performance

References

02-FEB-2022

to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Exhibit A01 A001 Test & Inspection

Report (CDRL)

1 15-SEP-2021

Exhibit A02 A002 Failure Analysis & Corrective Action Report

1 15-SEP-2021

Attachment 1 Drawings (Placeholder) 1 06-APR-2022 Attachment 2 NAVSEA Form 4340/2

Government Furnished Information List

1 06-APR-2022

Attachment 3 Pricing 2 02-FEB-2022 Attachment 4 Past Performance

References

02-FEB-2022

(End of Summary of Changes)

File details come from the government source that posted it. Updated .