This document is a corridor model component quantities report for the OR NPS CRLA 13(1), Rehabilitate East Rim Drive federal contract opportunity. The report provides material quantities and estimated costs for the 1230 station points along the project corridor. It details cut and fill volumes for grading, pavement and base materials for two layers of asphalt totaling 7.402 square feet and 12 square feet respectively, shoulder wedge quantities of 0.518 square feet, and backfill volumes. The total estimated cost for all material components along the 1247.101 station alignment is $1732.76. The related federal contract opportunity is solicitation number 69056722r000013 offered as a full and open competition by the Department of Transportation Federal Highway Administration to rehabilitate East Rim Drive in Oregon.
View the file
Other files
Show 40 more
Latest 50 of 113 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Corridor Model Component Quantities Report
Report Created: Tuesday, May 4, 2021 Time: 12:09:18 PM
Corridor Name: APPR03_CORR
Alignment Name:
Input Grid Factor: 1.000000 Note: All units in this report are in feet, square feet and cubic yards unless specified otherwise.
1088.650
Cut Volume: 20.322 1.00 0.000
Fill Volume: 1.734 1.00 0.000
Mesh\Modeling\Components\Grading\XS_TC_Cut: 2.582 1.00 0.000
Mesh\Modeling\Components\Grading\XS_TC_Fill: 6.319 1.00 0.000
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:
7.402 1.00 0.000
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 2:
12.000 1.00 0.000
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Wedge:
0.518 1.00 0.000
Mesh\Modeling\Components\Subex\XS_TC_Subex_Backfill1: 1.00 0.000
1090.000
Cut Volume: 20.232 1.014 0.04 0.038
Fill Volume: 1.766 0.087 0.04 0.003
Mesh\Modeling\Components\Grading\XS_TC_Cut: 2.436 3.386 1.00 3.386
Mesh\Modeling\Components\Grading\XS_TC_Fill: 6.382 8.572 1.00 8.572
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:
7.402 0.370 0.04 0.014
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 2:
12.000 0.600 0.04 0.022
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Wedge:
0.518 0.026 0.04 0.001
Mesh\Modeling\Components\Subex\XS_TC_Subex_Backfill1: 0.04 0.000
1095.000
Cut Volume: 20.413 3.763 0.04 0.139
Fill Volume: 1.877 0.337 0.04 0.012
Mesh\Modeling\Components\Grading\XS_TC_Cut: 3.356 14.480 1.00 14.480
Mesh\Modeling\Components\Grading\XS_TC_Fill: 6.613 32.486 1.00 32.486
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:
7.402 1.371 0.04 0.051
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 2:
12.000 2.222 0.04 0.082
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Wedge:
0.518 0.096 0.04 0.004
Mesh\Modeling\Components\Subex\XS_TC_Subex_Backfill1: 0.04 0.000
1100.000
Cut Volume: 20.328 3.772 0.04 0.140
Fill Volume: 1.973 0.356 0.04 0.013
Mesh\Modeling\Components\Grading\XS_TC_Cut: 3.077 16.082 1.00 16.082
Mesh\Modeling\Components\Grading\XS_TC_Fill: 6.844 33.643 1.00 33.643
Component End Area
Totals
Component Surface Area
Totals
Station Material Area Volume Length Area Unit
Cost Material
Cost
Page 1 of 9Volumes Report
5/4/2021
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:
7.402 1.371 0.04 0.051
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 2:
12.000 2.222 0.04 0.082
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Wedge:
0.518 0.096 0.04 0.004
Mesh\Modeling\Components\Subex\XS_TC_Subex_Backfill1: 0.04 0.000
1105.000
Cut Volume: 20.074 3.741 0.04 0.139
Fill Volume: 2.064 0.374 0.04 0.014
Mesh\Modeling\Components\Grading\XS_TC_Cut: 2.798 14.689 1.00 14.689
Mesh\Modeling\Components\Grading\XS_TC_Fill: 7.076 34.800 1.00 34.800
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:
7.402 1.371 0.04 0.051
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 2:
12.000 2.222 0.04 0.082
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Wedge:
0.518 0.096 0.04 0.004
Mesh\Modeling\Components\Subex\XS_TC_Subex_Backfill1: 0.04 0.000
1110.000
Cut Volume: 19.768 3.689 0.04 0.137
Fill Volume: 2.080 0.384 0.04 0.014
Mesh\Modeling\Components\Grading\XS_TC_Cut: 2.774 13.930 1.00 13.930
Mesh\Modeling\Components\Grading\XS_TC_Fill: 6.589 34.162 1.00 34.162
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:
7.402 1.371 0.04 0.051
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 2:
12.000 2.222 0.04 0.082
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Wedge:
0.518 0.096 0.04 0.004
Mesh\Modeling\Components\Subex\XS_TC_Subex_Backfill1: 0.04 0.000
1115.000
Cut Volume: 19.545 3.640 0.04 0.135
Fill Volume: 1.906 0.369 0.04 0.014
Mesh\Modeling\Components\Grading\XS_TC_Cut: 2.728 13.754 1.00 13.754
Mesh\Modeling\Components\Grading\XS_TC_Fill: 6.035 31.561 1.00 31.561
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:
7.402 1.371 0.04 0.051
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 2:
12.000 2.222 0.04 0.082
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Wedge:
0.518 0.096 0.04 0.004
Mesh\Modeling\Components\Subex\XS_TC_Subex_Backfill1: 0.04 0.000
1120.000
Cut Volume: 19.463 3.612 0.04 0.134
Fill Volume: 2.597 0.417 0.04 0.015
Mesh\Modeling\Components\Grading\XS_TC_Cut: 2.682 13.524 1.00 13.524
Mesh\Modeling\Components\Grading\XS_TC_Fill: 7.030 32.662 1.00 32.662
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:
7.402 1.371 0.04 0.051
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 12.000 2.222 0.04 0.082
Component End Area
Totals
Component Surface Area
Totals
Station Material Area Volume Length Area Unit
Cost Material
Cost
Page 2 of 9Volumes Report
2:
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Wedge:
0.518 0.096 0.04 0.004
Mesh\Modeling\Components\Subex\XS_TC_Subex_Backfill1: 0.04 0.000
1125.000
Cut Volume: 19.408 3.599 0.04 0.133
Fill Volume: 3.445 0.559 0.04 0.021
Mesh\Modeling\Components\Grading\XS_TC_Cut: 2.636 13.294 1.00 13.294
Mesh\Modeling\Components\Grading\XS_TC_Fill: 8.436 38.664 1.00 38.664
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:
7.402 1.371 0.04 0.051
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 2:
12.000 2.222 0.04 0.082
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Wedge:
0.518 0.096 0.04 0.004
Mesh\Modeling\Components\Subex\XS_TC_Subex_Backfill1: 0.04 0.000
1130.000
Cut Volume: 19.309 3.585 0.04 0.133
Fill Volume: 3.442 0.638 0.04 0.024
Mesh\Modeling\Components\Grading\XS_TC_Cut: 2.590 13.064 1.00 13.064
Mesh\Modeling\Components\Grading\XS_TC_Fill: 8.592 42.568 1.00 42.568
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:
7.402 1.371 0.04 0.051
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 2:
12.000 2.222 0.04 0.082
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Wedge:
0.518 0.096 0.04 0.004
Mesh\Modeling\Components\Subex\XS_TC_Subex_Backfill1: 0.04 0.000
1135.000
Cut Volume: 19.165 3.562 0.04 0.132
Fill Volume: 3.382 0.632 0.04 0.023
Mesh\Modeling\Components\Grading\XS_TC_Cut: 2.544 12.835 1.00 12.835
Mesh\Modeling\Components\Grading\XS_TC_Fill: 8.748 43.348 1.00 43.348
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:
7.402 1.371 0.04 0.051
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 2:
12.000 2.222 0.04 0.082
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Wedge:
0.518 0.096 0.04 0.004
Mesh\Modeling\Components\Subex\XS_TC_Subex_Backfill1: 0.04 0.000
1140.000
Cut Volume: 19.051 3.538 0.04 0.131
Fill Volume: 3.280 0.617 0.04 0.023
Mesh\Modeling\Components\Grading\XS_TC_Cut: 2.498 12.605 1.00 12.605
Mesh\Modeling\Components\Grading\XS_TC_Fill: 8.904 44.128 1.00 44.128
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:
7.402 1.371 0.04 0.051
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 2:
12.000 2.222 0.04 0.082
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Wedge:
0.518 0.096 0.04 0.004
Component End Area
Totals
Component Surface Area
Totals
Station Material Area Volume Length Area Unit
Cost Material
Cost
Page 3 of 9Volumes Report
Mesh\Modeling\Components\Subex\XS_TC_Subex_Backfill1: 0.04 0.000
1145.000
Cut Volume: 18.963 3.520 0.04 0.130
Fill Volume: 3.137 0.594 0.04 0.022
Mesh\Modeling\Components\Grading\XS_TC_Cut: 2.452 12.375 1.00 12.375
Mesh\Modeling\Components\Grading\XS_TC_Fill: 9.059 44.908 1.00 44.908
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:
7.402 1.371 0.04 0.051
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 2:
12.000 2.222 0.04 0.082
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Wedge:
0.518 0.096 0.04 0.004
Mesh\Modeling\Components\Subex\XS_TC_Subex_Backfill1: 0.04 0.000
1150.000
Cut Volume: 18.900 3.506 0.04 0.130
Fill Volume: 2.953 0.564 0.04 0.021
Mesh\Modeling\Components\Grading\XS_TC_Cut: 2.406 12.145 1.00 12.145
Mesh\Modeling\Components\Grading\XS_TC_Fill: 9.215 45.687 1.00 45.687
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:
7.402 1.371 0.04 0.051
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 2:
12.000 2.222 0.04 0.082
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Wedge:
0.518 0.096 0.04 0.004
Mesh\Modeling\Components\Subex\XS_TC_Subex_Backfill1: 0.04 0.000
1155.000
Cut Volume: 18.863 3.497 0.04 0.130
Fill Volume: 2.728 0.526 0.04 0.019
Mesh\Modeling\Components\Grading\XS_TC_Cut: 2.360 11.916 1.00 11.916
Mesh\Modeling\Components\Grading\XS_TC_Fill: 9.371 46.467 1.00 46.467
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:
7.402 1.371 0.04 0.051
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 2:
12.000 2.222 0.04 0.082
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Wedge:
0.518 0.096 0.04 0.004
Mesh\Modeling\Components\Subex\XS_TC_Subex_Backfill1: 0.04 0.000
1160.000
Cut Volume: 18.811 3.488 0.04 0.129
Fill Volume: 2.461 0.480 0.04 0.018
Mesh\Modeling\Components\Grading\XS_TC_Cut: 2.166 11.316 1.00 11.316
Mesh\Modeling\Components\Grading\XS_TC_Fill: 9.527 47.247 1.00 47.247
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:
7.402 1.371 0.04 0.051
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 2:
12.000 2.222 0.04 0.082
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Wedge:
0.518 0.096 0.04 0.004
Mesh\Modeling\Components\Subex\XS_TC_Subex_Backfill1: 0.04 0.000
1165.000
Component End Area
Totals
Component Surface Area
Totals
Station Material Area Volume Length Area Unit
Cost Material
Cost
Page 4 of 9Volumes Report
Cut Volume: 18.453 3.450 0.04 0.128
Fill Volume: 2.154 0.427 0.04 0.016
Mesh\Modeling\Components\Grading\XS_TC_Cut: 1.501 9.167 1.00 9.167
Mesh\Modeling\Components\Grading\XS_TC_Fill: 9.683 48.027 1.00 48.027
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:
7.402 1.371 0.04 0.051
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 2:
12.000 2.222 0.04 0.082
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Wedge:
0.518 0.096 0.04 0.004
Mesh\Modeling\Components\Subex\XS_TC_Subex_Backfill1: 0.04 0.000
1170.000
Cut Volume: 18.043 3.379 0.04 0.125
Fill Volume: 1.814 0.367 0.04 0.014
Mesh\Modeling\Components\Grading\XS_TC_Cut: 0.835 5.838 1.00 5.838
Mesh\Modeling\Components\Grading\XS_TC_Fill: 8.932 46.538 1.00 46.538
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:
7.402 1.371 0.04 0.051
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 2:
12.000 2.222 0.04 0.082
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Wedge:
0.518 0.096 0.04 0.004
Mesh\Modeling\Components\Subex\XS_TC_Subex_Backfill1: 0.04 0.000
1175.000
Cut Volume: 17.817 3.320 0.04 0.123
Fill Volume: 1.404 0.298 0.04 0.011
Mesh\Modeling\Components\Grading\XS_TC_Cut: 0.600 3.587 1.00 3.587
Mesh\Modeling\Components\Grading\XS_TC_Fill: 8.194 42.815 1.00 42.815
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:
7.402 1.371 0.04 0.051
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 2:
12.000 2.222 0.04 0.082
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Wedge:
0.518 0.096 0.04 0.004
Mesh\Modeling\Components\Subex\XS_TC_Subex_Backfill1: 0.04 0.000
1180.000
Cut Volume: 17.730 3.291 0.04 0.122
Fill Volume: 0.372 0.164 0.04 0.006
Mesh\Modeling\Components\Grading\XS_TC_Cut: 0.543 2.858 1.00 2.858
Mesh\Modeling\Components\Grading\XS_TC_Fill: 2.495 26.723 1.00 26.723
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:
7.402 1.371 0.04 0.051
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 2:
12.000 2.222 0.04 0.082
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Wedge:
0.518 0.096 0.04 0.004
Mesh\Modeling\Components\Subex\XS_TC_Subex_Backfill1: 0.04 0.000
1185.000
Cut Volume: 17.740 3.284 0.04 0.122
Fill Volume: 0.365 0.068 0.04 0.003
Mesh\Modeling\Components\Grading\XS_TC_Cut: 0.486 2.572 1.00 2.572
Component End Area
Totals
Component Surface Area
Totals
Station Material Area Volume Length Area Unit
Cost Material
Cost
Page 5 of 9Volumes Report
Mesh\Modeling\Components\Grading\XS_TC_Fill: 2.512 12.518 1.00 12.518
1:
7.402 1.371 0.04 0.051
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 2:
12.000 2.222 0.04 0.082
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Wedge:
0.518 0.096 0.04 0.004
Mesh\Modeling\Components\Subex\XS_TC_Subex_Backfill1: 0.04 0.000
1190.000
Cut Volume: 17.768 3.288 0.04 0.122
Fill Volume: 0.395 0.070 0.04 0.003
Mesh\Modeling\Components\Grading\XS_TC_Cut: 0.429 2.286 1.00 2.286
Mesh\Modeling\Components\Grading\XS_TC_Fill: 2.619 12.827 1.00 12.827
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:
7.402 1.371 0.04 0.051
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 2:
12.000 2.222 0.04 0.082
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Wedge:
0.518 0.096 0.04 0.004
Mesh\Modeling\Components\Subex\XS_TC_Subex_Backfill1: 0.04 0.000
1195.000
Cut Volume: 17.804 3.294 0.04 0.122
Fill Volume: 0.427 0.076 0.04 0.003
Mesh\Modeling\Components\Grading\XS_TC_Cut: 0.371 2.000 1.00 2.000
Mesh\Modeling\Components\Grading\XS_TC_Fill: 2.725 13.360 1.00 13.360
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:
7.402 1.371 0.04 0.051
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 2:
12.000 2.222 0.04 0.082
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Wedge:
0.518 0.096 0.04 0.004
Mesh\Modeling\Components\Subex\XS_TC_Subex_Backfill1: 0.04 0.000
1200.000
Cut Volume: 17.849 3.301 0.04 0.122
Fill Volume: 0.274 0.065 0.04 0.002
Mesh\Modeling\Components\Grading\XS_TC_Cut: 0.314 1.714 1.00 1.714
Mesh\Modeling\Components\Grading\XS_TC_Fill: 1.721 11.116 1.00 11.116
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:
7.402 1.371 0.04 0.051
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 2:
12.000 2.222 0.04 0.082
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Wedge:
0.518 0.096 0.04 0.004
Mesh\Modeling\Components\Subex\XS_TC_Subex_Backfill1: 0.04 0.000
1205.000
Cut Volume: 17.663 3.288 0.04 0.122
Fill Volume: 0.760 0.096 0.04 0.004
Mesh\Modeling\Components\Grading\XS_TC_Cut: 1.00 0.000
Mesh\Modeling\Components\Grading\XS_TC_Fill: 9.029 26.877 1.00 26.877
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:
7.402 1.371 0.04 0.051
Component End Area
Totals
Component Surface Area
Totals
Station Material Area Volume Length Area Unit
Cost Material
Cost
Page 6 of 9Volumes Report
2:
12.000 2.222 0.04 0.082
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Wedge:
0.518 0.096 0.04 0.004
Mesh\Modeling\Components\Subex\XS_TC_Subex_Backfill1: 0.04 0.000
1210.000
Cut Volume: 17.427 3.249 0.04 0.120
Fill Volume: 2.504 0.302 0.04 0.011
Mesh\Modeling\Components\Grading\XS_TC_Cut: 1.00 0.000
Mesh\Modeling\Components\Grading\XS_TC_Fill: 9.904 47.335 1.00 47.335
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:
7.402 1.371 0.04 0.051
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 2:
12.000 2.222 0.04 0.082
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Wedge:
0.518 0.096 0.04 0.004
Mesh\Modeling\Components\Subex\XS_TC_Subex_Backfill1: 0.04 0.000
1215.000
Cut Volume: 17.501 3.234 0.04 0.120
Fill Volume: 4.793 0.676 0.04 0.025
Mesh\Modeling\Components\Grading\XS_TC_Cut: 1.00 0.000
Mesh\Modeling\Components\Grading\XS_TC_Fill: 11.082 52.467 1.00 52.467
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:
7.402 1.371 0.04 0.051
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 2:
12.000 2.222 0.04 0.082
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Wedge:
0.518 0.096 0.04 0.004
Mesh\Modeling\Components\Subex\XS_TC_Subex_Backfill1: 0.04 0.000
1220.000
Cut Volume: 17.783 3.267 0.04 0.121
Fill Volume: 6.990 1.091 0.04 0.040
Mesh\Modeling\Components\Grading\XS_TC_Cut: 1.00 0.000
Mesh\Modeling\Components\Grading\XS_TC_Fill: 10.813 54.739 1.00 54.739
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:
7.402 1.371 0.04 0.051
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 2:
12.000 2.222 0.04 0.082
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Wedge:
0.518 0.096 0.04 0.004
Mesh\Modeling\Components\Subex\XS_TC_Subex_Backfill1: 0.04 0.000
1225.000
Cut Volume: 18.027 3.316 0.04 0.123
Fill Volume: 9.709 1.546 0.04 0.057
Mesh\Modeling\Components\Grading\XS_TC_Cut: 1.00 0.000
Mesh\Modeling\Components\Grading\XS_TC_Fill: 11.119 54.830 1.00 54.830
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:
7.402 1.371 0.04 0.051
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 2:
12.000 2.222 0.04 0.082
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder 0.518 0.096 0.04 0.004
Component End Area
Totals
Component Surface Area
Totals
Station Material Area Volume Length Area Unit
Cost Material
Cost
Page 7 of 9Volumes Report
Wedge:
Mesh\Modeling\Components\Subex\XS_TC_Subex_Backfill1: 0.04 0.000
1230.000
Cut Volume: 18.324 3.366 0.04 0.125
Fill Volume: 12.263 2.034 0.04 0.075
Mesh\Modeling\Components\Grading\XS_TC_Cut: 1.00 0.000
Mesh\Modeling\Components\Grading\XS_TC_Fill: 13.285 61.011 1.00 61.011
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:
7.402 1.371 0.04 0.051
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 2:
12.000 2.222 0.04 0.082
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Wedge:
0.518 0.096 0.04 0.004
Mesh\Modeling\Components\Subex\XS_TC_Subex_Backfill1: 0.04 0.000
1235.000
Cut Volume: 18.713 3.429 0.04 0.127
Fill Volume: 13.381 2.374 0.04 0.088
Mesh\Modeling\Components\Grading\XS_TC_Cut: 1.00 0.000
Mesh\Modeling\Components\Grading\XS_TC_Fill: 13.486 66.928 1.00 66.928
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:
7.402 1.371 0.04 0.051
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 2:
12.000 2.222 0.04 0.082
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Wedge:
0.518 0.096 0.04 0.004
Mesh\Modeling\Components\Subex\XS_TC_Subex_Backfill1: 0.04 0.000
1240.000
Cut Volume: 19.201 3.511 0.04 0.130
Fill Volume: 7.778 1.959 0.04 0.073
Mesh\Modeling\Components\Grading\XS_TC_Cut: 1.00 0.000
Mesh\Modeling\Components\Grading\XS_TC_Fill: 9.909 58.487 1.00 58.487
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:
7.402 1.371 0.04 0.051
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 2:
12.000 2.222 0.04 0.082
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Wedge:
0.518 0.096 0.04 0.004
Mesh\Modeling\Components\Subex\XS_TC_Subex_Backfill1: 0.04 0.000
1245.000
Cut Volume: 20.101 3.639 0.04 0.135
Fill Volume: 2.127 0.917 0.04 0.034
Mesh\Modeling\Components\Grading\XS_TC_Cut: 1.00 0.000
Mesh\Modeling\Components\Grading\XS_TC_Fill: 10.373 50.705 1.00 50.705
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:
7.402 1.371 0.04 0.051
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 2:
12.000 2.222 0.04 0.082
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Wedge:
0.518 0.096 0.04 0.004
Mesh\Modeling\Components\Subex\XS_TC_Subex_Backfill1: 0.04 0.000
Component End Area
Totals
Component Surface Area
Totals
Station Material Area Volume Length Area Unit
Cost Material
Cost
Page 8 of 9Volumes Report
1247.101
Cut Volume: 20.420 1.576 0.04 0.058
Fill Volume: 0.246 0.092 0.04 0.003
Mesh\Modeling\Components\Grading\XS_TC_Cut: 1.00 0.000
Mesh\Modeling\Components\Grading\XS_TC_Fill: 7.394 18.663 1.00 18.663
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:
7.402 0.576 0.04 0.021
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 2:
12.000 0.934 0.04 0.035
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Wedge:
0.518 0.040 0.04 0.001
Mesh\Modeling\Components\Subex\XS_TC_Subex_Backfill1: 0.04 0.000
Totals:
Cut Volume: 110.010 0.04 4.074
Fill Volume: 19.560 0.04 0.724
Mesh\Modeling\Components\Grading\XS_TC_Cut: 219.415 1.00 219.415
Mesh\Modeling\Components\Grading\XS_TC_Fill: 1266.869 1.00 1266.869
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 1:
43.438 0.04 1.609
Mesh\Modeling\Components\Pavt\XS_TC_Pavement Layer 2:
70.422 0.04 2.608
Mesh\Modeling\Components\Shoulder\XS_TC_Shoulder Wedge:
3.040 0.04 0.113
Mesh\Modeling\Components\Subex\XS_TC_Subex_Backfill1: 0.04 0.000
Total Estimated Cost: 1732.76
Component End Area
Totals
Component Surface Area
Totals
Station Material Area Volume Length Area Unit
Cost Material
Cost
Page 9 of 9Volumes Report