RFP 6100061206 Multiple Range SAROCA BDISBO SDB VBE presentation.pdf
PDF 4 MB Posted
- Attached to
- Multiple Range SAROCA
- Solicitation number
- 6100061206
- Issued by
- Lebanon County, Allentown City, Pennsylvania
About this file
This document is a Pre-Bid Meeting presentation by the Pennsylvania Department of General Services (DGS) regarding RFP 6100061206 for the Multiple Range SAROCA project. The project includes general construction, HVAC, plumbing, and electrical work for several new Small Arms Range Operations Control Area (SAROCA) facilities at the Fort Indiantown Gap Pennsylvania National Guard Training Center. The estimated construction values range from $800,001 to $1,000,000 for general construction, up to $10,000 for HVAC and plumbing, and $100,001 to $200,000 for electrical work. Bids are due on June 24, 2024, and a mandatory pre-bid conference will be held on June 6, 2024. The Department of General Services has set Small Diverse Business (SDB) and Veteran Business Enterprise (VBE) participation goals of 10% and 3% respectively for the general construction portion of the project.
The presentation details the requirements for bidders to meet the SDB and VBE participation goals or demonstrate good faith efforts. It provides guidance on searching for and identifying certified SDB and VBE vendors, as well as instructions for completing the required SDB and VBE submittal forms. Bidders must submit separate SDB and VBE packets, and failure to do so will result in their bid being rejected. The presentation also covers dually certified SDB/VBE vendors and how their participation can be credited towards both goals.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Administrative Procedures 2023 DMVA.docx | DOCX document | |
| Bid docs to be returned.pdf | ||
| FTIG Area_Maps_9_11_letter.pdf | ||
| Attachment_03_FTIG_Traffic_Route.pdf | ||
| Instructions to Bidders 2023 DMVA.doc | DOC document | |
| 2024 SAROCA Projects_Addendum 03.pdf | ||
| Addendum #1.docx | DOCX document | |
| Addendum #3.docx | DOCX document | |
| Addendum #4.docx | DOCX document | |
| Pre-bid sign in.pdf | ||
| 2024_Range Rd SAROCA_Complete Specs.pdf | ||
| General Conditions to the Construction Contract DMVA 2023 v5.docx | DOCX document | |
| Notice to Bidders.docx | DOCX document | |
| Addendum #2.docx | DOCX document | |
| Construction_RFP_IFB_SDB_Participation_Form_2024.01.26 (1).pdf | ||
| Construction_RFP_IFB_VBE_Participation_Form_2024.01.26 (1).pdf | ||
| 2024_Range Rd SAROCA_Complete Drawings.pdf | ||
| Bidder Name and Address_Addendum form.docx | DOCX document | |
| Wage Rates.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pennsylvania Department of General Services
Pre-Bid Meeting BDISBO Presentation
RFP 6100061206 Multiple Range
SAROCA
Issuing Officer Tina Rebuck - trebuck@pa.gov
June 6, 2024 9:00 AM
What’s the Point?
Diversity Defined
•Diversity is…
• everything that makes us unique,
• our cognitive skills and personality traits, and
• also the things that shape our identity (e.g.
race, age, gender, religion, sexual orientation, cultural background), etc.
Diversity is the Mix Inclusion is making the mix work. ~Andres Tapia
Equity Defined
Equity is the fair treatment, access, opportunity, and advancement for all people, while at the same time striving to identify and eliminate barriers that have prevented the full participation of small businesses.
Equity Defined
EQUALITY IS THE
END GOAL.
EQUITY IS THE
MEANS TO GET
THERE.
Inclusion Defined Inclusion is about:
• Small Businesses as prime contractors
• Primes subcontracting with SDB, VBE vendors
• Engaging with vendors representative of the community
Inclusion Defined
Diversity, Equity, and Inclusion
Diversity
Having a seat at the table
Equity
Entering the conversation without barriers
Inclusion
Being heard and having a voice at the table
Small Diverse Business Enterprise (SDB) and Veteran Business Enterprise (VBE)
Bid References Instructions to Bidders 2023 DMVA
• Section 5 – Submission/Signing of Bids
• Section 30 – Small Diverse Business and Veteran Business Participation Information
Administrative Procedures 2023 DMVA
• No. 13 – Small Diverse Business and Veteran Business Enterprise Participation
BID DOCS TO BE RETURNED WITH BID SUBMISSION
• Construction_RFP_IFB_SDB_Participation_Form_2024.01.26.pdf
• Construction_RFP_IFB_VBE_Participation_Form_2024.01.26.pdf
A Bidder/Offeror’s failure to meet the SDB participation goal in full and the
VBE participation goal in full, or their failure to receive an approved Good
Faith Efforts waiver for any unmet portion of either the SDB or VBE participation goal will result in the rejection of the Bid or Proposal as nonresponsive.
Solicitation Specific Goals
Primes are welcome to exceed the goal!
• Available subcontracting opportunities across the entire state for the applicable services,
• Availability of DGS-verified SDB/VBEs to perform commercially useful functions, and
• Historical analysis of similar projects within the last 3 years.
PA - eMarketplace (state.pa.us)
` SDB VBE
.1 General Construction –ALL BASE BIDS 10% 3% https://www.emarketplace.state.pa.us/Solicitations.aspx?SID=6100061206
SDB and VBE Classification
Small Diverse Business
(SDB)
Goal oriented
➢Woman Business Enterprise
(WBE)
➢ Service-Disabled Veteran Business Enterprise (SDVBE)
➢Minority Business Enterprise
(MBE)
➢ LGBT Business Enterprise
(LGBTBE)
➢Disability-Owned Business Enterprise (DOBE)
Veteran Business Enterprise (VBE)
Goal oriented
➢ Veteran Business Enterprise (VBE)
➢ Service-Disabled Veteran Business Enterprise
(SDVBE)
Vendors must self-certify as a Small Business (SB) prior to SDB/VBE validation.
SDBs and VBEs must be certified/valid as of bid close due date and time.
SB Eligibility Requirements
•The business must be a for-profit, United States business.
•The business must be independently owned.
•The business may not be dominant in its field of operation.
•The business may not employ more than 100 full-time equivalent employees.
•The business may not exceed three-year average gross revenues of $47 Million, regardless of business type.
Commonwealth Phone Directory | Department of General Services | Commonwealth of Pennsylvania https://www.dgs.pa.gov/Pages/default.aspx https://www.dgs.pa.gov/Pages/default.aspx
Finding SDB/VBE vendors
• http://www.dgs.internet.state.pa.us/suppliersearch
• Access Search Guide -https://www.dgs.pa.gov/Small%20Diverse%20Business %20Program/Documents/Finding%20SBs%20and%20S DBs.pdf
• Supplier Search assistance available from Issuing Officer or Bureau of Diversity Procurement Liaison http://www.dgs.internet.state.pa.us/suppliersearch https://www.dgs.pa.gov/Small%20Diverse%20Business%20Program/Documents/Finding%20SBs%20and%20SDBs.pdf https://www.dgs.pa.gov/Small%20Diverse%20Business%20Program/Documents/Finding%20SBs%20and%20SDBs.pdf https://www.dgs.pa.gov/Small%20Diverse%20Business%20Program/Documents/Finding%20SBs%20and%20SDBs.pdf
Quick Search
IMPORTANT: Always click Reset prior to a new search to clear parameters from previous searches http://www.dgs.internet.state.pa.us/suppliersearch http://www.dgs.internet.state.pa.us/suppliersearch
Advanced Search
Select one or more classifications. To pull only SDBs, check “Select all Small Diverse Business Classifications” below.
To Include SBs, check “Small Business”.
Enter a brief code description (e.g. Door)
Browse and select one or more codes. Don’t know the codes you want?
Download the entire list in Excel.
See slide 13 to understand the UNSPSC code hierarchy.
Click arrow to expand Segment for additional codes
OR
UNSPSC Commodity Code Search
UNSPSC Commodity Code Search Write down your code selections
Advanced Search
Use multiple filters to restrict your search results to exactly what and where you need.
Search Results
Certified Small Businesses
• Advanced Building Controls LLC
• Advanced Building Performance Inc
• Advanced Cleaning Solutions LLC
Small Diverse Businesses
• Advanced Building Performance Inc
• Advanced Cleaning Solutions LLC
Veteran Business Enterprise
• Advanced Cleaning Solutions LLC
Supplier Profile
SB, SDB & VBE Expiration Dates
SB, SDB & VBE Classifications
Contact Information
Search Results
Certified Small Businesses
• Advanced Building Controls LLC
• Advanced Building Performance Inc
• Advanced Cleaning Solutions LLC
Small Diverse Businesses
• Advanced Building Performance Inc
• Advanced Cleaning Solutions LLC
Veteran Business Enterprise
• Advanced Cleaning Solutions LLC
Excel Export Results – Supplier Contacts
Excel Export Results includes Vendor ID, Supplier Name, Contact Name, Email, Phone, Fax
Upcoming Supplier Search Training
The training will focus on the basics of the supplier search process including recognizing the UNSPSC Codes Structure, accessing the DGS Supplier Search Database and Searching for Small, Small Diverse and Small Veteran Owned Businesses to gain a better understanding of supplier search results.
The 30-minute sessions will be offered via Teams on-line presentations on the following dates in 2024: (No RSVP Required)
Targeted Audience (External): Potential prime contractors that conduct business with the commonwealth who want to learn the basics of finding DGS certified small diverse and veteran owned businesses.
• 10AM June 5 (Wed)
• 10AM June 20 (Thu)
• 10AM July 3 (Wed)
• 10AM July 17 (Wed)
• 10AM July 31 (Wed)
• 10AM Aug 14 (Wed)
• 10AM Aug 28 (Wed)
• 10AM Sep 4 (Wed)
• 10AM Sep 18 (Wed)
• 10AM Oct 16 (Wed)
• 10AM Oct 30 (Wed)
• 10AM Nov 13 (Wed)
• 10AM Nov 27 (Wed)
• 10AM Dec 11 (Wed)
BDISBO Events Page https://www.dgs.pa.gov/Small%20Diverse%20Business%20Program/Pages/News-Media.aspx
New Forms and Processes
•SDB/VBE Instructions – SDB-1/VBE-1 READ
•SDB/VBE Participation Submittal – SDB-2/VBE-2
•SDB/VBE Utilization Schedule – SDB-3/VBE-3
•Letter of Commitment – SDB 3.1/VBE-3.1
•Guidance for Good Faith Effort (GFE) Waiver –
SDB-4/VBE-4 READ
•GFE Waiver – SDB-5/VBE-5
Bid packages available in e-Builder in the Package Invitation/Bid Info in the Invitation Documents folder
Solicitation-Specific Goals
SDB Submittal – SDB-2
SDB Utilization Schedule – SDB-3
Letter of Commitment SDB-3.1
SDB to expect a letter and SIGN it!
Guidance to Document GFE SDB-4
READ, READ, READ
▪ The ability or desire of a prime contractor to perform the work of a contract with its own organization does not relieve the Offeror of the responsibility to make Good Faith Efforts to meet the stated participation goal.
• Prime must complete all components of the GFE paperwork.
Details/Evidence are important, proof is required.
• Carefully review SDB and VBE submittal Instructions, specifically Section VI of SDB/VBE-1 which lists pertinent items as Fatal errors.
Good Faith Efforts Packet SDB-5
Good Faith Efforts (GFE) Partial or Full Waiver ❑ Identified Items of Work Applicant Made
Available to SDBs (Part 1)
❑ Identified SDBs and Record of Solicitations (Part 2)
❑ SDB Outreach Compliance Statement (Part 3)
❑ Additional Information Regarding Rejected SDB Quotes (Part 4)
❑ SDB Subcontractor Unavailability Certificate (Part 5)
SDB GFE Documentation – SDB-5
Complete all five parts
GFE Waiver – Part 1
Identified Items of Work Offeror Made Available to SDBs
GFE Waiver – Part 2
Identified SDBs and Record of Solicitations
GFE Waiver – Part 3
SDB Outreach Compliance Statement
GFE Waiver – Part 4
Additional Information Regarding Rejected SDB Quotes
GFE Waiver – Part 5
SDB Subcontractor Unavailability Certificate
SDB/VBE Response Submittal
BIDS FOR THIS PROJECT WILL ONLY BE ACCEPTED ELECTRONICALLY
THROUGH WWW.PASUPPLIERPORTAL.STATE.PA.US.
Any questions with the PA Supplier Portal must go through the Help Desk at 877-435-7363.
Slide text goes here
How to Meet the Goal
Submittal Forms
1. Complete SDB-2&3/VBE-2&3 by putting your company name as vendor with appropriate percentage commitment to fulfill each goal amount.
2. Complete SDB-2&3/VBE-2&3 by noting SDB vendor on SDB submittal and VBE vendor on VBE submittal with appropriate percentage commitment to fulfill each goal amount.
3. Complete SDB-2&3 /VBE-2&3 by noting same vendor on both SDB-2&3 and VBE-2&3 with highest percentage value commitment on BOTH forms.
3 Scenarios
1. Self-Perform as a DGS-verified SDB and/or VBE Prime vendor
2. Find Separate DGS-verified SDB and VBE vendors
3. Use a DGS Dually-verified SDB/VBE vendor
DGS Dually Verified SDB/VBE
Sample Scenario: Solicitation Participation Goals
SDB = 10% VBE= 3%
Estimated contract value = $1,000.00
Dually-Verified Vendor Instructions If a DGS-verified SDB is dually verified as a VBE, the firm will receive credit towards both the
SDB participation goal and the VBE participation goal as set forth on the SDB and VBE
Participation Summary Sheet. This credit may exceed the participation goal percentage, as shown in the example below.
Example: The SDB participation goal is 10% and the VBE participation goal is 5%. A subcontractor is DGS-verified as both an SDB and a VBE and will perform 10% of the contract work. The prime contractor can satisfy both the SDB participation goal and the
VBE participation goal through that dually verified subcontractor’s performance of 10% of the contract work, unless otherwise agreed to by the parties in writing and approved by
BDISBO and the Issuing Office.
Based on this example, the percentage commitment indicated on SDB-3 for SDB work on this contract would be 10%, and the VBE percentage commitment indicated on VBE-3 on this contract would be 10% as well. These contractual commitments meet the SDB participation goal of 10% and exceed the 5% VBE participation goal for this contract.
Please note that the dually verified SDB/VBE firm only receives 10% of the contract work based on the example above.
Newly Revised
Best Practices
Do’s
• Read the solicitation and all instructions completely.
• Submit SEPARATE SDB and VBE submittal forms.
• Validate subcontractor SDB/VBE status in DGS Supplier Database.
• Ensure that all appropriate forms are completed and signed correctly.
• Submit questions early per the solicitation requirements.
Don'ts
• Make any assumptions.
• Copy SDB submittal paperwork. Download and complete the VBE submittal separately, titles and accuracy matter.
• Skip any portion of the GFE request documentation.
• No SDB/VBE submittal packets due for zero goal bids/discipline.
REMINDER
SEPARATE SDB/VBE
SUBMITTALS WITH
EACH DISCIPLINE
AND BASE BID!
REMINDER
Failure to submit fully completed SDB and VBE submittal packets or GFE waiver request documentation will result in removal of your bid for award consideration
Questions?
BDISBO Contact Info
Bureau of Diversity, Inclusion and Small Business Opportunities
North Office Building 401 North Street, Room 611 Harrisburg, PA 17120-0500
717.783.3119 GS-BDISBO@pa.gov
mailto:GS-BDISBO@pa.gov
| Slide 1: Pre-Bid Meeting BDISBO Presentation RFP 6100061206 Multiple Range SAROCA Issuing Officer Tina Rebuck - trebuck@pa.gov |
| Slide 2: What’s the Point? |
| Slide 3: Diversity Defined |
| Slide 4: Diversity is the Mix Inclusion is making the mix work. ~Andres Tapia |
| Slide 5: Equity Defined |
| Slide 6 |
| Slide 7: Inclusion Defined |
| Slide 8: Diversity, Equity, and Inclusion |
| Slide 9: |
| Slide 10: Solicitation Specific Goals |
| Slide 11: SDB and VBE Classification |
| Slide 12: Finding SDB/VBE vendors |
| Slide 13: Quick Search |
| Slide 14: Advanced Search |
| Slide 15: UNSPSC Commodity Code Search |
| Slide 16: UNSPSC Commodity Code Search |
| Slide 17: Advanced Search |
| Slide 18: Search Results |
| Slide 19: Supplier Profile |
| Slide 20: Search Results |
| Slide 21: Excel Export Results – Supplier Contacts |
| Slide 22: Upcoming Supplier Search Training |
| Slide 23: New Forms and Processes |
| Slide 24: Solicitation-Specific Goals |
| Slide 25: SDB Submittal – SDB-2 |
| Slide 26: SDB Utilization Schedule – SDB-3 |
| Slide 27: Letter of Commitment SDB-3.1 |
| Slide 28: Guidance to Document GFE SDB-4 |
| Slide 29: Good Faith Efforts Packet SDB-5 |
| Slide 30: SDB GFE Documentation – SDB-5 |
| Slide 31: GFE Waiver – Part 1 |
| Slide 32: GFE Waiver – Part 2 |
| Slide 33: GFE Waiver – Part 3 |
| Slide 34: GFE Waiver – Part 4 |
| Slide 35: GFE Waiver – Part 5 |
| Slide 36: SDB/VBE Response Submittal |
| Slide 37: How to Meet the Goal |
| Slide 38: DGS Dually Verified SDB/VBE |
| Slide 39: Dually-Verified Vendor Instructions |
| Slide 40: Best Practices |
| Slide 41: REMINDER |
| Slide 42: REMINDER |
| Slide 43: Questions? |
| Slide 44: BDISBO Contact Info |
File details come from the government source that posted it. Updated .