RFP CDRL A001 TECHNICAL DIRECTIVES REQUIREMENTS 10 DAY REPORT C-130.pdf

PDF 138 KB Posted

Attached to
C-130 Maintenance & Repair Services
Solicitation number
N6264924R0029
Issued by

About this file

This document is a Contract Data Requirements List (CDRL) that specifies the technical directives requirements for a C-130 aircraft maintenance and repair services contract. The CDRL requires the contractor to submit a Technical Directives Requirements 10-Day Report within 10 work days after an aircraft is inducted for Periodic Maintenance Inspection (PMI). The report identifies the technical directives required for incorporation based on a review of the aircraft logbooks and other documentation. The report must be submitted in a specified format and distributed to various government stakeholders. The CDRL also includes details on the frequency, submission dates, distribution, and acceptance criteria for the report.

The related federal contract opportunity is a Request for Proposals (RFP) for C-130 Maintenance & Repair Services, Solicitation Number N6264924R0029. The RFP provides instructions for submitting proposals electronically, deadlines for proposal submission and questions, and a list of the required attachments and forms. The RFP is being issued by the Department of the Navy, Naval Supply Systems Command.

View the file

Other files

File Type Posted
N6264924R0029 Amendment 0001.pdf PDF
N6264924R0029 Amendment 0001 Conformed.pdf PDF
RFP CDRL A004 DISCREPANT PART ON INDUCTION REPORTC-130.pdf PDF
RFP CDRL A007 SCHEDULED REMOVAL CARDS C-130.pdf PDF
Attachment 05 Drafting and Processing LMR (2023-06-23).docx DOCX document
RFP CDRL C002 PRESENTATION DOCUMENTATION C-130 DistroE.pdf PDF
RFP CDRL A008 SITUATION SUMMARY REPORT C-130.pdf PDF
RFP CDRL A003 TDC KIT RECEIPT AND REPORT OF KIT DISCREPANCY C-130.pdf PDF
Attachment 12 GFP (2023-06-23).xlsx XLSX spreadsheet
Attachment 07 PEMA Specifications (2023-06-23).docx DOCX document
Attachment 02 Contract Admin Plan (2023-06-23).docx DOCX document
RFP CDRL A009 AIRCRAFT CONDITION EVALUATION REPORT C-130.pdf PDF
RFP CDRL D001 PHASE-IN TRANSITION PLAN C-130 DistroE.pdf PDF
RFP CDRL D002 TRANSITION STATUS REPORT C-130 DistroE.pdf PDF
RFP CDRL A014 CORROSION INSPECTION (CI) REPORT C-130 (2023-07).pdf PDF
Attachment 01 KC-130J_IDIQ_Attachment_01_PWS_(2024-07-26).docx DOCX document
RFP CDRL A011 WEIGHT AND BALANCE REPORTS C-130 (2023-07).pdf PDF
RFP CDRL D004 TRAINING PLAN C-130 DistroE.pdf PDF
RFP CDRL A012 Maintenance History Summary (MHS) Report C-130.pdf PDF
RFP CDRL A006 NOTIFICATION OF AIRCRAFT DELAY.pdf PDF
Attachment 09 Facility_Requirements (2023-06-23).docx DOCX document
RFP CDRL F001 INTEGRATED MASTER SCHEDULE C-130 DistroE.pdf PDF
RFP CDRL A013 NON-DESTRUCTIVE INSPECTION (NDI) REPORT C-130.pdf PDF
Attachment 04 OSHE Provisions (2023-06-23).docx DOCX document
RFP CDRL B002 AIRCRAFT AWAITING PARTS REPORT (AWP) C-130 DistroE.pdf PDF
Attachment 11 Support_Equipment (2023-06-23).docx DOCX document
Attachment 03 QASP (2023-06-23).docx DOCX document
RFP CDRL B003 FINAL MATERIAL CONSUMPTION REPORT C-130.pdf PDF
RFP CDRL G001 MATERIAL EXPENSE REPORT C-130 DistroE.pdf PDF
RFP CDRL D003 TRANSITION INVENTORY PLAN (SHUT-DOWN) C-130 DistroE.pdf PDF
Attachment 08 Airfield_Requirements (2023-06-23).docx DOCX document
Attachment 10 Repairable Items (2023-06-23).docx DOCX document
RFP CDRL A002 TECHNICAL DIRECTIVES REPORT C-130.pdf PDF
RFP CDRL L001 TECHNICAL DATA INVENTORY LIST C-130.pdf PDF
RFP CDRL A010 NOTED BUT NOT CORRECTED (NBNC) REPORT C-130.pdf PDF
RFP CDRL C001 MEETING MINUTES C-130 DistroE.pdf PDF
RFP CDRL B001 AVDLR TRACKER C-130.pdf PDF
Attachment 06 Drafting and Processing TEI (2023-06-23).docx DOCX document
Attachment 13 RFP Question Form.xlsx XLSX spreadsheet
RFP N6264924R0029.pdf PDF
RFP CDRL A005 PRODUCTION PLAN C-130.pdf PDF
Attachment 14 Technical Data Request Form.docx DOCX document
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: A001
title: TECHNICAL DIRECTIVES REQUIREMENTS 10 DAY REPORT C-130
sub:
auth: DI-MGMT-80933A/T (See Block 16)
ref: PWS 3.1.1
req_ofc: FRC WESTPAC PRODUCTION
dd250: NO
appcode: N/A
dist: NONE
freq: See Block16
asof: N/A
firstsub: See Block16
subsub: See Block16
addressee1: FRCWP IPTL
draft1:
reg1: 1
repro1:
addressee2: FRCWP Production
draft2:
reg2: 1
repro2:
addressee3: FRCWP Acquisition
draft3:
reg3: 1
repro3:
addressee4: DCMA
draft4:
reg4: 1
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_reg: 4
total_repro: 0
remarks: (1) Block 1 Description: Contractor shall submit Technical Directives Requirement 10 Day Report report within 10 work days after an aircraft is inducted to PMI.

(2) Block 1 Purpose: This document identifies Technical Directives required for incorporation after review of the aircraft logbooks, List 02 and List 04, or the PMI special work request. This document is required also for aircraft initial inspection.

(3) Block 4 Format and Content: DI-MGMT-80933A Format and Content are tailored out. Technical Directives Requirements 10-Day Report shall be submitted in accordance with the sample format attached.

(4) Block 10 Frequency: Once. Revisions due as required.

(5) Block 12/13 Submission: Submission due 10 days after PMI aircraft is inducted.10 Days after PMI aircraft is inducted.

(6) Block 14 Distribution: CDRL shall be emailed to:

TBD

The Contractor shall use the following subject line format for emails containing CDRL submissions:

Contract Number_KC-130J_Company Name (three-letter code)_CDRL Number_ YYY-MM-DD_BUNO (if applicable)

(7) Acceptance: The Government shall have five working days for review and acceptance/rejection of each submission. No response will indicate acceptance.

group:
total_price:
prep_name:
line_item: x005
exhibit: A
xtdp: Off
xtm: Off
othercat: X-MGMT
system: C-130 PMI AIRCRAFT
ctr_no: TBD
contr: TBD
remarksb:
Page2:
Reset:
prep_date:
app_by:
app_date:
Page: 1
of_pages: 1
app: Adobe Professional 8.0

File details come from the government source that posted it. Updated .