This is a Request for Proposal (RFP) issued by the Washington Convention and Sports Authority, operating as Events DC, for Lenel Access Control Modernization and Infrastructure Upgrade Services at the Walter E. Washington Convention Center. The project encompasses complete replacement, upgrade, and modernization of the existing Lenel OnGuard Access Control System throughout the 2.3 million square foot facility, including migration from legacy 7.x components to Lenel OnGuard 8.3 or newer, deployment of new intelligent controllers, network infrastructure, HID iClass SEOS credentialing systems, and CAD-based as-built documentation. The work is structured in six phases: server and network infrastructure, system migration, South Building implementation, Middle Building implementation, North Building implementation, and project closeout. The RFP was released January 22, 2026, with a pre-proposal conference and mandatory site visit scheduled for February 9, 2026, at 12:00 PM EST at the Convention Center. Written questions are due February 12, 2026, at 5:00 PM EST, and proposals must be submitted electronically by February 26, 2026, at 5:00 PM EST. The base contract term extends from the date of award through September 30, 2028, with four one-year renewal options available at Events DC's discretion.

This procurement includes a 35 percent set-aside for Certified Business Enterprises (CBEs) as mandated under the Small and Certified Business Enterprise Development and Assistance Amendment Act of 2014, restricting competition to qualified CBE firms. Contractors must be certified Lenel OnGuard Value-Added Resellers with a minimum of ten years of enterprise-level experience, possess at least six years with Lenel OnGuard 7.x or higher, provide a Lead Technician with Lenel Certified Professional (LCP) or Lenel Certified Expert (LCE) credentials, and demonstrate a Project Manager with ten years of relevant experience managing projects exceeding $1 million. For contracts exceeding $300,000, contractors must comply with First Source Employment requirements ensuring 51 percent of new hires are District of Columbia residents and must award at least 35 percent of annual contract value to certified Small Business Enterprises or CBEs through a preliminary subcontracting plan. The project is structured as a firm-fixed-price contract with fully loaded hourly rates for personnel and other direct costs. Evaluation is based on technical merit (65 points maximum) and price (35 points maximum), with CBE preference points up to 12 points for a total maximum score of 112 points. No specific contract value is disclosed in the solicitation.

View the file

Other files for this state and local contract opportunity

Other files attached to LENEL ACCESS CONTROL MODERNIZATION AND INFASTRUCTURE UPGRADE SERVICES, newest first.
File Type Posted
Addenda_2_Lenel_Access_RFP.pdf PDF
Addenda_1_Lenel_Access_RFP.pdf PDF
Addenda_1_Lenel_Access_RFP.pdf PDF
RFP_Lenel_System_Final.pdf PDF
Pricing_Cost_Form_Lenel.pdf PDF
RFP_Lenel_System_Final.pdf PDF
Pricing_Cost_Form_Lenel.pdf PDF
Pricing_Cost_Form_Lenel.pdf PDF
REPRESENTATIONS_AND_CERTIFICATIONS~2.pdf PDF
SBE_Subcontracting_Plan.pdf PDF
2020_ACH_FORM.pdf PDF
FIRST_SOURCE_EMPLOYMENT_AGREEMENT_-_Non-Construction_-_Final_02222016_0_(1).pdf PDF
OCPS_Disclosure_Statement_2025.pdf PDF
W9_Form_2.pdf PDF
2020_ACH_FORM.pdf PDF
Events_DC_SCTs_March_2025_FINAL_(no_construction_terms)_(1).pdf PDF
W9_Form_2.pdf PDF
2020_ACH_FORM.pdf PDF
FIRST_SOURCE_EMPLOYMENT_AGREEMENT_-_Non-Construction_-_Final_02222016_0_(1).pdf PDF
OCPS_Disclosure_Statement_2025.pdf PDF
W9_Form_2.pdf PDF
Events_DC_SCTs_March_2025_FINAL_(no_construction_terms)_(1).pdf PDF
Rules_of_the_Jobsite_for_Contractors_Updated_October_2014_(1).pdf PDF
SBE_Subcontracting_Plan.pdf PDF
Final_Tax_Certification_Affidavit-NEW.pdf PDF
Rules_of_the_Jobsite_for_Contractors_Updated_October_2014_(1).pdf PDF
Final_Tax_Certification_Affidavit-NEW.pdf PDF
REPRESENTATIONS_AND_CERTIFICATIONS~2.pdf PDF
FIRST_SOURCE_EMPLOYMENT_AGREEMENT_-_Non-Construction_-_Final_02222016_0_(1).pdf PDF
OCPS_Disclosure_Statement_2025.pdf PDF
SBE_Subcontracting_Plan.pdf PDF
Events_DC_SCTs_March_2025_FINAL_(no_construction_terms)_(1).pdf PDF
Final_Tax_Certification_Affidavit-NEW.pdf PDF
REPRESENTATIONS_AND_CERTIFICATIONS~2.pdf PDF
Rules_of_the_Jobsite_for_Contractors_Updated_October_2014_(1).pdf PDF
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP for LENEL ACCESS CONTROL MODERNIZATION AND INFASTRUCTURE UPGRADE SERVICES

BID #25-S-026

P a g e 1 | 28

LENEL ACCESS CONTROL MODERNIZATION AND INFASTRUCTURE UPGRADE

SERVICES

REQUEST FOR PROPOSAL (RFP)

BID # 25-S-026

The Washington Convention and Sports Authority t/a Events DC is soliciting proposals from qualified contractors to provide Lenel Access Control Modernization And Infrastructure Upgrade Services at the Walter E. Washington Convention Center.

This Request for Proposal (“RFP”) has a thirty-five percent (35%) set-aside for a Certified Business Enterprise (CBE) as required under the provisions of “The Small and Certified Business Enterprise Development and Assistance Amendment Act of 2014” (the “Act”), effective June 10, 2014.

Interested parties can view a copy of the RFP by accessing Event DC’s e-Procurement website at https://eventsdc.com/about/procurement.

Key Dates

RFP Release Date: Thursday, January 22, 2026

RFP Pre-Proposal Conference: Monday, February 9, 2026; 12:00PM, EST

RFP Questions Due Date: Thursday, February 12, 2026; 5:00PM, EST

RFP Response Due Date: Thursday, February 26, 2026; 5:00PM, EST

Primary Contact

Name: Gerald Green Deputy Director, Office of Contracts and Procurement Services Email: ggreen@eventsdc.com Phone: (202) 249-3028 https://eventsdc.com/about/procurement mailto:ggreen@eventsdc.com

BID #XX

P a g e 2 | 28

TABLE OF CONTENTS

Section A – Introduction……….…………..……………………….……………………

Section B – General Information………………….……………….……………………….4

Section C – Scope of Work………………………………………………………………….6

Section D – Contract Term, Deliverables and Performance……………...…….………..9

Section E – Specific Contract Terms and Conditions/Special Contract Requirements.11

Section F – Contract Clauses…………………….…………………....…………………..16

Section G – Submission Requirements…………......……………………………….……17

Section H – Technical Approach………...……….….……….………………………...…18

Section I – Cost Proposal…………………..………………………………………….…..21

Section J – Evaluation Factors……………..….…………………………………….……24

Section K – List of Attachments………………...……….……………………………….28

P a g e 3 | 28

SECTION A – INTRODUCTION

A.1 The Washington Convention and Sports Authority t/a Events DC (“Events DC”) is an independent authority of the District of Columbia (“District”) Government and operates as a corporate body with a legal existence separate from the District. Events DC is governed by a twelve (12)-member Board of Directors appointed in accordance with D.C. Code § 1-

1202.05. The organization’s day-to-day operations are managed by its President/Chief Executive Officer.

A.2 Events DC is responsible for promoting, developing, and maintaining the District as a location for conventions, trade shows, meetings, concerts, sporting and entertainment events, and other special events. In that regard, it owns, manages and/or operates the Walter E. Washington Convention Center (the “Convention Center”), the Carnegie Library at Mt.

Vernon Square, Robert F. Kennedy Memorial Stadium and its surrounding campus (which includes the Festival Grounds, the Fields at RFK Campus, and Skate Park), the non-military portions of the District of Columbia Armory, Gateway DC, the R.I.S.E. Demonstration Center, Nationals Park, and CareFirst Arena.

A.3 The Convention Center is a 2.3 million square foot convention and meeting facility that includes seven hundred and three thousand (703,000) square feet of exhibit space, a total of seventy-seven (77) break-out rooms and the largest ballroom in the Mid-Atlantic region.

The Convention Center has five (5) vertical levels [(2) of which are under grade], and spans three (3) city blocks. The levels above grade are divided into three (3) separate buildings connected by bridges across L and M Streets. The Convention Center hosts approximately two hundred (200) events per year with an average annual attendance figure of 1.2 million people.

A.4 Events DC is seeking a qualified contractor (the “Contractor”) to provide Lenel Access Control Modernization and Infrastructure Upgrade Services (the “Services” or “Work”) at the Convention Center.

A.5 Events DC intends to award a Firm-Fixed-Price contract (the “Contract”) for the Services.

[End of Section A]

P a g e 4 | 28

SECTION B – GENERAL INFORMATION

B.1 GENERAL DESCRIPTION OF WORK

(a) Events DC seeks an experienced Contractor to provide the Services at the Convention Center.

(b) The Contractor(s) will conduct all Work under the direction of Events DC’s designated on-site representative, the Contracting Officer’s Technical Representative (“COTR”). Contact information for the COTR will be provided at the time of Contract award.

(c) Events DC contemplates the award of a Firm-Fixed-Price contract for the Work detailed in Section C below. The Base Term of the Contract will be from date of award to September 30, 2028 with four (4), one-year renewal option years (each an “Option,” collectively, the “Option Years”).

(d) Vendors wishing to respond to this RFP (“Offerors”) must register in the Events DC e-Procurement system. Reponses must be submitted electronically. An Offeror’s response must include two (2) separate submissions: a “Technical Proposal” and a “Cost Proposal”, as outlined in Sections I and J respectively below.

B.2 CONTRACTOR QUALIFICATIONS

To be considered for award of the Contract, the Contractor must:

(a) Be a certified Lenel OnGuard Value-Added Reseller (“VAR”) with a minimum of ten (10) years of documented experience and proven performance supporting enterprise level Lenel Systems;

(b) Possess at least six (6) years of demonstrated experience with Lenel OnGuard 7.x or higher;

(c) Possess a Lead Technician with a valid Lenel Certified Professional (LCP) or Lenel Certified

Expert (LCE) credential with at least six (6) years proven capabilities with Lenel intelligent controllers, LNL-1320 boards, HID Signo or iClass SEOS readers;

(d) Possess a Project Manager with at least ten (10) years of relevant project experience with projects exceeding $1 million with demonstrated experience of the Work identified in Section C.1. below;

(e) Be able to provide relevant examples in one or more “first tier” major market convention centers (i.e., a convention center with a minimum of 500,000 gross square feed of exhibit space) or a four-star hotel with a minimum of two hundred (200) rooms as the principal stakeholder that demonstrate the Work as identified in Section C.1. below;

(f) Perform all Work in conformance with applicable federal, state and District laws, codes and regulations; and

(g) Perform all Work in compliance with NFPA 72, UL294 and OSHA standards.

B.3 PRE-PROPOSAL CONFERENCE/SITE VISIT

(a) A Pre-Proposal Conference/Site Visit (the “Site Visit”) is scheduled for Monday, February 9, 2026; 12:00PM, EST for all prospective Offerors. Notification of intent to attend must be

P a g e 5 | 28 provided via e-mail to Gerald Green, Deputy Director, Office of Contracts and Procurement at ggreen@eventsdc.com no later than 3:00PM, EST, Friday, Friday, February 6, 2026.

(b) Prospective Bidders shall meet at the Walter E. Washington Convention Center, Office of Contracts and Procurement, 801 Allen Y. Lew Place, NW, Jarvis Boardroom, Washington, DC, 20001. The number of individuals representing each prospective Bidder is limited to three (3).

(c) The purpose of the Site Visit is to walk potential Bidders through the facilities, and to provide an opportunity for informal questions and answers. If a prospective Bidder desires a binding answer to any question asked and answered informally at the Site Visit, the questions must be submitted in writing through the e-Procurement system at https://eventsdc.com/about/procurement.

B.4 QUESTIONS

(a) If a prospective Offeror has any questions relative to this RFP, the Offeror shall submit the questions in the e-Procurement system via the “Q&A” tab of the Bid to receive a binding answer.

Any question asked and answered outside of the e-Procurement system will be considered informal and non-binding.

(b) Questions shall be received no later than Thursday, February 12, 2026; 5:00PM, EST. Events DC will not consider any questions received after this date.

(c) Events DC will furnish responses promptly to the requesting prospective Offeror and to other prospective Offerors if deemed by Events DC to be necessary to prepare a complete and accurate proposal, or if the lack of a copy of the response would be prejudicial to any other prospective Offeror.

[End of Section B] mailto:ggreen@eventsdc.com https://eventsdc.com/about/procurement

P a g e 6 | 28

SECTION C – SCOPE OF WORK

C.1 GENERAL REQUIREMENTS

Events DC seeks a Contractor to provide the Services at the Convention Center. The Contractor will replace, upgrade and modernize the existing Lenel OnGuard Access Control System throughout the Convention Center. The Contractor must be able to perform all of the tasks listed in Sections C.1.1 through C.1.7 below. The Work performed by the Contractor shall include, but is not limited to, the following:

C.1.1. SCOPE OF WORK

(a) The Contractor shall modernize the Lenel OnGuard Access Control System and ensure system reliability, cybersecurity compliance, and long-term maintainability by replacing current end-of-life hardware, upgrading software to the current Lenel OnGuard release, and deploying new controllers, network infrastructure, and credentialing across the Convention Center.

(b) The Contractor shall replace Legacy 7.x components and servers with Lenel OnGuard 8.3 or newer.

(c) The Contractor shall upgrade controller boards, panels, peripherals door devices (readers, strikes, and REX sensors.

(d) The Contractor shall transition credentialing operations to encrypted, FIPS-compliant HID iCLASS SEOS or equivalent smart cards.

(e) The Contractor shall deliver new CAD-based, as-built documentation and asset mapping for all installed components.

(f) The Contractor shall provide comprehensive training and turnover documentation for Events DC’s Security and Facilities staff.

C.1.2 PHASE 1 - SERVER AND NETWORK INFRASTRUCTURE

(a) The Contractor shall inventory and baseline the existing Lenel system.

(b) The Contractor shall remove existing Lenel servers, and furnish and failover servers for redundancy.

(c) The Contractor shall configure and install Lenel OnGuard Pro Network Server software with primary and secondary database replication.

(d) The Contractor shall furnish and install MDF/IDF network components, including switches, fiber interconnects, wall-mount or free-standing racks, and all cabling.

(e) The Contractor shall ensure all racks meet fire-rate mounting and labeling standards.

(f) The Contractor shall furnish and install a new ID badge printer system compatible with Lenel OnGuard 8.3 or higher. The printer shall support dual-sided color printing, high resolution

P a g e 7 | 28 retransfer printing, and include lamination and encoding functionalities for HID iClass SEOS credentials.

(g) The Contractor shall install, configure and connect the printer to the Lenel credentialing workstation while ensuring driver and firmware compatibility with Events DC’s network and security standards.

C.1.3 PHASE 2 – SYSTEM MIGRATION

(a) The Contractor shall validate existing M-Series and downstream reader boards.

(b) The Contractor shall migrate all active reader connections and associated data to the new server(s) environment with minimal downtime.

(c) The Contractor shall transfer, verify, and validate the Lenel database, access groups, and credential records.

(d) The Contractor shall decommission legacy servers following the successful acceptance testing.

C.1.4 PHASE 3 – SOUTH BUILDING IMPLEMENTATION

(a) The Contractor shall remove and replace all access control panels, cabling and door peripherals.

(b) The Contractor shall install Intelligent Dual Reader Controls, Reader Boards and Card Readers.

(c) The Contractor shall integrate new composite cabling and relays for door strikes and sensors.

(d) The Contractor shall conduct functional testing and user training for all South Building access points.

C.1.5 PHASE 4 – MIDDLE BUILDING IMPLEMENTATION

(a) The Contractor shall perform the same modernization tasks as described in Section C.1.4 for the Middle Building.

(b) The Contractor shall replace and label all wiring, readers and controllers.

(c) The Contractor shall verify connectivity and convert all devices to the current Lenel protocol.

C.1.6 PHASE 5 – NORTH BUILDING IMPLEMENTATION

(a) The Contractor shall complete infrastructure replacement for all remaining access control points.

(b) The Contractor shall replace legacy door strikes, REX devices, and readers.

(c) The Contractor shall integrate each endpoint into the new Lenel 8.3 environment and verify operations.

P a g e 8 | 28

C.1.7 PHASE 6 – PROJECT CLOSEOUT

(a) The Contractor shall provide final CAD drawings showing panel, door and device locations.

(b) The Contractor shall update MDF/IDF rack layouts and cable pathways.

(c) The Contractor shall deliver device matrix identifying boards, IP addresses, MAC addresses, and switch port mapping.

(d) The Contractor shall provide warranty documentation and equipment specification booklets.

(e) The Contractor shall deliver comprehensive testing results and training certification sign-offs.

(f) The Contractor shall submit final close-out report and confirmation of punch-list completion.

[End of Section C]

P a g e 9 | 28

SECTION D – CONTRACT TERM, DELIVERABLES AND PERFORMANCE

D.1 TERM OF CONTRACT

(a) The base term of the Contract shall be from date of award through September 30, 2028.

(b) Events DC has the right to extend the term of the Contract for four (4), one-year option periods, or successive fractions thereof, by written modification to the Contract before expiration, provided that Events DC gives the Contractor preliminary written notice of its intent to extend at least thirty (30) days before the Contract expires. The preliminary notice does not commit Events DC to an extension. The Contractor may waive the thirty (30) day preliminary notice requirement by providing a written waiver to the COTR prior to expiration of the Contract. The exercise of an Option is subject to the availability of funds at the time the Option is exercised.

D.2 DELIVERABLES

The Contractor shall provide, at a minimum, the deliverables described below. Additionally, and upon request, the Contractor shall provide other reports which may be presented to Events DC’s Board of Directors, or the Council of the District of Columbia.

DELIVERABLE

METHOD OF

DELIVERY DUE DATE TO WHOM

Inventory of Existing Lenel

OnGuard Access Control Systems

Electronic TBD COTR

Project Timeline Reports Electronic TBD COTR

Close-Out Report Electronic TBD COTR

Warranty In-Person TBD COTR

Equipment Specification

Booklets In-Person TBD COTR

Invoices E-mail Monthly COTR and invoices@eventsdc.com

D.3 PERFORMANCE

(a) Events DC desires to obtain complete and satisfactory performance in accordance with the specifications and requirements of this RFP and the Contract. To this end, Events DC is contracting for the complete performance of services identified in Section C above and reserves mailto:invoices@eventsdc.com

P a g e 10 | 28 the right to assess deductions for non-performance. Events DC will consider inadequate performance to be as undesirable as non-performance, as the cost of correcting inadequate performance may equal or exceed the cost of initial performance.

(b) The Contractor may risk termination or replacement if continued engagement is contrary to a consistent productive relationship between the parties to the Contract, or poses an unacceptable risk to Events DC’s business and reputation in the marketplace.

D.4 CONTRACTOR FURNISHED EQUIPMENT

(a) The Contractor is solely responsible for the quality and performance of all Contractor provided materials and equipment. The Contractor shall be responsible for the cost of any repairs necessary to its equipment.

(b) The Contractor and its personnel shall be knowledgeable and trained in the proper use and operation of all equipment used to fulfill the requirements of the Contract.

(c) All Contractor provided materials, and equipment shall be available for inspection by Events DC at the request of the COTR.

[End of Section D]

P a g e 11 | 28

SECTION E – SPECIFIC CONTRACT PROVISIONS

E.1 STANDARD CONTRACT TERMS AND CONDITIONS

Events DC’s Standard Contract Terms and Conditions (March 2025) are located under the “Files” tab of the bid. In the event of a conflict between this RFP and the standard contract terms and conditions, the prevailing document shall be this RFP.

E.2 REQUIRED SUBCONTRACTING SET-ASIDE

Thirty-five percent (35%) of the annual total dollar value of the Contract has been set-aside for performance through subcontracting with businesses certified by the District’s Department of Small and Local Business Development as Small Certified Enterprises (“SBEs”). If there are insufficient qualified SBEs to completely fulfill this requirement, then the subcontracting requirement may be satisfied by subcontracting thirty-five percent (35%) of the total annual dollar value to any CBE, provided that all reasonable efforts shall be made to ensure that qualified CBEs are significant participants in the overall subcontracting work. Any Offeror responding to this RFP shall submit a preliminary subcontracting plan meeting the requirements of this section with its response to this RFP. Any Offeror failing to submit a plan with its response to this RFP will be deemed non-responsive. Further, final Contract award is contingent on approval of the plan by the COTR; disapproval of a subcontracting plan will result in non-award of the Contract. Once the plan is approved by the COTR and the Contract is awarded, changes may only occur with the prior written approval of Events DC’s Chief Contracting Officer and the Director of the District’s Department of Small and Local Business Development (“DSLBD”).

The preliminary subcontracting plan must include the following:

(a) The name and address of each subcontractor;

(b) The current certification number of each SBE or CBE subcontractor;

(c) The scope of work to be performed by each subcontractor; and

(d) The price to be paid by the beneficiary to each subcontractor.

A subcontracting plan template is available under the “Attachments” tab.

E.3 U.S. DEPARTMENT OF LABOR WAGE DETERMINATIONS

The Contractor shall be bound by the current and applicable Wage Determination No. 2015-4281, Revision 35, December 3, 2025, issued by the U.S. Department of Labor in accordance with the Service Contract Act (41 U.S.C. 351 et seq.), for the term of the Contract. If an option is exercised, the Contractor shall be bound by the applicable wage rate at the time of the exercise. If the option is exercised and a revised wage determination is applicable for the option period, the Contractor may be entitled to an equitable adjustment.

P a g e 12 | 28

E.4 INSURANCE

Prior to the commencement of any Work, the Contractor shall obtain and maintain throughout the term of the Contract, the following insurance coverage at its sole cost and expense:

(a) Commercial General Liability Insurance, written on an occurrence basis, at limits of at least $1,000,000 per occurrence and $2,000,000 general aggregate, for bodily injury and property damage liability, including broad form coverage for property damage, products and completed operations, personal injury (e.g., false arrest, false imprisonment, defamation, libel and slander, discrimination and invasion of privacy), independent contractor’s liability and contractual liability.

(b) Umbrella Liability Insurance (or excess liability insurance), which shall be excess of any general liability and automobile liability policy, and which shall be following form or be broader than underlying policies, at per occurrence limits of at least $5,000,000.

(c) Automobile Liability Insurance in the amount of at least $1,000,000 combined single limit, which shall cover bodily injury (or death) and property damage, and covering owned, hired or non-owned vehicles and any other equipment required to be licensed for road use.

(d) Workers’ Compensation Insurance at statutory limits, and employer’s liability coverage at limits of at least $100,000 per occurrence for bodily injury by accident and $100,000 per employee for bodily injury by disease; $500,000 policy limit.

(e) All-risk Property Insurance to protect against loss of owned or rented equipment and tools brought onto and/or used on any portion of the premises by Contractor and its subcontractors.

(f) Errors and Omissions/Professional Liability Insurance at limits of at least $5,000,000 per claim and $5,000,000 aggregate. The retroactive insurance date of such insurance shall be no later than the commencement date of the Contract.

(g) Cyber Liability Insurance at limits of at least $1,000,000 per claim and $3,000,000 aggregate, for claims resulting from a failure of computer security, theft or disclosure of confidential information, unauthorized access, unauthorized use, service attack, transmission of a computer virus, failure to protect personally identifiable or confidential information, and potential or actual violation of a privacy regulation.

All insurance policies shall be issued by companies licensed to do business in the District of Columbia and on forms acceptable to Events DC and shall provide that the coverage thereunder may not be reduced or canceled unless thirty (30) days unrestricted prior written notice thereof is furnished to Events DC. All insurance shall be primary and not contributory. All insurance policies shall be written by companies with an A.M. Best Co. rating of A+ VII or better and shall contain a waiver of subrogation in favor of Events DC. The policies described above shall each contain an endorsement to include the Washington Convention and Sports Authority t/a Events DC as additional insured or loss payee as applicable. The additional insured endorsements shall have no added exclusions or limitations of coverage to limits of liability contractually required or percentage of negligence attributed to the named insured. Certificates of insurance (or copies of policies, if required by Events DC) for the coverage described herein shall be furnished to Events DC prior to commencing Work and shall state that Events DC is an additional insured or loss payee as prescribed herein.

P a g e 13 | 28

The Contractor shall immediately notify Events DC of cancellation or material modification of any policy. If the insurance provided is not in compliance with the requirements herein, Events DC may, at its option, require the Contractor to stop Work pending such compliance.

The Contractor shall immediately report in writing to Events DC any incident that might reasonably be expected to result in any claim under any insurance required under the Contract. The Contractor shall cooperate fully with Events DC in the investigation and disposition of any claim arising out of the performance of the Contract.

E.5 INDEMNIFICATION

(a) The Contractor shall defend, indemnify and hold harmless Events DC, its directors, officers, agents, employees, and other representatives and, as applicable, the District of Columbia (each, an “Indemnified Party”), from and against any and all losses, expenses (including, without limitation, reasonable attorneys’ fees and costs), liabilities, judgments, demands, claims and damages of any kind arising from or relating to or as a consequence of any act, omission, neglect, breach or default of the Contractor, its agents, employees, or its subcontractors in connection with the Contract.

(b) The indemnification obligation under this section shall not be limited by the existence of any insurance policy or by any limitation on the amount or type of damages, compensation or benefits payable by or for Contractor or any subcontractor and shall survive the termination of the Contract. Events DC agrees to give Contractor written notice of any claim of indemnity under this section. Additionally, Contractor shall, at its own expense, control the defense or settlement of such claim with counsel satisfactory to Events DC, provided that Contractor shall not settle any claim which imposes upon an Indemnified Party any obligation, or in any way prejudices the rights of an Indemnified Party, without the Indemnified Party’s prior written consent. In addition to other remedies available to Events DC, Events DC may withhold or retain monies due or to become due to the Contractor under the Contract to satisfy any outstanding claim which Events DC may have against the Contractor.

E.6 51% DISTRICT RESIDENT NEW HIRES REQUIREMENT AND FIRST SOURCE

EMPLOYMENT AGREEMENT

(a) The Contractor shall comply with the First Source Agreement Act of 1984 (“First Source

Act”), D.C. Code § 2-219.01 et seq., as amended.

(b) The Contractor shall enter into and maintain, during the term of the Contract, a First Source

Employment Agreement with the District’s Department of Employment Services (“DOES”) in which the Contractor shall agree that:

1. The first source for finding employees to fill all jobs created in order to perform the

Contract shall be DOES; and

2. The first source for finding employees to fill any vacancy occurring in all jobs covered by the First Source Employment Agreement shall be the DOES First Source Register.

(c) The Contractor shall submit to DOES, no later than the 10th day of each month following execution of the Contract, a First Source Agreement Contract Compliance Report (“Compliance Report”) verifying its compliance with the First Source Agreement for the preceding month. The Compliance Report for the contract shall include the following:

P a g e 14 | 28

1. Number of employees needed;

2. Number of current employees transferred;

3. Number of new job openings created;

4. Number of job openings listed with DOES;

5. Total number of District residents hired for the reporting period and the cumulative total number of District residents hired; and

6. Total number of all employees hired for the reporting period and the cumulative total number of employees hired, including:

a. Name;

b. Social Security Number;

c. Job Title;

d. Hire Date;

e. Place of residence; and

f. Referral source for all new hires.

(d) If the Contract amount is equal to or greater than $300,000.00, the Contractor agrees that fifty-one percent (51%) of the new employees hired for the Contract shall be District residents.

(e) With the submission of the Contractor’s final request for payments from Events DC, the Contractor shall:

1. Document in a report to the Chief Contracting Officer its compliance with Section E.6(d); or

2. Submit a request to the Chief Contracting Officer for a waiver of compliance with Section E.6(d) and include the following documentation:

a. Material supporting a good faith effort to comply;

b. Referrals provided by DOES and other referral sources;

c. Advertisement of job openings listed with DOES and other referral sources; and

d. Any documentation supporting the waiver request to satisfy the requirements of

Section E.6(f) below.

(f) The Chief Contracting Officer may waive the provisions of Section E.6(d) if the Chief Contracting Officer finds that:

1. A good faith effort to comply is demonstrated by the Contractor;

2. The Contractor is located outside the Washington Standard Metropolitan Statistical Area and none of the contract Work is performed inside the Washington Standard Metropolitan Statistical Area which includes the District of Columbia; the Virginia cities of Alexandria, Falls Church, Manassas, Manassas Park, Fairfax, and Fredericksburg, the Virginia counties of Fairfax, Arlington, Prince William, Loudoun, Stafford, Clarke, Warren, Fauquier, Culpeper, Spotsylvania, and King George, the Maryland counties of Montgomery, Prince Georges, Charles, Frederick, and Calvert; and the West Virginia counties of Berkeley and Jefferson;

3. The Contractor enters into a special workforce development training and replacement arrangement with DOES; or

P a g e 15 | 28

4. DOES certifies that there are insufficient numbers of District residents in the labor market possessing the skills required by the position created as a result of the Contract.

(g) Upon receipt of the Contractor’s final payment request and related documentation required by this Section E.6, the Chief Contracting Officer shall determine whether the Contractor is in compliance with Section E.6(d) or whether a waiver of compliance pursuant to Section E.6(f) is justified. If the Chief Contracting Officer determines that the Contractor is in compliance, or that a waiver of compliance is justified, the Chief Contracting Officer shall, within two (2) business days of making the determination, forward a copy of the determination to the Chief Finance Officer (CFO) and the COTR.

(h) Willful breach of the First Source Employment Agreement, or failure to submit the report required by Section E.6(e) of this RFP, or deliberate submission of falsified data, may be enforced by the Chief Contracting Officer through imposition of penalties, including monetary fines of five percent (5%) of the total amount of the direct and indirect labor costs of the Contract. The Contractor shall pay all penalties to DOES, or may appeal the decision of the Chief Contracting Officer, including the imposition of penalties, to the District’s Contract Appeals Board (CAB).

(i) The provisions of Section E.6(d - h) do not apply to non-profit organizations.

[End of Section E]

P a g e 16 | 28

SECTION F – SPECIAL CONTRACT REQUIREMENTS

F.1 PUBLICITY

The Contractor shall always obtain the prior written consent of the COTR before it, any of its officers, agents, or employees, either during or after expiration or termination of the Contract, makes any statement, or issues any material, for publication through any medium of communication, bearing on the Services performed or information collected under the Contract.

F.2 REQUEST FOR RECORDS

Events DC, in its sole discretion, may make available for public inspection and copying any record produced or collected pursuant to an Events DC contract with a contractor. If Events DC receives a request for a record maintained by Contractor, then a copy of the request will be provided to Contractor, and Contractor shall cooperate with Events DC in responding to the request by, among other actions, providing all responsive records to Events DC within the timeframe designated by Events DC. Events DC will determine whether such records will be released and will reimburse Contractor for the reasonable cost of producing the records. This section shall survive termination or expiration of the contract.

F.3 AMERICANS WITH DISABILITIES ACT OF 1990 (ADA)

During the performance of the Contract, the Contractor and any of its subcontractors shall comply with the Americans with Disabilities Act ( 42 U.S.C. 12101 et seq.).

F.4 LIVING WAGE ACT OF 2006

Throughout the performance of the contract, Contractor and any of its subcontractors shall comply with the Living Wage Act of 2006, as amended (D.C. Code §§ 2-220.01-.11).

[End of Section F]

P a g e 17 | 28

SECTION G - CONTRACT CLAUSES

G.1 CONFIDENTIALY OF INFORMATION

All information obtained by the Contractor relating to any employee or licensee of Events DC must be kept in absolute confidence and shall not be used by the Contractor in connection with any other matters, nor shall any such information be disclosed to any other person, firm, or corporation, in accordance with District and Federal laws governing the confidentiality of records.

G.2 TIME

Time, if stated in a number of days, will include Saturdays, Sundays, and holidays, unless otherwise stated herein.

G.3 CONTINUITY OF SERVICES

The Contractor recognizes that the Services to be provided under the Contract are vital to Events DC and must be continued without interruption and that, upon contract expiration or termination, a successor (either Events DC or another contractor), may at Events DC option, continue to provide these Services.

To that end, the Contractor will be required to:

(a) Cooperate fully with Events DC and any successor contractor to effect an orderly and efficient transition to the successor contractor.

(b) In conjunction with Events DC and the successor contractor, develop a comprehensive transition and succession plan, which plan shall be submitted to Event DC’s Chief Contracting Officer for review and approval.

(c) Provide transition services for up to ninety (90) days after the expiration of the Contract.

[End of Section G]

P a g e 18 | 28

SECTION H – SUBMISSION INSTRUCTIONS

H.1 OVERVIEW

All Offerors shall submit responses electronically via the e-Procurement system to be considered for this award. The responses shall be prepared as two (2) separate documents, one titled “Technical Proposal,” with seven (7) parts as detailed in Section I below, and a separate document titled “Cost Proposal” as detailed in Section J below.

Unnecessarily elaborate brochures or other presentations beyond those sufficient to present a complete and effective response to this solicitation are not desired and may be construed as an indication of the Offeror's lack of cost consciousness. Elaborate artwork, expensive paper and bindings, and expensive visual and other presentation aids are neither necessary nor desired.

H.2 ELECTRONIC SUBMISSION REQUIREMENTS

(a) All Offerors must also submit proposals electronically via the e-Procurement system.

(b) The following bid Tab must be accessed by the Offeror and requested information provided:

1. Public Files Tab: Complete and submit all required documents with the description of “Required.”

(c) You may confirm whether your submission has been successfully transmitted to Events DC by logging into the e-Procurement system and opening Bid # 25-S-026. The status will show as “submitted” if the proposal was successfully submitted, or “in-progress” if additional action is required.

H.3 PROPOSAL DUE DATE

Proposals are due no later than Thursday, February 26, 2026; 5:00PM, EST.

H.4 AMENDMENTS

Any amendments to this RFP, including changes in the due date or scope of work, will be issued via the e-Procurement system and will appear on the “Public Files” tab of the bid.

H.5 RESTRICTION ON DISCLOSURE AND USE OF DATA

Offerors requesting non-disclosure of information included in the proposal on the grounds that such information is proprietary, or trade secret shall mark the title page with the following legend (with the understanding that Events DC’s compliance therewith is subject to applicable law or judicial process):

“This proposal includes data that shall not be disclosed outside Events DC and shall not be duplicated, used or disclosed in whole or in part for any purpose except for use in the procurement process. If, however, a contract is awarded to this Offeror as a result of or in connection with the

P a g e 19 | 28 submission of this data, Events DC will have the right to duplicate, use, or disclose the data to the extent consistent with Events DC’s needs in the procurement process. This restriction does not limit Events DC’s rights to use, without restriction, information contained in this proposal if it is obtained from another source. The data subject to this restriction are contained in sheets (insert page numbers or other identification of sheets).”

H.6 PROPOSAL PROTESTS

(a) All protests by an Offeror aggrieved in connection with this solicitation or the award of Contract hereunder must be made in writing to Events DC’s Director of Contracts and Procurement within seven (7) business days after the protester knew or should have known of the facts giving rise thereto. Protests shall be served on Events DC by obtaining a written and dated acknowledgment of receipt from the Chief Contracting Officer. Protests served on Events DC after the seven (7)-day period will not be considered. To expedite handling of protests, the envelope should be labeled “Protest”. The written protest shall include, at a minimum, the following:

1. The name and address of the protester;

2. Appropriate identification of the procurement, (e.g., the solicitation number and if a contract has been awarded, its number);

3. A statement of reasons for the protest; and

4. Supporting exhibits, evidence or documents to substantiate any claims, unless not available within the filing time, in which case, the expected availability date should be indicated.

(b) Protests will be reviewed and decided in accordance with Section 309 of Events DC’s procurement regulations (19 D.C.M.R. 309). The D.C. Contract Appeals Board (CAB) shall have exclusive jurisdiction to hear and decide appeals from final decisions by Events DC regarding a protest; provided, however, that no appeal may be taken to the CAB unless and until all administrative review procedures provided for in Events DC’s procurement regulations have first been fully and properly complied with and exhausted.

(c) The CAB shall hear and decide appeals from final decisions of Events DC and grant relief in accordance with D.C. Code § 1-1189.8(c-f) and regulations promulgated thereunder, and such other statutes and regulations as are applicable to Events DC. The unsuccessful protester shall be responsible for any and all costs of the CAB in connection with any appeal and shall reimburse Events DC for such costs.

H.7 RETENTION OF PROPOSALS

All proposal documents shall be the property of Events DC and retained by Events DC and thereafter will not be returned to the Offerors.

H.8 BEST AND FINAL OFFERS

If, subsequent to receiving offers, negotiations are conducted, all Offerors within the competitive range will be so notified and may be provided an opportunity to submit written “Best and Final Offers” (BAFO) at the designated date and time. BAFOs will be subject to the late submissions, late modifications and late withdrawals of proposals provisions of this solicitation. After receipt of BAFOs, P a g e 20 | 28 no discussions will be reopened unless the Chief Contracting Officer determines that it is clearly in Events DC’s best interest to do so, (e.g., it is clear that information available at that time is inadequate to reasonably justify Contractor selection and award based on the BAFOs received). If discussions are reopened, the Chief Contracting Officer may issue an additional request for BAFOs to all Offerors still within the competitive range.

[End of Section H]

P a g e 21 | 28

SECTION I – TECHNICAL PROPOSAL

The Technical Proposal must contain sufficient detail to provide a clear and concise representation of the Offeror’s capability to meet the requirements of Section C above and to demonstrate how the Offeror meets the evaluation criteria in Section K below. The Offeror must submit information in a clear, concise, factual and logical manner providing a comprehensive description of its technical qualifications.

I.1 TAB 1 – COMPANY PROFILE

(a) Company name, business address, telephone and fax number;

(b) Year established (including former firm names and year established, if applicable);

(c) Type of ownership;

(d) State whether the company is licensed to do business in the District of Columba and possesses the necessary professional licenses to perform the Work;

(e) Primary company contact name, mailing address, email address, and telephone number; and

(f) If a certified joint venture is contemplated, provide the same information for each joint venture company.

I.2 TAB 2 – QUALIFICATIONS AND EXPERIENCE OF KEY PERSONNEL

The Offeror shall provide the following:

(a) The description of the specialized experience and qualifications of its Key Personnel who will perform the Work;

(b) Brief statement and resumes of Key Personnel and the Project Team to include Project Manager and Lead Technician. The statement must include a description of the experience directly related to the scope of work contained herein (such as work examples from comparable projects/clients from across our business lines of sports, entertainment, special events, conventions, hospitality and destination marketing);

(c) Documentation/proof of Lead Technician being certified as a Lenel Certified Professional

(LCP) or Lenel Certified Expert (LCE) credential; and

(d) Identify any additional personnel that will perform the Work identified in Section C above.

P a g e 22 | 28

I.3 TAB 3 - SPECIALIZED AND SIGNIFICANT EXPERIENCE, TECHNICAL

COMPETENCE, AND COMPANY REFERENCES

The Offeror shall describe its experience in performing the type of work described in Section C above.

Tab 3 must include:

(a) Documentation and/or proof that demonstrates that Contractor is a Certified Lenel OnGuard Value-Added Reseller or Dealer authorized to install and support Lenel systems.

(b) Three (3) references letters from past customers who can validate the Contractor’s ability to successfully perform the Work requested by Events DC.

I.4 TAB 4 – COMPANY’S TECHNICAL APPROACH

The Offeror shall provide a detailed plan to provide the Work outlined in Section C above to Events DC. In this section, the Offeror should discuss the various tools/equipment, reports, approaches, and experience that the Offeror plans to utilize and employ in a manner that addresses the needs outlined within the scope.

I.5 TAB 5 – DISCLOSURES

(a) Certify in writing that it knows of no conflict between its interests and those of Events DC and it knows of no facts or circumstances that might create the appearance of a conflict between its interests and those of Events DC;

(b) Disclose whether the Offeror is involved in litigation against Events DC and/or the

District of Columbia;

(c) Disclose any existing condition or interest which might conflict with the interest, operation or reputation of Events DC; and

(d) Agree to promptly update Events DC upon learning of facts or circumstances rendering any disclosures as inaccurate.

I.6 TAB 6 – REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS

(a) A completed W-9 form;

(b) A completed Tax Certification Affidavit (form located under the “Attachments” tab);

(c) A completed Representations, Certifications, and Other Statements of Offeror’s form (located under the “Attachments” tab);

(d) A completed Disclosure Statement (form located under the “Attachments” tab); and

P a g e 23 | 28

(e) A completed ACH form.

I.7 TAB 7 – EXCEPTIONS

The Offeror shall set forth any exceptions to the RFP or to any of the standard contract terms and conditions. Each exception shall be listed separately, followed by a detailed statement explaining the Offeror’s justification for the exception. Review and acceptance of an exception and/or modification of the RFP shall be at the sole and absolute discretion of Events DC and shall be final. Failure of the Offeror to request an exception shall be deemed a waiver of any and all future rights to request such an exception.

[End of Section I]

P a g e 24 | 28

SECTION J – COST PROPOSAL

J.1 PRICING

(a) The Offeror shall provide firm fixed prices for each phase of the Work set forth in Section C

(b) The Offeror shall provide fully loaded, fixed hourly rates for all personnel required to provide the Work set forth in Section C above. The term “fully-loaded, fixed hourly rate” shall mean an hourly rate that includes the base labor rate, overhead cost, fringe benefits, general and administrative expenses and profit.

(c) Other Direct Costs (ODC): ODCs are all other allowable costs directly allocable to the performance of the task. Offerors should submit a list of, and total price for, anticipated ODC and proposed costs which may be paid on a cost-reimbursement basis. Examples of ODC shall include, but not be limited to, the purchase of equipment rentals, licenses, and any costs related to the tasks outlined in Section C above. ODCs exclude travel-related expenses and lodging.

J.2 OPTION YEAR PRICING

The Offeror must include Option Year pricing in its cost proposal. An offer will be determined to be non-responsive if it fails to include Option Year pricing. Offerors shall repeat the above pricing format for each Option Year noted.

[End of Section J]

SECTION K - EVALUATION FACTORS

P a g e 25 | 28

K.1 OVERVIEW

Events DC will make an award to the responsive Offeror(s) whose proposal conforms to the RFP and is most advantageous to Events DC, considering the technical expertise and cost or price. For this RFP, technical quality is more important than cost or price. As proposals become more equal in their technical merit, the evaluated cost or price becomes more important. The total maximum score is 112 points.

K.2 TECHNICAL EVALUATION: 65 POINTS MAXIMUM

(a) 20 Points: Technical Proposal Tab 2 – “Qualifications and Experience of Key Personnel”

This factor will be based upon the demonstrated effectiveness in developing and implementing Lenel Access Control Systems. This factor will be evaluated based on the submission of resumes and relevant experience of the personnel who will be working directly with Events DC, especially those partners responsible for directing the Work and advice provided.

(i) The description of the specialized experience and qualifications of its Key Personnel who will perform the Work;

(ii) Brief statement and resumes of Key Personnel and the Project Team to include Project Manager and Lead Technician. The statement must include a description of the experience directly related to the scope of work contained herein (such as work examples from comparable projects/clients from across our business lines of sports, entertainment, special events, conventions, hospitality and destination marketing);

(iii) Documentation/proof of Lead Technician being certified as a Lenel Certified Professional (LCP) or Lenel Certified Expert (LCE) credential; and

(iv) Identify any additional personnel that will perform the Work identified in Section C

(b) 25 Points: Technical Proposal Tab 3 – “Specialized and Significant Experience, Technical Competence, and Company References”

This factor will be evaluated based on the Offeror’s experience in providing the Work detailed in Section C above and project approach, including the demonstrated understanding of Events DC’s needs, as well as the demonstrated specialized experience and technical competence of the Offeror. This factor will be evaluated based on the breadth and depth of the Offeror’s related experience.

Three (3) references letters from past customers who can validate the Contractor’s ability to successfully perform the Work requested by Events DC.

P a g e 26 | 28

(c) 20 Points: Technical Proposal Tab 4 – “Company’s Technical Approach”

This factor will be evaluated based on a qualitative assessment of the proposal in meeting the requirements of Section C above. Events DC will give credit to demonstrated insight, suggested approaches, priorities, or areas of emphasis; and innovative and constructive thinking to providing all Work. In addition, Events DC will evaluate the Offeror’s capabilities based upon their description of the tools and resources that will be used to complete the Work, which shall include, but not be limited to, examples or a description of the following:

1. Previous strategies and capabilities with the implementation of Lenel Access Control

Systems;

2. Internal tools or platforms used to track project timelines measure and provide results reporting;

3. Recommended innovative approaches or best practices; and

4. Internal team experience/expertise in relation to the practices mentioned in this SOW.

K.3 PRICE EVALUATION: 35 POINTS MAXIMUM

The price evaluation will be objective. The Offeror with the lowest total price will receive the maximum price points. All other proposals for the task evaluated will receive a proportionately lower score.

The following formula will be used to determine each Offeror’s evaluated price score:

Lowest price proposal (x) weight = Evaluated price score Price of proposal being evaluated

K.4 DSLBD PREFERENCE CRITERIA

Any Offeror seeking to receive preferences for this solicitation must submit at the time of, and as part of its bid or proposal, the following documentation, as applicable to the preference being sought:

Evidence of the Offeror’s or joint venture’s certification by the DSLBD as an SBE, ROB, LRB, LBE, DZE, DBE, VOB, or LME.

K.5 CBE PREFERENCE POINTS: 12 POINTS MAXIMUM

Events DC will allocate a maximum of 12 preference points to qualified vendors in accordance with D.C. Code § 2-218.43 as follows:

(a) Three (3) points for a small business enterprise (SBE);

(b) Five (5) points for a resident-owned business (ROB);

(c) Five (5) points for a longtime resident business (LRB);

(d) Two (2) points for a local business enterprise (LBE);

P a g e 27 | 28

(e) Two (2) points for a local business enterprise with its principal office located in an enterprise zone (DZE);

(f) Two (2) points for a disadvantaged business enterprise (DBE);

(g) Two (2) points for a veteran-owned business enterprise (VOB); and

(h) Two (2) points for a local manufacturing business enterprise (LME).

K.6 PREFERENCES FOR CERTIFIED JOINT VENTURES

When the DSLBD certifies a joint venture, the certified joint venture will receive preference based on the percentage of ownership the CBE(s) partner has in the joint venture, subject to the maximum preference limitation set forth in the preceding paragraph.

K.7 EVALUATION OF OPTION YEARS

Events DC will evaluate the total price for all Option Years as well as the base term. Evaluation of Option Years shall not obligate Events DC to exercise them.

[End of Section K]

P a g e 28 | 28

SECTION L - LIST OF ATTACHMENTS

The following documents can be found under the “Attachment” tab of the BID:

NO. FORM ACTION REQUIRED

1 W-9 form Sign and Include in Technical Proposal – Tab 6 2 Tax Certification Affidavit Sign and Include in Technical Proposal – Tab 6 3 Representations and Certifications Sign and Include in Technical Proposal – Tab 6 4 ACH form Sign and Include in Technical Proposal – Tab 6

6 Disclosure Statement Sign and Include in Technical Proposal – Tab 6 7 Standard Contract Terms and Conditions Informational 8 Wage Determinations Informational 9 Pricing Form Complete and Include in Cost Proposal 10 Preliminary Subcontracting Plan Sign and include in Technical Proposal 11 Rules of the Jobsite for Contractors Informational

[End of Section L]

[END OF THIS RFP]