This solicitation is for the rehabilitation of East Rim Drive. The Department of Transportation Federal Highway Administration is seeking proposals to rehabilitate East Rim Drive located within Crater Lake National Park in Oregon. Responses are due by July 15th, 2022 as indicated in solicitation number 69056722r000013. Proposals should include plans and costs for repairing and resurfacing the 17-mile roadway around Crater Lake to improve safety and accessibility for visitors. The awarded firm will be responsible for repairing pavement failures, replacing guardrails, and performing other rehabilitation work outlined in the request for proposals.

View the file

Other files

File Type Posted
Amendment A001.pdf PDF
QA 1-30-23.pdf PDF
Geotech Report 0920_Rehabilitate East Rim Drive_Final Geotechnical Recommendations.pdf PDF
OR NPS CRLA 13(1) APPR 03_XYZ Base and Subgrade.pdf PDF
OR NPS CRLA 13(1) XS_MAIN_COR_2.pdf PDF
OR NPS CRLA 13(1)_Main_COR_4_Super_Report.pdf PDF
OR NPS CRLA 13(1)_Main_COR_2_VA.pdf PDF
OR NPS CRLA 13(1)_Main_COR_4_Earthwrok_Report.pdf PDF
OR NPS CRLA 13(1) XYZ Main_COR_4_Ditch.xlsx XLSX spreadsheet
OR NPS CRLA 13(1)_Main_COR_1_HA.pdf PDF
FLH Bridge oversized or overload vehicle permit request form April 2019.pdf PDF
OR NPS CRLA 13(1)_Main_COR_4_VA.pdf PDF
OR NPS CRLA 13(1)_APPR04_NamedBoundary_Earthwork_Report.pdf PDF
OR NPS CRLA 13(1) APPR 02_Staking Report.pdf PDF
OR NPS CRLA 13(1)_Plans_Final.pdf PDF
OR NPS CRLA 13(1) XYZ_APPR_04_ETW_EOP.pdf PDF
OR NPS CRLA 13(1) XYZ Main_COR_1_Ditch_PavedDitch.xlsx XLSX spreadsheet
OR NPS CRLA 13(1)_APPR03_Earthwrok_Report.pdf PDF
OR NPS CRLA 13(1) XYZ APPR_01_Base and Subgrade.xlsx XLSX spreadsheet
OR NPS CRLA 13(1) XS_APPR 01.pdf PDF
OR NPS CRLA 13(1) XYZ APPR_03_Base and Subgrade.xlsx XLSX spreadsheet
OR NPS CRLA 13(1)_Main_COR_2_HA.pdf PDF
OR NPS CRLA 13(1) XYZ_Main_COR_2_ETW_EOP_Guardwalls.pdf PDF
OR NPS CRLA 13(1)_APPR_02_HA.pdf PDF
OR NPS CRLA 13(1)_Main_COR_1_Staking_Report.pdf PDF
OR NPS CRLA 13(1)_Main_COR_1_VA.pdf PDF
OR NPS CRLA 13(1) XYZ Main_COR_2_Base and Subgrade.xlsx XLSX spreadsheet
OR NPS CRLA 13(1) XS_APPR 04.pdf PDF
OR NPS CRLA 13(1) APPR 01_Staking Report.pdf PDF
OR NPS CRLA 13(1) XYZ Main_COR_3_Ditch.xlsx XLSX spreadsheet
OR NPS CRLA 13(1)_Clearing Limits_L_495 00 to 755 00_INCL_APPR_03.pdf PDF
OR NPS CRLA 13(1) XYZ Main_COR_2_ETW_EOP_Guardwalls.xlsx XLSX spreadsheet
OR NPS CRLA 13(1) XYZ Main_Cor_3_Base and Subgrade.pdf PDF
OR NPS CRLA 13(1)_APPR01_Earthwrok_Report.pdf PDF
OR NPS CRLA 13(1) APPR 04_Staking Report.pdf PDF
OR NPS CRLA 13(1) XYZ Main_Cor_1_Base and Subgrade.pdf PDF
Additional Physical Data 3_East Rim.zip ZIP file
OR NPS CRLA 13(1) XYZ_Main_COR_1_ETW_EOP_Guardwalls.pdf PDF
OR NPS CRLA 13(1) XYZ_Main_COR_3_ETW_EOP_Guardswalls.pdf PDF
OR NPS CRLA 13(1)_APPR_04_HA.pdf PDF
OR NPS CRLA 13(1)_Main_COR_1_Super_Report.pdf PDF
OR NPS CRLA 13(1) XS_MAIN_COR_3.pdf PDF
OR NPS CRLA 13(1) XYZ Main_COR_2_Ditch_PavedDitch.xlsx XLSX spreadsheet
OR NPS CRLA 13(1)_APPR02_Earthwrok_Report.pdf PDF
Additional Physical Data_5_East Rim Drive.zip ZIP file
Additional Physical Data 2_East Rim.zip ZIP file
OR NPS CRLA 13(1) XYZ_Main_Cor_1_Paved_DItch_Allpoints.pdf PDF
OR NPS CRLA 13(1)_APPR_01_VA.pdf PDF
OR NPS CRLA 13(1) XYZ APPR_04_Base and Subgrade.xlsx XLSX spreadsheet
OR NPS CRLA 13(1)_Clearing Limits_L_251 00 to 495 00_INCL_APP01_02.pdf PDF
Show 40 more

Latest 50 of 113 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR PROPOSALS

Solicitation No. 69056722R000013

Project Number: OR NPS CRLA 13(1) Project Name: Rehabilitate East Rim Drive

Solicitation, Offer & Award, Bid Schedule, Contract Clauses, General Wage Decision, Special Contract Requirements, and Plans

This solicitation cites Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14 This project uses U.S. Customary units of measure

ISSUING OFFICE:

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

610 EAST FIFTH STREET

VANCOUVER, WA 98661-3801

Phone: (360) 619-7520 – FAX: (360) 619-7932 e-mail : wfl.contracts@dot.gov

QUICK INDEX

Page Item --- Submittal Checklist --- Authority to Sign --- Bid Bond --- Table of Contents A-1 Notice to Bidders A-3 SF 1442, Solicitation, Offer and

Award A-7 Bid Schedule B-1 Solicitation Provisions C-1 Contract Clauses D-1 General Wage Decision E-1 Special Contract Requirements H-1 Permits I-1 Fire Protection and Suppression

BID REMINDERS

Electronic bids will not be accepted. Submit printed copy of bid to the address listed on the enclosed SF 1442. Before submitting your bid, please review the following:

• Have you rechecked your bid figures?

• Have you completed the bid schedule?

• Have you completed and signed the SF 1442, Solicitation, Offer & Award?

• Have you acknowledged all amendments?

• Have you completed the Representations &

Certifications (Page B-1)?

• Is your bid guarantee enclosed in proper form and amount (see FAR Clause 52.228-1), including Power of Attorney affidavit?

• Does the lower left corner of the proposal envelope state “Bid Enclosed”?

• Does the lower left corner include the Solicitation Number and the project number/name?

Proposal Due Date:

See Page A-3, Block 13A

A-1 Notice to Bidders

This solicitation is offered as full and open competition mailto:wfl.contracts@fhwa.dot.gov

PROJECT No. OR NPS CRLA 13(1)

PROJECT NAME Rehabilitate East Rim Drive

BEGINNING AT See plans

ENDING AT See plans

LENGTH See plans

NATIONAL Crater Lake

COUNTY Klamath

STATE Oregon

FIXED COMPLETION DATE See FAR Clause 52.211-10 (FAR Clauses begin on page C-1)

Offeror Submittal Checklist

Bid Submittal Checklist OR NPS CRLA 13(1), Rehabilitate East Rim Drive

Before submitting your offer, please review the following:

Done?

Is this in the envelope?

Bid Envelope

Did I correctly address the envelope? (See page A-3, blocks 7 & 8) Does the lower left corner of the envelope include the Solicitation Number and the project name/number?

Pages A-3 & A-4 (SF 1442, Solicitation Offer & Award) Did I include our firm name and address in block 14?

Did I include our firm’s phone number in block 15?

Did I include our firm’s remittance address in block 16?

(Use when different than block 14)

Did I include my unique entity identifier and Cage Code?

Did I include the number & date of all amendments in block 19?

Did the appropriate official sign/date in block 20A, 20B & 20C?

Bid Schedule (see page A-7) Did I insert “Unit Bid Price” and “Amount Bid” for each bid item?

Did the appropriate official initial corrections?

When applicable, did I include the totals for each schedule in the summary page? (See last page of bid schedules.)

Bid Bond (Standard Form 24) Bids received without a valid bid bond will be rejected.

Did I complete my bid bond correctly?

Did I include the original?

Did I attach the Power of Attorney to the bid bond?

Authority to Sign Did I include a completed form for each person signing the SF1442 and Bid Bond?

Representations & Certifications & FAR Clause Did I include the completed B-pages (beginning on B-1)?

Did I include the completed clause 1252.228-74 Notification of Payment Bond Protection?

System for Award Management (SAM) SAM.gov Do we have up-to-date data in SAM?

Veteran Reporting (FAR Clause 52.222-37) If applicable, did I ensure our firm has completed this annual report?

NOTE: The Contractor is fully responsible to verify that all data is correct each time a bid package is submitted. Failure to properly input and/or update your data may cause the bid to be rejected.

https://sam.gov/content/home

Offeror Submittal Checklist

Bid Submittal Checklist

Driving Directions to our Vancouver Washington Office:

Directions to WFLHD https://www.google.com/maps/place/610+E+5th+St,+Vancouver,+WA+98661/data=!4m2!3m1!1s0x5495a8ae3f2d7083:0x5b7adcfa96ade37a?hl=en

Authority to Sign

INSTRUCTIONS: When the offeror/principal is a corporation, include this certification with your offer/bid.

Corporate Certificate

I, ____________________________________________ (name), certify that I am the

________________________________________(title), of the corporation named as the Offeror/Principal herein;

that _________________________________________(name), who signed this offer and/or bid bond on behalf of ___________________________ (company name) is

________________________________________ (title) of this corporation;

that the offer was duly signed for and on behalf of said corporation by authority and scope of its governing body, and within the scope of its corporate powers.

_____________________________________ (signature) Affix Corporate Seal

_____________________________________ (title)

INSTRUCTIONS: When the offeror/principal is a limited liability company, include this certification with your offer/bid.

Limited Liability Certificate

I, ____________________________________________ (name), certify that I am the

________________________________________(title), of the limited liability company named as the Offeror/Principal herein;

that _________________________________________(name), who signed this offer and/or bid bond on behalf of ___________________________ (company name) is

________________________________________ (title) of this company;

that the offer was duly signed for and on behalf of said company by authority and scope of its governing body, and within the scope of its powers.

_____________________________________ (signature) Affix Company Seal (as applicable) ___________________________________ (title)

INSTRUCTIONS: When the offeror/principal is a partnership, include this certification

Authority to Bind Partnership

This certifies that the names and signatures of all partners are listed below, and that the person signing the proposal has the authority to actually bind the partnership pursuant to its partnership agreement. Each of the partners individually has full authority to enter into and execute contractual instruments on behalf of said partnership, except as follows:

(State “None” or describe limitations, if any)

This authority shall remain in full force and effect until such time as the revocation of authority by any cause whatsoever has been furnished in writing to and acknowledge by the Contracting Officer.

(Include names and signatures of all partners)

INSTRUCTIONS: When the offeror/principal is a joint venture, include this certification

Authority to Bind Joint Venture

This certifies that the person signing the proposal has the authority to actually bind the joint venture pursuant to its joint venture agreement, and that each of the named persons listed below individually has full authority to enter into and execute contractual instruments on behalf of said joint venture, except as follows:

(State “None” or describe limitations, if any)

This authority shall remain in full force and effect until such time as the revocation of authority by any cause whatsoever has been furnished in writing to and acknowledge by the Contracting Officer.

(Include names and signatures of all applicable individuals)

INSTRUCTIONS: When the offeror/principal is a sole proprietorship, the signature on the offer/bid and on the bonds must be as follows:

Sole Proprietorship Requirement

An Offeror/Principal that is a sole proprietorship must submit an offer/bid and a bond signed by the sole proprietor, or by one duly authorized to sign for the sole proprietor.

If the signature is by someone other than the sole proprietor, a copy of the power of attorney authorizing the individual to sign must be provided with the offer/bid.

BID BOND

(See instructions on reverse)

DATE BOND EXECUTED (Must not be later than bid opening date) OMB Control Number: 9000-0045

Expiration Date: 8/31/2025 Paperwork Reduction Act Statement - This information collection meets the requirements of 44 USC § 3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number. The OMB control number for this collection is 9000-0045. We estimate that it will take 25 minutes to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800 F Street, NW, Washington, DC 20405.

SURETY(IES) (Name and business address)

PENAL SUM OF BOND BID IDENTIFICATION

PERCENT

OF BID

PRICE

AMOUNT NOT TO EXCEED BID DATE INVITATION NUMBER

MILLION(S) THOUSAND(S) HUNDRED(S) CENTS

FOR (Construction, Supplies or Services)

OBLIGATION:

We, the Principal and Surety(ies) are firmly bound to the United States of America (hereinafter called the Government) in the above penal sum. For payment of the penal sum, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally. However, where the Sureties are corporations acting as co-sureties, we, the Sureties, bind ourselves in such sum "jointly and severally" as well as "severally" only for the purpose of allowing a joint action or actions against any or all of us. For all other purposes, each Surety binds itself, jointly and severally with the Principal, for the payment of the sum shown opposite the name of the Surety. If no limit of liability is indicated, the limit of liability is the full amount of the penal sum.

CONDITIONS:

The Principal has submitted the bid identified above.

THEREFORE:

The above obligation is void if the Principal - (a) upon acceptance by the Government of the bid identified above, within the period specified therein for acceptance (sixty (60) days if no period is specified), executes the further contractual documents and gives the bond(s) required by the terms of the bid as accepted within the time specified (ten (10) days if no period is specified) after receipt of the forms by the principal; or (b) in the event of failure to execute such further contractual documents and give such bonds, pays the Government for any cost of procuring the work which exceeds the amount of the bid.

Each Surety executing this instrument agrees that its obligation is not impaired by any extension(s) of the time for acceptance of the bid that the Principal may grant to the Government.

Notice to the surety(ies) of extension(s) is waived. However, waiver of the notice applies only to extensions aggregating not more than sixty (60) calendar days in addition to the period originally allowed for acceptance of the bid.

WITNESS:

The Principal and Surety(ies) executed this bid bond and affixed their seals on the above date.

PRINCIPAL

SIGNATURE(S)

1.

(Seal)

2.

3.

Corporate Seal NAME(S) &

TITLE(S)

(Typed)

1. 2. 3.

INDIVIDUAL SURETY(IES)

SIGNATURE(S)

1.

(Seal) 2.

(Seal)

NAME(S)

(Typed)

1. 2.

CORPORATE SURETY(IES)

SU

R

ET

Y

A

NAME &

ADDRESS

STATE OF INCORPORATION LIABILITY LIMIT ($)

Seal SIGNATURE(S) 1. 2.

NAME(S) &

TITLE(S)

(Typed)

1. 2.

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is NOT usable

STANDARD FORM 24 (REV. 8/2016)

Prescribed by GSA - FAR (48 CFR) 53.228(a)

PRINCIPAL (Legal name and business address) TYPE OF ORGANIZATION ("X" one)

INDIVIDUAL PARTNERSHIP JOINT VENTURE

CORPORATION OTHER (Specify)

STATE OF INCORPORATION

SU

R

ET

Y

B

NAME &

ADDRESS

STATE OF INCORPORATION LIABILITY LIMIT ($)

Corporate Seal SIGNATURE(S) 1. 2.

NAME(S) &

TITLE(S)

(Typed)

1. 2.

SU

R

ET

Y

C

NAME &

ADDRESS

STATE OF INCORPORATION LIABILITY LIMIT ($)

Corporate

Seal SIGNATURE(S) 1. 2.

NAME(S) &

TITLE(S)

(Typed)

1. 2.

SU

R

ET

Y

D NAME &

ADDRESS

STATE OF INCORPORATION LIABILITY LIMIT ($)

Corporate

Seal SIGNATURE(S)

1. 2.

NAME(S) &

TITLE(S)

(Typed)

1. 2.

SU

R

ET

Y

E

NAME &

Seal

SIGNATURE(S) 1. 2.

NAME(S) &

TITLE(S)

(Typed)

1. 2.

SU

R

ET

Y

F

NAME &

SIGNATURE(S) 1. 2.

NAME(S) &

TITLE(S)

(Typed)

1. 2.

SU

R

ET

Y

G

NAME &

SIGNATURE(S)

1. 2.

NAME(S) &

TITLE(S)

(Typed)

1. 2.

INSTRUCTIONS

1. This form is authorized for use when a bid guaranty is required. Any deviation from this form will require the written approval of the Administrator of General Services.

2. Insert the full legal name and business address of the Principal in the space designated "Principal" on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.

3. The bond may express penal sum as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 20% of the bid price but the amount not to exceed dollars).

4. (a) Corporations executing the bond as sureties must appear on the Department of the Treasury's list of approved sureties and must act within the limitations listed therein. The value put into the LIABILITY LIMIT block is the penal sum (i.e., the face value) of the bond, unless a co-surety arrangement is proposed.

(b) When multiple corporate sureties are involved, their names and addresses shall appear in the spaces (Surety A, Surety B, etc.) headed "CORPORATE

SURETY(IES)." In the space designated "SURETY(IES)" on the face of the form, insert only the letter identifier corresponding to each of the sureties. Moreover, when co-surety arrangements exist, the parties may allocate their respective limitations of liability under the bond, provided that the sum total of their liability equals 100% of the bond penal sum.

(c) When individual sureties are involved, a completed Affidavit of Individual Surety (Standard Form 28) for each individual surety, shall accompany the bond.

The Government may require the surety to furnish additional substantiating information concerning its financial capability.

5. Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the word "Corporate Seal"; and shall affix an adhesive seal if executed in Maine, New Hampshire, or any other jurisdiction requiring adhesive seals.

6. Type the name and title of each person signing this bond in the space provided.

7. In its application to negotiated contracts, the terms "bid" and "bidder" shall include "proposal" and "offeror."

STANDARD FORM 24 (REV. 8/2016) BACK

Table of Contents Project: OR NPS CRLA 13(1), Rehabilitate East Rim Drive

TABLE OF CONTENTS

06/15/22–FP14

DESCRIPTION PAGE

Notice to Offeror .............................................................................................................................. A-1

Solicitation, Offer, and Award (SF 1442) ...................................................................................... A-3

Bid Schedule .................................................................................................................................... A-7

Solicitation Provisions ...................................................................................................................... B-1

Contract Clauses ............................................................................................................................... C-1

General Wage Decision ................................................................................................................... D-1

SCRs Table of Contents

SPECIAL CONTRACT REQUIREMENTS (SCR)

The following Special Contract Requirements amend and supplement the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14), U.S. Department of Transportation, Federal Highway Administration.

Division 100 ......................................................................................................................... E-1 Division 150 ....................................................................................................................... E-36 Division 200 ......................................................................................................................... F-1 Division 250 ......................................................................................................................... F-9 Division 300 ....................................................................................................................... F-12 Division 400 ....................................................................................................................... F-25 Division 500 ....................................................................................................................... F-50 Division 600 ....................................................................................................................... F-57 Division 700 .........................................................................................................................G-1

Permits .............................................................................................................................................. H-1

Fire Protection and Suppression Plan ............................................................................................... I-1

Table of Contents Project: OR NPS CRLA 13(1), Rehabilitate East Rim Drive

(This page intentionally left blank)

A-1

Notice to Offeror Project: OR NPS CRLA 13(1), Rehabilitate East Rim Drive

NOTICE TO OFFEROR

06/15/22–FP14

THIS PROJECT IS BEING SOLICITED AND AWARDED UNDER FP-14.

The FP-14 is FLH’s Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects. To view the FP-14 electronically go to:

https://highways.dot.gov/federal-lands/specs.

The FP-14 is a dual unit document with U.S. Customary units being the primary unit shown.

Metric equivalents are shown in parenthesis.

When submitting bids, drawings, calculations, and other construction documents, use only U.S. Customary units of measure, unless otherwise stated.

I. Project Location

General Location. The project work is located 71 miles north of Klamath Falls, Oregon in Klamath County. Approximate Global Positioning System (GPS) coordinates for the beginning of the project are 42°58'46.63"N, 122° 4'59.62"W.

Project Limits. Signs have not been erected to identify the project limits. No Government personnel will be available for show-me tours.

II. Pre-offeror Information.

GENERAL AND TECHNICAL QUESTIONS REGARDING PROPOSED WORK FOR

THIS PROJECT WILL BE ACCEPTED UNTIL CLOSE-OF-BUSINESS ON 02/17/2023

Refer to page A-5 for information on how to submit questions related to General Information and Technical Information. Answers to General and Technical Questions will be posted at https://sam.gov/opp/b8187269aa0742b48febc92bcef0d933/view.

Every attempt to respond to questions will be made. However, response to questions received after the above posted date is not guaranteed.

LPTA. This solicitation is solicited under the Lowest Priced Technically Acceptable. Selection of the successful offer is based on price and technical.

Base & Option Schedules. Offers for construction of this project are being invited under a Base schedule and two Option schedules. (Option X, and Option Y) Complete the Base schedule and all Options according to Subsection 102.02. Award of the contract will be made according to https://highways.dot.gov/federal-lands/specs https://sam.gov/opp/b8187269aa0742b48febc92bcef0d933/view

A-2

Project: OR NPS CRLA 13(1), Rehabilitate East Rim Drive

Subsection 102.05A. The apparent successful offeror will be determined by the lowest bid for the combined total of the Base and Option schedules.

Electronic Plan Sheets. This solicitation includes electronic plan sheets available at https://sam.gov/opp/b8187269aa0742b48febc92bcef0d933/view.

Physical Data. Physical data applicable to this project is listed in FAR Clause 52.236-4 Physical Data.

Representations & Certifications. Submit or update Representations and Certifications online at https://www.sam.gov/SAM/ before bid submittal. For more details go to FAR Provision 52.204- 8 Annual Representations and Certifications (see page B-2.). If you have previously registered on-line and the NAICS code for this solicitation is different than the code listed in your online file, please note the amended changes on the lines provided in FAR 52.204-8.

Requests for Information. Requests for technical information (Plan and Division 100 – 700 Specification questions only) about this project will only be accepted in writing (see Block 9 on page A-5).

Price Evaluation Factor. This solicitation contains a Price Evaluation Factor. In accordance with 13 CFR subsection 126.613, we will apply a factor of 10% to an apparent low bid submitted by a large business when we also receive a bid from a HUBZone small business; the 10% factor does not apply to an apparent low bid submitted by a small business.

HUBZone. If the contract is awarded after applying the price preference for HUBZone small business concerns under FAR clause 52.219-4; at least 50 percent of the cost of the contract performance incurred for personnel must be spent on the prime Contractor’s employees or the employees of other qualified HUBZone small business concerns.

SF 1442, Solicitation, Offer, and Award. Particular attention should be paid to Standard Form l442, Solicitation, Offer and Award, to assure that Blocks 14, 15, 16, 19, 20A, and 20C are completed correctly. Sign Block 20B according to the instructions in Subsection 102.02. You must submit a completed ‘Authority to Sign’ document. You must also complete the representations and certifications contained in the Contract Provisions beginning on page B-1.

Failure to furnish or complete any of the above may result in your bid being considered nonresponsive and being rejected.

SF 1442, Solicitation, Offer, and Award. Particular attention should be paid to Standard Form l442, Solicitation, Offer and Award, to assure that Blocks 14, 15, 16, 19, 20A, 20B, and 20C are completed correctly. Block 20B must be signed according to the instructions in Subsection 102.02.

You must submit a completed “Authority to Sign” document. You must also complete the representations and certifications contained in the Contract Provisions beginning on page B-1.

Facsimile and email offers, modifications, and withdrawals. Facsimile and email offers are not authorized for this solicitation. Offers may be modified or withdrawn by email, if such notice is received by the time specified for receipt of offers. The Government will not be responsible for https://sam.gov/opp/b8187269aa0742b48febc92bcef0d933/view https://www.sam.gov/SAM/

A-2a

Project: OR NPS CRLA 13(1), Rehabilitate East Rim Drive any failure attributable to the transmission or receipt of email data. See FAR Provision 52.215-1, Instructions to Offerors – Competitive Acquisition. EMAIL WFL.Contracts@dot.gov. To confirm receipt, call 360.619.7520.

Fraud Alert. Current and potential U.S. Department of Transportation (DOT) Contractors have recently been receiving fraudulent letters purporting to be issued by DOT. These fraudulent letters request that the Contractors resubmit their banking information to DOT. If you receive such a letter, please DO NOT complete the requested worksheet that is attached to the letters and DO NOT release any information. To register or update information, Contractors are required to go directly through the System for Award Management (SAM) website and never through a third party. You can access SAM at https://www.sam.gov/SAM/ .

COVID-19 Site Access Constraints. There may be access constraints related to the COVID-19 Pandemic. If you are intending to submit an Offer and are unable to visit the sites because of access constraints related to the COVID-19 Pandemic, please let us know.

III. Post Award Information.

Insurance. Insurance requirements are described in Subsection 107.05.

Contractor Performance Evaluations. This office posts performance evaluations in the Contractor Performance Assessment Reporting System (CPARS); for additional information, see http://www.cpars.gov/index.htm. Upon receiving an email notice of evaluation availability, you will have 14-60 days to review the evaluation online and submit comments. If you are unable to access the system, call 360.619.7520 for assistance or for a copy of the evaluation.

IV. Specifications and Permits.

Specifications. This solicitation and subsequent contract are governed by the Federal Acquisition Regulation (FAR), agency supplemental regulations, and the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14. An electronic version may be found at https://highways.dot.gov/federal-lands/specs. A single paper copy can also be obtained from the Research & Technology Product Distribution Center (RTPDC) by e-mail to:

report.center@dot.gov, or by phone 814-239-1160, or fax 814-239-2156.

Electronic Documentation. Requires all documents (including but not limited to correspondence, notifications, submittals, reports, and pay notes) to be submitted in a pdf format, or an approved fixed-layout electronic format. See Subsection 103.06.

Material Sources. Government-provided material sources have been identified under Subsection 105.02(a). The Government has also identified potential weed-free Contractor-located sources under Subsection 105.02(c). Other material sources and waste sites have not been identified for this project. Secure all permits and clearances for Contractor-located sites and sources. See Subsection 105.02(c).

mailto:WFL.Contracts@dot.gov https://www.sam.gov/SAM/ http://www.cpars.gov/index.htm https://highways.dot.gov/federal-lands/specs mailto:report.center@dot.gov

A-2b

Project: OR NPS CRLA 13(1), Rehabilitate East Rim Drive

Price Adjustment Clause. A price adjustment specification for fuel and asphalt binder has been included in this contract. See Subsection 109.06A.

Scheduling Requirements. Carefully review Section 155 of the Special Contract Requirements.

This new scheduling specification requires the following activities prior to mobilization and work on the project site: 1) a designated schedule manager, 2) a baseline schedule submittal (schedule, schedule narrative, and submittal log), 3) a schedule submittal meeting, and 4) an approved baseline schedule submittal. Schedule submittals are to be managed by the schedule manager and approved monthly to receive full progress payments.

a. Sealed offers in original an

____________________ 02/14/2023

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE

SOLICITATION

(Construction, Alteration, or Repair)

3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

Federal Highway Administration

Western Federal Lands Highway Div.

610 E. 5th St.

Vancouver WA 98661

690567 8. ADDRESS OFFER TO

Federal Highway Administration Western Federal Lands Highway Div.

610 E. 5th St. Vancouver WA 98661

a. NAME

See Page A-5

b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

360-619-7520

See Block 10 x 01/12/2023

1. SOLICITATION NO.

69056722R000013

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

This solicitation is designed OR NPS CRLA 13(1), Rehabilitate East Rim Drive

IN STRICT ACCORDANCE WITH:

Federal Acquisition Regulations (FAR) and Transportation Acquisition Regulations

(TAR).

General Wage Decision

Special Contract Requirements

Standard Specifications for Construction of Roads and Bridges on Federal Highway

Projects, FP-14

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 calendar days and complete it within ________________ ________________ calendar days after receiving

See Page A-5

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time

________ 60 ______ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected .

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

A-3

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

Federal Highway Administration Western Federal Lands Highway Div.

610 E. 5th St.

Vancouver WA 98661

690567

DEAN UMATHUM

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Unique Entity Identifier (Formerly DUNS) Cage Code:

See Bid Schedule

All Items on Bid Schedule

See Page A-5

A-4

Federal Highway Administration Western Federal Lands Highway Div.

610 E. 5th St.

Vancouver WA 98661

A-5

Continuation SF 1442

Block 9 FOR GENERAL INFORMATION, call 360.619.7520 from the hours of 8:00 a.m. to 4:00 p.m. local time or e-mail us at wfl.contracts@dot.gov.

FOR TECHNICAL INFORMATION (plan and specification questions only), requests for technical information about this project will only be accepted in writing.

Submit questions via e-mail at wfl.plans-spec@dot.gov.

QUESTIONS/ANSWERS POSTED ONLINE. You can view questions and answers on the Contract Opportunities Website https://beta.sam.gov/ .

• Insert the solicitation number in the search box

• Scroll to the project.

• Make sure you are on the most recent view and look in the right section of the page for the most recent Q&A document.

FOR DAVIS-BACON WAGE RATE INFORMATION call the Department of Labor at 415.625.7716 (DRBA - Western Region)

FOR PHYSICAL DATA, See FAR Contract Clause 52.236-4, Physical Data, (clauses begin on page C-1) for a listing of available data. Physical Data will be posted with the solicitation on the Beta.Sam website.

Block 11 COMPLETION DATE: Work shall be completed on or before the date specified in FAR Clause 52.211-10, Commencement, Prosecution, and Completion of Work, subject to such extensions as may be authorized by the terms of the contract and the specifications made a part thereof. Contract Clauses begin on pages C-1.

Block 12A PERFORMANCE & PAYMENT BONDS: See FAR Clause, 52.228-15, Performance and Payment Bonds - Construction (clauses begin on page C-1) and Subsection 102.06 of the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14, U.S. Customary Units.

Block 13B BID BOND AMOUNT: See FAR Clause 52.228-1, Bid Guarantee (clauses begin on page C-1).

ADDITIONAL INFORMATION: See Subsections 102.03 and 102.04 of Standard

Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP- 14, U.S. Customary Units.

Block 24 SUBMITTING INVOICES: See Subsection 109.08 of the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects FP-14, U.S. Customary Units.

ESTIMATED PRICE RANGE. The price range of the project work is between $25,000,000 and $35,000,000.

SUBCONTRACTING PLAN. This Request for Proposals requires an offeror who is a LARGE business to submit an acceptable subcontracting plan prior to contract award. A large business is one whose average gross annual receipts over the past 3 years equal $36.5 million or more. For your information the subcontracting plan form is included beginning on page A-6a. This requirement does not apply to SMALL businesses mailto:wfl.contracts@dot.gov mailto:wfl.plans-spec@dot.gov https://beta.sam.gov/

A-6

ATTACHMENT 1 – FHWA SUBCONTRACTING PLAN

1. INSTRUCTIONS:

• Where subcontracting opportunities will not exist for the solicitation, the bidder/offeror shall submit a response outlining the rationale for making this determination with its proposal/bid. The statement shall be signed by an official authorized to make decisions on behalf of the firm.

• The following information shall be provided in the bidder/offeror subcontracting plan submission and shall be expressed in terms of goal percentages of the total planned subcontracting dollars.

• Text lines may be added to this template as needed.

*insert and complete additional tables if the contract includes option year(s).

1 Percentage = (subcontracted amount in the category/total planned subcontracted amount) 2 Planned subcontracts to “other than small business” concerns + subcontracts to Small Business concerns = 100% 3 SDVOSB is a subcategory of VOSB. Any dollar amount applied to SDVOSB also applies to VOSB.

4 In this document, the term WOSB includes Economically Disadvantaged WOSB (EDWOSB) concerns.

SUBCONTRACTING GOALS – BASE YEAR

Total prime contract amount – Base Year: $ Total planned subcontracted amount (regardless of firm/entity size status) – Base Year: $

Total planned subcontracts to “other than small business” concerns (i.e., large, non-profit, university, etc.)

$ %1

Total planned subcontracts to Small Business concerns: $ %2

• Total planned subcontracts to Veteran Owned Small Business concerns (VOSB)3:

o Total planned subcontracts to Service-Disabled Veteran Owned Small Business (SDVOSB) concerns:

• Total planned subcontracts to Historically Underutilized Business Zones (HUBZones):

• Total planned subcontracts to Small Disadvantaged Business (SDB) concerns (includes 8(a), Alaska Native Corporations (ANC), and Indian Tribes):

• Total planned subcontract awards to Women-Owned Small Business concerns (WOSB)4 concerns:

A-6a

1.1 Rationale if establishing a goal lower than 3% for VOSB:

1.2 Rationale if establishing a goal lower than 3% for SDVOSB:

1.3 Rationale if establishing a goal lower than 3% for HUBZone:

1.4 Rationale if establishing a goal lower than 5% for SDB:

1.5 Rationale if establishing a goal lower than 5% for WOSB:

1.6 Rationale if establishing a goal lower than the current DOT subcontracting goal:

2. The following principal types of supplies and/or services are planned to be subcontracted under this contract. [Add additional rows if more space is needed.]

5 List all applicable size standards for each proposed subcontractor.

Type of Supply/Service to be Subcontracted

Company/Firm Name

Subcontracted Amount

Subcontractor Size Standard (Other Than

SB, SB, VOSB, SDVOSB,

HUBZone, SDB, WOSB)5 https://www.sba.gov/document/support-agency-contracting-goals

A-6b

3. The following methods were used to develop the subcontract percentage goals:

4. The following methods were used to identify potential subcontract sources for solicitation purposes. (i.e. source lists used and organizations contacted to identify potential SB concerns, such as the System for Award Management (www.SAM.gov), Dynamic Small Business Search (www.DSBS.sba.gov), trade associations, industry conferences/fairs, etc.)

5. [Select appropriate option.] Indirect costs [were/were not] included in establishing the subcontracting goals specified in the table above.

6. If indirect costs were included, the following method was used to determine the proportionate share of indirect costs to be incurred with SB, VOSB, SDVOSB, HUBZone, SDB and WOSB subcontractors:

7. The following individual will administer the subcontracting program:

Name:

Title:

Address:

Telephone:

E-mail:

This individual's specific duties, as they relate to the subcontracting program, are as follows:

8. The following efforts will be taken to ensure that SB, SDB, VOSB, SDVOSB, HUBZone, and WOSB subcontractors will have an equitable opportunity to compete for subcontracts:

http://www.sam.gov/ http://www.dsbs.sba.gov/

A-6c

[initial] It is agreed that FAR Clause 52.219-8, Utilization of Small Business Concerns, will be included in all subcontracts, which offer further subcontracting opportunities. It is further agreed that all subcontractors (except small business concerns) at all tiers below the prime contractor who receive subcontracts in excess of $700,000 ($1.5M for construction of any public facility with further subcontracting possibilities) will be required to adopt and comply with a subcontracting plan in accordance with FAR Clause 52.219-9.

9. The following types of records will be maintained concerning procedures that have been adopted to comply with the requirements and goals in the plan (i.e., establishment of source lists, guides and other data that identify SB, VOSB, SDVOSB, HUBZone, SDB and WOSB concerns; a description of the offeror’s efforts to locate SB, VOSB, SDVOSB, HUBZone, SDB and WOSB concerns and to award subcontracts to them, etc.) and shall be maintained through completion of the contract:

10. In accordance with FAR Subpart 19.704(a)(10) through (15), the Contractor further agrees to:

[Initial each line]

Cooperate in any studies or surveys as may be required;

Submit periodic reports as may be required so that the Government can determine the extent of compliance by the Contractor with the subcontracting plan;

After November 30, 2017, include subcontracting data for each order when reporting subcontracting achievements for indefinite-delivery, indefinite-quantity contracts intended for use by multiple agencies;

Submit the Individual Subcontract Report (ISR), and the Summary Subcontract Report (SSR) using the Electronic Subcontracting Reporting System (eSRS) at http://www.esrs.gov/ within the timeframes identified at FAR Subpart 19.704(a)(10)(iv);

Ensure that other than small business subcontractors with subcontracting plans agree to submit eSRS documents online as required;

Provide its prime contract number and its unique entity identifier, and the e-mail address of the offeror’s official responsible for acknowledging receipt of or rejecting the ISRs to all first-tier subcontractors with subcontracting plans so they can enter this information into the eSRS when submitting their ISRs;

Require that each subcontractor with a subcontracting plan provide the prime contract number, its own unique entity identifier, and the e-mail address of the subcontractor’s official responsible for acknowledging receipt of or rejecting the ISRs, to its subcontractors with subcontracting plans;

http://www.esrs.gov/

A-6d

Make a good faith effort to acquire articles, equipment, supplies, services, or materials, or obtain the performance of construction work from the small business concerns that the offeror used in preparing the bid or proposal, in the same or greater scope, amount, and quality used in preparing and submitting the bid or proposal;

Provide the contracting officer with a written explanation if the contractor fails to acquire articles, equipment, supplies, services or materials or obtain the performance of construction work as described in FAR 19.704(a)(12) of this section. This written explanation will be submitted to the contracting officer within 30 days of contract completion;

Will not prohibit a subcontractor from discussing with the contracting officer any material matter pertaining to payment to or utilization of a subcontractor; and

Pay its small business subcontractors on time and in accordance with the terms and conditions of the subcontract, and notify the contracting officer if the offeror pays a reduced or an untimely payment to a small business subcontractor (see FAR 52.242-5).

Submitted by:

POC Name:

Title:

Email Address:

Company Name:

DUNS/CAGE:

Mailing Address:

Signature http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/52_237.htm#P308_50712

A - 7

Bidder/Offeror please note: Before preparing the bid, carefully read the Solicitation Provisions. Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the corrected unit price extension shall govern. When the word "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item. When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount. Total all of the amounts bid for each pay item and show the total bid amount.

Bid Schedule

Project No:OR NPS CRLA 13(1)

Project Name:Rehabilitate East Rim Drive

A - 8

Item No. Pay Item No. Description Quantity Unit Unit Price Amount

A0020 15101-0000 MOBILIZATION

ALL LPSM $___LPSM_____ $____________

A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING

ALL LPSM $___LPSM_____ $____________

A0060 15301-0000 CONTRACTOR QUALITY CONTROL

ALL LPSM $___LPSM_____ $____________

A0080 15401-0000 CONTRACTOR TESTING

ALL LPSM $___LPSM_____ $____________

A0100 15501-0000 CONSTRUCTION SCHEDULE

ALL LPSM $___LPSM_____ $____________

A0120 15705-0100 SOIL EROSION CONTROL, SILT FENCE

3,350 LNFT $____________ $____________

A0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

3,641 LNFT $____________ $____________

A0160 15706-0200 SOIL EROSION CONTROL, CHECK DAM

60 EACH $____________ $____________

A0180 15706-1000 SOIL EROSION CONTROL, INLET PROTECTION

5 EACH $____________ $____________

A0200 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT

3 EACH $____________ $____________

A0220 15802-0000 WATERING FOR DUST CONTROL

ALL LPSM $___LPSM_____ $____________

A0240 20101-0000 CLEARING AND GRUBBING

12.7 ACRE $____________ $____________

A0260 20211-0000 SPECIAL CLEARING AND GRUBBING

300 SQYD $____________ $____________

A0280 20301-1400 REMOVAL OF INLET (DROP)

1 EACH $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

A - 9

A0300 20301-2400 REMOVAL OF SIGN

1 EACH $____________ $____________

A0320 20302-0600 REMOVAL OF CURB, STONE

22 LNFT $____________ $____________

A0340 20302-1600 REMOVAL OF PAVED WATERWAY

4,012 LNFT $____________ $____________

A0360 20303-3000 REMOVAL OF SIDEWALK, ASPHALT

755 SQYD $____________ $____________

A0380 20310-1000 PLUG, EXISTING PIPE (ABANDON IN PLACE)

1 EACH $____________ $____________

A0400 20401-0000 ROADWAY EXCAVATION

28,318 CUYD $____________ $____________

A0420 20402-0000 SUBEXCAVATION

21,335 CUYD $____________ $____________

A0440 20410-0000 SELECT BORROW

18,229 CUYD $____________ $____________

A0460 20465-0000 CONSERVE AND PLACE BOULDER

125 EACH $____________ $____________

A0480 20701-0200 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE B (NON-WOVEN)

49,176 SQYD $____________ $____________

A0500 20703-2000 GEOGRID, STABILIZATION

67,395 SQYD $____________ $____________

A0520 21101-1000 ROADWAY OBLITERATION, METHOD 1

1,978 SQYD $____________ $____________

A0540 25101-0000 PLACED RIPRAP, METHOD A (GOVERNMENT FURNISHED)

51 CUYD $____________ $____________

A0560 25101-0100 PLACED RIPRAP, METHOD A, CLASS 1

2,314 CUYD $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

A - 10

A0580 25101-2000 PLACED RIPRAP, METHOD B (ENERGY DISSIPATOR)

28 CUYD $____________ $____________

A0600 25120-0000 RIPRAP DITCH, METHOD A

20 LNFT $____________ $____________

A0620 25210-0000 ROCKERY (BLANKET)

577 SQFT $____________ $____________

A0640 25301-0000 GABIONS

3,270 SQFT $____________ $____________

A0660 30302-1000 DITCH RECONDITIONING

150 LNFT $____________ $____________

A0680 30303-3000 ROADWAY RECONDITIONING

460 SQYD $____________ $____________

A0700 30801-1000 RECYCLED AGGREGATE BASE, 6-INCH DEPT

150,767 SQYD $____________ $____________

A0720 31301-0000 AGGREGATE-TOPSOIL COURSE

1,781 TON $____________ $____________

A0740 40101-5600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH

NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL (TYPE III

ROUGHNESS, 4-INCH COMPACTED DEPTH)

33,248 TON $____________ $____________

A0780 40105-3000 ANTISTRIP ADDITIVE, TYPE 3

512.7 TON $____________ $____________

A0820 41202-0000 TACK COAT

31,338 GAL $____________ $____________

A0840 41301-1000 ASPHALT PAVEMENT MILLING, 4-INCH DEPTH

14,907 SQYD $____________ $____________

A0860 41301-1300 ASPHALT PAVEMENT MILLING, 6-INCH DEPTH

142,618 SQYD $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

A - 11

A0880 50101-2600 MINOR CONCRETE PAVEMENT, PLAIN, 6-INCH DEPTH

132 SQYD $____________ $____________

A0900 56604-0000 REINFORCED SHOTCRETE (GUARDWALL UNDERPINNING)

27 CUYD $____________ $____________

A0920 60201-0400 12-INCH PIPE CULVERT

450 LNFT $____________ $____________

A0940 60404-0000 CATCH BASIN (TYPE 1)

10 EACH $____________ $____________

A0960 60704-0000 CLEANING CULVERT IN PLACE

46 EACH $____________ $____________

A0980 60705-0000 REPAIRING DRAINAGE STRUCTURE

1 EACH $____________ $____________

A1000 60706-0000 CLEANING DRAINAGE STRUCTURE

1 EACH $____________ $____________

A1020 60901-4200 CURB, STONE, TYPE 1, 18-INCH DEPTH

464 LNFT $____________ $____________

A1040 60901-6350 CURB, STONE, TYPE 2, 24-INCH DEPTH

40 LNFT $____________ $____________

A1060 60907-1000 PAVED DITCH, ASPHALT

4,012 LNFT $____________ $____________

A1080 61501-0800 SIDEWALK, AGGREGATE

50 SQYD $____________ $____________

A1100 61501-1100 SIDEWALK, ASPHALT

1,063 SQYD $____________ $____________

A1120 61505-1000 ACCESSIBILITY RAMP, CONCRETE

1 EACH $____________ $____________

A1140 61509-0000 DETECTABLE WARNING PANELS

1 SQYD $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

A - 12

A1160 61902-0000 GATE

1 EACH $____________ $____________

A1180 61920-2000 REMOVE AND RESET GATE

1 EACH $____________ $____________

A1200 62003-0000 STONE MASONRY (UNDERPINNING WITH MICROPILES)

ALL LPSM $___LPSM_____ $____________

A1220 62003-0000 STONE MASONRY (WAYSIDE BASE)

ALL LPSM $___LPSM_____ $____________

A1240 62010-1000 STONE MASONRY GUARDWALL

1,160 LNFT $____________ $____________

A1260 62011-0300 STONE MASONRY HEADWALL FOR 18-INCH PIPE CULVERT

1 EACH $____________ $____________

A1280 62011-0500 STONE MASONRY HEADWALL FOR 24-INCH PIPE CULVERT

1 EACH $____________ $____________

A1300 62013-2000 STONE MASONRY WALL (REPAIR AND REPOINT 2' TO 6' HEIGHT)

90 SQYD $____________ $____________

A1320 62013-2000 STONE MASONRY WALL (REPAIR AND REPOINT > 6' HEIGHT)

77 SQYD $____________ $____________

A1340 62027-0000 REMOVE AND RESET STONE MASONRY (CURB)

17 LNFT $____________ $____________

A1360 62028-1000 REMOVE AND RESET STONE MASONRY HEADWALL

1 EACH $____________ $____________

A1380 62031-0000 REPOINT STONE MASONRY (2' TO 6' HEIGHT)

17,090 SQFT $____________ $____________

A1400 62031-0000 REPOINT STONE MASONRY (> 6' HEIGHT)

18,040 SQFT $____________ $____________

A1420 62031-0000 REPOINT STONE MASONRY (HEADWALL)

75 SQFT $____________ $____________

Bid Schedule Schedule:A Schedule Type:Base

A - 13

A1440 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY

160 HOUR $____________ $____________

A1460 62201-0600 BACKHOE LOADER, 8 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET,

30-INCH WIDTH

200 HOUR $____________ $____________

A1480 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY WITH

THUMB ATTACHMENT

150 HOUR $____________ $____________

A1500 62201-3900 SNOW PLOW

900 HOUR $____________ $____________

A1520 62301-0000 GENERAL LABOR

260 HOUR $____________ $____________

A1540 62405-0100 PLACING CONSERVED TOPSOIL, 2-INCH DEPTH

46,401 SQYD $____________ $____________

A1560 63302-0000 SIGN SYSTEM

29 SQFT $____________ $____________

A1580 63316-1000 REMOVE AND RESET SIGN

12 EACH $____________ $____________

A1600 63318-1000 SNOW POLE HOLDER