About this file

This document is an attachment titled "Airfield Requirement" that provides details on the airfield and facility requirements for the KC-130J Integrated Maintenance Plan (IMP) Planned Maintenance Interval (PMI) C-130 maintenance contract opportunity.

The attachment specifies the external and internal dimensional requirements for the C-130 aircraft, including wingspan, length, height, cabin dimensions, weights, and takeoff/landing requirements. It references NAS 3306 for airfield Category 4 requirements and DCMA 8210.1C for airfield compliance, including the need to obtain waivers if unable to meet the specified requirements. The attachment also outlines requirements for the compass rose and Aircraft Rescue and Fire Fighting (ARFF) capabilities.

This attachment is part of the solicitation documents for the "C-130 Maintenance & Repair Services" contract opportunity under Solicitation Number N6264924R0029, with a proposal due date of November 13, 2024. The contracting agency is the Department of the Navy, Naval Supply Systems Command.

View the file

Other files

File Type Posted
N6264924R0029 Amendment 0001.pdf PDF
N6264924R0029 Amendment 0001 Conformed.pdf PDF
RFP CDRL A004 DISCREPANT PART ON INDUCTION REPORTC-130.pdf PDF
RFP CDRL A007 SCHEDULED REMOVAL CARDS C-130.pdf PDF
Attachment 05 Drafting and Processing LMR (2023-06-23).docx DOCX document
RFP CDRL C002 PRESENTATION DOCUMENTATION C-130 DistroE.pdf PDF
RFP CDRL A008 SITUATION SUMMARY REPORT C-130.pdf PDF
RFP CDRL A003 TDC KIT RECEIPT AND REPORT OF KIT DISCREPANCY C-130.pdf PDF
Attachment 12 GFP (2023-06-23).xlsx XLSX spreadsheet
Attachment 07 PEMA Specifications (2023-06-23).docx DOCX document
Attachment 02 Contract Admin Plan (2023-06-23).docx DOCX document
RFP CDRL A009 AIRCRAFT CONDITION EVALUATION REPORT C-130.pdf PDF
RFP CDRL D001 PHASE-IN TRANSITION PLAN C-130 DistroE.pdf PDF
RFP CDRL D002 TRANSITION STATUS REPORT C-130 DistroE.pdf PDF
RFP CDRL A014 CORROSION INSPECTION (CI) REPORT C-130 (2023-07).pdf PDF
Attachment 01 KC-130J_IDIQ_Attachment_01_PWS_(2024-07-26).docx DOCX document
RFP CDRL A011 WEIGHT AND BALANCE REPORTS C-130 (2023-07).pdf PDF
RFP CDRL D004 TRAINING PLAN C-130 DistroE.pdf PDF
RFP CDRL A012 Maintenance History Summary (MHS) Report C-130.pdf PDF
RFP CDRL A006 NOTIFICATION OF AIRCRAFT DELAY.pdf PDF
Attachment 09 Facility_Requirements (2023-06-23).docx DOCX document
RFP CDRL F001 INTEGRATED MASTER SCHEDULE C-130 DistroE.pdf PDF
RFP CDRL A013 NON-DESTRUCTIVE INSPECTION (NDI) REPORT C-130.pdf PDF
Attachment 04 OSHE Provisions (2023-06-23).docx DOCX document
RFP CDRL B002 AIRCRAFT AWAITING PARTS REPORT (AWP) C-130 DistroE.pdf PDF
Attachment 11 Support_Equipment (2023-06-23).docx DOCX document
Attachment 03 QASP (2023-06-23).docx DOCX document
RFP CDRL B003 FINAL MATERIAL CONSUMPTION REPORT C-130.pdf PDF
RFP CDRL G001 MATERIAL EXPENSE REPORT C-130 DistroE.pdf PDF
RFP CDRL D003 TRANSITION INVENTORY PLAN (SHUT-DOWN) C-130 DistroE.pdf PDF
Attachment 10 Repairable Items (2023-06-23).docx DOCX document
RFP CDRL A002 TECHNICAL DIRECTIVES REPORT C-130.pdf PDF
RFP CDRL L001 TECHNICAL DATA INVENTORY LIST C-130.pdf PDF
RFP CDRL A010 NOTED BUT NOT CORRECTED (NBNC) REPORT C-130.pdf PDF
RFP CDRL C001 MEETING MINUTES C-130 DistroE.pdf PDF
RFP CDRL B001 AVDLR TRACKER C-130.pdf PDF
Attachment 06 Drafting and Processing TEI (2023-06-23).docx DOCX document
RFP CDRL A001 TECHNICAL DIRECTIVES REQUIREMENTS 10 DAY REPORT C-130.pdf PDF
Attachment 13 RFP Question Form.xlsx XLSX spreadsheet
RFP N6264924R0029.pdf PDF
RFP CDRL A005 PRODUCTION PLAN C-130.pdf PDF
Attachment 14 Technical Data Request Form.docx DOCX document
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N62649XXXXXXX

Attachment (8) 23 June 2023

Attachment (8): Airfield Requirement For

KC-130J

Integrated Maintenance Plan (IMP) Planned Maintenance Interval (PMI)

C-130 Reference for Airfield requirements.

NAS 3306 - Airfield Category 4: Wingspans of 118ft (36m) up to but not including 171 ft (52m) and 1.3 VS of less than 141 knots.

External Dimensions

Wing Span132.6 ft/ 40.41 m
Wing Aspect Ratio10.1
Length (Overall)97.75 ft/ 29.79 m
Height (Overall)38.8 ft/ 11.84 m
Tailplane Span52.7 ft/ 16.05 m
Wheel Track14.25 ft / 4.34 m
Propeller Diameter13.5ft/4.11 m
Wing Area (gross)1,745 sq. ft/ 162.12 sq. m

Internal Dimensions

Cabin Length (excluding ramp)40 ft I 12.19 m
Cabin Length (including ramp)50.7ft/15.44m
Max. Width10.25 ft/ 3.12 m
Max. Height9 ft/2.74 m
Total useable volume4,551 cubic ft/ 128.9 cubic m

Weights

Operating Empty Weight75,562 lbs/ 34,274 kg
Takeoff Run to 15 m4,700 ft/ 1,433 m
Takeoff Run using max. effort procedures1,800ft/549m
Landing from 15 mat 58,967 kg AI.JW2,550 ft / 777 m
Landing Run at 58,967 kg AI.JW1 ,400 ft / 427 m
Runway LCN: asphalt37
Runway LCN: concrete42

Range with 18,144 kg payload and MIL-STD-3013 reserves 2,835 nm / 5,250 km

In tandem with C-130 characteristics above; must comply with DCMA 8210.1C Change 1 (or latest revision). When unable to meet the specific facility requirements of NAS 3306, contractors may seek relief through the appropriate Waiver Authority for this Instruction per DCMA 8210.1C Change 1 (or latest revision) per paragraphs 6.15.1, 6.16.1, and 6.18.2.

Compass Rose Must be compliant to USN/USMC requirements.

ARFF

Must comply with DCMA 8210.1C Change 1 and National Aerospace Standard (NAS) 3306. (latest revisions shall be used). When unable to meet the specific facility requirements of NAS 3306, contractors may seek relief through the appropriate Waiver Authority for this Instruction per DCMA 8210.1C Change 1 (or latest revision) per paragraphs 6.15.1, 6.16.1, and 6.18.2.