RFP_5000_BYS3046_ADD_1_v1.pdf
PDF 256 KB Posted
- Solicitation number
- RFP 5000 BYS3046
- Issued by
- Texas
About this file
This Solicitation Addendum No. 1, issued by the City of Austin Financial Services Central Procurement Office on March 11, 2026, supplements RFP 5000 BYS3046 for maintenance and repair services of pond pump and irrigation systems serving the City's sixty-seven water quality and retention/irrigation ponds. The RFP seeks a contractor to provide routine maintenance services, ad hoc repairs, and replacement parts for hardware utilized across Austin's re-irrigation water quality ponds and landscape irrigation systems within city limits and the Extra Territorial Jurisdiction. Key deliverables include a minimum of four annual maintenance visits per retention irrigation pond (two regular maintenance visits and two post-rain event inspections of at least 0.5 inches of rain over twelve hours), with eight Austin Aviation ponds requiring only one annual visit; 115 scheduled maintenance visits annually; 102 post-rain event visits across 45 ponds; 400 hours of labor for standard pond repairs; 40 hours of emergency on-site response services with a two-hour response requirement; and seven final acceptance inspections for new ponds. A non-mandatory pre-offer conference was held on March 4, 2026, via Microsoft Teams with six attendees from City of Austin departments and one representative from Divided Water Services. Written questions were due by March 6, 2026, with responses included in the addendum addressing requests for additional pond information and site visit scheduling. Proposals are due electronically by March 26, 2026, at 2:00 PM Central Daylight Time. The contract term is twenty-four months with options to extend for up to three additional twelve-month periods at the City's discretion.
The addendum clarifies that Exhibits A-F containing details of each Aviation and Austin Energy pond have been added to the solicitation, and that site visits cannot be arranged. Contractor qualifications must include a minimum of five continuous years of full-time experience in similar work scope, an irrigation service provider license, confined space and fall protection training, knowledge of City of Austin Environmental Criteria Manual requirements, access to an electronic/hydraulic truck-mounted crane or winch system, and retention of a licensed electrician. The City of Austin's procurement is subject to the Living Wage Program requiring a minimum of $22.05 per hour for all employees directly assigned to the contract, Wage Theft compliance training, and M/WBE Program requirements if applicable. Evaluation will be based on six weighted criteria: Project Concept and Strategy (30 points), Experience and References (20 points), Personnel Qualifications and Structure (10 points), Price Proposal (20 points), Local Business Preference (up to 10 points), and Small Business Preference (up to 10 points). The pricing submittal must include all-inclusive costs with a fixed percentage markup for non-specified parts not to exceed 25 percent and an estimated annual spending need of $5,000 for materials. Original Equipment Manufacturer (OEM) parts are required with a minimum one-year warranty on labor mandatory.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP_5000_BYS3046_ATT_3_v1.pdf | ||
| RFP_5000_BYS3046_TECH_DOC_6_v1.pdf | ||
| RFP_5000_BYS3046_0600_v1.xlsx | XLSX spreadsheet | |
| RFP_5000_BYS3046_0500_v1.pdf | ||
| RFP_5000_BYS3046_ATT_4_v1.pdf | ||
| RFP_5000_BYS3046_TECH_DOC_3_v1.pdf | ||
| RFP_5000_BYS3046_ATT_2_v1.pdf | ||
| RFP_5000_BYS3046_PAC1_v1.pdf | ||
| RFP_5000_BYS3046_TECH_DOC_1_v1.pdf | ||
| RFP_5000_BYS3046_TECH_DOC_2_v1.pdf | ||
| RFP_5000_BYS3046_TECH_DOC_5_v1.pdf | ||
| RFP_5000_BYS3046_PAC2_v1.docx | DOCX document | |
| RFP_5000_BYS3046_ATT_1_v1.xlsx | XLSX spreadsheet | |
| RFP_5000_BYS3046_TECH_DOC_4_v1.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION ADDENDUM
AUSTIN FINANCIAL SERVICES – CENTRAL PROCUREMENT
Revised 10/01/2024
Solicitation: RFP 5000 BYS3046 Addendum No: 1 Date: 3/11/2026
This addendum is to incorporate the following changes to the above referenced solicitation:
1.0 Clarifications: Exhibits A-F have been added to the solicitation with details of each Aviation and Austin Energy pond.
2.0 Questions:
Number Question Response
Can we get some additional information about the Austin Airport ponds/?
Yes, Exhibits A-F have been added to the solicitation with details of each Aviation and Austin Energy pond.
Can we schedule a site visit for the Austin Airport ponds/systems and the Austin Energy pond?
No, we are unable to arrange a site visit. However, Exhibits A-F have been added to the solicitation with details of each Aviation and Austin Energy pond.
3.0 Pre-Offer Conference Attendance is attached.
4.0 ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
ACKNOWLEDGED BY:
Offeror Name Offeror Authorized Signature Date
RETURN ONE COPY OF THIS ADDENDUM WITH YOUR RESPONSE PRIOR TO THE SOLICITATION CLOSING
DATE. FAILURE TO DO SO MAY CONSTITUTE GROUNDS FOR REJECTION OF YOUR OFFER.
Revised 6/5/2017
PURCHASING OFFICE MEETING SIGN-IN SHEET
Solicitation Description: Maintenance & Repair Pond Pump and Irrigation Systems
Meeting Date: 3/4/2026
Purchasing Office Point of Contact: Brenita Wilkison Place/Room: Microsoft Teams
Please Print Legibly
Name Company/Agency/Dept. Phone Email Address
Have you or do you expect to receive compensation for this meeting from your organization?
Brenita Wilkison COA Brenita.selement@austintexas.
gov
Yes No
Jeremy Cruz COA jeremy.cruz@austinenergy.co m
Robin Heller Divided Water Services info@dividedwaterservices.co m
Julie Strickland COA julie.strickland@austintexas.go v
Brad Buechler COA brad.buechler@flyaustin.com
Matthew Boger COA matthew.boger@austintexas.g ov
| Solicitation: RFP 5000 BYS3046 Addendum No: 1 Date: 3/11/2026 |
| ADP7354.tmp |
| Purchasing Office Meeting Sign-In Sheet |
| Please Print Legibly |
File details come from the government source that posted it. Updated .