OR NPS CRLA 13(1)_APPR04_NamedBoundary_Earthwork_Report.pdf

PDF 271 KB Posted

Attached to
OR NPS CRLA 13(1), Rehabilitate East Rim Drive
Solicitation number
69056722r000013
Issued by

About this file

This report provides quantities for earthwork on a road rehabilitation project. It includes named boundaries, alignment names, station names, material types, lengths, areas, and volumes for cut, fill, shoulder wedge, and pavement layers. The related federal solicitation is offered as a full and open competition to rehabilitate East Rim Drive in Oregon National Park Service. Interested offerors should review the attached solicitation documents for response due dates and additional terms. The work will be awarded by the Department of Transportation Federal Highway Administration.

View the file

Other files

File Type Posted
Amendment A001.pdf PDF
QA 1-30-23.pdf PDF
Geotech Report 0920_Rehabilitate East Rim Drive_Final Geotechnical Recommendations.pdf PDF
OR NPS CRLA 13(1) APPR 03_XYZ Base and Subgrade.pdf PDF
OR NPS CRLA 13(1) XS_MAIN_COR_2.pdf PDF
OR NPS CRLA 13(1)_Main_COR_4_Super_Report.pdf PDF
OR NPS CRLA 13(1)_Main_COR_2_VA.pdf PDF
OR NPS CRLA 13(1)_Main_COR_4_Earthwrok_Report.pdf PDF
OR NPS CRLA 13(1) XYZ Main_COR_4_Ditch.xlsx XLSX spreadsheet
OR NPS CRLA 13(1)_Main_COR_1_HA.pdf PDF
FLH Bridge oversized or overload vehicle permit request form April 2019.pdf PDF
OR NPS CRLA 13(1)_Main_COR_4_VA.pdf PDF
OR NPS CRLA 13(1) APPR 02_Staking Report.pdf PDF
OR NPS CRLA 13(1)_Plans_Final.pdf PDF
OR NPS CRLA 13(1) XYZ_APPR_04_ETW_EOP.pdf PDF
OR NPS CRLA 13(1) XYZ Main_COR_1_Ditch_PavedDitch.xlsx XLSX spreadsheet
OR NPS CRLA 13(1)_APPR03_Earthwrok_Report.pdf PDF
OR NPS CRLA 13(1) XYZ APPR_01_Base and Subgrade.xlsx XLSX spreadsheet
OR NPS CRLA 13(1) XS_APPR 01.pdf PDF
OR NPS CRLA 13(1) XYZ APPR_03_Base and Subgrade.xlsx XLSX spreadsheet
OR NPS CRLA 13(1)_Main_COR_2_HA.pdf PDF
OR NPS CRLA 13(1) XYZ_Main_COR_2_ETW_EOP_Guardwalls.pdf PDF
RFP_East Rim Drive.pdf PDF
OR NPS CRLA 13(1)_APPR_02_HA.pdf PDF
OR NPS CRLA 13(1)_Main_COR_1_Staking_Report.pdf PDF
OR NPS CRLA 13(1)_Main_COR_1_VA.pdf PDF
OR NPS CRLA 13(1) XYZ Main_COR_2_Base and Subgrade.xlsx XLSX spreadsheet
OR NPS CRLA 13(1) XS_APPR 04.pdf PDF
OR NPS CRLA 13(1) APPR 01_Staking Report.pdf PDF
OR NPS CRLA 13(1) XYZ Main_COR_3_Ditch.xlsx XLSX spreadsheet
OR NPS CRLA 13(1)_Clearing Limits_L_495 00 to 755 00_INCL_APPR_03.pdf PDF
OR NPS CRLA 13(1) XYZ Main_COR_2_ETW_EOP_Guardwalls.xlsx XLSX spreadsheet
OR NPS CRLA 13(1) XYZ Main_Cor_3_Base and Subgrade.pdf PDF
OR NPS CRLA 13(1)_APPR01_Earthwrok_Report.pdf PDF
OR NPS CRLA 13(1) APPR 04_Staking Report.pdf PDF
OR NPS CRLA 13(1) XYZ Main_Cor_1_Base and Subgrade.pdf PDF
Additional Physical Data 3_East Rim.zip ZIP file
OR NPS CRLA 13(1) XYZ_Main_COR_1_ETW_EOP_Guardwalls.pdf PDF
OR NPS CRLA 13(1) XYZ_Main_COR_3_ETW_EOP_Guardswalls.pdf PDF
OR NPS CRLA 13(1)_APPR_04_HA.pdf PDF
OR NPS CRLA 13(1)_Main_COR_1_Super_Report.pdf PDF
OR NPS CRLA 13(1) XS_MAIN_COR_3.pdf PDF
OR NPS CRLA 13(1) XYZ Main_COR_2_Ditch_PavedDitch.xlsx XLSX spreadsheet
OR NPS CRLA 13(1)_APPR02_Earthwrok_Report.pdf PDF
Additional Physical Data_5_East Rim Drive.zip ZIP file
Additional Physical Data 2_East Rim.zip ZIP file
OR NPS CRLA 13(1) XYZ_Main_Cor_1_Paved_DItch_Allpoints.pdf PDF
OR NPS CRLA 13(1)_APPR_01_VA.pdf PDF
OR NPS CRLA 13(1) XYZ APPR_04_Base and Subgrade.xlsx XLSX spreadsheet
OR NPS CRLA 13(1)_Clearing Limits_L_251 00 to 495 00_INCL_APP01_02.pdf PDF
Show 40 more

Latest 50 of 113 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quantities Report by Named Boundary

Report Created: Tuesday, May 4, 2021 Time: 1:50:38 PM

Named Boundary Group:

APPR04

Alignment Name: APPR04

Input Grid Factor:

Note: All units in this report are in feet, square feet and cubic yards unless specified otherwise.

1278.470 APPR04:Appr4

AUX_01: 0.940

Edge of pavement: 480.786

XS_TL_Edge of Pavt 2: 467.823

XS_TL_Edge of Pavt: 354.350

XS_TL_Cut: 243.340

XS_TL_Centerline 1: 463.368

XS_TL_Centerline 2: 463.368

XS_TC_Pavement Layer 1: 3276.105 38.547

XS_TC_Pavement Layer 2: 3434.218 63.486

XS_TC_Cut: 727.320

XS_TC_Shoulder Wedge: 366.920 3.438

XS_TC_Fill: 43.236

Volumes_Cut: 4478.184 143.870

Volumes_Fill: 91.735 0.148

Baseline: 98.893

XS_TL_Edge of Pavt 1: 113.473

XS_TL_Subex_Backfill1: 113.473

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Page 1 of 1Volumes Report

5/4/2021

File details come from the government source that posted it. Updated .