This document is an amendment to Request for Proposal (RFP) #05TO-S953 for a Closed-Loop Payment Processing System issued by the State of Nevada Department of Administration Purchasing Division. The RFP seeks a solution to collect data related to each transaction, including sufficient information to calculate appropriate taxes, without requiring the chosen system to connect to any state systems or collect taxes simultaneously with the transaction during the Pilot Program. The revised timeline indicates a contract start date of April 1, 2020, with the system required to begin operating by July 1, 2020 pursuant to AB 466 Section 1(9). The State will defer to each vendor's system design regarding the requirement for the platform to be agnostic and allow for third-party processors and financial entities to participate. A single designated individual will lead the implementation, coordinating across relevant divisions and agencies. The requirement for the system's physical components to be located in Nevada is firm, and the State cannot provide guidance on the legality of a system's functions under federal law.
The RFP does not specify pricing terms, set-asides, incumbents, funding requirements or sources, or any other salient commercial information. Questions will be accepted in two phases, with the first set due by December 9, 2019, and the second set due by December 20, 2019, with answers posted shortly after each deadline.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Letter Of Intent~1.pdf | ||
| 05TO-S953 Closed-Loop Payment Processing System~1.docx | DOCX document | |
| RFP Amendment 1 Revised Timeline.docx | DOCX document | |
| RFP Amendment 3 .docx | DOCX document | |
| Quote Instructions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Steve Sisolak
State of Nevada Department of Administration Purchasing Division 515 E. Musser Street, Suite 300 Carson City, NV 89701
Peter Long
Governor
Acting Director
Kevin D. Doty
Administrator
| SUBJECT: |
| Amendment 2 to Request for Proposal (RFP) # 05TO-S953 |
| RFP TITLE: |
| Closed-Loop Payment Processing System |
| DATE OF AMENDMENT: |
| December 13, 2019 |
| DATE OF RFP RELEASE: |
| November 25, 2019 |
| OPENING DATE: |
| January 3, 2020 |
| OPENING TIME: |
| 2:00 PM PT |
| CONTACT: |
| Teri Becker |
The following shall be a part of RFP # 05TO-S953. If a vendor has already returned a proposal and any of the information provided below changes that proposal, please submit the changes along with this amendment. You need not re-submit an entire proposal prior to the opening date and time.
First Questions and Responses to RFP:
1. Technical Requirements - System Interfaces: Can you share more information related to the various State systems and databases (in addition to the Taxation payment processing system) which the proposed solution will need to connect? Primarily interested in technical requirements. Would state see value in platform collecting tax data and option for taxes to be collected upon each consumer transaction and submitted to a state bank account within days of every transaction within the state?
It will not be necessary for the chosen system to include tax collections simultaneous to a transaction, nor will it need to connect to any state systems for the duration of the Pilot Program. The State envisions the chosen system to collect data relative to each transaction, which will include sufficient information in calculating the appropriate taxes. The process for the collection of tax dollars will remain substantially similar to the current process for the duration of the Pilot Program.
2. Timeline - Implementation Targets: The revised Timeline identifies a 04/01/2020 date for “Contract start date”. Are there target dates or expectation about when the solution would go live in the marketplace (e.g. an Implementation Timeline)?
Pursuant to AB 466 Section 1(9), the System must begin operating by July 1, 2020.
3. Technical Requirements - 3rd Party Integration: Will state require platform to be agnostic and allow for 3rd party processors and financial entities who wish to participate within the NV closed loop platform?
The State will defer to each individual vendor’s system design.
4. Implementation - Project Leadership: Will the State have a single designated Implementation Lead or will the implementation responsibilities be spread across the leadership of the relevant State departments?
The State anticipates having a single designated individual act as a lead; however, the lead will coordinate implementation across all relevant divisions and agencies.
5. Scope of Work #2.5.5: Scope of Work #2.5.5 states: CLPPS servers, hardware, and any other physical or otherwise related components and any servers, hardware, and any other physical or otherwise related components controlled by a subcontractor must be physically located in Nevada. Is this physical location in Nevada a firm requirement or will you consider alternative locations?
This is a firm requirement.
6. Scope of Work #2.1.2: Scope of Work #2.1.2 states: All Vendor(s) systems, functions, products, devices, physical items, and any other components, must be created, established, offered, maintained, operated, and otherwise used in compliance with all federal, state, and local laws and regulations. Failure to do so will result in automatic termination of the contract for cause by the State. Please explain further as it is our understanding that possessing or selling Marijuana, and the processing of payments associated with sales is illegal under federal law.
Given the anticipated difference in each individual vendor’s system design, the State cannot provide guidance as to the legality of a system and its related functions.
ALL ELSE REMAINS THE SAME FOR RFP 05TO-S953.
Vendor must sign and return this amendment with proposal submitted.
Vendor Name:
Authorized Signature:
Title:
Date:
This document must be submitted in the “State Documents” section of vendors’ technical proposal.
Amendment # 2 RFP # 05TO-S953 Page 1 of 1 image1.wmf oleObject1.bin
File details come from the government source that posted it. Updated .