About this file
This document is a Request for Proposals (RFP) from Fermi Forward Discovery Group LLC for the Long-Baseline Neutrino Facility/Deep Underground Neutrino Experiment, specifically for Liquid Argon Circulation Vertical and Horizontal Delivery (VD and HD) systems. The solicitation seeks a subcontractor to engineer, manufacture, test, and deliver equipment, valves, and instrumentation for the LAr Circulation System. The project is for the Fermi National Accelerator Laboratory (Fermilab), with work to be performed at the Sanford Underground Research Facility in Lead, South Dakota.
Key dates include a deadline for questions on November 20, 2025, and proposal submission by December 4, 2025. FFDG anticipates awarding a single Firm Fixed Price subcontract by December 31, 2025. The project is divided into seven milestones spanning from April 2026 to December 2027, covering engineering, manufacturing, testing, and shipping of VD and HD liquid argon circulation systems. Evaluation will be based on past experience, technical merit, and quality, using a tradeoff source selection method that considers both price and technical factors. Proposals will be graded using a color-coded rating system from blue (exceeds requirements) to red (unacceptable).
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Proposals Number LBNF-372669-JD for
Long-Baseline Neutrino Facility/Deep Underground Neutrino Experiment
Liquid Argon Circulation VD and HD
This Request for Proposal consists of a model subcontract in Sections A through J and a Request for Proposal in Sections K through M.
Questions and inquiries are to be submitted via e-mail to Jeremy Duncan at jeremyd@fnal.gov no later than 5:00 p.m. Central Daylight Savings Time on November 20, 2025.
Proposals are to be submitted via e-mail to Jeremy Duncan at jeremyd@fnal.gov no later than 5:00 p.m. Central Daylight Savings Time on December 4, 2025.
mailto:jeremyd@fnal.gov
RFP LBNF-372669-JD LAr Circulation System Page 2 of 24
Draft Subcontract for LBNF Liquid Argon Circulation VD and HD Between Fermi Forward Discovery Group LLC and VENDOR
A1. Identification of Parties
A2. Subcontract Issued Under Prime Contract
A3. Relationships
A4. General Purpose of the Subcontract
A5. Period of Performance
A6. Order of Precedence
A7. Agreement
A8. Signature
Section B - Supplies or Services and Prices B1. Prices
B2. Firm Fixed Prices (FFP)
B3. Intentionally Omitted
Section C - Description of Work C1. Standards of Performance
C2. Technical Reports
C3. Conduct of Employees
C4. Statement of Work
Section D - Packaging and Marking D1. Packaging and Marking
Section E - Inspection and Acceptance E1. Inspection and Acceptance
Section F - Deliveries or Periods of Performance F1. Periods of Performance
Section G - Subcontract Administration Data G1. Subcontract Administration
G2. Notification of Potential Changes
G3. Invoices
G3.1 General Invoice Requirements
G4. Payment Schedule
G5. Closeout
Section H - Special Subcontract Requirements H1. FFDG Furnished U.S. Government Property
H2. Insurance
H3. Warranties
H4. Intentionally Left Blank
H5. Supervision
H6. Additional Requirements
RFP LBNF-372669-JD LAr Circulation System Page 3 of 24
H7. Additional Subcontract Terms for Work Performed at the Sanford Underground Research Facility
Section I - Subcontract Clauses I. General Clauses
Section J - List of Documents, Exhibits, and Other Attachments J. Incorporated Documents
Section K – Representations and Certifications Section L—Instructions, Conditions, and Notices to Offerors Section M—Evaluation Factors for Award
RFP LBNF-372669-JD LAr Circulation System Page 4 of 24
Subcontract Number TBD For LBNF Liquid Argon Circulation VD and HD
Between FFDG and SUBCONTRACTOR
A1. Identification of Parties
This Subcontract is between Fermi Forward Discovery Group LLC (“FFDG”) and the party identified in A8. below as the Subcontractor (“Subcontractor”).
A2. Subcontract Issued Under Prime Contract
This Subcontract is issued under Prime Contract No. 89243024CSC000002 between the United States Government (“Government”), represented by the Department of Energy (“DOE”), and FFDG for the management and operation of the Fermi National Accelerator Laboratory (“FNAL” or “Fermilab”) and the performance of research and development work.
A3. Relationships
Nothing in this Subcontract shall be deemed as creating any relationship between FFDG and Subcontractor other than that of contractor and subcontractor or buyer and seller. Subcontractor shall not interpret any clause contained herein as being binding or purporting to bind the United States Government, its officers, or its agents.
A4. General Purpose of the Subcontract
The general purpose of this Subcontract is the acquisition of Liquid Argon Circulation VD and HD for the Long- Baseline Neutrino Facility (LBNF). The scope encompasses the engineering, manufacture, testing, and delivery of equipment, valves, and instrumentation that make up the LAr Circulation System for LBNF.
A5. Period of Performance
The required delivery dates are identified in F1. of the Subcontract.
A6. Order of Precedence
Any inconsistency in this Subcontract shall be resolved by giving precedence in the following order: Section A, B, D, E, F, G, H, I, C.
RFP LBNF-372669-JD LAr Circulation System Page 5 of 24
A7. Agreement
The parties agree to perform their respective obligations in accordance with the sections, terms, and conditions, the documents referenced or incorporated herein, which constitute the entire Subcontract and shall supersede all prior negotiations, representations, or agreements, whether verbal or written.
A8. Signature
The parties have caused this Subcontract to be executed by their duly authorized agents by their signatures below.
Subcontractor:
TBD Fermi Forward Discovery Group LLC (FFDG)
Signature: Signature:
Name: Name:
Title: Title:
Date: Date:
RFP LBNF-372669-JD LAr Circulation System Page 6 of 24
Section B - Supplies or Services and Prices
B1. Prices
The Subcontractor shall provide the supplies or services at the prices shown in the table below.
Milestone Description Deliverable/Criteria for Completion Prices
01 Engineering Phase - VD and HD FFDG receipt and acceptance of all supply engineering deliverables for LAr Circulation-VD and HD as listed in Section 16 of the SOW.
02 Manufacturing Phase - VD Completion of the Manufacturing Phase of devices for LAr Circulation-VD (excluding testing and delivery to SURF) and delivery of all documentation in accordance with Section 16.1 of the SOW.
03 Testing - VD Successful completion of factory acceptance tests identified in Section 15 of the SOW for devices for LAr Circulation-
VD
04 Shipping - VD Delivery of all materials and equipment for LAr Circulation-VD to SURF in undamaged condition. Completion of FFDG receipt inspection and acceptance.
05 Manufacturing Phase - HD Completion of the Manufacturing Phase for LAr Circulation-HD (excluding testing and delivery to SURF) and delivery of all documentation in accordance with Section
16.1 of the SOW.
06 Testing - HD Successful completion of factory acceptance tests for LAr Circulation-HD identified in Section 15 of the SOW
07 Shipping - HD Delivery of all materials and equipment for LAr Circulation-HD to SURF in undamaged condition. Completion of FFDG receipt inspection and acceptance.
B2. Firm Fixed Prices (FFP)
The Firm Fixed Prices are not subject to any adjustment by the Subcontractor. Only the FFDG Procurement Specialist is authorized to change the Firm Fixed Prices.
B3. Intentionally Omitted
RFP LBNF-372669-JD LAr Circulation System Page 7 of 24
Section C - Description of Work
C1. Standards of Performance
The Subcontractor shall perform the work under this Subcontract by using its best efforts and know-how and its performance shall be accomplished in a workmanlike manner by qualified, careful, and efficient personnel, in accordance with professional standards of care. The Subcontractor shall perform all design and fabrication as necessary to produce the results indicated in Attachment J-4.
FFDG's review of the design does not relieve the Subcontractor of compliance with the Subcontract requirements or its obligations to deliver fully functional valves that meet the requirements of this Subcontract.
C2. Technical Reports
The Subcontractor shall prepare and submit to the Procurement Specialist and/or distribute, as directed by the Procurement Specialist, such reports concerning technical aspects of work under this Subcontract, in such quantity and form (including detail) and at such times, as may be specified in this Subcontract.
C3. Conduct of Employees
The Subcontractor shall be responsible for maintaining satisfactory standards of employee competency, conduct, and integrity and shall be responsible for taking such disciplinary action with respect to its employees as may be necessary. The Subcontractor shall immediately remove from the work under this Subcontract any employee of the Subcontractor who, in the sole discretion of FFDG, is found to be unsatisfactory in technical performance or personal conduct.
C4. Statement of Work
The Subcontractor shall complete and deliver the work in accordance with the Statement of Work at Attachment J-4.
RFP LBNF-372669-JD LAr Circulation System Page 8 of 24
Section D - Packaging and Marking
D1. Packaging and Marking
Unless otherwise stated in the Subcontract, the Subcontractor shall adequately package and mark all material, drawings, or other items required under Section 14 of the SOW to prevent damage during shipment to SURF.
D2. Shipping Address
All items shall be shipped to the following address, or a nearby staging area, as directed by FFDG:
FFDG
1313 E. Saint Patrick Street Rapid City, South Dakota 57701
D3. Freight Terms
All items shall be shipped FOB Destination. Subcontractor shall bear risk of loss during shipment to the FFDG warehouse.
RFP LBNF-372669-JD LAr Circulation System Page 9 of 24
Section E - Inspection and Acceptance E1. Inspection and Acceptance
Inspection and acceptance shall be in accordance with the Statement of Work in Attachment J-4 and applicable clauses per Section I. FFDG, or its representative, shall perform QA/QC Delivery inspections upon receipt.
RFP LBNF-372669-JD LAr Circulation System Page 10 of 24
Section F - Deliveries or Periods of Performance
F1. Periods of Performance
Completion of services shall be in accordance with the following table:
Milestone Description Delivery Date*
01 Engineering Phase – VD/HD 07 April 2026
02 Manufacturing Phase - VD 01 May 2027
03 Testing - VD 01 June 2027
04 Shipping - VD 01 July 2027
05 Manufacturing Phase - HD 01 September 2027
06 Testing - HD 01 November 2027
07 Shipping - HD 01 December 2027
*For purposes of the RFP, these are FFDG’s requested completion dates. Proposals shall comment on the feasibility of FFDG’s requested completion dates. Each proposal must include the offerors’ forecasted delivery dates based on current shop availability and expected turnaround.
RFP LBNF-372669-JD LAr Circulation System Page 11 of 24
Section G - Subcontract Administration Data
G1. Subcontract Administration
a. FFDG’s Procurement Specialist for this Subcontract is shown below. The Procurement Specialist or their designate is the only person authorized to make changes in the terms, conditions and requirements of this Subcontract or make modifications to this Subcontract including changes or modifications to the Statement of Work. The Subcontractor shall direct all notices and requests for approval required by this Subcontract to the Procurement Specialist at the following address:
FFDG Procurement Specialist Attention : Jeremy Duncan Email: jeremyd@fnal.gov Phone: 865-300-0443
Fermi Forward LLC 168 Ross Street Lead, SD 57754
b. Any notices and approvals required by this Subcontract from FFDG to the Subcontractor shall be issued by the FFDG Procurement Specialist.
c. FFDG’s Technical Representative for this Subcontract is shown below. The Technical Representative is the person designated to monitor the Subcontract work and to interpret and clarify the technical requirements of the Statement of Work. The Technical Representative is not authorized to make changes to the work or modify any of the terms and conditions, including the schedule and the pricing of this Subcontract.
FFDG Technical Representative* Attention: Zachery West Email: zwest@fnal.gov Phone: 630-840-4489 Fermi Forward Discovery Group LLC *In addition, please CC David Montanari dmontana@fnal.gov on all technical correspondence.
d. Unless otherwise stated in the Subcontract, reports required by the Subcontract shall be separately submitted to the FFDG Procurement Specialist and the FFDG Technical Representative. Unless otherwise stated in the Subcontract, the reports shall be submitted by email.
G2. Notification of Potential Changes
The Subcontractor shall provide notification to FFDG of potential changes to this Subcontract. The primary purpose of this clause is to obtain prompt reporting by the Subcontractor of circumstances or FFDG actions that the Subcontractor considers to constitute a change to this Subcontract. The Subcontractor shall notify the FFDG Procurement Specialist in writing of any actions, inactions, or communications by FFDG that the Subcontractor regards as a potential change to this Subcontract. This notice requirement does not apply to formal change mailto:zwest@fnal.gov mailto:dmontana@fnal.gov
RFP LBNF-372669-JD LAr Circulation System Page 12 of 24 orders identified as such in writing and signed by the FFDG Procurement Specialist pursuant to the Subcontract’s Changes clause. The Subcontractor shall provide the notice promptly, but no later than ten calendar days from the date that the Subcontractor identifies the potential change. Based on the most accurate information available to the Subcontractor, the notice shall state:
(1) The date, nature, and circumstances of the conduct regarded as a change;
(2) The name, function, and activity of each FFDG individual and Subcontractor official or employee involved in or knowledgeable about such conduct;
(3) The identification of any documents and the substance of any oral communication involved in such conduct;
(4) In the instance of alleged acceleration of scheduled performance or delivery, the basis upon which it arose; and
(5) The elements of Subcontract performance for which the Subcontractor may seek an equitable adjustment under this clause.
FFDG is not obligated to reimburse the Subcontractor for any work performed outside of the Subcontract scope without authorization from the FFDG Procurement Specialist.
G3. Invoices
All invoices shall be emailed to apinvoices@fnal.gov with a copy to the Procurement Specialist. The subject line of the email shall state the Subcontractor’s name and the Subcontract number.
If the Subcontractor is unable to submit an invoice by email, it may submit the invoice to the following address:
FFDG Accounts Payable Fermi National Accelerator Laboratory P.O. Box 500 – Mail Station 112 Batavia, IL 60510
G3.1 General Invoice Requirements
Invoices shall be sent electronically to APINVOICES@FNAL.GOV.
Invoices shall contain the following information:
1. Subcontractor name as stated in the Subcontract
2. Remittance address
3. Telephone number and/or email address of person requesting payment
4. Subcontractor's statement that the invoice is correct
5. FFDG purchase order/subcontract number
6. Invoice number
7. Invoice date
8. Total invoice amount
9. Description, price, and quantity of materials, property, or services delivered or completed
10. For services: a detailed description of services provided and dates of service
11. For goods received: date shipped or date of delivery
12. Payment terms
13. Shipping terms and required documentation. A copy of pre-paid freight bill is required if charge is $250 or more.
mailto:apinvoices@fnal.gov mailto:APINVOICES@FNAL.GOV
RFP LBNF-372669-JD LAr Circulation System Page 13 of 24
14. Other documentation as required by the Subcontract
G4. Payment Schedule
a. FFDG shall pay the Subcontractor, upon the submission of proper invoices in accordance with any requirements from the clauses referenced in Section I, the prices stipulated in this Subcontract for services rendered and accepted, less any deductions provided in this Subcontract.
b. The Milestone Payment Schedule for this Subcontract is captured in Section B, above.
G5. Closeout
The Subcontractor shall, as a condition of full payment, assist FFDG after the completion of the work in accomplishing the administrative closeout of this Subcontract.
RFP LBNF-372669-JD LAr Circulation System Page 14 of 24
Section H - Special Subcontract Requirements
H1. FFDG Furnished U.S. Government Property
FFDG shall furnish the following U.S. Government Property:
1. LAr Pumps VD: available no later than January 31, 2027
2. LAr Pumps HD: available no later than February 28, 2027
Basic dimensions of the LAr pumps are provided in Attachment J-14. Notwithstanding any provision to the contrary in the FFDG General Terms and Conditions, Subcontractor is responsible for risk of loss for Government Property in its care, custody, and control.
H2. Insurance
The insurance requirements for this Subcontract are as shown in Attachment J-1.
H3. Warranties
Warranties under this Subcontract are as described in Attachment J-1.
H4. Intentionally Left Blank
H5. Supervision
FFDG employees shall not direct or supervise Subcontractor's employees, either directly or indirectly. The Subcontractor is solely responsible for directing and supervising its employees.
H6. Additional Requirements
Subcontractor compliance with all the orders, regulations, plans, manuals, and other directives listed in the Statement of Work and in the Incorporated Documents is a material term of this Subcontract.
H7. Additional Subcontract Terms for Work Performed at the Sanford Underground Research Facility
“SDSTA” means the South Dakota Science & Technology Authority, created by the South Dakota legislature, and operator of the Sanford Underground Research Facility.
“SURF” means the Sanford Underground Research Facility, located in Lead, South Dakota, and which is the Far Site for the Long Baseline Neutrino Facility (LBNF) project of the Fermi National Accelerator Laboratory.
RFP LBNF-372669-JD LAr Circulation System Page 15 of 24
Section I - Subcontract Clauses I. General Clauses
The general terms and conditions for this Subcontract are listed in Attachment J-1. The clauses listed in that Attachment shall be applicable to this Subcontract as stated therein based on the value of the Subcontract, the status of the Subcontractor, and the nature and location of the work. The Subcontractor shall flow down to sub-tier subcontractors the clauses as specified in that Attachment.
RFP LBNF-372669-JD LAr Circulation System Page 16 of 24
Section J - List of Documents, Exhibits, and Other Attachments
J. Incorporated Documents
The following documents are incorporated as a part of this Subcontract.
Number Description/Title Revision and/or Date J-1 FFDG General Terms and Conditions (Supplies) For purposes of J-1, “Fermilab,” and “Fermilab site” include SURF 08.2025
J-2 Reserved J-3 Reserved J-4 LBNF/DUNE-US Liquid Argon Circulation VD and HD Statement of
Work (SOW) EDMS 3200496 v.1 07/29/2025
J-5 Reserved J-6 Reserved J-7 Reserved J-8 LBNF/DUNE-US Argon Cryogenic Packages Project Management
Requirements, Quality Assurance, and Quality Control Plan
EDMS 3327678
07/25/2025
J-9 Subcontractor’s Corporate Quality Control Plan TO BE DETERMINED J-10 Small Business Subcontracting Plan TO BE DETERMINED J-11 Sub-Tier Subcontractors and Outside Associates and Consultants TO BE DETERMINED J-12 Reserved J-13 LBNF/DUNE-US Argon Cryogenic Packages Project Schedule EDMS 3327676
07/25/2025 J-14 Liquid Argon Pump Exterior Interface Details Drawing (FOR
INFORMATIONAL PURPOSES ONLY—NOT PART OF SUPPLY)
BNCP-76-998
RFP LBNF-372669-JD LAr Circulation System Page 17 of 24
Section K – Representations and Certifications
Subcontractor Annual Representations and Certifications (SARC) Revision 3 Proposal Certifications form (PUR-466) Revision 1
RFP LBNF-372669-JD LAr Circulation System Page 18 of 24
Section L—Instructions, Conditions, and Notices to Offerors
The following requirements must be adhered to for the Offeror’s submission of Proposals to Fermi Forward (FFDG) in support of this specific requirement:
L1. PROPOSAL RESPONSE AND DUE DATE AND TIME
A) Proposals shall be submitted via email to Jeremy Duncan at jeremyd@fnal.gov no later than 5:00 p.m.
Central Daylight Savings Time on December 4, 2025.
B) Representations and Certifications must be:
• Submitted on the forms furnished by FFDG or on copies of those forms, which have been manually signed and scanned.
• The person signing the Representations and Certifications must initial each erasure or change appearing on a completed form.
• The Offeror’s Representations and Certifications shall be signed by an authorized representative of the company.
C) Submit an email with 1 scanned pdf copy of the Technical Proposal volume and 1 scanned pdf copy of the Price/Contractual Proposal volume.
L2. INQUIRIES AND QUESTIONS
Direct all price/contractual and technical questions that you may have concerning this RFP in writing via email to jeremyd@fnal.gov. All inquiries and questions regarding this solicitation must be received no later November 20, 2025, in order to allow FFDG sufficient time to respond prior to the proposal due date. Offerors shall reference the solicitation number in the subject line of the email correspondence. The person designated below shall be the only contact for all inquiries regarding any aspect of this RFP and its requirements.
Fermi Forward Discovery Group LLC Attention: Jeremy R. Duncan LBNF Procurement Specialist Phone: (865) 300-0443 Email: jeremyd@fnal.gov
Responses to written questions, which involve an interpretation or change to this RFP, will be issued in writing by an RFP amendment and mailed to all parties recorded by FFDG as having received a copy of the RFP. All such amendments issued by FFDG prior to the time that FFDG receives proposals shall be considered part of the RFP.
Companies receiving this RFP other than directly from FFDG Procurement are responsible for notifying the FFDG contact for RFP inquiries that they are in receipt of an RFP package, and for providing a company name, contact name, and email address in the event an amendment is issued.
Only additional information provided by formal written amendment shall be binding. Oral and other interpretations or clarifications are not binding on FFDG.
L3. EXPLANATION TO PROSPECTIVE OFFERORS.
Any explanation desired by a prospective Offeror regarding the meaning or interpretation of the solicitation, drawings, specification, etc., must be requested with sufficient time to allow for a reply to reach all prospective Offerors before the submission of their offers. Any information given to a mailto:jduncan@fnal.gov
RFP LBNF-372669-JD LAr Circulation System Page 19 of 24 prospective Offeror will be furnished to all prospective Offerors if such information is necessary in submitting offers or if the lack of such information would be prejudicial to any other prospective Offerors.
Direct any question concerning the RFP in writing to:
Jeremy Duncan Procurement Specialist jeremyd@fnal.gov 865-300-0443
L.4 MINIMUM OFFER ACCEPTANCE PERIOD
“Acceptance period,” as used in this provision, means the number of calendar days available to FFDG for awarding a Subcontract from the date specified in this RFP. Once awarded a Subcontract, the Offeror agrees to perform in compliance with the Subcontract terms.
FFDG requires a minimum acceptance period of 90 calendar days.
An offer allowing less than FFDG’s minimum acceptance period may be rejected.
L.5 EVALUATION OF PROPOSALS
An Evaluation Team will evaluate the proposals. Offerors should be prepared to respond to requests by the Evaluation Team for responses and/or site visits deemed necessary to assist in the detailed evaluation process.
Failure to complete any section of the Proposal may render the proposal insufficient, and it may not be evaluated. All items requested herein will be considered in the evaluation process. FFDG may conduct negotiations with any Offeror to resolve inadequacies or clarify issues in submittals.
Proposals will be evaluated in accordance with this RFP.
FFDG shall evaluate proposals for award purposes without considering any conditions or contingencies.
Negotiations may be conducted with those Offerors submitting technically acceptable proposals.
L.6 Reserved
L.7 ACKNOWLEDGMENT OF AMENDMENTS TO SOLICITATIONS
Offerors shall acknowledge receipt of any amendment to this solicitation (a) by signing and returning the amendment; (b) by e-mail to jeremyd@fnal.gov; or (c) by completing the Representations, Certifications and Acknowledgments (Form SARC). FFDG must receive the acknowledgment by the time and at the place specified for receipt of offers.
L.8 RESPONSIBLE OFFERORS
FFDG reserves the right to award a Subcontract only to a responsible Offeror. A responsible Offeror is defined as a company that demonstrates the financial ability, resources, skills, capability, willingness, and business integrity necessary to perform the Subcontract. FFDG determination of whether an Offeror is responsible is at FFDG’s sole discretion.
L.9 Reserved mailto:ecatton@fnal.gov
RFP LBNF-372669-JD LAr Circulation System Page 20 of 24
L.10 SUBMISSION OF PROPOSALS
The Offeror’s written proposal shall be submitted electronically to the e-mail address listed below: The subject, title, or description line of all email correspondence shall include the RFP number.
jeremyd@fnal.gov Attention: Jeremy Duncan Procurement Specialist Subject: (e.g. RFP LBNF-372669-JD)
The cover page of an electronic Proposal shall list the solicitation number, due date and time, and the name and address of the Offeror. Facsimile offers will not be considered.
L.11 LATE SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF PROPOSALS
Any proposal received at the email designated in the solicitation after the exact time specified for receipt will not be considered unless it is in the best interest of FFDG to evaluate it, and it is received before the award is made.
L.12 REQUIREMENTS FOR PROPOSAL
Offerors shall submit two (2) separate pdf proposal volumes.
The Technical Proposal volume shall contain all the pertinent technical information exclusive of the prices and other information required in the Price/Business Proposal volume. The Technical Proposal volume shall include all the information required by the Technical Proposal Preparation Instructions below.
Technical Proposal Preparation Instructions:
The Offeror’s Technical Proposal should discuss each evaluation factor stated in Section M. The Technical Proposal should provide the following documentation to facilitate FFDG’s evaluation of each evaluation factor:
Proposal Format for Criterion 1: This section shall include relevant examples of valve boxes and cryogenic piping fabrication that you have produced that are similar to those required by this solicitation. Each example should provide a description sufficiently detailed to demonstrate the offeror’s capabilities. Provide three (3) examples of work completed within the last 5 years. If more than three (3) examples are provided, FFDG will evaluate the three (3) most relevant examples.
Proposal Format for Criterion 2: In this section, the Offeror should describe its approach to engineering, manufacturing, testing, and delivery of the Liquid Argon Circulation Systems VD and HD. This section should fully demonstrate your ability to meet all the requirements of our Statement of Work. At a minimum, this section of your proposal must include:
• The name and qualifications of the key personnel (e.g. project manager, engineering lead, QA manager, lead machinist, certified weld inspector, lead technician) with listed years of experience
• A brief description of the facilities, tooling, and other resources to be utilized in the performance of the work shall be provided.
o Including a detailed list of inspection tools that will be used for dimensional inspection o Including a detailed list of leak testing machines and calibrated leaks with certifications
• Location(s) of the offeror’s facilities to be used in the performance of the work.
• List of long lead materials (if any)
• List of key subcontractors/suppliers
RFP LBNF-372669-JD LAr Circulation System Page 21 of 24
• Internal, General Procedures for:
o Cold Shock Testing o Helium Leak Testing o Multilayer Insulation Fabrication and Application o High Purity Cleaning for Oxygen Service
• Weld Procedure Specification for Stainless Steel TIG welding with a list of qualified welders within the company that can weld per the procedure
• List of software that will be used for the following:
o ASME B31.3 Flexibility Analysis o Vacuum Vessel Sizing/Calculations o Control Valve Sizing Calculations o Relief Valve Orifice and Capacity Sizing Calculations o 3D Modeling / 2D Manufacturing Drawings
• A basic schedule with the proposed durations for completion of each task and delivery dates for each of the seven milestones listed in Section F of this RFP.
Proposal Format for Criterion 3: This section shall include the offeror’s Corporate Quality Control Plan and a copy of any program certifications held by the offeror.
Price/Business Proposal: The Price/Business Proposal shall include the following:
• Subcontractor Annual Representations and Certifications (SARC)
• PUR-466 Proposal Certifications Form
• Pricing for each Milestone/Subcontract Line Item (SLIN) in Section B
• Small Business Subcontracting Plan, in accordance with FAR Clause 52.219-9, Small Business
Subcontracting Plan (Aug. 2018). Small businesses are exempt from this requirement.
• List of authorized negotiator(s) and contact information.
• Any written exceptions or proposed changes to the terms and conditions or other provisions of the model subcontract contained in this RFP.
L.13 CERTIFIED COST OR PRICING DATA
Offerors are not required to submit certified cost or pricing data with their offers; however, such data may be requested at a later date.
L.14 EXCEPTIONS
FFDG warns Offerors that taking exceptions to any term or condition of this RFP (including submitting any alternate proposals that requires relaxation of a requirement) may make an Offeror ineligible for subcontract award. If exceptions are taken, Offerors shall identify the section or attachment of the RFP and paragraph or clause designation which the Offeror is taking exception to. The reason for any exception(s) shall be clearly stated in the Offeror’s proposal.
L.15 RELEASE OF CLAIMS, LIABLITY AND PREPARATION EXPENSES
RFP LBNF-372669-JD LAr Circulation System Page 22 of 24
This RFP does not commit FFDG to pay for any costs incurred in the preparation and submission of an offer or for any other such costs incurred prior to the execution of a Subcontract.
L.16 AWARD OF SUBCONTRACT
FFDG intends to award one Firm Fixed Price (FFP) subcontract as a result of this RFP. It is anticipated that award will occur by December 31, 2025. Sections A-K of this RFP represent a model of the FFP subcontract that FFDG intends to award. Award will be on FFDG’s form and will not incorporate offeror’s proposal forms except where indicated.
Unless specified otherwise elsewhere in this Request for Proposal, the Subcontract will be awarded to the responsible Offeror whose offer represents the best value, total cost of the acquisition and other factors considered.
FFDG reserves the right to reject any or all offers and to waive informalities and minor irregularities in offers received.
Except as may otherwise be provided in the Request for Proposal, FFDG may accept any item or group of items of any offer, unless the Offeror qualifies the offer by specific limitations.
FFDG may accept within the time specified therein, any offer (or part thereof, as provided in (c) above), whether or not there are negotiations subsequent to its receipt. If subsequent negotiations are conducted, they shall not constitute a rejection or counteroffer on the part of the FFDG.
It is FFDG’s intent to award based on initial offers. Accordingly, each offer should be submitted on the most favorable terms, from a price and technical standpoint that the Offeror can submit. However, FFDG may allow for proposal revisions if FFDG deems it necessary.
L.17 SUBCONTRACTING
Unless otherwise specified, the successful Offeror shall be responsible for performance of any lower-tier subcontractor that may perform work under this Subcontract. Performance by a lower-tier subcontractor employee is subject to FFDG consent and will be considered in FFDG’s evaluation. The FFDG Subcontractor must ensure that any lower-tier subcontractor abides by all terms and conditions and requirements of the FFDG Subcontract.
L.18 SUMMARY
The prospective Offeror is hereby reminded to review all attachments and terms and conditions of this solicitation prior to submitting their written proposal. All proposals must be submitted in accordance with this Request for Proposal and with all related requirements, representations, and certifications.
Proposals shall include the following submittals:
• Technical Proposal that specifically responds to each evaluation factor per the proposal format requirements stated in Section L
• Price/Contractual Proposal
• PUR-466 Proposal Certifications Form
• Subcontractor Annual Representations & Certifications (SARC)
• Subcontractor Corporate QA Plan
• Small Business Subcontracting Plan (if offeror is not a small business)
RFP LBNF-372669-JD LAr Circulation System Page 23 of 24
Section M—Evaluation Factors for Award
M1. Basis for Subcontract Award
1.1 FFDG expects to award a Subcontract to an Offeror who is deemed responsible, whose proposal conforms to this solicitation’s requirements, and whose proposal is judged to represent the best value to
FFDG.
1.2 FFDG will use a Tradeoff source selection method. The best value is represented by the most advantageous proposal, price and other factors considered. Offerors are advised that a proposal meeting the solicitation requirements with the lowest evaluated price may not be selected if award to a higher evaluated price proposal is determined to be most advantageous to FFDG.
1.3 FFDG expects to award one Firm Fixed Price (FFP) subcontract as a result of this solicitation.
However, FFDG may reject any or all proposals and not make any award based on this solicitation. FFDG may waive any informality or minor irregularity in proposal(s) received at its sole discretion.
1.4 FFDG reserves the right to award without discussions with Offerors. Accordingly, Offerors should submit their best proposals.
M2. Technical Evaluation Factors
Each proposal shall be evaluated relative to the following factors. The evaluation factors are listed in descending order of importance. All evaluation factors other than cost or price, when combined, are of equal importance to cost or price.
1) Past Experience and Past Performance
Corporate past experience in the engineering, manufacturing, and delivery of equipment that is comparable to FFDG requirements. At a minimum, the offeror shall demonstrate past experience pertaining to three (3) projects of similar scope and completed within the past five (5) years. In addition, the level of performance achieved by the offeror on each past project will be considered.
2) Technical Merit of Offeror's Approach to accomplish the SOW.
FFDG will evaluate the degree to which the offeror's proposal demonstrates its ability to meet or exceed the technical requirements for the Liquid Argon Circulation VD and HD as defined in the Statement of Work. Evaluation under this factor includes, but is not limited to, the following key considerations:
- How well the offeror demonstrates that it understands FFDG requirements and possesses the expertise to comply with them.
- Engineering and manufacturing approach.
- Project management
- Testing Capabilities
- Packaging
- Schedule for performance of the work.
RFP LBNF-372669-JD LAr Circulation System Page 24 of 24
3) Quality
- The degree to which the offeror's proposed QA plan demonstrates an ability to meet FFDG requirements.
- Certification to an internationally recognized standard is preferred.
M3. EVALUATION PROCESS
Each technical criterion will be graded based on the following ratings:
(1) Blue—Proposal exceeds the requirements; provides little or no risk to FFDG.
(2) Green—Proposal fully satisfies the requirements; provides low to moderate risk to FFDG.
(3) Yellow—Proposal marginally satisfies requirements; provides moderate to high risk to FFDG.
(4) Red—Proposal does not satisfy requirements; provides unacceptable risk to FFDG.
| A1. Identification of Parties |
| A2. Subcontract Issued Under Prime Contract |
| A3. Relationships |
| A4. General Purpose of the Subcontract |
| A5. Period of Performance |
| A6. Order of Precedence |
| A7. Agreement |
| A8. Signature |
| Section B - Supplies or Services and Prices |
| B1. Prices |
| B2. Firm Fixed Prices (FFP) |
| B3. Intentionally Omitted |
| Section C - Description of Work |
| C1. Standards of Performance |
| C2. Technical Reports |
| C3. Conduct of Employees |
| C4. Statement of Work |
| Section D - Packaging and Marking |
| D1. Packaging and Marking |
| Section E - Inspection and Acceptance |
| E1. Inspection and Acceptance |
| Section F - Deliveries or Periods of Performance |
| F1. Periods of Performance |
| Section G - Subcontract Administration Data |
| G1. Subcontract Administration |
| G2. Notification of Potential Changes |
| G3. Invoices |
| G3.1 General Invoice Requirements |
| G4. Payment Schedule |
| G5. Closeout |
| Section H - Special Subcontract Requirements |
| H1. FFDG Furnished U.S. Government Property |
| H2. Insurance |
| H3. Warranties |
| H4. Intentionally Left Blank |
| H5. Supervision |
| H6. Additional Requirements |
| H7. Additional Subcontract Terms for Work Performed at the Sanford Underground Research Facility |
| Section I - Subcontract Clauses |
| I. General Clauses |
| Section J - List of Documents, Exhibits, and Other Attachments |
| J. Incorporated Documents |
| Section K – Representations and Certifications |
| Section L—Instructions, Conditions, and Notices to Offerors |
| L1. PROPOSAL RESPONSE AND DUE DATE AND TIME |
| L2. INQUIRIES AND QUESTIONS |
| L3. EXPLANATION TO PROSPECTIVE OFFERORS. |
| L.4 MINIMUM OFFER ACCEPTANCE PERIOD |
| An offer allowing less than FFDG’s minimum acceptance period may be rejected. |
| L.5 EVALUATION OF PROPOSALS |
| L.7 ACKNOWLEDGMENT OF AMENDMENTS TO SOLICITATIONS |
| L.8 RESPONSIBLE OFFERORS |
| L.9 Reserved |
| L.10 SUBMISSION OF PROPOSALS |
| The Offeror’s written proposal shall be submitted electronically to the e-mail address listed below: The subject, title, or description line of all email correspondence shall include the RFP number. |
| The cover page of an electronic Proposal shall list the solicitation number, due date and time, and the name and address of the Offeror. Facsimile offers will not be considered. |
| L.11 LATE SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF PROPOSALS |
| L.12 REQUIREMENTS FOR PROPOSAL |
| Proposal Format for Criterion 1: This section shall include relevant examples of valve boxes and cryogenic piping fabrication that you have produced that are similar to those required by this solicitation. Each example should provide a description ... |
| Proposal Format for Criterion 3: This section shall include the offeror’s Corporate Quality Control Plan and a copy of any program certifications held by the offeror. |
| L.13 CERTIFIED COST OR PRICING DATA |
| L.14 EXCEPTIONS |
| L.15 RELEASE OF CLAIMS, LIABLITY AND PREPARATION EXPENSES |
| L.16 AWARD OF SUBCONTRACT |
| L.17 SUBCONTRACTING |
| L.18 SUMMARY |
| Small Business Subcontracting Plan (if offeror is not a small business) |
Section M—Evaluation Factors for Award