RFP 26-013-Q Joint Use Inspections Make-Ready Pole Loading Analysis.pdf
PDF 6 MB Posted
- Attached to
- EWEB RFP 26-013-Q Joint Use Inspection, Make-Ready Requirements, & Pole Loading Analysis
- Solicitation number
- S-P00140-00015672
- Issued by
- Lane County, Oregon
About this file
Summary
This is a Request for Proposals (RFP) document issued by the Eugene Water & Electric Board (EWEB) in Oregon for engineering consulting services related to joint use pole attachments. EWEB seeks qualified engineering firms to provide pre-construction and post-construction inspections, make-ready requirements analysis, and pole loading analyses for telecommunications and utility attachments on EWEB's poles located in Lane and Linn Counties, Oregon. The work involves processing permit applications, conducting field inspections, verifying clearances and compliance with National Electrical Safety Code (NESC) standards, preparing construction documents, performing structural analyses using industry software such as O-Calc or SpidaCalc, and coordinating with multiple stakeholders. The RFP closing date is February 10, 2026, at 2:00 PM PT, with optional pre-proposal conferences scheduled for January 13, 2026, at 9:00 AM PT and January 27, 2026, at 1:00 PM PT. The contract term is approximately five years from the award date, with potential extension provisions. Historical data indicates EWEB received between 102 and 461 pole attachment applications annually from 2019 to 2024, with volumes trending upward, ranging from 1,629 to 6,068 total poles per year.
The evaluation process utilizes a Qualifications-Based Selection (QBS) methodology with a multi-step approach: Step One screens for pass/fail minimum requirements including five years of continuous business experience and three relevant client references; Step Two scores written proposals on project management, process and communication, key staff experience, client references, and value-added services for a maximum of 85 points; Step Three evaluates pricing proposals submitted within 24 hours of shortlist notification for up to 15 points, yielding 100 total possible points. Proposers must demonstrate professional liability insurance of at least $2,000,000, commercial general liability of $1,000,000 per occurrence, and maintain workers' compensation coverage. The contract includes detailed specifications requiring compliance with NESC standards, EWEB-specific construction standards, and Oregon Administrative Rules. No pricing should be submitted with initial proposals; all qualified firms will be invited to submit detailed cost estimates after shortlisting. The estimated annual contract value ranges from approximately $240,000 to $1,425,000 based on historical inspection volumes and pole loading analysis requirements, though actual costs will vary depending on demand and the selected consultant's fee structure.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pricing Proposal - Scenarios.pdf | ||
| 26-013-Q Pre-Proposal Meeting Presentation.pdf | ||
| Addendum 1 - RFP 26-013-Q.pdf | ||
| Scenario 2 - Z115 EWEB PLAs.zip | ZIP file | |
| RFP 26-013-Q - Opening Tab Sheet.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP 26-013-Q / Joint Use, Make Ready Requirements, and Pole Loading Analysis 1
Eugene Water & Electric Board
REQUEST FOR PROPOSALS
for
Joint Use Inspection, Make Ready Requirements, and Pole Loading Analysis
A&E
RFP No.: 26-013-Q Closing Date: February 10, 2026 Time: 02:00 PM PT
Description: Eugene Water and Electric Board (EWEB) is requesting proposals from firms able to provide pre/post inspections and make-ready requirements for attachments of joint use involving the Utility’s poles, as well as completing pole loading analyses.
Purchasing Contact: Kristin Kokkeler (541) 685-7107 kristin.kokkeler@eweb.org
Pre-Proposal Conference: YES - Voluntary Date: January 13, 2026 Time: 09:00 AM & Date: January 27, 2026 Time: 01:00 PM
Location: Microsoft Teams video conference. RSVP Purchasing Contact at the above email reference to receive an Outlook invitation to the conference.
This is a COMPETITIVE SEALED PROCUREMENT.
ELECTRONIC PROPOSALS SUBMITTED VIA THE OREGONBUYS BID SITE ARE REQUIRED. Emailed submittals will not be accepted.
To ensure your submission is received prior to the closing date and time, it is recommended that you begin the submittal process on the OregonBuys website at least 72-hours prior to the closing date and time listed above.
SINGLE POINT OF CONTACT: There will be only one point of contact for the entire Request for Proposal process. The contact point is the EWEB Purchasing Office, and the contact person is the Purchasing Contact listed above, unless otherwise stated. Any questions or issues that may arise regarding the specifications, the bidding process, and/or the award process shall be directed to the Purchasing Contact listed above. EWEB’s official response to any questions or requests will be in writing via the Addendum process.
FOR MORE INFORMATION, please refer to Part 1 “Instructions to Proposers”
RFP 26-013-Q / Joint Use, Make Ready Requirements, and Pole Loading Analysis 2
TABLE OF CONTENTS
Section Description
Legal Advertisement
1 Instructions to Proposers
2 Scope of Work
3 Minimum Qualifications and Requirements
4 Evaluation Process & Proposer Selection
5 Evaluation Criteria
6 Proposal Form
EXHIBITS
Sample Contract Pole Attachment Agreement EWEB Permit Procedure Pole Attachment Heights & Clearance Requirements for Telecommunications / Joint Users
RFP 26-013-Q / Joint Use, Make Ready Requirements, and Pole Loading Analysis 3
LEGAL ADVERTISEMENT
RFP #26-013-Q
Joint Use Inspection, Make Ready Requirements, and Pole Loading Analysis
The Eugene Water & Electric Board (EWEB) requests proposals from engineering consulting firms interested in providing pre/post inspections and make-ready requirements for attachments of joint use involving the Utility’s poles, as well as completing pole loading analyses.
Proposals shall be submitted on the State of Oregon – OregonBuys website (https://oregonbuys.gov/bso/), before, 02:00 PM PST, February 10, 2026. (Emailed responses will not be accepted.) Proposals will not be accepted after this hour and date.
RFP documents may be obtained by downloading the RFP documents from the State of Oregon's bid site ("OregonBuys"): https://oregonbuys.gov/bso/. (On OregonBuys home page, search for bid #26-013-Q. For navigation help, please call 1-855-800-5046.)
Optional Pre-Proposal Conferences will be held at 09:00 AM PST, January 13, 2026, AND 01:00 PM PST, January 27, 2026 via Microsoft Teams. The purpose of the conference is to discuss the work to be performed with the prospective Proposers and allow them to ask questions concerning the RFP. Please RSVP beforehand to (Purchasing Contact): kristin.kokkeler@eweb.org.
All proposals shall be submitted as set forth in Section 1 - Instructions to Proposers. EWEB is not responsible for proposals submitted in any manner, format or to any delivery point other than as required by the Solicitation Document.
No proposal may be withdrawn after the hour set for the opening thereof until the elapse of thirty (30) days from the date and time set for opening.
EWEB reserves the right to waive any or all informalities and irregularities (EWEB Rule 3-0470) and may cancel the Request for Proposals or reject any or all proposals pursuant to EWEB Rule 3-0640.
Date: January 5, 2026
Kristin Kokkeler, Purchasing Contact https://oregonbuys.gov/bso/ mailto:kristin.kokkeler@eweb.org
RFP 26-013-Q / Joint Use, Make Ready Requirements, and Pole Loading Analysis 4
1. INSTRUCTIONS TO PROPOSERS
All proposals and contracts are subject to the provisions and requirements of the Oregon Revised Statutes 279A and 279B and EWEB Public Contracting Rules Divisions 1, 2, 3 and 6.
INFORMATION OF RECORD
The official source of information for this project until the Intent to Award is posted is located at the State of Oregon's bid site, located at https://oregonbuys.gov/bso/. IT IS THE SOLE RESPONSIBILITY OF THE PROPOSER TO
CHECK THE WEBSITE ON A TIMELY BASIS.
PROPOSAL PREPARATION
1.1 PROPOSAL FORMAT AND COST
Proposals shall be typewritten or prepared in ink and shall be submitted electronically, per Section 1.8 below. Proposals shall conform to the requirements of the Request for Proposals. All necessary attachments shall be submitted with the proposal and in the required format.
Proposer is responsible for all costs incurred in connection with its Proposal, including, but not limited to, the costs to prepare and submit the Proposal, costs of samples and other supporting materials, costs to participate in demonstrations, and costs associated with protests.
1.2 CONFORMANCE TO SOLICITATION REQUIREMENTS
Proposals shall conform to the requirements of the Request for Proposals. All necessary attachments shall be submitted with the proposal and in the required format.
1.3 PROTEST OF SPECIFICATIONS / REQUIREMENTS
A Proposer who believes that the procurement process is contrary to law, or that the solicitation is unnecessarily restrictive in that specifications limit competition arbitrarily, without reasonably promoting the fulfillment of the procurement needs of EWEB, or that the solicitation document is legally flawed in that it contains terms or conditions that are contrary to law, or that the solicitation improperly specifies a brand name as defined in ORS 279B.200, may submit a protest via email to kristin.kokkeler@eweb.org. Insert the following in the subject header:
RFP SPECIFICATION PROTEST, RFP #26-013-Q
To be considered, protests shall be received no less than 5 business days before close (EW-3-0700(2)).
Protest of specifications shall include the reason for protest, any and all evidence and documented factual information that supports Proposer’s protest, and any proposed changes to the requirements. The EWEB Purchasing department shall promptly respond to each written protest, and where appropriate, issue all revisions, substitutions, or clarifications via Addenda to all Proposers. Proposers must exhaust all administrative remedies before seeking judicial review.
1.4 PROPOSER'S PROPOSED TERMS AND CONDITIONS Rule 3-0230(7)(b)
Proposers may include in the Cover Letter of their response, proposed revisions to the contractual terms and conditions in the Sample Contract (Exhibit 1) and the Scope of Work included in this RFP document.
(Proposer may show proposed changes by using Word Track Changes tool OR providing proposed revisions in cover letter.) Proposers may not protest or request to change the entire terms and conditions of the solicitation. For example, you may not seek to replace EWEB’s terms and conditions in whole with your company’s terms and conditions, standard contract, master services agreement, etc.
Terms included with Proposer’s proposal documents will not be considered unless they are listed in the Cover Letter as requested terms to negotiate.
mailto:kristin.kokkeler@eweb.org
RFP 26-013-Q / Joint Use, Make Ready Requirements, and Pole Loading Analysis 5
EWEB reserves the right to negotiate the proposed terms and/or conditions with Proposer, and either accept or reject the proposed terms and/or conditions. REQUESTS FOR REVISION OF EWEB CONTRACTUAL
TERMS AND CONDITIONS MAY BE MADE AT TIME OF PROPOSAL SUBMISSION. THERE MAY BE NO
OPPORTUNITY TO DO SO AT A LATER DATE.
NO PROPOSED TERMS OR CONDITIONS SHALL BECOME A PART OF THE AWARDED CONTRACT UNLESS
ACCEPTED BY EWEB AND INCORPORATED INTO THE CONTRACT IN WRITING.
1.5 SIGNATURE ON PROPOSAL
Proposals shall be signed by an authorized representative of the Proposer. Signature on a proposal certifies that the proposal is made without connection with any person, firm or corporation making a proposal for the same goods and/or services and is in all respects fair and made without collusion or fraud. Signature on a proposal also certifies that the Proposer has read, fully understands and agrees with all solicitation requirements, terms and conditions. No consideration will be given to any claim resulting from proposing without fully comprehending all requirements of the Request for Proposals.
Proposers shall only enter information within the proposal document where it is requested or required.
Proposers shall NOT make any alterations to the original solicitation document. Any proposal that has been altered may be rejected.
1.6 CANCELLATION, REJECTION, DELAY OF RFP
Pursuant to Rule 3-0640, EWEB may cancel, reject in whole or in any part any proposals, if EWEB determines it is in the best interest of EWEB to do so.
1.7 PRE-PROPOSAL CONFERENCE
Optional Pre-Proposal Conferences will be held at 09:00 AM PST, January 13, 2026, and 01:00 PM PST, January 27, 2026 via Microsoft Teams. The purpose of the conference is to discuss the work to be performed with the prospective Proposers and allow them to ask questions concerning the project. Please RSVP beforehand to the Purchasing Contact at: kristin.kokkeler@eweb.org.
1.8 PROPOSAL SUBMISSION
(a) OregonBuys Electronic Response
Please be sure to combine all documents into one pdf file before attempting to submit your bid into the OregonBuys bid site.
In order to submit an electronic proposal on the OregonBuys website, Proposer must be registered with OregonBuys and able to submit an electronic proposal. For instructions to register on OregonBuys, visit the following site: OrBuysSupplierRegistrationSteps.pdf (oregon.gov)
If you experience any issues registering, please contact OregonBuys at:
Phone: 1-855-800-5046 Email: support.oregonbuys@das.oregon.gov
When Proposer is submitting their proposal electronically, Proposer should follow the procedures outlined in any of the following:
https://www.oregon.gov/das/ORBuys/Documents/OregonBuys%20Vendor%20Formal%20Solicitation%20R esponse.pdf for electronic submission.
A video presentation on submitting an electronic proposal may be found at: Supplier - Submitting a Quote - Overview (periscopeholdings.com)
Terminology specific to the OregonBuys system may be found at:
https://www.oregon.gov/das/ORBuys/Documents/Phase1TerminologyCrosswalk.pdf
Proposals received in a manner other than through the OregonBuys website and/or after the closing mailto:kristin.kokkeler@eweb.org https://www.oregon.gov/das/ORBuys/Documents/OrBuysSupplierRegistrationSteps.pdf mailto:support.oregonbuys@das.oregon.gov https://www.oregon.gov/das/ORBuys/Documents/OregonBuys%20Vendor%20Formal%20Solicitation%20Response.pdf https://www.oregon.gov/das/ORBuys/Documents/OregonBuys%20Vendor%20Formal%20Solicitation%20Response.pdf https://www.periscopeholdings.com/courses/suppliersubmittingaquote/#/lessons/-IJ5uftCSaLqTjitSezQGrNh9dTNGqaA https://www.periscopeholdings.com/courses/suppliersubmittingaquote/#/lessons/-IJ5uftCSaLqTjitSezQGrNh9dTNGqaA https://www.oregon.gov/das/ORBuys/Documents/Phase1TerminologyCrosswalk.pdf
RFP 26-013-Q / Joint Use, Make Ready Requirements, and Pole Loading Analysis 6 date and time will not be considered and will be rejected. EWEB is not responsible for proposals submitted in any manner format or to any delivery point other than as required by the Solicitation document.
(b) REQUIRED PROPOSAL PACKAGE Complete, sign, and return the following documents as RFP response. Failing to include these documents could lead to rejection of proposal.
• Cover Sheet, with:
Contractual Acceptance: Statement accepting ALL terms and conditions contained in this solicitation and the Sample Contract (Exhibit 1). Statement may also include request for negotiation of proposed terms and conditions as allowed per Section 1.4.
Termination for Default: Proposers shall indicate if they have had a contract terminated for default in the last five years. Termination for default is defined as notice to stop performance that was delivered to the Proposer due to the Proposer’s non-performance or poor performance and the issue of performance was either (a) not litigated due to inaction on the part of the Proposer, or (b) litigated and determined that the Proposer was in default.
NOTE: If a Proposer has had a contract terminated for default in this period, then the Proposer shall submit full details including the other party’s name, address and phone number. EWEB will evaluate the facts and may, at its sole discretion, reject the proposal on the grounds of Proposer’s past performance.
• Proposal Form (Section 6)
• Response to Minimum Requirements (Section 3)
• Response to All Evaluation Criteria (Section 5)
• All Addenda Acknowledged
IMPORTANT NOTE RE PRICING – DO NOT submit pricing proposal with your submission. All Proposers should be prepared to submit their pricing within 24 hours of formal invitation to submit pricing, shortly after shortlist notification.)
(c) RESPONSIVENESS / RESPONSIBILTIY A “Responsive” proposal is a proposal that substantially complies with the Request for Proposals instructions and requirements.
A “Responsible” Proposer can demonstrate ability to meet the requirements of the Scope of Work, has the appropriate experience, is legally qualified to do the Work, has the required certifications required, has a satisfactory record of integrity and can meet the other requirements described in
ORS 279B.110(2).
1.9 ADDENDA
Any VERBAL communication cannot and shall not be construed as approval of the acceptability of any deviation to any requirement. All changes to requirements and/or the solicitation documents will be made in the form of Addenda. The Proposer is responsible for ensuring that all Addenda have been downloaded and are acknowledged in their RFP Response. Proposer may sign each issued Addendum and include with response or acknowledge in the space provided on the Proposal Form.
All Addenda can be obtained electronically at the State of Oregon's bid site ("Oregon Buys"):
https://oregonbuys.gov/bso/.
https://oregonbuys.gov/bso/
RFP 26-013-Q / Joint Use, Make Ready Requirements, and Pole Loading Analysis 7
1.10 PROPOSAL MODIFICATION
If a Proposer wishes to make modifications to a submitted Proposal, Proposer must do so through OregonBuys prior to the Proposal Due Date and Time stated on the Cover Page for this RFP.
1.11 PROPOSAL WITHDRAWALS:
If a Proposer wishes to withdraw a submitted Proposal, Proposer must do so through OregonBuys, using the “Withdraw Quote” button prior to the Proposal Due Date and Time stated on the Cover Page for this RFP.
1.12 EXCEPTIONS
Any exceptions to the requirements of this solicitation MUST be submitted in accordance with Item 1.3
PROTEST OF SPECIFICATIONS / REQUIREMENTS. Exceptions submitted with your proposal, or in any manner other than the process provided herein, may cause your proposal to be ruled non-Responsive and rejected.
1.13 PROPOSAL OPENING: Unless otherwise provided by Law or Rule, proposals received in response to this
Request for Proposals shall be opened at the scheduled closing date and time at the EWEB Purchasing department located at 4200 Roosevelt Blvd, Eugene, Oregon 97402. Enquiring Proposers shall be informed only of the names of Proposers submitting proposals. No other information shall be available at that time.
Award decisions will NOT be made at the opening.
1.14 ALTERNATE PROPOSALS
Proposers may submit more than one proposal. All proposals must comply with the requirements of the RFP except that additional proposals may incorporate, by reference, repetitive information which is provided in the complete proposal.
1.15 PROPRIETARY DATA/PUBLIC RECORD
This Request for Proposal, together with copies of all documents pertaining to the award of a contract, shall be kept by EWEB and made a part of a file or record which shall be open to public inspection. If a proposal contains any information that is considered a trade secret under ORS 192.345(2), each sheet of such information shall be marked with the following legend:
"This data constitutes a trade secret under ORS 192.345(2) and shall not be disclosed except in accordance with the Oregon Public Records Law, ORS Chapter 192."
The Oregon Public Records Law exempts from disclosures only bona fide trade secrets, and the exemption from disclosure applies only "unless the public interest requires disclosure in the particular instance" ORS 192.345(2). Therefore, non-disclosure of documents or any portion of a document submitted as part of a proposal may depend upon official or judicial determinations made pursuant to the Public Records Law.
The above restriction may not include cost or price information, which shall be open to public inspection.
1.16 SOCIAL EQUITY
EWEB supports the use of Minority, Women, Emerging Small Businesses (M/W/ESB), local businesses, Disadvantaged Business Enterprises and Qualified Rehabilitation Facilities (QRF). EWEB encourages the awarded offeror to use the following voluntary practices to promote open competitive opportunities for disadvantaged businesses as applicable:
a. Access lists of certified minorities, women, emerging small business or disadvantaged business enterprises from the Oregon State Office of Minority, Women and Emerging Small Business (OMWESB) by visiting their website at:
https://oregon4biz.diversitysoftware.com/FrontEnd/SearchCertifiedDirectory.asp
b. Visit the Oregon State Qualified Rehabilitation Facilities Program website to search for Qualified
Rehabilitation Facilities from whom to procure products or services.
https://oregon4biz.diversitysoftware.com/FrontEnd/SearchCertifiedDirectory.asp
RFP 26-013-Q / Joint Use, Make Ready Requirements, and Pole Loading Analysis 8
SCHEDULE OF EVENTS
1.17 The schedule of events set out herein represent Eugene Water & Electric Board’s best estimate of the schedule that will be followed.
Request for Proposal released 1/05/26
Voluntary Pre-Proposal Conference 1/13/26 & 1/27/26
Last Date for EWEB to receive Protest of Requirements/Specifications 1/19/2026
Last day for EWEB to receive questions from Proposers 2/02/26
Last day EWEB will post Addenda on Bid Site 2/03/26
Closing date (last day to submit proposals to EWEB) 2/10/26
Responses evaluated 2/11/26-2/18/25
Optional interviews / Presentations held TBD
Pricing evaluated 2/23/26 – 2/26/26
Intent to Award announcement Posted on Bid Site 3/03/2026
Board approval April 2026
Contract award TBD
RFP 26-013-Q / Joint Use, Make Ready Requirements, and Pole Loading Analysis 9
2. SCOPE OF WORK
2.1 BACKGROUND /OBJECTIVES
Eugene Water and Electric Board (EWEB) is requesting proposals from firms able to provide pre/post inspections and make-ready requirements for attachments of joint use involving the Utility’s poles, as well as completing pole loading analyses. Proposers will accurately process attachment permits while promoting efficient communication between EWEB and the attaching party. Changes to the scope of work may take place as the actual contract is established, dependent on capability and capacity for both EWEB and the service provider.
2.2 LENGTH OF CONTRACT
The contract for this project (“Contract”) will start from the date of award and will last approximately five
(5) years.
2.3 LOCATION OF WORK
The location of the majority of work to be performed, completed and managed is at Contractor’s business location and in EWEB’s service territory in Lane and Linn Counties, Oregon. All work will be along city streets, county, state and private roads, or on public or private rights-of-way occupied by EWEB facilities. https://www.eweb.org/documents/about-us/eweb-service-territory-map.jpg
EWEB WILL NOT provide workspace for the Contractor. The Contractor must provide its own workspace.
OR, if workspace will be provided on-site, state the conditions.
2.4 ENGINEERS ESTIMATE
The EWEB estimate for these services listed below.
Year # PA Tickets Total Poles Average # of poles per ticket PLA Review 1 Contractor PLA 2 Annual Total
2019 102 1,629 16 $ 97,740 $ 285,075 $ 382,815 2020 142 1,021 7 $ 61,260 $ 178,675 $ 239,935 2021 145 2,047 14 $ 122,820 $ 358,225 $ 481,045 2022 234 1,920 8 $ 115,200 $ 336,000 $ 451,200 2023 339 3,342 10 $ 200,520 $ 584,850 $ 785,370 2024 461 6,068 13 $ 364,080 $ 1,061,900 $ 1,425,980
1) Assumes half of the applicants opt for performing their own PLA, $120 per review. Assumes the joint user is submitting a completed analysis such as an O-calc report and the contractor will review for accuracy and compare the inputs to EWEB’s GIS data.
2) Contractor handles field measurements and uses EWEB GIS data to develop the PLA using O-Calc or spreadsheet analysis. With the field data collection this will be significantly cheaper the larger the number of poles in the application. I used $350 as an average cost.
2.5 SCOPE OF WORK
a. General Consultant performance is based on deliverable products and outcomes (“Deliverables”). The selected Proposer and EWEB will negotiate the final description of work tasks and Deliverables, within the scope of what is advertised here, for inclusion in the Contract.
b. General Requirements
1. Provide a Project Manager as the primary source of communication between the contractor and https://www.eweb.org/documents/about-us/eweb-service-territory-map.jpg
RFP 26-013-Q / Joint Use, Make Ready Requirements, and Pole Loading Analysis 10
EWEB.
2. Be knowledgeable of Oregon Administrative Rules Chapter 860, Divisions 24 and 28.
3. Be knowledgeable of the NESC rules related to Joint Use poles, including Overhead Line
Clearances and Pole Loading applications.
4. Become familiar with EWEB’s Joint Use contracts and how they apply to attachees. Copies of executed contracts will be provided to the awardee. See attached EWEB Joint Use Agreement Template.
5. Become familiar with EWEB construction standards pertaining to locations of secondary, neutrals, guying and risers. These Standards will be provided to the awardee.
6. Provide QA process and documentation for licensee submittals with consistent consequences if quality is not adequate.
7. Promote and maintain safe working practices.
8. Field personnel shall follow EWEB’s normal operating hours unless other arrangements have been made.
c. SCOPE OF WORK Services provided shall include but will not be limited to:
1. Pre Inspections
• Collecting existing attachment owner and heights at poles and at mid-spans.
• Verify pole data (height, class, material etc.).
• Record existing pole conditions at proposed attachments, including and not limited to
EWEB/NESC clearance standards
• Determine make-ready requirements for new attachments.
• Determine if guying is required to support new attachments.
• Input data into the Pole Owner section of the Joint Use Project Spreadsheet.
o EWEB will submit applications to Contractor after these been reviewed by EWEB team members and added to the request in the EWEB system (WAM/SAP).
2. Pole Loading Analysis
• Required on every pole that sees a change in loading, unless attachments are removed
• EWEB shall provide maps with conductor (size/type/tension) and pole (class/height/species) details for analysis.
• Transmission poles shall be modeled in O-Calc, SpidaCalc, or PLS-CADD. For Distribution poles a spreadsheet pole loading analysis is also acceptable. EWEB can provide LiDAR for transmission lines if PLS-CADD is being used. This may not be accurate for current conditions and would need to be verified.
• Transmission poles shall be modeled as NESC Grade B construction with medium district loading. Distribution poles shall be modeled as NESC Grade C construction with medium district loading, except at crossings, where distribution shall also conform to Grade B construction.
• Analysis shall conform to current NESC requirements and evaluate structural loading as well as clearances. Where pole utilization exceeds 90% provide replacement recommendations for corrections (pole class/size, additional anchors/guys, etc.).
• Results shall be submitted as a pdf, EWEB may request the native file format (.pplx, .spida, .xyz, etc.)
3. Make-ready Requirements (if needed)
• May be required to prepare construction prints. Prints to be reviewed and finalized by a
EWEB staff prior to issuing. (using Designer software)
RFP 26-013-Q / Joint Use, Make Ready Requirements, and Pole Loading Analysis 11
• Include guying requirements.
• May be required to prepare bill of materials, using EWEB Inventory Sheet, Designer software.
• Determine crew type, size and estimated hours for pre-bill assessment.
• May be required to determine and submit required permitting, and notifications to City of
Eugene, ODOT, Lane County, Railroad, etc.
• Update Pole attachment (PA) and transfer (PT) notices in NJUNS (National Joint Use
Notifications System).
• For pole replacements, verify all comms and streetlights, if applicable, have been transferred to the new pole and the stub is ready to be pulled.
4. Pre-construction meetings (if needed)
• Coordinate meetings with installation contractors, the Utility’s Joint Use Specialist, and others as required.
• Review EWEB pole attachment construction standards, attachment requirements to ensure clearances, guying requirements and anchor placements, and project timelines.
• Exchange project contacts.
• Frequency of joint walkouts with attachees take place roughly five times a year, only when there are issues or a busy pole that the Contractor would like help determining what to do or what Make Ready’s are needed.
5. Post Inspections
• Verify new attachment heights at poles and at mid-spans.
• Verify required clearances were met at poles and mid-spans.
• Verify required guying was installed as called out.
• Report unsatisfactory conditions to designated EWEB staff.
2.6 REQUIREMENTS
A. Make-Ready Requirements
• Requirements shall conform to EWEB current specifications and NESC requirements.
• Attachments to distribution only poles must conform to NESC Grade C construction with medium loading except as noted.
• Attachments to Poles supporting any of the EWEB’s Transmission System must conform to NESC
Grade B construction with medium loading except as noted.
• Construction documents to be done with software formats that are easily accessible to EWEB including but not limited to .dwg, pdf, docx, or .mxd. Other formats will be considered.
• Final prints to be bundled in .pdf format.
B. Availability
• Provide in response maximum number of days firm will need to begin a pre or post inspection after notification.
• Consultant to have staff to handle simultaneous high volume attachment requests at any given time.
C. Past Project Numbers The number of joint use attachment projects will vary depending on the demand placed by the attaching entities. These numbers are expected to increase in the coming years. The chart below provides historical data and does not necessarily represent what the coming demands may be.
RFP 26-013-Q / Joint Use, Make Ready Requirements, and Pole Loading Analysis 12
Pole Attachment (PA) Tickets
Year # PA Tickets Total Poles Year over Year Ticket Increase
Year over Year Pole Increase
2019 102 1,629 2020 142 1,021 39.22% -37.32% 2021 145 2,047 2.11% 100.49% 2022 234 1,920 61.38% -6.20% 2023 339 3,342 44.87% 74.06% 2024 461 6,068 35.99% 81.57%
Make Ready (MR) Tickets (1 Pole per Ticket)
Year # MR Tickets Year over Year Ticket Increase
2019 6
2020 103 1616.67%
2021 272 164.08% 2022 31 -88.60% 2023 183 490.32% 2024 473 158.47%
Current Metrics:
• 16,320 distribution poles and 1,422 transmission poles available for joint use.
• In 2024, EWEB received roughly 162 transmission pole requests.
2.7 TASKS
1. Verify completeness and compliance with EWEB Submittal requirements of permit applications.
See EWEB Checklist.
2. Provide Inspections:
a. Pre-attachment inspection.
b. Post-attachment inspection.
3. Monitor and process attachment requests using NJUNS, email and Excel attachee summary reports.
4. Review pole loading report:
a. Verify permissible loading constraints. See EWEB Checklist.
b. Forward loading information to EWEB for site specific regrade to Grade C, if applicable.
c. Verify correct EWEB attachments. See Sample Pole Information Request.
5. Identify violations of the NESC, EWEB construction guidelines and contract agreement.
6. Drive by pole stubs to verify all attachments have transferred to the new pole so EWEB or Lumen can pull the pole stub. If not, determine who is still attached.
7. Make-Ready Ticket Assistance:
a. Field MR requests and see if work is needed or possible.
b. Measure attachment heights.
c. Take pictures of poles if needed.
8. Reports
RFP 26-013-Q / Joint Use, Make Ready Requirements, and Pole Loading Analysis 13
a. Track requests from EWEB and report on them monthly:
i. Pre-inspection requests:
• Contractor reviewed attachee pole loading reports.
• Contractor performed pole loading reports.
ii. Post inspection requests.
iii. Requests to inspect pole stub to be pulled.
b. NJUNS tickets’ status counts.
c. Produce reports regarding task completions - as needed.
d. Partition billings dependent on PA requestor per Accelerated Project – see Article II, Article
IV and Article XI from the EWEB Joint Use Agreement Template.
2.8 Value Added Opportunities (not currently included in this project)
• Perform cost estimates for Make Ready.
• Assist EWEB to create joint use standards and guidelines.
• Complete the following Make Ready (MR) tasks:
o Verify submitted MR accuracy.
o Forward power MR request to EWEB.
o Track and communicate status of MR poles to both requestor and EWEB.
o Prompt updates for aging requests.
• Maintain databases:
o NJUNS – EWEB to provide member code access.
o Varasset – EWEB to provide remote access
Permit information – data entry Document found bootleg attachments- data entry Project summary spreadsheets per attaching company
• Other tasks as needed.
Actual scope of work will vary as needed to meet the EWEB’s objective. EWEB reserves the right to adjust task and scope as needed. A detailed contract scope of work will be developed upon consultant selection.
RFP 26-013-Q / Joint Use, Make Ready Requirements, and Pole Loading Analysis 14
3. MINIMUM REQUIREMENTS (PASS/FAIL)
Following are the “Minimum Requirements” that shall be met by all Proposers. Response to this section will be considered on a pass or fail basis. Response to each and all requirements must pass before a proposal will be reviewed and scored by the evaluation team.
Proposers shall respond to each of the Minimum Requirements in writing in a brief and concise manner. (See Submittal section following.) EWEB does not pre-qualify Proposers; your proposal must show that your firm meets the requirements. EWEB will attempt to answer questions or clarify the requirements if needed.
1. Proposer must have been in business providing inspection and analysis services similar to the scope of work described in this RFP document, continuously for at least 5 years.
2. Proposer should not have had a contract terminated for default or breach in the last 10 years. Termination for default is defined as notice to stop performance that was delivered to the Proposer due to the Proposer’s non-performance or poor performance and the issue of performance was either (a) not litigated due to inaction on the part of the Proposer, or (b) litigated and determined that the Proposer was in default.
NOTE: If a Contractor has had a contract terminated for default in this period, then the Contractor shall submit full details including the other party’s name, address and phone number. EWEB will evaluate the facts and may, at its sole discretion, reject the proposal on the grounds of Contractor’s past performance.
3. Proposer must provide client references (including EWEB) for 3 most relevant Joint-Use inspection and analysis contracts within the last 5 years, similar in nature to the requirements specified and required for this proposal, that will indicate quality performance, especially based on quality of deliverables and follow-through.
Submittal for Minimum Requirements
Please provide the following information on separate pages labeled “Minimum Requirements”.
1. Company Information:
a. Indicate whether Proposer is a sole proprietor, partnership, LLC, corporation or other (specify).
b. Indicate how many years Proposer has continuously been in business performing testing and inspection work similar to the scope described in this RFP.
2. Indicate whether Proposer has had a contract terminated for default or breach (as described in item A.2 above) in the last 10 years. NOTE: If a Proposer has had a contract terminated for default in this period, then the Proposer shall submit full details, including the other party’s name, address, and phone number. EWEB will evaluate the facts and may, at its sole discretion, reject the proposal on the grounds of Proposer’s past performance.
3. Related Project Experience
Provide client references for 3 most relevant inspection and analysis contracts within the last 5 years, similar in nature to the requirements specified and required for this proposal, that will indicate quality performance, especially based on quality of deliverables and follow-through. Please provide the following for each reference:
a. Name of client
b. Description of project and work provided
c. Order due date & actual completion date
d. Original contracted cost and actual cost at time of Final Completion
e. Client contact person who is able to attest for Proposer’s performance, including email address, telephone number, and city/state located in. (This person should be notified by Proposer that EWEB may contact him/her for purposes of checking references.)
RFP 26-013-Q / Joint Use, Make Ready Requirements, and Pole Loading Analysis 15
4. EVALUATION PROCESS & PROPOSER SELECTION
EWEB intends to use a Qualifications Based Selection (QBS) process appropriate for A&E projects. A Multi-Step Evaluation Process will be used to determine scores and final rankings. The following is a high-level view of the process:
STEP ONE: Minimum Requirements responses will be reviewed for a Pass / No Pass assessment. Proposals that earn a Pass assessment will move forward to Step Two.
STEP TWO: Written proposals are evaluated, and preliminary scores are ascertained. Up to 3 of the most qualified Proposers will be included on the shortlist and interviews / presentations may be utilized. (These are optional to EWEB.) Pricing will NOT be evaluated during this step.
STEP THREE: At the completion of Step Two, EWEB will release scoring and rankings of the qualified Proposers.
Proposers may elect to withdraw from further consideration at this point. Pricing information for all remaining candidates will be reviewed and added to the final scores and a Finalist will be selected for negotiation of a contract.
The total possible number of points are as follows:
Criteria Possible Points
Step One - Minimum Requirements Pass / No Pass only
Step Two - Qualifications Each Sub-total Initial Evaluation
Project Management 25 Process and Communication 25 Key Staff Experience 20 References from Past Clients 10
Value Added Services 5 85
Interviews (Optional to EWEB) “Scores Finalized”
Step Three - Pricing 15
TOTAL POSSIBLE POINTS 100
4.1 Review and Acknowledgment of Defective Proposals
Due to limited resources, EWEB generally will not completely review or analyze proposals that on their faces fail to comply with the minimum mandatory requirements of the solicitation documents nor will EWEB generally investigate the references or qualifications of such proposals. Therefore, EWEB will not acknowledge whether or not an unsuccessful proposal was complete, Responsive, Responsible, sufficient, or lawful in any respect. This is a public solicitation, the processes and procedures which are established and required by Oregon law and EWEB adopted rules. Proposers are advised to strictly follow the process, procedures, and requirements as set forth in the RFP documents and not anticipate or rely on any opportunity to negotiate, beyond such limitations that are identified herein.
4.2 Right of Rejection
Proposers must comply with all of the terms of the RFP, EWEB Rules, and all applicable local, state, and federal laws, administrative rules, and regulations. The Purchasing Contact may reject any proposal that
RFP 26-013-Q / Joint Use, Make Ready Requirements, and Pole Loading Analysis 16 does not comply with all of the material and substantial terms, conditions, and performance requirements of the RFP.
Proposers may not make stipulations or restrict the rights of EWEB. If a Proposer does so, the Purchasing Contact may determine the proposal to be a non-Responsive counteroffer, and the proposal may be rejected.
The Purchasing Contact may waive minor informalities that:
• do not affect Responsiveness
• are merely a matter of form or format
• do not change the relative standing or otherwise prejudice other offers
• do not change the meaning or scope of the RFQ/RFP
• are trivial, negligible, or immaterial in nature
• do not reflect a material change in the work
• do not constitute a substantial reservation against a requirement or provision
EWEB reserves the right to refrain from making an award if it determines that to be in its best interest.
A proposal from a debarred or suspended Proposer shall be rejected.
4.3 References
EWEB reserves the right to investigate any and all references and the past performance information provided in the proposal with respect to Respondent's successful performance of similar projects, compliance with specifications and contractual obligations, completion or delivery of a project on schedule, and lawful payment of employees and workers.
EWEB reserves the right to check any and all sources for information and to include sources other than the references provided in the Proposer's proposal. EWEB may consider information available from any such source including government bodies and regulatory authorities in evaluating respondents, including past experience EWEB has had with the Proposer.
4.4 Responsibility
EWEB reserves the right to investigate and evaluate, at any time prior to award and execution of the Contract, the apparent successful Proposer’s responsibility for performing the Contract, as defined in Rule 3-0500. Submission of a signed proposal shall constitute approval for EWEB to obtain any information EWEB deems necessary to conduct the evaluation. EWEB reserves the right to request additional information or documentation from the successful Proposer prior to award of a contract. Such information may include, but is not limited to, current and recent balance sheets, income statements, cash flow statements, or a performance bond from an acceptable surety. Failure to provide this information will result in the rescission of EWEB's Intent to Award.
EWEB may postpone the award of the Contract after announcement of the apparent successful Proposer in order to complete its investigation and evaluation. Failure of the apparent successful Proposer to demonstrate responsibility shall render the Proposer non-responsible and shall constitute grounds for rejection of the proposal.
4.5 Clarification of Response
EWEB reserves the right to request clarification of any item in any proposal, or to request additional information necessary to properly evaluate a particular proposal. All requests for clarification and responses shall be in writing.
During the evaluation of Proposals, Proposers must respond to any request for clarification from the Evaluation Committee within 24 hours of request (Monday through Friday). Inability of the Evaluation Committee to reach a Proposer for clarification and/or failure of a Proposer to respond within the time stated may result in rejection of that Proposer’s Proposal.
RFP 26-013-Q / Joint Use, Make Ready Requirements, and Pole Loading Analysis 17
4.6 Evaluation Process
STEP ONE
Proposer responses to Minimum Requirements (Section 3) will be reviewed and evaluated on a Pass/No
Pass basis. Those proposals that Pass will move forward for a review of written responses.
STEP TWO
Qualifications
Proposals will be evaluated and shortlisted for up to 3 Proposers or at a natural break in scoring. Proposals will be ranked from highest score to lowest. EWEB reserves the right to conduct interviews to further refine scores or to move forward to Step Three at this point.
Interviews / Presentations
In Step Two, the outcome of the written proposal evaluations may result in placement on a shortlist of finalists. EWEB may invite up to three (3) of the highest-ranked firms to interview / present. Each Proposer’s representatives, as identified by EWEB, shall be prepared to attend the interview within five (5) business days of notification by EWEB, and shall be provided with information regarding what to prepare for.
The points awarded for the written proposals will be re-evaluated in light of interview responses and scores may be revised and updated.
STEP THREE
Pricing Evaluated
Upon completion of the written evaluation and any optional interviews, EWEB will begin Step 3 and will forward a Shortlist Notification to all participating Proposers, stating the evaluation scores and rank for each shortlisted Proposer. At this point in the RFP process, any of the shortlisted Proposers will be permitted to withdraw from the solicitation process and consideration for award.
EWEB will request a pricing proposal for the scope of work related to the project. PROPOSERS SHOULD BE
PREPARED TO EMAIL PRICING PROPOSALS TO THE PURCHASING CONTACT WITHIN 24 HOURS.
4.7 Notice of Intent to Award
After the completion of the evaluation and rankings, the Purchasing Contact will issue a written notice of Intent to Award to all shortlisted Proposer and post on the OregonBuys bid site. The notice will set out the names and ranks of the Proposers and identify the highest ranked Proposer selected for award (“Finalist”).
4.8 Contract Negotiation
EWEB will begin negotiating a Contract with the Finalist and will direct negotiations toward obtaining written agreement on:
a) The statement of work;
b) The Contract price as it is affected by negotiating the Statement of Work; and
c) Any other terms and conditions reasonably related to those expressly authorized for negotiation in
Section 1.4 of this Request for Proposal.
A sample contract (Exhibit 1) and its related Attachment A Standard Terms and Conditions is attached for Proposer reference.
At any time during discussions or negotiations, EWEB may terminate such discussions or negotiations with the highest-ranked Proposer if it reasonably believes that:
a) The Proposer is not discussing or negotiating in good faith; or
b) Further discussions or negotiations with the Finalist will not result in the parties agreeing to the terms and conditions of a final Contract in a timely manner.
RFP 26-013-Q / Joint Use, Make Ready Requirements, and Pole Loading Analysis 18
If EWEB terminates negotiations, EWEB may then commence negotiations with the next highest ranked Proposer (the new “Finalist”) and continue the process until EWEB has determined to award the Contract to the Proposer with whom it is currently discussing or negotiating. If negotiations with any Proposer do not result in a Contract within a reasonable amount of time, as determined solely by EWEB, EWEB may reject all proposals and cancel the RFP. Nothing in the rule precludes EWEB from proceeding with a new formal solicitation for the same Work described in the RFP that failed to result in a Contract.
4.9 Proposer Selection
The firm with the highest total score as a result of written proposal/pricing scoring will be awarded the Contract.
4.10 Ties Among Proposers
Pursuant to Rule 4-0230, If determines after the ranking of potential firms, that two or more of them are equally qualified, EWEB may select a candidate through any process that the utility believes will result in the best value for EWEB taking into account the scope, complexity and nature of the Work. The process shall instill public confidence through ethical and fair dealing, honesty and good faith on the part of EWEB and Proposers and shall protect the integrity of the public contracting process.
As part of the procedure for choosing between two or more equally qualified candidates, EWEB may follow the procedure set forth in Rule 3-0300, (Preferences for Oregon Goods and Services; Nonresident bidders to select the firm) and may choose to give a reference to a local potential firm.
4.11 Protests and Judicial Review of Competitive Bidding and Proposals
Pursuant to Rule 3-0740, a bidder or proposer may protest the award of a public contract or a notice of intent to award a public contract, whichever occurs first, if the bidder or proposer is adversely affected because the bidder or proposer would be eligible to be awarded the public contract in the event that the protest were successful; and the reason for the protest is that all higher ranked proposals are Non- Responsive; EWEB has failed to conduct the evaluation of proposals in accordance with the criteria or processes described in the solicitation materials; EWEB has abused its discretion in rejecting the protestor's proposal or proposal as Non-Responsive; or EWEB's evaluation of proposals or EWEB's subsequent determination of award is otherwise in violation of EWEB Rules. The protest process may not be used to protest non-inclusion in the Competitive Range.
Eligible Proposers protesting award shall follow the procedures described herein. Protests that do not follow these procedures will not be considered. This protest procedure constitutes the sole administrative remedy available to Proposers.
a) Protests must be emailed to the Purchasing Contact received within seven (7) days after issuance of the notice of intent to award the Contract on the bid site. “Protest of RFP (insert #)” shall be entered in the subject header of the email. The Purchasing Contact will email a reply acknowledging receipt of the notice. EWEB will not consider late protests.
b) All protests must be in writing, signed by the protesting party or an authorized Agent and submitted to the EWEB Purchasing Contact listed on page 1. The protest must state all facts and arguments on which the protesting party is basing the protest.
c) Only protests stipulating an issue of fact concerning a matter of bias, discrimination or conflict of interest, non-compliance with procedures described in the procurement documents, or EWEB policy shall be considered. Protests based on procedural matters will not be considered.
d) EWEB’s Purchasing Supervisor will review the protest and will email the protesting party a written response within three (3) business days of receipt of the written protest to the email provided in Proposer’s proposal. Any written response may be comprised of a determination of the protest, a notice to the protesting party of the need for additional time in which to evaluate the matter, or other notice to the protesting party.
RFP 26-013-Q / Joint Use, Make Ready Requirements, and Pole Loading Analysis 19
e) If the Purchasing Supervisor’s determination (response) is adverse to the protester, any further appeal of the Purchasing Supervisor’s determination (response) by the party must be submitted via email to EWEB’s General Manager within three (3) business days of issuance of the Purchasing Supervisor’s determination (response).
f) EWEB’s General Manager will review any appeal of the Purchasing Supervisor’s determination and shall email or mail, the protesting party a written response within three (3) business days of receipt of written appeal to the email/postal address provided in Proposer’s RFP response,
g) If the determination of the General Manager is adverse to the protesting party’s interest, the protesting party may only appeal to EWEB’s Board of Commissioners by filing an emailed notice of appeal to the Board with the General Manager within two (2) business days of issuance of the General Manager’s written determination.
h) The Contract Review Board, in considering the protest, shall review the documentation presented to the Purchasing Supervisor and the General Manager on or before the next regularly scheduled Board Meeting, but in no event shall they be required to review in less than ten (10) business days, and thereafter, base their decision on such material. The Board review will be limited to the evaluation of compliance with EWEB’s policies and procedures, requirements of the RFP and the equal and fair application of EWEB’s contracting rules. The Contract Review Board's determination shall be EWEB's final decision.
i) An adversely affected or aggrieved Proposer must exhaust all avenues of administrative review procedures and relief before seeking judicial review of EWEB's Consultant selection or Contract award decision.
RFP 26-013-Q / Joint Use, Make Ready Requirements, and Pole Loading Analysis 20
5. EVALUATION CRITERIA
Instructions - Include in your proposal package a response to the following questions, listing the question first and the response directly beneath. Failure to respond to one or more questions could lower total score or cause the response to be deemed non-responsive and rejected.
5.1 Project Management (25 points possible)
Demonstrate Proposer’s ability to clearly define the desired action to be taken and to perform the tasks and subtasks identified in the Scope of Work.
Responses should address the following:
• Profile information for key contacts
• Staff training and certifications, provide assurance of knowledge of NESC and safe work practice
• Project tracking methods
• Verification of capacity to handle the work, how long to process approximately 500 ap and post inspections per year.