RFP_5000_BYS3046_TECH_DOC_1_v1.pdf

PDF 5 MB Posted

Attached to
Maintenance & Repair Pond Pump and Irrigation Systems
Solicitation number
RFP 5000 BYS3046
Issued by
Texas

About this file

This is a technical documentation file supporting a Request for Proposals (RFP 5000 BYS3046) issued by the City of Austin, Texas for maintenance and repair services of pond pump and irrigation systems. The document provides detailed specifications and construction notes for a water quality and detention pond located at the Cameron Road Warehouse in Cameron Industrial Park (14910 Cameron Road, Pflugerville, TX 78660). The pond is approximately 15,019 square feet and functions as both a detention and water quality/biofiltration facility. The technical specifications detail requirements for biofiltration medium installation, underdrain systems using PVC pipes with washed river gravel envelopes, geotextile filter fabric meeting City of Austin standards, level spreaders for flow distribution, and infiltration testing protocols. The document includes aerial photographs, site plans, cross-sectional profiles, and detailed construction drawings prepared by Garza EMC, LLC with design specifications referencing the City of Austin Environmental Criteria Manual standards.

The technical specifications establish comprehensive construction and quality assurance requirements for the biofiltration pond system, including provisions for separator element structures with vegetated hedgerows, biofiltration medium bed depths of minimum 18 inches meeting City specifications, underdrain lateral pipe spacing of maximum 10 feet with 3-inch minimum gravel envelope thickness, and mandatory infiltration testing per ASTM D 3385-09 standard conducted both immediately after media installation and prior to final engineer concurrence. Critical operational requirements include erosion control measures maintained throughout construction, prohibition of heavy equipment in biofiltration areas after media placement, sediment monitoring and removal during rain events, and contractor responsibility for site stabilization to prevent sediment intrusion. The specifications emphasize coordination with an environmental inspector, documentation of all erosion control measures, and adherence to City of Austin High Flow Filter Fabric specifications and standard specifications for all materials, with particular attention to proper installation techniques that prevent media compaction and ensure adequate water infiltration performance.

View the file

Other files

File Type Posted
RFP_5000_BYS3046_ATT_3_v1.pdf PDF
RFP_5000_BYS3046_TECH_DOC_6_v1.pdf PDF
RFP_5000_BYS3046_PAC2_v1.docx DOCX document
RFP_5000_BYS3046_ATT_1_v1.xlsx XLSX spreadsheet
RFP_5000_BYS3046_TECH_DOC_4_v1.pdf PDF
RFP_5000_BYS3046_0600_v1.xlsx XLSX spreadsheet
RFP_5000_BYS3046_0500_v1.pdf PDF
RFP_5000_BYS3046_ATT_4_v1.pdf PDF
RFP_5000_BYS3046_TECH_DOC_3_v1.pdf PDF
RFP_5000_BYS3046_ADD_1_v1.pdf PDF
RFP_5000_BYS3046_ATT_2_v1.pdf PDF
RFP_5000_BYS3046_PAC1_v1.pdf PDF
RFP_5000_BYS3046_TECH_DOC_2_v1.pdf PDF
RFP_5000_BYS3046_TECH_DOC_5_v1.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit A – AE Stormwater Pond Aerial Photographs

Cameron Road Warehouse -Cameron Industrial Park

14910 Cameron Road

Pflugerville, TX 78660

Pond Type: Detention and Water Quality / Biofiltration

Approximate Pond Area = 15,019 SF

X X

X X

X X

X X

X X

X

SE

PT

IC

D

R

AI

N F

IE

LD

D

ET

EN

TI

O N

P O

N D

W

AT

ER

Q

U

AL

IT

Y

PO

N

D

A A

B

B

OF

SHEET

V:

\1

6-

1\

C iv il\

-C

AD

\1

6-

1- W

Q -B

.d w g m od ifi ed b y m m al ta is o n

F eb

3, :1

AM

Q A

/ Q C

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

PR

O

JE

C

T N

O

Te l.

(5

) 2

-3

Fa x (5

) 2

-2

R ia lto B lv d.

, S ui te

Au st in

, T ex as

G ar za

EM

C , L

LC

C op yr ig ht

TB

PE

F

-1

D

AT

E N

O

R

EV

IS

IO

N

PS

D

JD

M

2/11/2025

C

AM

ER

O

N

IN

D U

ST

R

IA

L

PA

R

K

PH

AS

E

C

AM

ER

O

N R

O

AD

W

AT

ER

Q

U

AL

IT

Y

D

ET

EN

TI

O

N P

O N

D P

LA

N

TC

R

ES

IL

IE

N

C Y, L

LC

-0

PROFILE SCALEPROFILE LEGEND

SP-2023-0178D

OF

SHEET

V:

\1

6-

1\

C iv il\

-C

AD

\1

6-

1- W

Q -D

TL

.d w g m od ifi ed b y m m al ta is o n J an

0, 5:

P

M

Q A

/ Q C

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

PR

O

JE

C

T N

O

Te l.

(5

) 2

-3

Fa x (5

) 2

-2

R ia lto B lv d.

, S ui te

Au st in

, T ex as

G ar za

EM

C , L

LC

C op yr ig ht

TB

PE

F

-1

D

AT

E N

O

R

EV

IS

IO

N

PS

D

JD

M

3/7/2024

C

AM

ER

O

N

IN

D U

ST

R

IA

L

PA

R

K

PH

AS

E

C

AM

ER

O

N R

O

AD

W

AT

ER

Q

U

AL

IT

Y

D

ET

EN

TI

O

N P

O N

D N

O

TE

S

C

AL

C U

LA

TI

O N

S

TC

R

ES

IL

IE

N C

Y, L

LC

-0

SP-2023-0178D

BIOFILTRATION POND NOTES:

1. A SEPARATOR ELEMENT STRUCTURE IS REQUIRED FOR THE PARTIAL SEDIMENTATION BIOFILTRATION POND BETWEEN THE SEDIMENTATION AND FILTRATION AREAS AND SHOULD BE DESIGNED TO DISCHARGE THE FLOW EVENLY ACROSS THE FILTRATION BASIN. A REINFORCED VEGETATED HEDGEROW IS RECOMMENDED THAT USES FIVE (5) INCH BY EIGHT (8) INCH ROCK FLOW SPREADERS OR LOW GABION STRUCTURES, TWO (2) FEET WIDE AND SIX (6) INCHES TO TWELVE (12) INCHES DEEP, WITH HEDGEROWS LOCATED WITHIN THE STRUCTURE (SEE CITY OF AUSTIN ENVIRONMENTAL CRITERIA MANUAL (ECM) 1.6.7.C.2, FIGURE 1.6.7.C-2). THE OUTFLOW SIDE SHOULD INCORPORATE FEATURES TO PREVENT GOUGING OF THE FILTRATION

MEDIUM.

2. THE BIOFILTRATION MEDIUM SHALL MEET THE PERFORMANCE CRITERIA OUTLINED IN THE CITY OF AUSTIN ENVIRONMENTAL CRITERIA MANUAL (ECM)

1.6.7.C.4 AND THE CITY OF AUSTIN STANDARD SPECIFICATION SECTION 660S.1.

3. THE BIOFILTRATION MEDIUM BED FOR BIOFILTRATION BASINS MUST BE BUILT TO THE BIOFILTRATION BED CONFIGURATION ILLUSTRATED IN FIGURE 1.6.7.C-3 OF THE CITY OF AUSTIN ENVIRONMENTAL CRITERIA MANUAL (ECM) 1.6.7.C.4 (FOR DETAILS SEE STANDARD DETAIL 661-3).

4. THE BIOFILTRATION MEDIUM LAYER IS TO BE A MINIMUM OF EIGHTEEN (18) INCHES MEETING THE SPECIFICATIONS STATED. OTHER MATERIALS OR SUBSTANCES THAT MAY BE HARMFUL TO PLANT GROWTH OR PROVE A HINDRANCE TO THE PLANTING OR MAINTENANCE OPERATIONS SHALL NOT BE MIXED OR DUMPED WITHIN THE BIOFILTRATION AREA. NOTE: REQUIRED BIOFILTRATION MEDIUM BED DEPTHS SHOULD BE INTERPRETED AS FINAL

CONSOLIDATED VALUES RATHER THAN AS INITIALLY PLACED.

5. THE BIOFILTRATION UNDERDRAIN SYSTEM SHALL CONSIST OF ONE-HALF (0.5) TO ONE AND ONE-HALF (1.5) INCH DIAMETER WASHED, ROUNDED, RIVER GRAVEL SURROUNDING 6 INCH SCHEDULE 40 PVC UNDERDRAIN LATERAL PIPES. THE MAXIMUM SPACING FOR THE LATERALS SHOULD BE TEN (10) FEET BETWEEN LATERALS AND FIVE (5) FEET FROM A WALL OR SIDE. THE MINIMUM THICKNESS OF THE GRAVEL ENVELOPE IS 3 INCHES. THE SOIL MEDIUM

AND GRAVEL LAYER MUST BE SEPARATED BY A FILTER MATERIAL.

6. THE UNDERDRAIN FILTER MATERIAL GEOTEXTILE FABRIC SHALL MEET THE CITY OF AUSTIN HIGH FLOW FILTER FABRIC SPECIFICATIONS AS OUTLINED IN THE CITY OF AUSTIN ENVIRONMENTAL CRITERIA MANUAL (ECM) 1.6.7.C.4 AND THE CITY OF AUSTIN STANDARD SPECIFICATION SECTION 620S.1, TABLE 2:

7. THE GRADATION OF A GRANULAR FILTER DESIGN MUST COMPLY WITH SECTION 1.4.6.D.6, ROCK RIPRAP - FILTER. IN CASES WHERE THE REQUIREMENTS CANNOT BE MET WITH A SINGLE GRADATION MULTIPLE LAYERS OF GRANULAR FILTER MATERIAL OF VARYING GRADATIONS MAY BE REQUIRED TO MEET THE CRITERIA. THE THICKNESS OF A GRANULAR FILTER LAYER SHOULD BE NO LESS THAN 1.5 TIMES THE MAXIMUM SIZE IN THE FILTER

GRADATION OR FOUR INCHES (102 MM) WHICHEVER IS GREATER.

8. PRIOR TO COMMENCING THE RAIN GARDEN / BIOFILTRATION POND WORK, ALL REQUIRED EROSION CONTROLS AND TEMPORARY SEDIMENT CONTROL MEASURES SHALL BE IN PLACE PER THE APPROVED SITE PLAN AND/OR AS MODIFIED BY THE ENVIRONMENTAL INSPECTOR AND INSPECTED TO

ENSURE THEY ARE FUNCTIONING PROPERLY.

9. PRIOR TO COMMENCING THE INSTALLATION OF THE RAIN GARDEN / BIOFILTRATION POND UNDERDRAIN, GEOTEXTILE FABRIC, OR BIOFILTRATION

MEDIA:

a. ENSURE THAT ALL REQUIRED EROSION CONTROLS AND TEMPORARY SEDIMENT CONTROL MEASURES ARE IN PLACE AND HAVE BEEN INSPECTED TO

ENSURE THEY ARE FUNCTIONING PROPERLY.

b. REMOVE ANY AND ALL SEDIMENT BUILDUP FROM CONSTRUCTION ACTIVITIES IN THE RAIN GARDEN / BIOFILTRATION POND.

c. ENSURE THAT THE SITE AREA DRAINING TO THE RAIN GARDEN / BIOFILTRATION POND, INCLUDING ANY POND EARTHEN SIDE SLOPES AND, IS

STABILIZED SUCH THAT SEDIMENT FROM DISTURBED AREAS IS NO LONGER ENTERING THE RAIN GARDEN / BIOFILTRATION POND.

10. TO AVOID COMPACTION OF THE BIOFILTRATION MEDIUM AND PROMOTE WATER INFILTRATION, HEAVY EQUIPMENT SHALL NOT BE ALLOWED IN

BIOFILTRATION AREA AFTER THE BIOFILTRATION MEDIUM HAS BEEN PLACED. WHEN INSTALLING THE BIOFILTRATION MEDIA, DO SO IN A MANNER TO ENSURE THAT THE MEDIA IS NOT COMPACTED OR DRIVEN ON BY EQUIPMENT DURING THE INSTALLATION. THE BIOFILTRATION MEDIA SHALL BE PLACED

IN LIFTS WITHOUT HEAVY OPERATING EQUIPMENT OR COMPACTION.

11. IMMEDIATELY UPON COMPLETION OF THE BIOFILTRATION MEDIA INSTALLATION AND PRIOR TO ANY RAIN EVENTS, AN INFILRATION TEST FOLLOWING ASTM D 3385--09 STANDARD TEST METHOD FOR INFILTRATION RATE OF SOILS IN FIELD USING DOUBLE-RING INFILTROMETER SHALL BE PERFORMED AND PROVIDED TO THE ENGINEER FOR CONFIRMATION THAT THE INSTALLED BIOFILTRATION MEDIA MEETS THE INFILTRATION REQUIREMENTS OF THE

CITY OF AUSTIN ENVIRONMENTAL CRITERIA MANUAL (ECM) 1.6.7.C.4 DESIGN CRITERIA.

12. AFTER INSTALLATION OF THE BIOFILTRATION MEDIA, CONTRACTOR SHALL MONITOR THE RAIN GARDEN / BIOFILTRATION POND DURING ANY RAIN EVENTS AND INSTALL ADDITIONAL TEMPORARY SEDIMENT CONTROL MEASURES AS NEEDED TO PREVENT SEDIMENT FROM DISTURBED AREAS FROM

ACCUMULATING ON OR IN THE BIOFILTRATION MEDIA.

13. LEAVE ALL SITE EROSION CONTROLS IN PLACE AND MAINTAIN THEM REGULARLY UNTIL ALL DISTURBED AREAS ARE REVEGETATED OR OTHERWISE STABILIZED AND NO SEDIMENT FROM UN-STABILIZED AREAS IS ENTERING THE RAIN GARDEN / BIOFILTRATION POND. ONLY REMOVE EROSION

CONTROLS ONCE ALL DISTURBED AREAS ARE FULLY STABILIZED.

14. IF SEDIMENT IS ALLOWED TO ENTER THE RAIN GARDEN / BIOFILTRATION POND AFTER THE INSTALLATION OF THE BIOFILTRATION MEDIA, IT SHOULD BE REMOVED IMMEDIATELY. IF LARGE VOLUMES OF SEDIMENT IS ALLOWED TO ACCUMULATE ON OR IN THE BIOFILTRATION MEDIA, THE BIOFILTRATION MEDIA AND POTENTIALLY THE FILTER FABRIC MAY NEED TO BE REMOVED AND REPLACED IF IT BECOMES CLOGGED BY SEDIMENT.

15. PRIOR TO THE REQUEST FOR FINAL ENGINEER'S CONCURRENCE, AN INFILRATION TEST FOLLOWING ASTM D 3385--09 STANDARD TEST METHOD FOR INFILTRATION RATE OF SOILS IN FIELD USING DOUBLE-RING INFILTROMETER SHALL BE PERFORMED AND PROVIDED TO THE ENGINEER FOR CONFIRMATION THAT THE INSTALLED BIOFILTRATION MEDIA MEETS THE INFILTRATION REQUIREMENTS OF THE CITY OF AUSTIN ENVIRONMENTAL

CRITERIA MANUAL (ECM) 1.6.7.C.4 DESIGN CRITERIA.

03/19/2024

OF

SHEET

V:

\1

6-

1\

C iv il\

-C

AD

\1

6-

1- W

Q -D

TL

-1

.d w g m od ifi ed b y pd el ab ra o n J an

6, :0

AM

Q A

/ Q C

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

PR

O

JE

C

T N

O

Te l.

(5

) 2

-3

Fa x (5

) 2

-2

R ia lto B lv d.

, S ui te

Au st in

, T ex as

G ar za

EM

C , L

LC

C op yr ig ht

TB

PE

F

-1

D

AT

E N

O

R

EV

IS

IO

N

PS

D

JD

M

3/7/2024

634S-1

LEVEL SPREADER

LEVEL SPREADER

STABILIZED SLOPE

CHANNEL GRADE= 0%

DIVERSION

FL

OW

CROSS SECTION

LEVEL SPREADER

SECOND STRIP

GENERAL NOTES:

3. LEVEL SPREADER SHALL BE CONSTRUCTED ON UNDISTURBED SOIL (NOT ON FILL).

8. PERIODIC INSPECTION AND REQUIRED MAINTENANCE SHALL BE PROVIDED.

STANDARD SYMBOL

L=

CITY OF AUSTIN

STANDARD NO.

ADOPTED

WATERSHED PROTECTION DEPARTMENT

CITY OF AUSTIN

THE ARCHITECT/ENGINEER ASSUMES

RESPONSIBILITY FOR APPROPRIATE USE

OF THIS STANDARD.

LAST 6 m (20') OF DIVERSION

NOT TO EXCEED 1% GRADE

UNDISTURBED

OUTLET

FIRST STRIP OF

PROTECTIVE MATERIAL

LEVEL LIP OF

SPREADER

BOTH STRIPS OF PROTECTIVE

MATERIAL OVER EROSION STOP

100 mm (4'') MIN.

1.8 m (6') MIN.

FOR STAPLE REQUIREMENTS

SEE STANDARD & SPECIFICATIONS

FOR PROTECTIVE MATERIAL

150 mm (6'') MIN.

FILTER FABRIC

(U.V.)

0.3 m (1')

2. CONSTRUCT LEVEL LIP ON ZERO PERCENT GRADE TO INSURE UNIFORM SPREADING OF

SEDIMENT-FREE RUNOFF (CONVERTING CHANNEL FLOW TO SHEET FLOW).

4. A MATTING EROSION STOP SHALL BE PLACED VERTICALLY AND AT LEAST 150 mm (6'') DEEP IN A SILT TRENCH 0.3 m (1') BACK OF AND PARALLEL WITH THE LIP. THIS

EROSION STOP SHALL EXTEND THE ENTIRE LENGTH OF THE LEVEL LIP AND SHALL BE

TRIMMED AFTER BACKFILLING WITH TAMPED SOIL, SO THAT THE UPPER EDGE IS FLUSH

WITH THE SOIL SURFACE.

1. LEVEL SPREADERS SHALL BE INSTALLED UNDER THE DIRECT SUPERVISION OF THE

ENGINEER.

5. THE ENTIRE LEVEL LIP AREA SHALL BE PROTECTED BY PLACING 2 STRIPS OF JUTE,

EXCELSIOR OR OTHER APPROVED PROTECTIVE MATERIAL AS SHOWN ABOVE.

6. THE ENTRANCE CHANNEL SHALL NOT EXCEED A 1% GRADE FOR AT LEAST 6 m

(20') BEFORE ENTERING SPREADER.

7. STORM RUNOFF CONVERTED TO SHEET FLOW SHALL OUTLET ONTO STABILIZED AREAS.

WATER SHALL NOT BE RECONCENTRATED IMMEDIATELY BELOW THE POINT OF DISCHARGE.

3/27/00RECORD COPY SIGNED

BY J. PATRICK MURPHY

SP-2023-0178D

C

AM

ER

O

N

IN

D U

ST

R

IA

L

PA

R

K

PH

AS

E

C

AM

ER

O

N R

O

AD

W

AT

ER

Q

U

AL

IT

Y

D

ET

EN

TI

O

N P

O N

D D

ET

AI

LS

TC

R

ES

IL

IE

N C

Y, L

LC

-0

03/19/2024

Cameron Road Warehouse -Cameron Industrial Park

File details come from the government source that posted it. Updated .