RFP 277-22-0574 Attachment 1c Schedule of Deliverables.docx

DOCX document 62 KB Posted

Attached to
“Talk. They Hear You. ” National Media Campaign to Prevent and Reduce Underage Drinking and Other Substances-STOP Act
Solicitation number
277-22-0574
Issued by

View the file

Other files

File Type Posted
RFP 277-22-0574 Amendment 1.pdf PDF
RFP 277-22-0574 Attachment 1b General Requirements.docx DOCX document
RFP 277-22-0574 Attachment 2 QASP.docx DOCX document
RFP 277-22-0574 Attachment 15 Sealed Proposal Cover Page and Instructions.docx DOCX document
RFP 277-22-0574 Attachment 3 Voucher Review Sheet.docx DOCX document
RFP 277-22-0574 Attachment 5 Disclosure of Lobbying Activities.docx DOCX document
RFP 277-22-0574 Attachment 12 Breakdown of Proposed Estimated Costs and Labor Hours.docx DOCX document
RFP 277-22-0574 Attachment 6 Proposal Intent Response.docx DOCX document
RFP 277-22-0574.pdf PDF
RFP 277-22-0574 Attachment 16 HHS Section 508 Evaluation Product Accessibility Template.docx DOCX document
RFP 277-22-0574 Attachment 4 Billing Instructions.docx DOCX document
RFP 277-22-0574 Attachment 7 Packaging and Delivery of Proposals via eCPS.docx DOCX document
RFP 277-22-0574 Attachment 13 IT Total Estimate Cost Worksheets.xls XLS spreadsheet
RFP 277-22-0574 Cover Letter.pdf PDF
RFP 277-22-0574 Attachment 10 and 11 Client Letter and Contractor Perf Form.docx DOCX document
RFP 277-22-0574 Attachment 14 SAMPLE Summary of Costs and Hours Spreadsheet.xlsx XLSX spreadsheet
RFP 277-22-0574 Attachment 9 Contact Points.docx DOCX document
RFP 277-22-0574 Attachment 8 Government Notice for Handling Proposals.docx DOCX document
RFP 277-22-0574 Attachment 1a PWS.docx DOCX document
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP No. 277-22-0574 Attachment 1c Schedule of Deliverables and Report Requirements Secretary of Health and Human Services National Media Campaign to Prevent and Reduce Underage Drinking Sober Truth on Preventing Underage Drinking (STOP) Act

List of Deliverables Based on Division of Technology Management (DTM) and Office of Communication (OC) Requirements:

Item
Timeline
To
Section
1
Final Information Technology (IT) Plan
60 calendar days after award. Review annually
DTM thru Contracting Officer's Representative (COR)
II
2
Meeting on systems or websites migration from third-party hosted service to SAMHSA
At least 60 calendars days or earlier before the planned migration date
DTM Infrastructure Team thru COR
III
3
IT and Web Cost Reports
Twice a year (July and November)
DTM Federal Information Technology Acquisition Reform Act (FITARA) Team thru COR
IV
4
IT Investment Factsheet
90 calendar days after award and update annually
DTM FITARA Team thru COR
IV
5
Website Domain Registration
When registered and when requested
DTM FITARA Team thru COR
IV
6
Privacy Threshold Analysis (PTA)
30 calendar days after award
Privacy and Chief Information Security Officer (CISO) and Info.Privacy@samhsa.hhs.gov thru COR
V. A. 1. 5). b
7
Entity, data type and relationship diagrams
No later than 30 calendar days after award
CISO and Info.Privacy@samhsa.hhs.gov thru COR
V. A. 1. 5). c
8
Draft system’s Privacy Impact Assessments (PIAs) if full PIAs is needed
No later than 45 calendar days after contract effective date (CED)
Privacy Officer and Info.Privacy@samhsa.hhs.gov thru COR
V .A. 1. 5) .f
9
Encryption Key if applicable
When requested or at the end of the contract
Info.Privacy@samhsa.hhs.gov and COR
V. A. 1. 10) .h
10
Information Security Awareness and Privacy training
Within 30 calendar days after CED and annually
COR
V. A. 3. 1)
11
Security and Privacy Role-based Training
Within 30 calendar days after CED and annually
COR
V. A. 3. 2)
12
Security and Privacy Training Records
Within 35 calendar days after CED and annually
COR
V. A. 3. 3)
13
Read and sign Rules of Behavior
Within 35 calendar days after CED and annually
COR
V. A. 4
14
Staff Roster
Within 30 calendar days after CED and 10 days when staffing changes
COR
V. A. 5. 2)
15
Project Closeout/System Decommission meeting
At least 30 calendar days before project closeout/system decommission
DTM thru COR
V. A. 6
16
Initiate security assessment and authorization (SA&A) process
No later than 30 calendar days after CED
CISO thru COR
V. B. 2. 3)
17
System Authorization to Operate (ATO)
Before system goes live
CIO and CISO
V. B. 2. 4)
18
Information System Security Plan (ISSP) (with supporting artifacts and documents listed on the ATO package and the Security Checklist.)
Part of ATO package, before system goes live
CISO and security email box infosecurity@samhsa.hhs.gov
V. B. 2. 6) b

V. B. 2. 6)

19
E-Authentication Questionnaire (Risk Assessment)
Within 30 calendar days after CED
CISO and infosecurity@samhsa.hhs.gov. Template can be requested by emailing CISO and ISSO.
V. B. 2. 9)
20
Privacy and security kickoff meeting
Within four (4) weeks of CED
COR and CISO
Work plan
21
Annual Penetration Testing Summary Report
Annually, anytime during a contract year
COR and DTM Security Team
V. B. 2. 15)
22
Vulnerability scan reports for database, application, and operation system
Every 30 days after ATO is granted
Upload to SAMHSA Sharepoint Site directed by the SAMHSA Security team and COR
V. B. 3. 4)
23
Vulnerability “Change Report” and Cloud Security Continuous Monitoring Reporting
Every 30 days after ATO is granted
Upload to SAMHSA Sharepoint Site directed by the SAMHSA Security team and COR
V. B. 3. 4)

V. C. 4 2)

24
Permanent electronic records
60 days prior to period of performance expiration
DTM Records Management Officer
VI. B.5
25
Records management training and provide Contractor Records Management Training Completion Memorandum
Within 30 days of contract award or new contract staff start date and then annually for the life of the contract.
COR

VI. B. 11

26
Electronic Systems Questionnaire
Responses within 4 weeks after the CED and 30 days prior to modifications to system
DTM thru COR during the kickoff meeting
VI. B. 12
27
HHS Accessibility Checklist
Each content deliverables
COR
OC requirements I. G
28
Content Development and Management Plan
Within 60 days after CED
OC and DTM (including Records Officer) thru COR
OC requirements IV. A
29
Web Content Approval
No later than 3 weeks prior to the planned initial posting of document
COR
OC requirements IV. C
30
Web Content Migration Plan including a demo
Within 60 days after CED; demo within 30 days after CED
COR and DTM (including Records Officer) thru COR
OC requirements IV. D
31
Meeting on IT transition activities related to data, software, web content, and electronic records
Within 30 days after CED
COR, DTM, and OC
OC requirements IV. E
32
Reports of actual Web-related IT costs
Twice a year (July and November)
OC and DTM thru COR

(could be combined with IT and Web Cost reports, see #3) OC requirements IV. F

33
Transition Task
Schedule meeting with COR and DTM to discuss transition activities
COR and DTM
Transition Task

List of Deliverables Based on Specific Requirements:

TASK
DESCRIPTION
QUANTITY
DELIVERY

Task 1

Contract Management

Ongoing and upon COR request within 12hrs for urgent requests.

Subtask 1.1
Authoritative Guidance

Upon COR request

Subtask 1.2

Kick-off meeting

The Contractor shall participate in a kick-off meeting at the start of any new contract period with ongoing meetings held weekly between the Contractor, the COR, and other relevant parties. The Contractor shall provide agendas and summary of discussions, and documentation of decisions made prior to and following each meeting.

Ongoing meetings: Weekly meetings will be held between the Contractor, the COR, and other relevant parties for operational purposes and the execution of the contract tasks.

Virtual or in-person

Virtual or in-person once per week or 52 Within 2 weeks of Contract Effective Date (CED).

Agendas --at least two (2) business days in advance of each meeting.

Meeting Summaries shall be provided within three (3) business days following each meeting

Subtask 1.3
Prepare and submit a bi-annual operational budget by task, and dates of deliverables listing all expenses associated in accomplishing each task.

Ongoing Communications:

Monthly status, expenditure reports, and a payment voucher which documents progress toward key tasks and money spent or incurred to date.

One (1) copy to COR/CO
first and third quarter of each year.

On tenth (10) business day of each month or as prescribed

Task 1.4
Draft/Final Work Plans and budget
Two (2) copies to COR
1. Draft due NLT than 2 weeks after kickoff meeting.

2. Revised draft work plan due NLT 2 weeks after COR comments;

3. Final due within 5 days of receiving the COR’s comments and submit electronically

Task 1.5
Quarterly Campaign Assessment Reports
Two (2) copies to COR
Reports are due on the fifth (5) day of every third month or as requested by COR
Task 2
Development, Implementation, Dissemination (all years)
One (1) copy of all products developed to COR
Upon approval of COR or as requested by COR
Task 2.1
Logistical support for public kickoff event
One (1) copy to COR
Upon approval of COR or as requested by COR
Task 2.2
Product development and testing for:

Television and Radio PSAs for Network Broadcast

New Media Series, Product/Content Development, Social Media, and Podcasts

Print, Curricula, Tool Kits, and other Resource Materials

All products will be in English or Spanish and will include draft and final storyboards, scripts and dialogue, etc.

Two (2) Adult oriented television spots :30 and :60 versions; four (4) radio spots

One (1) Youth oriented television spots :30 and :60 versions; four (4) radio spots

One (1) Discussion Starter videos (4:00 to 10:00 mins

Webisode/Video Vignette Series (10 hrs.)

Six (6) Video Vignette or Podcast spots for Adults (6 hrs.)

Six (6) Video Vignettes or Podcasts for youth. (6 hrs.)

Maintain campaign website

30-40 Social Media messages per month

Twelve (12) print ads in English or Spanish

Three (3) Health and Wellness Curricula:

· 1), Motivational Interviewing for School Administrators and Student Assistance Professionals,

· 2) Motivational Interviewing for Parents and Caregivers,

· 3) Health, Wellness, and Wellbeing curriculum “This Life for Us”.

One (1) Product Catalog for adult

One (1) Product Catalog for youth.

Upon approval of work plan/SCP or as requested by COR

Submission of rough-cut for PSA for review by COR 1 week after completion;

Submission of all PSA masters to COR 1 week after completion

Draft shooting scripts, storyboards, and dialogue are due upon COR request.

Upon approval of work plan/SCP or as requested by COR

Upon approval of work plan/SCP or as requested by COR

Task 2.3
“Talk. They Hear You” Campaign Mobile Application Deployment and Maintenance

Provide ongoing maintenance, platform updates and software redesign, as necessary or requested by the COR in all three platforms: IOS, Windows, Android

The contractor shall maintain and update content for the mobile application within the content management system used by the mobile application “Contentful” to promote “Talk. They Hear You.” Campaign materials.

Revise at least two (2) content themes per year, to include video, audio, and other related digital content for the mobile application.

Upon approval of work plan/SCP or as requested by COR

Monitor and report application performance metrics, evaluate application effectiveness in achieving campaign objectives.

Task 2.4
“Screen4Success” Maintenance, Integration, and Deployment with the Talk. They Hear You” Campaign Mobile Application:

Provide ongoing maintenance, platform updates and software redesign, as necessary.

Hosting and maintenance for 100,000 users.

Upon approval of work plan/SCP or as requested by COR

Monitor and report application performance metrics, evaluate application effectiveness in achieving campaign objectives.

Task 2.5
Product Design, Development, Implementation, and Management Plan: Provide ongoing maintenance, platform updates and software redesign, as necessary

One (1) hosted solution, management plan, and continued development of the “Screen4Success” self-screening and referral management service as part of the “Talk. They Hear /You.” mobile application for three specific audiences:

1. Youth,

2. Parents/caregivers, and

3. collateral users (i.e. Student Assistance Professionals or Behavioral Health Specialists for up to 100,000 users.

Upon approval of work plan/SCP or as requested by COR

Ongoing maintenance, platform updates and software redesign,

Task 2.6
Procedures Manual with Data Collection Protocols:
One (1) procedures and data collection protocols manual
Upon approval of work plan/SCP or as requested by COR

Drafts are due with four (4) weeks after COR request for an update.

Task 2.7
Campaign Product Testing and Focus Groups
Identify up to five (5) communities with one (1) in person mtg and no more than two (2) webinars
Upon approval of work plan/SCP or as requested by COR
Task 2.8
Promotional/Distribution Plan
Two (2) copies. One (1) to COR and one (1) to OC
Upon approval of work plan/SCP or as requested by COR
Task 2.9
Partnership collaboration and partnership development
One (1) copy to COR
Upon approval of work plan/SCP or as requested by COR
Task 3 (informational only)
Evaluation plan and Reports
One (1) Conduct an impact and outcome evaluation that meets the objectives and directives set forth in Section 2(d) of the STOP Act,

One (1) Conduct a feasibility study of for implementing a dedicated youth media campaign to reduce underage drinking and other substance use.

Within four (4) weeks after CED

Task 3.1
Draft evaluation plan
Two (2) copies. One (1) to COR and one (1) to CBHSQ
Within four (4) weeks after CED
Task 3.2
Final evaluation plan
Two (2) copies. One (1) to COR and one (1) to CBHSQ
Within two (2) weeks after receiving COR and CBHSQ feedback.
Task 3.3
Draft data collection protocols and procedures manual
Two (2) copies.
Within eight (8) weeks after CED
Task 3.4
Final data collection protocols and procedures manual
Two (2) copies.
Within two (2) weeks of after receiving COR feedback.
Task 3.5
Draft management and analysis plans
Two (2) copies.
Within eight (8) weeks after CED
Task 3.6
Final management and analysis plans
Two (2) copies.
Within one (1) week of after receiving COR feedback
Task 3.7
Information collection request and OMB clearance packages
Two (2) copies.
Upon approval of COR or as requested by OMB/CBHSQ and COR
Task 3.8
Draft information collection request (ICR) documentation for OMB/RIHSC clearance packages
Two (2) copies.
Within two (2) weeks of COR approval of final data collection protocols
Task 3.9
Final information collection request (ICR) documentation for OMB/RIHSC clearance packages
Two (2) copies. One (1) to COR and one (1) to CBHSQ
Within one (1) week of COR receiving OMB comments
Task 3.10
Data collection and analysis (Evaluation implementation and feasibility study for youth campaign)
Two (2) copies. One (1) to COR and one (1) to CBHSQ
Within three (3) weeks of receiving notice from COR of final OMB approval
Task 3.11
Interim written report (Chapter 5, RTC)
Two (2) copies. One (1) to COR and one (1) to CBHSQ
Within three (3) weeks of COR request
Task 3.12
Short turnaround analyses
Four (4) short turn-around analyses over the 12-month period.

One (1) copy to COR of:

· Draft product

· Final product

Upon COR request and approval.

· Draft product due 24-72 hrs. of request;

· Final product within 24 hrs. of approval.

Task 3.13
Final written report (Chapter 5, RTC)
One (1) copy to COR
90 days prior to the estimated submission of Report to Congress
Task 3.14
Briefing/Testimony response and conference support
Six (6)
Within two (2) weeks of COR request
Task 3.15
Literature Bibliography:
Two (2) copies. One (1) to COR and one (1) to CBHSQ
Within two (2) weeks of COR request

The bibliography shall be updated, at a minimum, on a quarterly basis

Task 3.16
Communications and Media Experts List:
One (1) copy
Within two (2) weeks of COR Request
Task 4
Revised Strategic Communications Plan (SCP)

Feasibility study for youth campaign

One (1) copy to COR
Within thirty (30) days after CED

Within thirty (30) days after completion of study

Task 4.1
Communications and Media Experts List
One (1) copy to COR
As requested by COR
Task 5
Subject Matter Experts (SMEs) Meeting
One (1), one (1) day meeting
As requested by and upon COR Approval
Task 5.1
Onsite (or virtual) staff writer
One (1) copy of Draft Summary to COR

Two (2) copies of final revised report On the day of scheduled meeting and:

· Draft Discussion Summary within one (1) week after the meeting;

· Final Discussion Summary within One (1) week after approval of draft summary report of proceedings.

Task 6
Design, test, and evaluate campaign product
One (1) copy to COR
Work to start upon approval of Strategic Communication Plan in Task 4 or as requested by COR
Task 6.1
Campaign Products Draft Concepts
One (1) copy to COR
As requested by COR
Task 6.2
Campaign products evaluation pretesting, focus groups or pilot site testing
One (1) copy to COR
Within one (1) week after completion of pretesting or as requested by COR or scheduled in the SCP.
Task 6.3
Campaign Products Evaluation Reports and Publication Plan Clearances
Two (2) copies. One (1) to COR and one (1) to OC
As requested by COR
Task 7
Packaging and Distribution Plan
One (1) copy to COR
As requested by COR
Task 8
Collaboration development and stakeholders
One (1)
As requested by COR
Task 9
Training and TA Plan
One (1) copy to COR
As requested by COR
Task 9.1
Provide Technical Assistance--Provide on-line (email), telephonic, technical assistance to campaign stakeholders licensed for the Talk. They Hear You.”
Fifty (50) organizations, approximately 1,000 hours of virtual consultation, and 10 consultant days for all contract years.

Work to start upon approval of Strategic Communication Plan in Task 4 or as requested by COR

Task 9.2
Provide Training and Implementation
Fifty (50) organizations, approximately 1,000 hours of virtual consultation, and 10 consultant days annually for all contract years.
Work to start upon approval of Strategic Communication Plan in Task 4 or as requested by COR
Task 10
Transition Plan
Three (3) copies to COR
No later than four (4) months prior to the completion of period of performance
Optional Task 11
Opportunistic distribution
One (1) unit to COR
Within thirty days (30) of the EOT or as requested by COR
Optional Task 12
National off-site awareness raising event/Launch event

· Proposal

· Draft Run of Show (to include briefing books

One (1) copy to COR and as per PWS
· Within Two (2) weeks as requested by COR

· Within 3-9 months of EOT or as requested by COR

Optional Task 12.1
Event/Program production and planning
Two (2) copies to COR
One (1) month prior to the event or as requested by COR
Optional Task 12.2
Promotion and Artwork
One (1) copy to COR
As requested by COR
Optional Task 12.3
Webcasting
One (1) copy to COR
As requested by COR
Optional Task 13
Five creative concepts for Public Service Announcements Eng./span final to only include:

· One (1) :30 Sec TV PSA

· One (1) :60 Sec TV PSA for a total of two (2) TV PSAs

· Add open ended option to both PSAs for local organizations to personalize

One (1) copy to COR and copies as needed to vendors.
Within 3-9 months of EOT or as requested by COR
Optional Task 13.1
Distribution, Placement and Outcomes
Two (2) copies to COR/OC
Within 3-9 months of EOT or as requested by COR
Optional Task 13.2
Creative briefs, storyboards, screen treatments, script drafts, and final shooting scripts, and rough cuts.
One (1) copy to COR
Draft shooting scripts, storyboards, and dialogue are due two (2) weeks after COR request.
Optional Task 13.3
Concept Testing for PSAs:

· Screening questions, moderator’s guide, and

· Final report

One (1) copy to COR
Within three (3) months after EOT

Within four (4) weeks after COR Request

Submission of rough-cut for PSA for review by COR 1 week after completion;

Submission of all PSA masters to COR 1 week after completion

Optional Task 14
Market Analysis and Testing
One (1) copy to COR
Within three (3) months after EOT or as requested by COR
Optional Task 15
Expanded and /or Alternated Campaign Evaluation

As requested by COR

Optional Task 15.1
Evaluation proposal and implementation plan
Two (2) copies. One (1) to COR and one (1) to CBHSQ
Upon approval of COR or as requested by OMB/CBHSQ and COR
Optional Task 15.2
Draft evaluation plan
Two (2) copies. One (1) to COR and one (1) to CBHSQ
Within four (4) weeks after EOT
Optional Task 15.3
Final evaluation plan
Two (2) copies. One (1) to COR and one (1) to CBHSQ
Within two (2) weeks after receiving COR and CBHSQ feedback
Optional Task 15.4
Draft data collection protocols and procedures manual
Two (2) copies. One (1) to COR and one (1) to CBHSQ
Within eight (8) weeks after EOT
Optional Task 15.5
Final data collection protocols and procedures manual
Two (2) copies. One (1) to COR and one (1) to CBHSQ
Within two (2) weeks after receiving COR and CBHSQ feedback
Optional Task 15.6
Draft management and analysis plans
Two (2) copies. One (1) to COR and one (1) to CBHSQ
Within eight (8) weeks after EOT
Optional Task 15.7
Final management and analysis plans
Two (2) copies. One (1) to COR and one (1) to CBHSQ
Within two (2) weeks after receiving COR and CBHSQ feedback
Optional Task 15.8
Draft information collection request (ICR) documentation for OMB/RIHSC clearance packages
Two (2) copies. One (1) to COR and one (1) to CBHSQ
Within two (2) weeks of COR approval of final data collection protocols
Optional Task 15.9
Final information collection request (ICR) documentation for OMB/RIHSC clearance packages
Two (2) copies. One (1) to COR and one (1) to CBHSQ
Within one (1) week of COR receiving OMB comments
Optional Task 15.10
Data collection and analysis (Evaluation implementation)
Two (2) copies. One (1) to COR and one (1) to CBHSQ
Within three (3) weeks of receiving notice form COR of final OMB approval
Optional Task 15.11
Interim written report
Two (2) copies. One (1) to COR and one (1) to CBHSQ
Within three (3) weeks of the COR requesting report
Optional Task 15.12
Data Sets and Code Books
Two (2) copies. One (1) to COR and one (1) to CBHSQ
Within four (4) weeks of COR request.
Optional Task 15.13
Short turnaround analyses
One (1) copy to COR
Upon COR request and approval
Optional Task 15.14
Final written report
One (1) copy to COR
Within two (2) weeks of contract expiration date.
Optional Task 15.15
Briefing/Testimony response and conference support
One (1) copy to COR
Within two (2) weeks of COR request
Optional Task 15.16
Ongoing Communications:

· Project milestones

· Identification of challenges

· Recommended solutions for problems encountered and anticipated

· Deliverables due

· Deliverables submitted and upcoming

· Estimates for all costs associated with the contract

· Correlation of money spent/incurred to work completed

One (1) copy to COR/CO
On 10th business day of each month or as prescribed
Option Task 16
TV, radio and webisode
One (1) copy to COR/CO
Upon COR request and approval
Optional Task 16.1
Develop digital content
One (1) copy to COR/CO
Upon COR request and approval
Optional Task 16.2
Work Plan
One (1) copy to COR/CO
Draft Plan within 30 working days of EOT; and final within 60 days of EOT.
Optional Task 16.3
TV, radio and webisode product development
One (1) copy to COR/CO
Within 3-9 months of EOT or as requested by COR
Optional Task 16.4
Pre/Post-Production to include:

· Storyboards

· Screen treatments

· Scripts Draft/Final

· Rough cuts

One (1) copy to COR/CO
Upon COR request and approval

Draft due: two (2) weeks after COR request;

Final due two (2) weeks after COR comments

Submission of rough-cut PSA for review by COR 1 week after completion;

Submission of all PSA masters to COR 1 week after completion

Optional Task 17
Message Adaptation/PSAs for other substances
Optional Task 17.1
Message Adaptation, Content and Materials Development

(a) Toolkit (approximately 150 pages)

(b) Brochure (2 pages, 6 panels)

(c) Fact Sheet (8 ½ x 11” – one side and/or two sided)

(d) Flyer (8 ½ x 11” – one side and/or two sided)

(e) Poster (downloadable – 8 ½ x 11 to 30” x 40”)

(f) Drop-in Article/Op Ed (300 – 1,500 words)

(g) Social Media Content

(h) Web Banner Ads (728 x 90 or 120x600)

(i) Web Page Content

One (1) copy to COR/CO
Within 9 months of EOT or as requested by COR
Optional Task 17.2
Research and Analysis
One (1) copy to COR/CO
Within two (2) months of EOT
Optional Task 17.3
Publication Concept Clearance
One (1) copy to COR/CO
Within three (3) months of EOT submit concept clearance forms

Draft due: two (2) weeks after COR request;

Final due two (2) weeks after COR comments

Optional Task 18
Development of and updates to self-screening and referral management service “Screen4Success”
One (1) copy to COR/CO
Within six (6) months of EOT for 100,000 users
Subtask 18.1
17.

18.

Product Design, Development, Implementation, and Management Plan:

One (1) copy to COR/CO
Within four (4) weeks of EOT for 100,000 users
Subtask 18.2
Procedures Manual with Data Collection Protocols:
One (1) copy to COR/CO
Within eight (8) weeks of EOT
Optional Task 19
Student Assistance Policy and Implementation Academy for Behavioral Health in Schools
Assist seven (7) states or tribes with implementation of Policy Academy for school-based approaches to include consensus meeting and two (2) meetings
Ongoing over one year period.
Subtask 19.1
Kickoff meeting
One (1) meeting with COR/ACOR/Task Lead
Within ten (10) days of EOT
Subtask 19.2
Work Plan
One (1) copy to COR/CO
Within ten (10) days of Kickoff meeting
Subtask 19.3
Consensus Panel and Subject Mater Experts
1 consensus panel meeting with up to ten (10) subject matter experts
Within ten (30) days of EOT
Subtask 19.4
Application and Selection of Potential States/Tribes/Territories/Jurisdictions to Participate
Identification and selection of seven (7) states or tribes into the Policy Academy
Within ten (10) days of submitting the final work plan
Subtask 19.5
Orientation and Preparation
Assist seven (7) states or tribes with implementation of Policy Academy for school-based approaches
Within 30 days of EOT
Subtask 19.6
Policy Academy Meetings
Convene two (2) 2 ½ day Initial meeting to assist seven (7) states or tribes with implementation of Policy Academy for school-based approaches
Within 45 days of EOT
Subtask 19.7
Policy Academy Support
Convene and assist seven (7) states or tribes with implementation of Policy Academy for school-based approaches
Within 45 days of EOT
Subtask 19.8
Follow-up Policy Academy Support
Assist seven (7) states or tribes with implementation of Policy Academy for school-based approaches
Ongoing throughout the year