Attachment 04 OSHE Provisions (2023-06-23).docx

DOCX document 36 KB Posted

Attached to
C-130 Maintenance & Repair Services
Solicitation number
N6264924R0029
Issued by

About this file

This document is the Occupational Safety, Health and Environmental (OSHE) Provisions attachment for the KC-130J Integrated Maintenance Plan (IMP) Planned Maintenance Interval (PMI) contract opportunity.

The OSHE Provisions outline the contractor's requirements to develop and maintain a detailed Industrial Safety, Health, and Environmental Program, including policy, organization, responsibilities, surveillance, enforcement, training, fire protection/prevention, and emergency response procedures. The contractor must submit this ISHE plan for review prior to execution, when changed, and annually. Mishap/incident reporting and investigation requirements are specified, and the contractor's Aviation Safety Council must promote accident prevention and address company mishaps. Detailed requirements are provided for various industrial safety operations such as lifting devices, aircraft jacking, compressed gas storage, aircraft parking/towing, fuel/defuel, cleaning/painting, and more. The contractor must comply with all applicable documents referenced in the bibliography.

View the file

Other files

File Type Posted
N6264924R0029 Amendment 0001.pdf PDF
N6264924R0029 Amendment 0001 Conformed.pdf PDF
RFP CDRL A004 DISCREPANT PART ON INDUCTION REPORTC-130.pdf PDF
RFP CDRL A007 SCHEDULED REMOVAL CARDS C-130.pdf PDF
Attachment 05 Drafting and Processing LMR (2023-06-23).docx DOCX document
RFP CDRL C002 PRESENTATION DOCUMENTATION C-130 DistroE.pdf PDF
RFP CDRL A008 SITUATION SUMMARY REPORT C-130.pdf PDF
RFP CDRL A003 TDC KIT RECEIPT AND REPORT OF KIT DISCREPANCY C-130.pdf PDF
Attachment 12 GFP (2023-06-23).xlsx XLSX spreadsheet
Attachment 07 PEMA Specifications (2023-06-23).docx DOCX document
Attachment 02 Contract Admin Plan (2023-06-23).docx DOCX document
RFP CDRL A009 AIRCRAFT CONDITION EVALUATION REPORT C-130.pdf PDF
RFP CDRL D001 PHASE-IN TRANSITION PLAN C-130 DistroE.pdf PDF
RFP CDRL D002 TRANSITION STATUS REPORT C-130 DistroE.pdf PDF
RFP CDRL A014 CORROSION INSPECTION (CI) REPORT C-130 (2023-07).pdf PDF
Attachment 01 KC-130J_IDIQ_Attachment_01_PWS_(2024-07-26).docx DOCX document
RFP CDRL A011 WEIGHT AND BALANCE REPORTS C-130 (2023-07).pdf PDF
RFP CDRL D004 TRAINING PLAN C-130 DistroE.pdf PDF
RFP CDRL A012 Maintenance History Summary (MHS) Report C-130.pdf PDF
RFP CDRL A006 NOTIFICATION OF AIRCRAFT DELAY.pdf PDF
Attachment 09 Facility_Requirements (2023-06-23).docx DOCX document
RFP CDRL F001 INTEGRATED MASTER SCHEDULE C-130 DistroE.pdf PDF
RFP CDRL A013 NON-DESTRUCTIVE INSPECTION (NDI) REPORT C-130.pdf PDF
RFP CDRL B002 AIRCRAFT AWAITING PARTS REPORT (AWP) C-130 DistroE.pdf PDF
Attachment 11 Support_Equipment (2023-06-23).docx DOCX document
Attachment 03 QASP (2023-06-23).docx DOCX document
RFP CDRL B003 FINAL MATERIAL CONSUMPTION REPORT C-130.pdf PDF
RFP CDRL G001 MATERIAL EXPENSE REPORT C-130 DistroE.pdf PDF
RFP CDRL D003 TRANSITION INVENTORY PLAN (SHUT-DOWN) C-130 DistroE.pdf PDF
Attachment 08 Airfield_Requirements (2023-06-23).docx DOCX document
Attachment 10 Repairable Items (2023-06-23).docx DOCX document
RFP CDRL A002 TECHNICAL DIRECTIVES REPORT C-130.pdf PDF
RFP CDRL L001 TECHNICAL DATA INVENTORY LIST C-130.pdf PDF
RFP CDRL A010 NOTED BUT NOT CORRECTED (NBNC) REPORT C-130.pdf PDF
RFP CDRL C001 MEETING MINUTES C-130 DistroE.pdf PDF
RFP CDRL B001 AVDLR TRACKER C-130.pdf PDF
Attachment 06 Drafting and Processing TEI (2023-06-23).docx DOCX document
RFP CDRL A001 TECHNICAL DIRECTIVES REQUIREMENTS 10 DAY REPORT C-130.pdf PDF
Attachment 13 RFP Question Form.xlsx XLSX spreadsheet
RFP N6264924R0029.pdf PDF
RFP CDRL A005 PRODUCTION PLAN C-130.pdf PDF
Attachment 14 Technical Data Request Form.docx DOCX document
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N62649XXXXXXX

Attachment (4) 23 June 2023

Attachment (4): Occupational Safety, Health and Environmental Provisions For

KC-130J

Integrated Maintenance Plan (IMP) Planned Maintenance Interval (PMI)

SECTION I - GENERAL SAFETY, HEALTH, AND ENVIRONMENTAL REQUIREMENTS

1. The Contractor, and its sub-contractors, shall comply with the provisions as set forth in the instructions of the U.S. Government in the performance of this contract as specified within its body, attachments, and references. Equivalent host nation standards may be used upon approval of DCMA Contract Safety.

1.1. The Contractor shall be responsible for developing and maintaining a detailed Industrial Safety, Health, and Environmental Program that includes:

1.1.1. Policy, organization, responsibilities, surveillance, enforcement, and training.

1.1.2. Fire protection/prevention and emergency response. The contractor shall identify specific plans for fire protection/prevention along with coordination of external activities that support these requirements for response to emergencies to include fire, chemical spill, accident, terrorist threat, adverse weather, natural disaster, etc. This item includes joint participation with external agencies in emergency response drills and training exercises.

1.1.3. Specific methods of compliance with the requirements of this section.

1.1.4. Compliance with applicable technical manual for each type, model, series aircraft.

2. The Contractor shall submit to the Administrative Contracting Officer (ACO), Government Flight Representative (GFR), and Contracting Officer’s Representative (COR) a copy of his Industrial Safety, Health and Environmental (ISHE) plan for review prior to execution, when changed and annually thereafter as part of this contract. The plan submitted shall be in English and provide a detailed description of the Contractor’s ISHE program.

3. In addition to the Mishap/Incident Reporting and Investigation requirements of DCMA INST 8210.1C Change 1, Contractor's Flight and Ground Procedures, the Contractor shall comply with the following:

3.1. The Contractor shall report, within the prescribed timeline, identification/occurrence of any incident that meets the mishap criteria, to the GFR and Integrated Product Team Lead (IPTL) Government representative by telephone. This includes hazardous material spill, occupational injury and/or illness(es) to contractor personnel, and/or damage to Government property as well as aircraft and/or explosive-related incidents.

3.2. The contractor shall submit a written investigation report detailing all available facts relating to each mishap case of material spill, personnel injury or damage to Government property to the GFR and IPTL within the prescribed timeline.

4. The contractor’s Aviation Safety Council shall promote a program of accident prevention, accept action items, provide safety expertise, implement changes as required, and address company mishaps for trend analysis and recommendations and operate as a focal point for ISHE within the company. These meetings shall be held on a regular basis (minimum quarterly per contract year).

SECTION II - INDUSTRIAL SAFETY REQUIREMENTS

1. The contractor shall document program specific plans for hazard control that ensures for compliance identified by specific standards within the following operations:

a) Lifting Devices

b) Aircraft Jacking Operations

c) Handling, Storing, and Transporting Compressed Gas Cylinders

d) Parked Aircraft

e) Moving or Tie-Down of Aircraft

f) Emergency Procedures to Safeguard Parked Aircraft During Severe Weather Conditions

g) Storage of Work Stands, Loose Aircraft Parts and Materials not Required for In-Progress Work

h) Aircraft Towing, Parking, Mooring

i) Fuel/Defuel, Fuel Tank/Cell Repair Operations

j) Removal of Hangered Fueled Aircraft

k) Aircraft Cleaning/Paint Removal/Painting

l) Handling, Storage and Use of Flammable Liquids

m) Housekeeping

n) Foreign Object Damage (FOD) Prevention

o) Welding

p) Fire Protection/Prevention

q) Personal Protective Equipment

r) Respiratory Protection

s) Lockout/Tagout (Energy Control)

t) Storage and Disposal of Hazardous Waste

u) Material Spills and Spill Response Procedures

v) Fall Protection

SECTION III - ADDITIONAL REQUIREMENTS

None

BIBLIOGRAPHY

The Contractor shall be responsible for compliance with all applicable portions of the documents listed below:

NUMBER
TITLE

DCMA 8210.1C Change 1 /NAVAIRINST 3710.1 (Series) Contractor’s Flight and Ground Operations

NAS 3306 (current version)
National Aeronautical Standard (NAS) Facility Requirements for Aircraft Operations
NAVAIR 01-75GAJ-00JG-00-1
General Maintenance Manual
NAVAIR 01-1A-35
Aircraft Fuel Cells and Tanks
NAVAIR 17-1-114
Inspection and Proofload Testing of Lifting Slings for Aircraft and Related Components
NAVAIR 19-70-521
Operation and Intermediate Maintenance with Illustrated Parts Breakdown, Aircraft Jacks

NAVAIR 19-600-135-6-1

Jacks, All Types GLCA Preoperational Checklist Aircraft Hydraulic

NAVAIR 19-600-135-6-2

Hydraulic Aircraft Jacks Periodic Maintenance Requirements Manuals

NAVSUPINST 4440.128 (Series)
Storage and Handling of Liquefied and Gaseous Compressed Gasses and Their Full and Empty Cylinders
DOD 4145.19 (Series)
Storage and Material Handling
NFPA 407 (Series)
National Fire Protection Association (NFPA) Standard for Aircraft Fuel Servicing