RFP_including_AttachmentJ1.docx
DOCX document 162 KB Posted
- Solicitation number
- 12034320R4001
- Issued by
-
Department of Agriculture Forest Service
About this file
This solicitation is for the Crooked River Valley Rehabilitation Phase 3 project located on the Nez Perce-Clearwater National Forests in Idaho. The contractor will be responsible for installing approximately 4,300 linear feet of large wood structures, 2,800 linear feet of brush fascine Type 1, and 900 linear feet of brush fascine Type 2. An additional 32 acres will receive floodplain roughness treatments. The contractor must also coordinate pickup and delivery of approximately 12,000 plants ranging in size from 1 to 8 gallons from Wildlife Habitat Nursery in Princeton, Idaho to the project site. Planting activities are included. The government's estimate for the work is between $500,000 to $1,000,000. The completion deadline is October 15, 2020. Electronic submission of proposals is required due to COVID-19 precautions. The original bid bond must be mailed to the contracting office with a postmark no later than the offer deadline.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend1.doc | DOC document | |
| Attachment6_AerialPhotos.pdf | ||
| AttachmentJ3_PlantingPlan.pdf | ||
| Attachment7_PastPerformanceQuestionaire.doc | DOC document | |
| AttachmentJ5_SWPPPTemplate.docx | DOCX document | |
| AttachmentJ2_CrookedRiverPhase 3_DrawingsSigned.pdf | ||
| AttachmentJ4_TechnicalSpecifications.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| CONSTRUCTION RFP thru FAC 2019-05 – 08/13/2019 | 12034320R4001 |
| Crooked River Valley Rehabilitation Phase 3 – Red River R.D. | |
| Page 3 of 61 |
| CONSTRUCTION RFP thru FAC 2019-05 – 08/13/2019 | 12034320R4001 |
| Crooked River Valley Rehabilitation Phase 3 – Red River R.D. | |
| Page 18 of 61 |
OFFEROR'S COPY
NOTE: Attached forms must be completed and submitted intact.
Issuing Office:
USDA – Forest Service Region 1, Acquisition Management Idaho Montana Acquisition Team Grangeville Office, 104 Airport Road Grangeville, ID 83530
Offers Are Solicited For:
CROOKED RIVER VALLEY REHABILITATION - PHASE 3
Red River Ranger District Nez Perce-Clearwater National Forests Idaho County, Idaho
| Solicitation No. 12034320R4001 |
| HELP PREVENT FOREST FIRES |
IMPORTANT - NOTICE TO OFFEROR
1. This is a complete copy. Information and instructions for submission of proposals as well as contract provisions and specifications are contained in this OFFEROR REFERENCE COPY. This copy should be retained by offerors.
2. Note: An offer guarantee (Bid Bond) IS REQUIRED. Performance and Payment Bonds will be required of the successful offeror. (See Section I, FAR Clause 52.228-15.)
FS-6300-45 (11/79)
| CONSTRUCTION RFP thru FAC 2019-05 – 08/13/2019 | 12034320R4001 |
| Crooked River Valley Rehabilitation Phase 3 – Red River R.D. |
TABLE OF CONTENTS
Page(s)
PART I - THE SCHEDULE
SECTION A - SOLICITATION/CONTRACT FORM
SECTION B - SUPPLIES OR SERVICES AND PRICES
| B- 1 - Schedule of Items | 4 - 5 |
| B- 2 – Price Proposal Instructions | |
| B- 3 - Offer Submittal | |
| B- 4 – Payment for Bond Premiums | |
| B- 5 – Additional Classification Required – Davis Bacon General Wage Decision ID20200051 | |
| B- 6 – Idaho Use Tax |
SECTION C - DESCRIPTION/SPECIFICATIONS 6 - 11
| C- 1 – Project Description and Location |
| C- 2 – Technical Specifications |
| C- 3 – Drawings |
| C–4 – Government Furnished Property |
| C- 5 - Biobased Product Utilization |
SECTION E - INSPECTION AND ACCEPTANCE 12
| E- 1 – Clauses Incorporated by Reference |
| E- 2 – Contractor Quality Control Inspection System |
| E- 3 – Acceptance |
SECTION F - DELIVERIES OR PERFORMANCE 13
| F- 1 - Clauses Incorporated by Reference |
| F- 2 - Commencement, Prosecution, and Completion of Work Alternate I |
| F- 3 - Period of Performance |
SECTION G – CONTRACT ADMINISTRATION DATA 14
| G- 1 – Post Award Conference |
| G- 2 – Contracting Officer’s Representative |
| G- 3 – Submittal/Notification Timelines |
SECTION H - SPECIAL CONTRACT REQUIREMENTS 15 - 22
| H- 1 – Key Personnel |
| H- 2- Conditions on Use of Premises |
| H- 3 – Physical Data |
| H- 4 - Noxious Weed Control |
| H- 5 - Barricades, Warning Signs, and Other Devices |
| H- 6 - Environmental Protection |
| H- 7 - Landscape Preservation |
| H- 8 – Emergency Response |
| H- 9 - Loss, Damage, or Destruction |
| H- 10 - Incidental Payment Items |
| H- 11 - Conformity with Drawings and Specifications |
| H- 12 - Local Material Sources |
| H-13 - Samples, Tests, Cited Specifications |
H-14 - Invoice Processing Platform (IPP)
| H-15 - Idaho Worker’s Compensation Law |
| H- 16 – Equipment Rental |
PART II - CONTRACT CLAUSES
SECTION I - CONTRACT CLAUSES 23 - 32
| I- 1 - Clauses Incorporated by Reference |
| I-2 - Affirmative Procurement of Biobased Products Under Service and Construction Contracts |
| I-3 - Buy American - Construction Materials |
| I-4 - Bid Guarantee |
| I-5 - Performance and Payment Bonds - Construction |
| I-6 - Alternative Forms of Security |
| I-7 - Federal, State, and Local Taxes |
| I-8 – Reimbursement for Bond Premiums – Fixed-Price Construction |
| I-9 - Permits and Responsibilities |
| I-10 - Alterations In Contract |
| I-11 - Order of Precedence - Construction |
PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS 33 - 42
| J- 1 - Wage Decision |
| J- 2 – Drawings, Phase 3 |
| J- 3 – Drawings, Planting Plan |
| J- 4 – Technical Specifications |
| J- 5 – Crooked River Valley Stormwater Pollution Prevention Plan Template |
| J- 6 – Aerial Photos |
| J- 7 – Past Performance Questionaire |
PART IV - REPRESENTATIONS AND INSTRUCTIONS
| SECTION K - REPRESENTATIONS, CERTIFICATIONS, AND OTHER | 43 - 50 |
| STATEMENTS OF OFFERORS AND RESPONDENTS |
K- 1 - Annual Representations and Certifications K- 2 - Incorporation by Reference of Representations and Certifications K- 3 – Representation Regarding Certain Telecommunications and Vide0 Surveillance Services or Equipment K- 4 – Information Regarding Responsibility Matters K- 5 – Violation of Arms Control Treaties or Agreements-Certification
| SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS | 51 - 58 |
| AND RESPONDENTS |
| L- 1 - Solicitation Provisions Incorporated by Reference |
| L- 2 - System for Award Management |
| L- 3 - Inquiries |
L- 4 - Facsimile Proposals and E-Mail Proposals
| L- 5 - Instructions for the Preparation of Technical and Business Proposals |
| L- 6 - Amendments to Proposals |
| L- 7 - Type of Contract |
| L- 8 - Construction Wage Rate Requirements—Secondary Site of the Work |
| L-9 - Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity |
for Construction
| L-10 - Notice of Buy American Requirements - Construction Materials |
| L-11 - Service of Protest |
| L-12 - Site Visit (Construction) |
| L-13 - Preparation of Proposals – Construction |
| SECTION M - EVALUATION FACTORS FOR AWARD | 59 - 61 | |
| M- 1 - Evaluation Criteria | ||
| M- 2 - Award Statement |
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
12034320R4001
2. TYPE OF SOLICITATION
|_| SEALED BID (IFB)
|_| NEGOTIATED (RFP)
3. DATE ISSUED
03/30/2020
PAGE OF PAGES
IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.
4. CONTRACT NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
989910
6. PROJECT NUMBER
| 7. ISSUED BY | CODE |
| 8. ADDRESS OFFER TO |
USDA - Forest Service Region 1, Acquisition Management Idaho Montana Acquisition Team Grangeville Office, 104 Airport Road Grangeville, ID 83530
USDA - Forest Service Region 1, Acquisition Management Idaho Montana Acquisition Team Grangeville Office, 104 Airport Road Grangeville, ID 83530
| 9. FOR INFORMATION |
| CALL: |
| a. NAME |
KAREN RUKLIC
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
(208) 983-5144 OR EMAIL: karen.ruklic@usda.gov
SOLICITATION
NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder”.
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date):
Crooked River Valley Rehabilitation Phase 3
Red River Ranger Station Nez Perce-Clearwater National Forests Idaho County, Idaho
Price Range: The Government’s estimate is between $500,000 and $1,000,000.
** ALL OFFER DOCUMENTS, INCLUDING SCANNED BID BOND, SHALL BE SUBMITTED ELECTRONICALLY TO KAREN RUKLIC AT karen.ruklic@usda.gov and RECEIVED BY WEDNESDAY, APRIL 29, 2020 AT 4:00 PM PST.
THE ORIGINAL BID BOND SHALL BE MAILED TO THE ADDRESS IN BLOCK 8, POSTMARKED NO LATER THAN THE OFFER DEADLINE. SEE SECTIONS B-3, L-4 AND L-5 FOR FURTHER INSTRUCTIONS.
11. The Contract time shall begin upon receipt of contract |_| notice to proceed and shall be completed no later than October 15, 2020. This performance period is |_| mandatory, |_| negotiable. (See Section F, Clause 52.211-10, Alt I)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If “YES,” indicate within how many calendar days after award in Item 12b.)
| |_| YES | |_| NO | |
| 12b. CALENDAR DAYS |
| 13. ADDITIONAL SOLICITATION REQUIREMENTS: | |||
| a. | Sealed offers in original and 1 copy to perform the work required are due at the place specified in Item 8 by 4:00 pm local time Wednesday, April 29, 2020. If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due. | ||
| b. | An offer guarantee | |_| is, | |_| is not required. (If “is required” see AGAR Clause 452.228-70) |
| c. | All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference. | ||
| d. | Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected. |
| STANDARD FORM 1442 (REV. 8/2014) |
| Prescribed by GSA - FAR (48 CFR) 53.236-1(d) |
12034320R4001 Crooked River Valley Rehabilitation Phase 3 – Red River R.D.
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
15. TELEPHONE NUMBER (Include area code)
Duns No. _________________
CAGE Code (see FAR Provision 52.204-16) ____________
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
PLEASE COMPLETE THIS BLOCK
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
| AMENDMENT NUMBER |
| DATE |
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
| 24. SUBMIT INVOICES TO ADDRESS SHOWN IN |
| (4 copies unless otherwise specified) |
| ITEM |
| 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO | |
| |_| 10 U.S.C. 2304(c) ( ) | |X| 41 U.S.C. 3304(a) ( ) |
| 26. ADMINISTERED BY |
| 27. PAYMENT WILL BE MADE BY |
USDA – Forest Service Idaho Montana Acquisition Team Nez Perce-Clearwater NFs Grangeville Office - 104 Airport Road Grangeville, Idaho 83530
All invoices will be processed using the Department of Treasury’s Invoice Processing Platform (IPP), visit http://www.ipp.gov to learn more. Contractors must follow the instructions on how to submit invoices via IPP.
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
| |_| | 28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract. |
| |_| | 29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary. |
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
KAREN RUKLIC
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA
BY
31c. DATE
STANDARD FORM 1442 (REV. 8/2014) BACK
PART I - THE SCHEDULE
SECTION B - SUPPLIES OR SERVICES AND PRICES
CROOKED RIVER VALLEY REHABILITATION – PHASE 3
RED RIVER RANGER DISTRICT
NEZ PERCE-CLEARWATER NATIONAL FORESTS
IDAHO COUNTY, IDAHO
B- 1 Schedule of Items
| PAY ITEM |
| DESCRIPTION |
| METH. MEAS. |
| PAY UNIT |
| EST. QTY |
| UNIT PRICE |
| TOTAL PRICE |
Crooked River Valley Rehabilitation Phase 3
| A1 |
| Mobilization and Demobilization |
| LSQ |
| LS |
| 1 |
| XXXX |
A2
| Water Management and Environmental Controls |
| LSQ |
| LS |
| 1 |
| XXXX |
| A3 |
| Survey and Staking |
| LSQ |
| LS |
| 1 |
| XXXX |
| A4 |
| Large Wood Structure Type 2 |
| AQ |
| LF |
| 4255 |
| A5 |
| Brush Fascine Type 1 |
| AQ |
| LF |
| 2755 |
| A6 |
| Brush Fascine Type 2 |
| AQ |
| LF |
| 925 |
| A7 |
| Floodplain Micro-topography |
| AQ |
| ACRES |
| 32 |
| A8 |
| Equipment Rental Rate for Excavator and Operator |
| AQ |
| HOURS |
| 10 |
| A9 |
| Equipment Rental Rate for Dump Truck and Operator |
| AQ |
| HOURS |
| 10 |
| A10 |
| Equipment Rental Rate for Bulldozer and Operator |
AQ
HOURS
SUB-TOTAL (All Phase 3 Items A1-A10): $_________________________________
Crooked River Valley Rehabilitation Planting
| B1 |
| Mobilization and Demobilization |
| LSQ |
| LS |
| 1 |
| XXXX |
B2
| Plant Delivery (from Nursery to Project Site) |
| LSQ |
| LS |
| 1 |
| XXXX |
| B3 |
| Planting in Large Wood Structures (LWST2), 8 gal |
| LSQ |
| LF |
| 4210 |
| B4 |
| Planting in Brush Fascines (BFT1), 5 gal |
| AQ |
| LF |
| 2740 |
| B5 |
| Trench Planting between Brush Fascines (BFT1), 5-gal |
| AQ |
| LF |
| 2280 |
| B6 |
| Single Hole Planting in Floodplain |
Micro-topography, 5-8 gal
| AQ |
| EA |
| 7,525 |
| B7 |
| Single Hole Planting in Floodplain Micro-topography, 1-gal |
| AQ |
| EA |
| 200 |
| B8 |
| Exclosure Installation (Aspens) |
| AQ |
| EA |
| 40 |
| B9 |
| Trench Planting - Side Channel, 1-2 gal |
| AQ |
| LF |
| 2,614 |
| B10 |
| Equipment Rental Rate for Mini Excavator and Operator |
| AQ |
| HOURS |
| 10 |
| B11 |
| Equipment Rental Rate for Compact Loader and Operator |
AQ
HOURS
SUB-TOTAL (All Planting Items B1-B11): $_________________________________
TOTAL (All Items A1-B11): $_________________________________
* Designated Method of Measurement: AQ - Actual Quantities, LSQ - Lump Sum Quantities;
LF – Linear Feet
B-2 PRICE PROPOSAL INSTRUCTIONS: Complete Schedule of Items B-1 (A1-A10 and B1-B-11). Provide total amounts for all items and unit prices for all items not designated as Lump Sum. Provide unit prices to the nearest cent and do not round the extended totals.
In addition, the Contractor shall give a price per hour for Items: A8 Excavator and Operator, A9 Dump Truck and Operator, A10 Bulldozer and Operator, B11 Mini Excavator and Operator, and B12 Compact Loader and Operator for additional work above the estimated quantities that is encountered during the contract performance. See H-16 for details. **The Government does not guarantee that any hourly work shall be ordered and reserves the right to reduce or eliminate entirely the work under these items with no adjustment in contract unit price.
B-3 OFFER SUBMITTAL: As your offer, submit the following documentation electronically to Karen Ruklic at karen.ruklic@usda.gov. A completed and signed original Standard Form 1442, a completed Schedule of Items (Section B-1), a Technical Proposal, a scanned copy of the original bid bond, and a completed Section K. Technical and price proposals are required for evaluation of offers. See Section L for proposal instructions and Section M for evaluation/award information. The original bid bond shall be mailed to the address in Block 8 of the SF-1442. The bid bond shall be mailed/postmarked no later than the date offers are due.
B-4 PAYMENT FOR BOND PREMIUMS Note: Payment for bond premiums in accordance with FAR Clause 52.232-5, Payments Under Fixed-Price Construction Contracts, shall not be in addition to the contract price.
B-5 ADDITIONAL CLASSIFICATION REQUIRED – DAVIS-BACON GENERAL WAGE DECISION ID20200051, dated 03/06/2020: A wage rate for an Excavator Operator shall be conformed after award in accordance with FAR 52.222-6 Construction Wage Rate Requirements (AUG 2018) and direction provided in the subject Wage Decision. The most recent wage rate approved by the Department of Labor for this classification was $28.60 per hour rate with $15.20 fringe benefits (conformed July 12, 2019 for Idaho County).
B-6 - IDAHO USE TAX - Under clause 52.236-7, Permits and Responsibilities, Contractors shall be responsible for complying with any Federal, State, and municipal laws, codes and regulations applicable to the performance of the work. Questions regarding the assessment of Idaho Use Tax on Government Furnished Property should be directed to the Idaho State Tax Commission at (208) 799-3491. See Section B-4 for a complete description of the GFP to be provided under this contract. Please note that the total purchase price of the plants supplied by the Government is $328,252.05.
SECTION C - DESCRIPTION/SPECIFICATIONS
C- 1 – PROJECT DESCRIPTION AND LOCATION
(a) Objectives and Background:
The objective of the Crooked River Valley Rehabilitation Project is to address the impacts of historical dredge mining on aquatic habitat conditions. The Crooked River Valley Rehabilitation project was designed to be constructed in multiple phases over 6 years. Phases completed include construction of a bypass channel and levee/haul road, Option 2 floodplain connection, and Phases 1 and 2 floodplain restoration/river channel construction including installation of forty-nine (49) Type 1 - Large Wood Structures. Work to be completed in 2020 includes Phase 3 and planting. The project is being performed on the Red River Ranger District of the Nez Perce Clearwater National Forests in collaboration with the Nez Perce Tribe Watershed Program and funded by Bonneville Power Administration. In addition, U.S. Forest Service stewardship funds are also planned for use to accomplish watershed restoration objectives while supporting the local economy.
(b) Scope of Work:
This contract requires completion of Phase 3 of the Crooked River Valley Rehabilitation Project and Planting on the Nez Perce- Clearwater National Forest, Idaho County, Idaho. Phase 3 requires installing approximately 4255 linear feet of Large Wood Structures, 2755 linear feet of Brush Fascine Type 1 and 925 linear feet of Brush Fascine Type 2 and up to 32 acres of floodplain roughness. This work is detailed in the Crooked River Valley Rehabilitation Phase 3 drawing set and the Technical Specifications.
Planting is also included in this phase and has a separate drawing set titled Crooked River Valley Rehabilitation Planting Plan. Approximately 12,327 plants ranging from 8-gallon to 1-gallon will be planted and approximately 6,950 linear feet of bank stability structures will receive planting while the structures are being installed. Additionally, approximately 2,280 feet of 18”-deep trenches shall be dug between Brush Fascine Type 1 structures to plant 5-gallon plants and 2,614 linear feet of 18” deep by 12-18” wide trenches shall be dug along the side channel for 1-gallon and 2-gallon plants. Each plant shall be watered to ensure root to soil contact.
Contractor shall furnish all labor, equipment, operating supplies supervision, transportation, materials (except those designated as Government-furnished), and incidentals necessary to complete the project as required by the contract, plans, and specifications.
(c) Description of Work.
The river channel was diverted into the bypass channel in 2018 and 2019. The new channel is isolated by a diversion structure that will pass water at high flows. Work will occur in the dry with the exception of some pools that may hold water. Work will not occur in these areas until fish salvage is complete after the July 15, 2020 instream work window. Work where the project area is dry may occur prior to July 15, 2020.
The Contractor shall maintain the haul road internal to the project as necessary. The Contractor is allowed to cross the bypass channel at the bridge up to 10 times with an excavator in order to access the project area.
The Contractor shall stake the locations of the Large Wood Structure Type 2, Brush Fascine Type 1, and Brush Fascine Type 2, collectively referred to as bank stability structures, as needed. The contractor shall construct approximately 4,255 linear feet of Large Wood Structure Type 2, 2,755 linear feet of Brush Fascine Type 1, and 925 linear feet of Brush Fascine Type 2. Refer to plan Sheets 5.0 through 5.3 for the location and layout of the bank stability structures. Forty nine Large Wood Structure Type 1 were constructed in Phases 1 and 2, and are also depicted on the plan sheets. The contractor may cross the newly constructed river channel in a maximum of 7 areas in order to access the west side of the project area. All river crossings shall be restored to pre-work conditions per design cross sections (Sheet 6.0-Phase 3) upon completion. The Contractor shall use mechanical equipment to dig approximately 7,525 single holes for 8-gallon and 5-gallon size plants over 25 acres also scheduled to receive floodplain micro-topography. Holes for the 8-gallon size plants shall be dug to a minimum depth of 24” and 18” for the 5-gallon size plants.
The Contractor is responsible for coordinating pick up and transporting plants from the Nursery in Princeton, Idaho to the project area. (See Section B 200, Plant Delivery from Nursery, in the Technical Specification for additonal details). Plants shall be hauled in a closed container to protect them during transport and offloaded onsite. Planting activities shall be performed in a manner that insures plant survival and growth. Plant survival and growth depends on the initial health of the plants, the manner in which plants are handled and planted, environmental conditions such as soil moisture and weather, and animal damage to the plants. The Contractor shall water all plants upon planting and ensure plants are watered as they are staged on the floodplain. The services secured with this contract require appropriate handling and planting techniques as well as planting during a period of time when environmental conditions are most favorable to ensure survival.
Thirty two acres of floodplain will receive micro-topography treatments, or floodplain roughness, as described in the Crooked River Valley Rehabilitation Phase 3 Designs. Floodplain roughness involves mixing soil and large wood into the floodplain to create ridges and furrows. Soil is stockpiled throughout the floodplain to be mixed into the top 6-12 inches in areas indicated on plan sheet 6.4. Large and small wood and brush are stockpiled throughout the floodplain to be partially buried. More brush is available at the south stockpile area and shall be incorporated into floodplain micro-topography. The Contractor shall preserve the depressions, ponds, swales and side channel features on the floodplain; however, large wood may be added to these features to enhance off-channel habitats.
(d) Project Location: The project is approximately 45 mi east of Grangeville, Idaho. At the junction of Highway 14 and the Crooked River Road (FR 233, MP 41), travel south for approximately 2.0 miles to the beginning of the project area.
(e) Price Range: Government cost estimate, per FAR 36.204, is between $500,000 - $1,000,000.
(f) Pre Bid Tour: No formal pre-bid tour is planned due current restrictions linked to the COVID-19 pandemic. Aerial photos of the project area following Phase 2 construction have been provided as an attachment to the solicitation (see Section J). To facilitate good, clear communication, it is requested that contractors email all their questions to Karen Ruklic at karen.ruklic@usda.gov by Tuesday, April 14, 2020 so that a consolidated set of answers may be provided to all contractors via a solicitation amendment. See Section L-12 FAR 52.236-27 Site Visit (Construction) (FEB 1995) if you have questions regarding visiting the site.
(g) Estimated Start Date: The estimated start date is June 20, 2020 and the completion deadline is October 15, 2020. (See Section F, FAR Clause 52.211-10 Alt I.) IMPORTANT: snow pack is above average this year. This may affect the start date since access to the project area with large equipment surpassing the bridge limit, may require crossing Crooked River. See Attachment J-4 Technical Specifications, Section 01505 Mobilization and Demobilization for temporary bridge load ratings.
C-2 - TECHNICAL SPECIFICATIONS Stand-alone technical specifications have been prepared for the Crooked River Valley Rehabilitation Phase 3 and Crooked River Planting. The technical specifications are provided in a separate attachment in Section J.
C-3 - DRAWINGS- Titled “CROOKED RIVER VALLEY REHABILITATION PHASE 3” and “CROOKED RIVER VALLEY REHABILITION PLANTING DESIGN”. The following drawings are a part of this solicitation and any resulting contract and are found in a separate attachment in Section J.
CROOKED RIVER VALLEY REHABILITATION; PHASE 3
| DESCRIPTION |
| SHEET NO. |
| Cover Sheet- Title Sheet |
| 1.0 |
| Existing Conditions |
| 2.0 |
| Rehabilitation Plan |
| 3.0 |
| Access, Staging and Survey Control |
| 4.0 |
| Water Management Plan |
| 4.1 |
| Site Plan |
| 5.0 |
| Site Plan |
| 5.1 |
| Site Plan |
| 5.2 |
| Site Plan |
| 5.3 |
| Typical Cross Section |
| 6.0 |
| Brush Fascine Type 1 |
| 6.1 |
| Brush Fascine Type 2 |
| 6.2 |
| Large Wood Structure Type 2 |
| 6.3 |
| Floodplain Roughness Detail |
| 6.4 |
CROOKED RIVER VALLEY PLANTING PLAN
| Title sheet |
| 1.0 |
| Rehabilitation/staging plan |
| 2.0 |
| Summary of quantities/specifications |
| 3.0 |
| Site plan |
| 4.0 |
| Site plan |
| 4.1 |
| Site plan |
| 4.2 |
| Site plan |
| 4.3 |
| Riffle planting typical |
| 5.0 |
| Meander bend planting typical |
| 5.1 |
| Floodplain/side channel planting typical |
| 5.2 |
C- 4 GOVERNMENT-FURNISHED PROPERTY
The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause 52.245-2 contained in Section I of the contract.
· Woody Material for Large Wood Structures and Floodplain Roughness logs, are on site. Additional medium category material shall be imported from an adjacent timber sale contract with the Government’s resources.
· Small-Medium Wood and Brush for floodplain roughness and vegetation salvage, on site.
· Various gradations of soil and rock – on site, if needed.
· Vegetative Fill, on site.
· Fencing, (40) 16’ cattle panels and (160) 6’ T posts, on site.
· Planting Stock – Tall 1 Gallon, 2 5 & 8 Gallon Plants (itemized below). All plants shall be supplied by the government. All plants are stored at the Wildlife Habitat Nursery in Princeton, Idaho and shall be delivered to the site by the Contractor.
| Species |
| Code |
| Total |
| Thin-leaf Alder Tall 1G |
| ALIN |
| 600 |
| Thin-leaf Alder 2G |
| ALIN |
| 600 |
| Thin-leaf Alder 5G |
| ALIN |
| 3,600 |
| Thin-leaf Alder 8G |
| ALIN |
| 2,435 |
| Water Birch 8G |
| BEOC |
| 115 |
| Quaking Aspen Tall 1G |
| POTRE |
| 200 |
| Black Cottonwood 5G |
| POTRI |
| 1,027 |
| Black Cottonwood 8G |
| POTRI |
| 500 |
| Drummond Willow Tall 1G |
| SADR |
| 100 |
| Drummond Willow 2G |
| SADR |
| 250 |
| Sandbar Willow Tall 1G |
| SAEXm |
| 100 |
| Geyer Willow Tall 1G |
| SAGE |
| 100 |
| Engleman spruce 5G |
| PIEN |
| 1,750 |
| Engleman spruce 8G |
| PIEN |
| 950 |
| TOTALS |
| 12,327 |
It is the contractor’s responsibility to coordinate the pickup and delivery of the planting stock to the site of work from the nursery. See Section B 200 in the Technical Specifications for Contractor requirements. The contractor shall provide appropriate transport and on-site storage and care of the planting material in a manner which will ensure their health and vitality prior to planting.
Wildlife Habitat Nursery; owner, Denny Dawes, is the contractor from whom the planting stock was purchased. This company’s contact information is as follows:
Address: 1025 E. Hatter Creek Road, Princeton, ID 83857 Telephone: 208-875-2500 Email address: wild@potlatch.com
Government inspectors will be on site to inspect planting materials delivered to the site and will reject plants that are in unacceptable condition (e.g. desiccated, damaged, etc.). If the number of rejected plants is significant, a contract modification will be negotiated.
The Contractor shall return the plant pots in good condition to Wildlife Habitat Nursery OR the staging area at the top of the access route.
The total purchase price of the plants supplied by the government is $328,252.05. Questions regarding assessment of Idaho Use Tax on Government Furnished Property (GFP) should be directed to the Idaho State Tax Commission in accordance with the clause on page 5.
See FAR 52.245-1 in Section I-1 for additional information.
C- 5 BIOBASED PRODUCT UTILIZATION
The Contractor must comply with the Agricultural Act of 2014; the Food, Conservation and Energy Act of 2008 (FCEA), 7 U.S.C. 8102; the Farm Security and Rural Investment Act of 2002 (FSRIA), 7 U.S.C. 8102; the Federal Acquisition Regulation; Executive Order (EO) 13514, “Federal Leadership in Environmental, Energy and Economic Performance,” dated October 5, 2009; EO 13423, “Strengthening Federal Environmental, Energy, and Transportation Management,” dated January 24, 2007; and Presidential Memorandum, “Driving Innovation and Creating Jobs in Rural America through Biobased and Sustainable Product Procurement,” dated February 2012, to provide biobased products.
The Contractor shall utilize products and material made from biobased materials to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to applicable Federal specifications and standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer’s Representative (COR).
The following is an example list of products that may be used in this contract for which biobased products are available. The list is not all inclusive. It is desirable that Contractors be able to supply the greatest number of biobased products listed meeting the health and environmental specifications.
| Hydraulic Fluids | Penetrating Lubricants | Degreasers |
| Absorbents | Diesel Fuel Additives | Greases |
| Dust Suppressants | 2-Cycle Engine Oil | Sorbents |
| Adhesive and Mastic Removers | Cleaners | Concrete/Asphalt Release Fluids |
| Composite Panels | Sealers | Wood and Concrete Sealers |
| Graffiti and Grease Removers | Stain Removers | Metalworking Fluids |
Biobased products that are designated for preferred procurement under USDA’s Biopreferred Program must meet the required minimum biobased content as stated in the USDA Final Rule available at www.biopreferred.gov. The Contractor should provide data for their biobased products such as biobased content and source of biobased material.
In addition to the biobased products designated by the U.S. Department of Agriculture in the Biopreferred Program, the Contractor is encouraged to use other commercially available biobased products.
Additionally, the winning Contractor on each anniversary date of the contract shall compile a complete list of biobased products, including the information above, purchased to carry out the contract requirements. The Contractor shall list volume to be used and total cost for each individual product. This information will be used for reporting purposes (see Section I, FAR Clause 52.223-2).
A demonstration of proper use, an effective training program, and technical assistance are essential to the success of the purchase and use of some biobased products that may function differently than a conventional product.
PART I - THE SCHEDULE
SECTION E - INSPECTION AND ACCEPTANCE
E- 1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address: Federal Acquisition Regulations - http://www.acquisition.gov/far.
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246-12 Inspection of Construction (AUG 1996)
E-2 CONTRACTOR QUALITY CONTROL INSPECTION SYSTEM
The Contractor shall identify the quality control inspection system it will use to ensure that contract specifications will be achieved. At no time shall the contractor rely upon Government inspections to provide notification of unsatisfactory performance. The Contractor shall produce written inspection records in a format and at times and places satisfactory to the Contracting Officer. Inspection records shall be made available upon request of the Contracting Officer and be maintained until the date of contract closure. The Contracting Officer may observe the Contractor's inspection at any time and shall otherwise have unlimited access to the inspection data.
E-3 ACCEPTANCE
The Forest Service shall perform an inspection upon Contractor’s written request and assurance that work has been completed. Request shall be for a reasonable portion of work. Acceptance may be made for all or portions of work.
PART I - THE SCHEDULE
SECTION F - DELIVERIES OR PERFORMANCE
F- 1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition Regulations - http://www.acquisition.gov/far and the Agriculture Acquisition Regulations – http://www.dm.usda.gov/procurement/policy/agar.html.
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.242-14 Suspension of Work (APR 1984)
F- 2 FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984) Alternate I (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10-calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than October 15, 2020. The time stated for completion shall include final cleanup of the premises.
The completion date is based on the assumption that the successful offeror will receive the notice to proceed by June 20, 2020. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.
All in-stream work must occur after July 15, 2020. Mechanized equipment is prohibited from entering the active channel prior to this date.
F- 3 AGAR 452.211.74 Period of Performance (FEB 1988)
The period of performance of this contract is from June 20, 2020 through October 15, 2020.
SECTION G – CONTRACT ADMINISTRATION DATA
G-1 - AGAR 452.215-73 POST AWARD CONFERENCE (NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled within 30 days of commencement of work. The conference will be held at the Nez Perce-Clearwater National Forests’ Office, 104 Airport Road, Grangeville, ID and will include discussion of such topics as contract terms and work performance requirements, work progress schedule and safety plans.
G-2 - CONTRACTING OFFICER'S REPRESENTATIVE
The Contracting Officer will designate a representative, hereinafter referred to as the Contracting Officer's Representative (COR) or, alternatively, as the Engineer, who will provide on-the-ground administration for the Government. The COR will be designated in writing and a copy of the designation will be furnished to the Contractor before or at the prework conference. The Contractor is cautioned to read the COR designation because certain authority under the contract is reserved solely for the Contracting Officer. The term "Contracting Officer" as used throughout the Specifications, shall be interpreted to include the Contracting Officer's designated representative(s) acting within the limits of their delegation of authority.
G-3 - SUBMITTAL/NOTIFICATION TIMELINES
The submittal and notification timelines required are provided in the Technical Specifications 01300.
PART I - THE SCHEDULE
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H-1 KEY PERSONNEL
The key personnel specified in the Offeror’s Technical Proposal are considered to be essential to the work being performed hereunder. Prior to diverting any of the specified individuals to other programs, the Contractor shall notify the Contracting Officer reasonably in advance and shall submit justification (including proposed substitutions) in sufficient detail to permit evaluation of the impact on the contract.
The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions.
No diversion shall be made by the Contractor without the written consent of the Contracting Officer: Provided that the Contracting Officer may ratify in writing such diversion and such ratification shall constitute the consent of the Contracting Officer required by this clause. The contract may be amended from time to time during the course of the contract to either add or delete personnel, as appropriate.
H-2 CONDITIONS ON USE OF PREMISES (Camping)
(a) Camping will be allowed only at the sites designated on the project maps or approved in advance by the District Ranger.
(b) No improvements of a permanent nature shall be constructed without prior written approval of the C.O.R.
(c) Temporary structures such as tent frames, hitch racks, tents and tent pegs shall be removed at the end of the period of use, all evidence of the camp eliminated, and the site restored to its original condition. Final payment will not be authorized until the campsite has been cleaned up and the site is approved by the Contracting Officer or his designated representative. Reusable native material may be neatly stacked for future use.
(c) Livestock will not be permitted without written approval from the Contracting Officer.
(d) Vegetation shall be undisturbed to the maximum extent possible. The Contractor will be permitted to cut only those trees designated by the COR.
(e) Storage of petroleum products in excess of 50 gallons at the campsite will require the approval of the COR. All petroleum spills shall be immediately cleaned up. All spills will be reported immediately to the CO or COR. Spills over 25 gallons will be reported to CO and the Idaho State Department of Enviromental Quality. No waste disposal of petroleum product will be permitted on National Forest land.
(f) Chemical toilets are preferred for all campsites.
(g) Refuse including waste materials, garbage, and rubbish of all kinds, shall be disposed of in the following manner, and shall guard the purity of streams and living waters:
Garbage, trash, sewage waste, and other litter shall be kept in closed fly-proof containers and periodically hauled to an approved disposal facility located outside of the National Forest.
(h) No waste or by-products shall be discharged if it contains any substances in concentrations which will result in substantial harm to fish and wildlife, or to human water supplies.
(j) The camp area shall be maintained to present a clean, neat, and orderly appearance. Disposal of trash and debris, unusable machinery, Forest Service authorized improvements, etc., shall be kept current. Building materials, firewood, etc., shall be neatly stacked.
(k) The campsite shall be left in a clean condition. Any clean-up work not accomplished by the Contractor at time of camp closure will be done by the Forest Service, and the actual cost of such clean-up will be deducted from payment otherwise due the Contractor.
H-3 FAR 52.236-4 PHYSICAL DATA (APR 1984)
Data and information furnished or referred to below is for the Contractor’s information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
1. The indications of physical conditions on the plans and in the specifications are the result of site investigations by Forest Service specialists making physical determination based on surface observations.
1. Weather Conditions. Normal snow conditions indicate a work season from approximately June 1 to October 30. Freezing temperatures can occur throughout the season.
1. Transportation Facilities. Access from Grangeville is Mount Idaho Grade to State Highway 14 for approximately 29 miles to Crooked River Road 233. The project area is adjacent to County Road 233 from approximate Mile 0.25 to Mile 2.25. State Highway 14 is a two lane, asphalt highway with shoulders and regular turnouts. Crooked River Road 233 is a lane and a half, gravel road without shoulders or turnouts. It is the Contractor’s responsibility to coordinate with appropriate State and County offices to ensure that load limit restrictions are met and/or proper permits are obtained.
During the summer construction season, road reconstruction work will occur on Hwy 14 near MP 39. The highway will be restricted to one lane traffic between approximately July 10 and August 30, at this location. The potential exists for further width restrictions during this period. The Contractor shall coordinate directly with the Idaho Department of Transportation during equipment mobilization/demobilization.
Road 233 is an Idaho County maintained road. The Contractor shall observe and follow all Idaho County regulations pertaining to haul on this road and obtain all necessary permits. Vehicles must be “highway legal” to travel on Idaho County roads without an approved permit. Hauling shall not occur on Road 233 after 12 pm on Fridays or weekends. Mining traffic on the 233 Road is anticipated throughout the season.
(d) Material Source/ Stockpile Site.
(a) South Staging area
a. Location: Within the project site, just to the south along temporary haul route
b. Inventory: brush, various gradation of soil and rock, vegetative soil.
H-4 - NOXIOUS WEED CONTROL. (2/96) In order to prevent the potential spread of noxious weeds into work areas, Contractor shall be required to use weed-free equipment.
The following is considered proof of weed-free equipment:
The Contractor will be required to clean all construction equipment prior to entry on to the work area. This cleaning shall remove all dirt and plant parts and material that could carry noxious weed seeds into the work area. Only clean construction equipment inspected by the Forest Service will be allowed to operate within the work area. All subsequent move-ins of construction equipment shall be treated in the same manner as initial move-in.
Prior to the initial move-in, and all subsequent move-ins, the Contractor shall make all construction equipment available for inspection by the Forest Service at an agreed upon location off Forest Service land. The Contractor shall give the Forest Service at least 48 hours advance notification when equipment is ready for inspection.
Straw/Hay Bales and erosion controll devices shall be certified as “Weed Free”. The source field shall be inspected and certified by the county extension agent from the county that the straw/hay is grown. Each shipment onto the forest shall be accompanied by a certification tag stating that it is weed free. The contractor shall furnish the Forest Service with a statement of certification.
H-5 BARRICADES, WARNING SIGNS, AND OTHER DEVICES
The Contractor shall provide, erect, and maintain all necessary barricades, suitable and sufficient lights, danger signals, signs, and other traffic control devices, and shall take all necessary precautions for the protection of the work and safety of the public. Roads closed to traffic shall be protected by effective barricades, and obstructions shall be illuminated during the hours of darkness. Suitable warning signs shall be provided to properly control and direct traffic.
The Contractor shall erect warning signs in advance to any place on the project where operations may interfere with the use of the road or trail by traffic and at all intermediate points where the new work crosses or coincides with an existing road or trail. All road barricades, warning signs, lights, temporary signals, flagmen and pilot car operators and equipment, and other protective devices, except for special devices, shall conform with Part VI of the Manual on Uniform Traffic Control Devices for Streets and Highways (MUTDC), published by the Federal Highway Administration and applicable safety codes. The MUTDC can be read or downloaded at http://mutcd.fhwa.dot.gov/pdfs/2009r1r2/pdf_index.htm.
As a minimum, it is anticipated that the following type and number of signs will be required:
| Location |
| Designation |
| Quantity |
| On Road 233, on either side of temporary access road |
| TRUCKS ENTERING ROADWAY |
| 2 |
H-6 ENVIRONMENTAL PROTECTION
The contractor is required to have a spill plan. The plan will contain a description of the specific hazardous materials, procedures, and spill containment that will be used, including inventory, storage, and handling.
All vehicles carrying fuel will have specific equipment and materials needed to contain or clean up any incidental spills at the project site.
All pumps and generators used in or near streams will have appropriate spill containment structures and/or absorbent pads in place during use.
When storage facilities for oil or oil products are on site, appropriate preventive measures shall be taken to insure that any spill of such oil or oil products does not enter any stream or any other body of water. If a spill of petroleum product should occur in water, immediately notify the Contracting Officer and appropriate state agencies.
Service and refuel all equipment at least 150 feet away from water bodies in the areas approved by the Contracting Officer. If the total oil or oil products storage exceeds 1320 gallons or if any single container exceeds a capacity of 660 gallons, prepare a Spill Prevention Control and Countermeasures (SPCC) Plan. Meet all applicable EPA requirements (40 CFR 112) including certification by a registered professional engineer.
Contractor shall ensure that all personnel involved in handling and packaging the hazardous materials are trained for the level of expertise required for the proper performance of the task and, in particular, in the areas of chemical incompatibility, general first aid procedures, and spills. Provide handling and personal protective equipment appropriate to ensure safe handling of the hazardous material according to 29 CFR 1910.120). Notify the Forest Service in writing of all hazardous material that may be brought onto the National Forest.
The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. The contractor must clean up spills or leaks in a manner that complies with Federal, state, and local laws and regulations and to the satisfaction of the CO. When necessary provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.
Equipment Fuel/Oil Leakage All equipment used for instream work will be cleaned of external oil, grease, dirt and mud; and leaks repaired; prior to arriving at the project site. All equipment will be inspected by the Contracting Officer’s Representative before unloading at site. Any leaks or accumulations of grease will be corrected before entering streams or areas that drain directly to streams or wetlands.
Equipment used for in-stream or riparian work (including chainsaws and other hand power tools) will be fueled and serviced in an area approved by the CO. When not in use, vehicles will be stored in the designated staging area. The staging area should be in an area that will not deliver fuel, oil, etc. to streams.
Contractor is required to have a Spill Kit or equivalent that contains oil-absorbing floating booms, and other equipment such as pads and absorbent “peanuts” appropriate for the size of the stream, available on-site during all phases of construction. For small streams with few pools or slack water, booms may not be effective. Use pads and straw bales to anchor booms if necessary. Booms will be placed in a location that facilitates an immediate response to potential petroleum leakage.
Fish-Friendly Hydraulic Fluids
In accordance with Technical Specification 01505, Mobilization and Demobilization, Section General, Note 4, equipment that will be used in live water shall utilize hydraulic fluid that is non-toxic to salmonids. The criteria used to determine if the hydraulic fluid is nontoxic to salmonids during acute exposure is found in footnote 1. According to guidance provided by the National Oceanic and Atmospheric Administration, the following products meet the required criteria:
· Chevron Clarity Hydraulic Oil A W
· Ecoterra Hydraulic Oil
· GreensCare Plus
· Mobil EAL 224H
The government does not endorse any of these specific products and urges contractors to perform independent research regarding the performance characteristics of each product.
H-7 Landscape Preservation
(a) The Contractor shall confine operations to within the clearing limits or other areas designated in contract documents, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits. Material, which falls outside of these limits, shall be retrieved, disposed of, or incorporated in the work as directed by the Contracting Officer.
(b) Operation shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.).
Pollutants such as fuels, lubricants, bitumens, raw sewage, and other harmful materials shall not be discharged into or near rivers, streams, and impoundments or into natural or manmade channels leading thereto. Wash water or waste water from concrete or aggregate operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.
Mechanized equipment shall not be operated in live streams without written approval by the Contracting Officer.
H- 8 AGAR 452.236-77 Emergency Response (NOV 1996)
(a) Contractor’s Responsibility for Fire Fighting.
(1) The Contractor, under the provisions of FAR clause 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements, shall immediately extinguish all fires on the work site other than those fires in use as a part of the work.
(2) The Contractor may be held liable for all damages and for all costs incurred by the Government for labor, subsistence, equipment, supplies, and transportation deemed necessary to control or suppress a fire set or caused by the Contractor or the Contractor’s agents or employees.
(b) Contractor’s Responsibility for Notification in Case of Fire. The Contractor shall immediately notify the Government of any fires sighted on or in the vicinity of the work site.
(c)…
This is the start of the file's text. The full file is on GovTribe.