RFP 2523-883 Amended Scoring Example.xlsx
XLSX spreadsheet 36 KB Posted
- Attached to
- Enterprise Cloud Fax (reissued)
- Solicitation number
- 2523-883
- Issued by
- Adams County, Asotin County, Benton County, Chelan County, Clallam County, Clark County, Columbia County, Cowlitz County, Douglas County, Ferry County, Franklin County, Garfield County, Grant County, Grays Harbor County, Island County, Jefferson County, King County, Kitsap County, Kittitas County, Klickitat County, Lewis County, Lincoln County, Mason County, Okanogan County, Pacific County, Pend Oreille County, Pierce County, San Juan County, Skagit County, Skamania County, Snohomish County, Spokane County, Stevens County, Thurston County, Wahkiakum County, Walla Walla County, Whatcom County, Whitman County, Yakima County, Asotin City, Clarkston City, Clarkston Heights-Vineland CDP, West Clarkston-Highland CDP, Benton City, Chelan City, Chelan Falls CDP, Clallam Bay CDP, Lewisville CDP, Rock Island City, Pacific Beach CDP, Whidbey Island Station CDP, Mercer Island City, Pacific City, Bainbridge Island City, Kingston CDP, Kitsap Lake CDP, Kittitas City, Klickitat CDP, Okanogan City, Anderson Island CDP, Fort Lewis CDP, Fox Island CDP, Herron Island CDP, Ketron Island CDP, North Fort Lewis CDP, Raft Island CDP, Stevenson City, Hat Island CDP, Lake Stevens City, Snohomish City, Spokane City, Spokane Valley City, Puget Island CDP, Garfield Town, Yakima City, Washington
About this file
This document is a scoring example spreadsheet for RFP 2523-883, an Enterprise Cloud Fax solicitation issued by the Division of Information Technology (DIT) within the Washington State Department of Social and Health Services (DSHS). The RFP seeks a qualified contractor to provide a cloud fax solution available to all DSHS business units. The procurement example demonstrates cost proposals and scoring methodologies for three fictional bidders—FaxesRUs, FutureFax, and JustTheFax—across a phased implementation structure spanning four implementation phases. The document does not specify explicit response dates, due dates, site visits, or bidders' conferences, as it functions as a scoring reference document rather than the primary solicitation materials.
The scoring example illustrates a detailed cost evaluation methodology across three primary cost categories: One-Time Costs (OTC), Setup Fees (SUPF), and Recurring Items Costs (RIC). Scoring ranges are established as follows: OTC scores from 0–25 points with a mean score of 12.5; SUPF scores from 0–50 points with a mean score of 25; Phase 1 RIC scores from 0–200 points with a mean score of 100; Phase 2 RIC scores from 0–150 points with a mean score of 75; Phase 3 RIC scores from 0–100 points with a mean score of 50; and Phase 4 RIC scores from 0–50 points with a mean score of 25. Bids are evaluated based on percentage deviation from mean costs across all phases, with lower-cost proposals receiving higher scores. The fictional bids demonstrate final cost proposal scores ranging from 208.51 to 382.68 points, with JustTheFax achieving the highest score despite higher overall costs due to favorable positioning relative to phase-specific cost means.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP 2523-883 Attachment A.docx | DOCX document | |
| RFP 2523-883 Amendment 2 to Attachment D.docx | DOCX document | |
| RFP 2523-883 Amendment 01.docx | DOCX document | |
| RFP 26-VMD05.pdf | ||
| RFP 2523-883 Attachment C.docx | DOCX document | |
| RFP 2523-883 Amended Attachment D.docx | DOCX document | |
| RFP 2523-873 Amendment 2.docx | DOCX document | |
| RFP 2523-883 Amendment 4.docx | DOCX document | |
| RFP 2523-883 Attachment D.docx | DOCX document | |
| PreBid Conterence Presentation Materials.pdf | ||
| RFP 2523-883 Attachment B.docx | DOCX document | |
| RFP 2523-883 FAQs.docx | DOCX document | |
| RFP 2523-883 Cloud Fax.docx | DOCX document | |
| RFP 2523-883 Amendment 3.docx | DOCX document | |
| RFP 2523-883 Scoring Example.xlsx | XLSX spreadsheet | |
| RFP 2523-883 Attachment E.docx | DOCX document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FaxesRUs
| Bidder: FaxesRUs (Bidder and Data are ficticious!) | ||||||
| One Time Costs | ||||||
| ITEM | COST TYPE?** | QUANTITY - in Units (PROPOSED) | UNIT DESCRIPTION | COST PER UNIT (PROPOSED) | TOTAL COST (PROPOSED) |
| Account Setup* | OTC | 1 | n/a | 5000.0000 | 5000.0000 |
| Post-setup Testing Fee | OTC | 3500 | connections | 0.0100 | 35.0000 |
| TOTAL OTC: | 5,035.00 | ||||
| * Bidders must assume that all 5 (five) DSHS Administrations will be setup at the outset) | |||||
| **Cost Types are either OTC (One Time Costs), SUPF (Setup Fees), RIC (Recurring Items Cost. See RFP document for further details.) |
| Phase 1 (Note: Phase lengths used here are for scoring purposes only and are not contractual commitments.) | |||||
| ITEM | COST TYPE?** | QUANTITY | COST PER UNIT (PROPOSED) | TOTAL COST (PROPOSED) |
| Phase 1 SetUp Fees (one time per Implementation Phase) | |||||
| Local Numbers Ported | SUPF | 150 | 1.3000 | 195.0000 | |
| Web Portal Setup and addition (per user) | SUPF | 50 | 2.0000 | 100.0000 | |
| ATA (or other) Hardware Adapters (physical – not virtual) | SUPF | 100 | 62.5000 | 6250.0000 | |
| Setup Fee Per Added Department | SUPF | 20 | 0.0000 | 0.0000 | |
| Monthly (Recurring) Fees during Phase 1 (Duration: 36 months if no Phase 2, otherwise 9 months) | |||||
| Local Numbers Monthly Fee | RIC | 150 | 1.8500 | 277.5000 | |
| Web Portal Monthly User Fee | RIC | 50 | 1.3200 | 66.0000 | |
| Inbound Faxes Monthly Fee | RIC | 60000 | 0.0440 | 2640.0000 | |
| Outbound Faxes Monthly Fee | RIC | 30000 | 0.0660 | 1980.0000 | |
| ATA (or other) Hardware Adapters (physical – not virtual) | RIC | 100 | 1.3500 | 135.0000 | |
| Phase 1 SUPF Costs: | $6,545.00 | ||||
| Phase 1 Monthly RIC Costs: | $5,098.50 | ||||
| Phase 1 RIC Costs if Phase 2 is implemented: | $30,591.00 | (Phase 1 RIC costs multiplied by number of months until the next Implementation Phase. | |||
| Phase 2 (Note: Phase lengths used here are for scoring purposes only and are not contractual commitments.) | |||||
| ITEM | COST TYPE?** | ADDED QUANTITY | COST PER UNIT AFTER ADDITION (PROPOSED) | TOTAL COST FOR ADDED UNITS (PROPOSED) |
| Phase 2 Implementation SetUp Fees (one time per implementation) | ||||||
| Local Numbers Ported | SUPF | 150 | 1.2700 | 190.5000 | ||
| Web Portal Setup and addition (per user) | SUPF | 950 | 1.1600 | 1102.0000 | ||
| ATA (or other) Hardware Adapters (physical – not virtual) | SUPF | 75 | 62.0000 | 4650.0000 | Cumulatve Total # of Units after Imeplementation of Phase 2 | Monthly Total |
During Phase 2 only
| Setup Fee Per Added Department | SUPF | 35 | 0.0000 | 0.0000 | ||
| Phase 2 - Montly Fees Lifespan of Recurring Costs: 27 Months if No Phase 3, otherwise 12 mos | ||||||
| Local ADDED Numbers Monthly Fee | RIC | 150 | 1.7700 | 265.5000 | 300 | 531.0000 |
| Web Portal ADDED Monthly User Fee | RIC | 950 | 1.2800 | 1216.0000 | 1000 | 1280.0000 |
| Inbound Faxes ADDED Monthly Fee | RIC | 60000 | 0.0390 | 2340.0000 | 120000 | 4680.0000 |
| Outbound Faxes ADDED Monthly Fee | RIC | 30000 | 0.0590 | 1770.0000 | 60000 | 3540.0000 |
| ATA Hardware Adapters ADDED Monthly Fee | RIC | 75 | 1.3300 | 99.7500 | 175 | 232.7500 |
| Phase 2 SUPF Costs: | $5,943 | |||||
| Phase 2 only RIC Costs if Phase 3 is implemented: | $68,295 | (Phase 2 RIC costs multiplied by number of months until the next hypothetical Implementation Phase. |
| Phase 3 (Note: Phase lengths used here are for scoring purposes only and are not contractual commitments.) | |||||
| ITEM | COST TYPE?** | ADDED QUANTITY | COST PER UNIT AFTER ADDITION (PROPOSED) | TOTAL COST FOR ADDED UNITS (PROPOSED) |
| Phase 3 Implementation SetUp Fees (one time per implementation) | ||||||
| Local Numbers Ported | SUPF | 550 | 1.6900 | 929.5000 | ||
| Web Portal Setup and addition (per user) | SUPF | 4000 | 1.0270 | 4108.0000 | ||
| ATA (or other) Hardware Adapters (physical – not virtual) | SUPF | 400 | 60.0000 | 24000.0000 | Cumulatve Total # of Units after implementation of Phase 3 | Monthly Total |
During Phase 3 ONLY
| Setup Fee Per Added Department | SUPF | 35 | 0.0000 | 0.0000 | |||
| Phase 3 - Montly Fees Lifespan of Recurring Costs: 15 Months if No Phase 4, otherwise 12 months | |||||||
| Local Numbers ADDED Monthly Fee | RIC | 550 | 1.6200 | 891.0000 | 850 | 1377.0000 | |
| Web Portal ADDED Monthly User Fee | RIC | 4000 | 1.1700 | 4680.0000 | 5000 | 5850.0000 | |
| Inbound Faxes ADDED Monthly Fee | RIC | 220000 | 0.0300 | 6600.0000 | 340000 | 10200.0000 | |
| Outbound Faxes ADDED Monthly Fee | RIC | 110000 | 0.0500 | 5500.0000 | 170000 | 8500.0000 | |
| ATA Hardware Adapters ADDED Monthly Fee | RIC | 400 | 1.2500 | 500.0000 | 575 | 718.7500 | |
| Phase 3 SUPF Costs: | $29,038 | ||||||
| Phase 3 ONLY RIC Costs if Phase 4 is implemented: | $218,052 | (Phase 3 RIC costs multiplied by number of months until the next hypothetical Implementation Phase. | |||||
| Phase 4 (Note: Phase lengths used here are for scoring purposes only and are not contractual commitments.) | |||||||
| ITEM | COST TYPE?** | ADDED QUANTITY | COST PER UNIT AFTER ADDITON (PROPOSED) | TOTAL COST FOR ADDED UNITS (PROPOSED) |
| Phase 4 Implementation SetUp Fees (one time per implementation) | ||||||
| Local Numbers Ported | SUPF | 4150 | 0.9000 | 3735.0000 | ||
| Web Portal Setup and addition (per user) | SUPF | 5000 | 0.6000 | 3000.0000 | ||
| ATA (or other) Hardware Adapters (physical – not virtual) | SUPF | 500 | 50.0000 | 25000.0000 | ||
| Setup Fee Per Added Department | SUPF | 55 | 0.0000 | 0.0000 | Cumulatve Total # of Units after implementation of Phase 4 | Monthly Total |
During Phase 4 ONLY
| Phase 4 - Montly Fees Lifespan of Recurring Costs: 3 months | ||||||
| Local Numbers ADDED Monthly Fee | RIC | 4150 | 0.7500 | 3112.5000 | 5000 | 3750.0000 |
| Web Portal ADDED Monthly User Fee | RIC | 5000 | 0.9000 | 4500.0000 | 10000 | 9000.0000 |
| Inbound Faxes ADDED Monthly Fee | RIC | 1660000 | 0.0200 | 33200.0000 | 2000000 | 40000.0000 |
| Outbound Faxes ADDED Monthly Fee | RIC | 830000 | 0.0350 | 29050.0000 | 1000000 | 35000.0000 |
| ATA Hardware Adapters ADDED Monthly Fee | RIC | 425 | 2.1000 | 892.5000 | 1000 | 2100.0000 |
| Phase 4 SUPF Costs: | $31,735 | (Phase 4 RIC costs multiplied by full remaining contract length if Phase 4 is the last Phase implemented) | ||||
| Phase 4 ONLY RIC Costs: | $424,530 | (Phase 4 RIC costs multiplied by number of months remaining in the contract |
FutureFax
| Bidder: FutureFax (Bidder and data are ficticious!) | ||||||
| One Time Costs | ||||||
| ITEM | COST TYPE?** | QUANTITY - in Units (PROPOSED) | UNIT DESCRIPTION | COST PER UNIT (PROPOSED) | TOTAL COST (PROPOSED) |
| Account Setup Fee | OTC | 1 | n/a | 2500.0000 | 2500.0000 |
| Initial Customer Meeting and Consult | OTC | 5 | Hours | 150.0000 | 750.0000 |
| TOTAL OTC: | 3,250.00 | ||||
| **Cost Types are either OTC (One Time Costs), SUPF (Setup Fees), RIC (Recurring Items Cost. See RFP document for further details.) |
| Phase 1 (Note: Phase lengths used here are for scoring purposes only and are not contractual commitments.) | |||||
| ITEM | COST TYPE?** | QUANTITY | COST PER UNIT (PROPOSED) | TOTAL COST (PROPOSED) |
| Phase 1 SetUp Fees (one time per Implementation Phase) | |||||
| Local Numbers Ported | SUPF | 150 | 1.5000 | 225.0000 | |
| Web Portal Setup and addition (per user) | SUPF | 50 | 1.2000 | 60.0000 | |
| ATA (or other) Hardware Adapters (physical – not virtual) | SUPF | 100 | 60.0000 | 6000.0000 | |
| Setup Fee Per Added Department | SUPF | 20 | 3.5000 | 70.0000 | |
| Monthly (Recurring) Fees during Phase 1 (Duration: 36 months if no Phase 2, otherwise 9 months) | |||||
| Local Numbers Monthly Fee | RIC | 150 | 1.0000 | 150.0000 | |
| Web Portal Monthly User Fee | RIC | 50 | 1.2500 | 62.5000 | |
| Inbound Faxes Monthly Fee | RIC | 60000 | 0.0500 | 3000.0000 | |
| Outbound Faxes Monthly Fee | RIC | 30000 | 0.0800 | 2400.0000 | |
| ATA (or other) Hardware Adapters (physical – not virtual) | RIC | 100 | 2.6000 | 260.0000 | |
| Phase 1 SUPF Costs: | $6,355.00 | ||||
| Phase 1 RIC Costs if Phase 2 is implemented: | $52,852.50 | (Phase 1 RIC costs multiplied by number of months until the next Implementation Phase. ) | |||
| Phase 2 (Note: Phase lengths used here are for scoring purposes only and are not contractual commitments.) | |||||
| ITEM | COST TYPE?** | ADDED QUANTITY | COST PER UNIT AFTER ADDITION (PROPOSED) | TOTAL COST FOR ADDED UNITS (PROPOSED) |
| Phase 2 Implementation SetUp Fees (one time per implementation) | ||||||
| Local Numbers Ported | SUPF | 150 | 1.5000 | 225.0000 | ||
| Web Portal Setup and addition (per user) | SUPF | 950 | 1.2000 | 1140.0000 | ||
| ATA (or other) Hardware Adapters (physical – not virtual) | SUPF | 75 | 58.0000 | 4350.0000 | Cumulatve Total # of Units after Imeplementation of Phase 2 | Monthly Total |
During Phase 2 only
| Setup Fee Per Added Department | SUPF | 35 | 3.5000 | 122.5000 | ||
| Phase 2 - Montly Fees Lifespan of Recurring Costs: 27 Months if No Phase 3, otherwise 12 mos | ||||||
| Local ADDED Numbers Monthly Fee | RIC | 150 | 0.9000 | 135.0000 | 300 | 270.0000 |
| Web Portal ADDED Monthly User Fee | RIC | 950 | 1.1700 | 1111.5000 | 1000 | 1170.0000 |
| Inbound Faxes ADDED Monthly Fee | RIC | 60000 | 0.0400 | 2400.0000 | 120000 | 4800.0000 |
| Outbound Faxes ADDED Monthly Fee | RIC | 30000 | 0.0600 | 1800.0000 | 60000 | 3600.0000 |
| ATA Hardware Adapters ADDED Monthly Fee | RIC | 75 | 2.5000 | 187.5000 | 175 | 437.5000 |
| Phase 2 SUPF Costs: | $5,838 | |||||
| Phase 2 only RIC Costs if Phase 3 is implemented: | $67,608 | (Phase 2 RIC costs multiplied by number of months until the next hypothetical Implementation Phase. |
| Phase 3 (Note: Phase lengths used here are for scoring purposes only and are not contractual commitments.) | |||||
| ITEM | COST TYPE?** | ADDED QUANTITY | COST PER UNIT AFTER ADDITION (PROPOSED) | TOTAL COST FOR ADDED UNITS (PROPOSED) |
| Phase 3 Implementation SetUp Fees (one time per implementation) | ||||||
| Local Numbers Ported | SUPF | 550 | 1.4500 | 797.5000 | ||
| Web Portal Setup and addition (per user) | SUPF | 4000 | 1.1000 | 4400.0000 | ||
| ATA (or other) Hardware Adapters (physical – not virtual) | SUPF | 400 | 56.0000 | 22400.0000 | Cumulatve Total # of Units after implementation of Phase 3 | Monthly Total |
During Phase 3 ONLY
| Setup Fee Per Added Department | SUPF | 35 | 3.2500 | 113.7500 | |||
| Phase 3 - Montly Fees Lifespan of Recurring Costs: 15 Months if No Phase 4, otherwise 12 months | |||||||
| Local Numbers ADDED Monthly Fee | RIC | 550 | 0.8000 | 440.0000 | 850 | 680.0000 | |
| Web Portal ADDED Monthly User Fee | RIC | 4000 | 1.0000 | 4000.0000 | 5000 | 5000.0000 | |
| Inbound Faxes ADDED Monthly Fee | RIC | 220000 | 0.0300 | 6600.0000 | 340000 | 10200.0000 | |
| Outbound Faxes ADDED Monthly Fee | RIC | 110000 | 0.0500 | 5500.0000 | 170000 | 8500.0000 | |
| ATA Hardware Adapters ADDED Monthly Fee | RIC | 400 | 2.3000 | 920.0000 | 575 | 1322.5000 | |
| Phase 3 SUPF Costs: | $27,711 | ||||||
| Phase 3 ONLY RIC Costs if Phase 4 is implemented: | $209,520 | (Phase 3 RIC costs multiplied by number of months until the next hypothetical Implementation Phase. | |||||
| Phase 4 (Note: Phase lengths used here are for scoring purposes only and are not contractual commitments.) | |||||||
| ITEM | COST TYPE?** | ADDED QUANTITY | COST PER UNIT AFTER ADDITON (PROPOSED) | TOTAL COST FOR ADDED UNITS (PROPOSED) |
| Phase 4 Implementation SetUp Fees (one time per implementation) | ||||||
| Local Numbers Ported | SUPF | 4150 | 0.9000 | 3735.0000 | ||
| Web Portal Setup and addition (per user) | SUPF | 5000 | 0.6000 | 3000.0000 | ||
| ATA (or other) Hardware Adapters (physical – not virtual) | SUPF | 500 | 50.0000 | 25000.0000 | Cumulatve Total # of Units after implementation of Phase 4 | Monthly Total |
During Phase 4 ONLY
| Setup Fee Per Added Department | SUPF | 55 | 3.0000 | 165.0000 | ||
| Phase 4 - Montly Fees Lifespan of Recurring Costs: 3 months | ||||||
| Local Numbers ADDED Monthly Fee | RIC | 4150 | 0.7500 | 3112.5000 | 5000 | 3750.0000 |
| Web Portal ADDED Monthly User Fee | RIC | 5000 | 0.9000 | 4500.0000 | 10000 | 9000.0000 |
| Inbound Faxes ADDED Monthly Fee | RIC | 1660000 | 0.0200 | 33200.0000 | 2000000 | 40000.0000 |
| Outbound Faxes ADDED Monthly Fee | RIC | 830000 | 0.0350 | 29050.0000 | 1000000 | 35000.0000 |
| ATA Hardware Adapters ADDED Monthly Fee | RIC | 425 | 2.1000 | 892.5000 | 1000 | 2100.0000 |
| Phase 4 SUPF Costs: | $31,900 | (Phase 4 RIC costs multiplied by full remaining contract length if Phase 4 is the last Phase implemented) | ||||
| Phase 4 ONLY RIC Costs: | $424,530 | (Phase 4 RIC costs multiplied by number of months remaining in the contract |
JustTheFax
| Bidder: JustTheFax (Bidder and submitted data are ficticious!) | ||||||
| One Time Costs | ||||||
| ITEM | COST TYPE?** | QUANTITY - in Units (PROPOSED) | UNIT DESCRIPTION | COST PER UNIT (PROPOSED) | TOTAL COST (PROPOSED) |
| Account Setup Fee | OTC | 1 | n/a | $3,500.0000 | $3,500.0000 |
| Administrative User Training | OTC | 10 | Hours | $50.0000 | $500.0000 |
| TOTAL OTC: | 4,000.00 | ||||
| **Cost Types are either OTC (One Time Costs), SUPF (Setup Fees), RIC (Recurring Items Cost. See RFP document for further details.) |
| Phase 1 (Note: Phase lengths and quantities used here are for scoring purposes only and are not contractual commitments.) | |||||
| ITEM | COST TYPE?** | QUANTITY | COST PER UNIT (PROPOSED) | TOTAL COST (PROPOSED) |
| Phase 1 SetUp Fees (one time per Implementation Phase) | |||||
| Local Numbers Ported | SUPF | 150 | 1.0000 | 150.0000 | |
| Web Portal Setup and addition (per user) | SUPF | 50 | 0.8500 | 42.5000 | |
| ATA (or other) Hardware Adapters (physical – not virtual) | SUPF | 100 | 40.0000 | 4000.0000 | |
| Setup Fee Per Added Department | SUPF | 20 | 34.0000 | 680.0000 | |
| Monthly (Recurring) Fees during Phase 1 (Duration: 36 months if no Phase 2, otherwise 9 months) | |||||
| Local Numbers Monthly Fee | RIC | 150 | 0.7500 | 112.5000 | |
| Web Portal Monthly User Fee | RIC | 50 | 1.1000 | 55.0000 | |
| Inbound Faxes Monthly Fee | RIC | 60000 | 0.0200 | 1200.0000 | |
| Outbound Faxes Monthly Fee | RIC | 30000 | 0.0300 | 900.0000 | |
| ATA (or other) Hardware Adapters (physical – not virtual) | RIC | 100 | 2.0000 | 200.0000 | |
| Phase 1 SUPF Costs: | $4,872.50 | ||||
| Phase 1 RIC Costs if Phase 2 is implemented: | $22,207.50 | (Phase 1 RIC costs multiplied by number of months until the next Implementation Phase. | |||
| Phase 2 (Note: Phase lengths and quantities used here are for scoring purposes only and are not contractual commitments.) | |||||
| ITEM | COST TYPE?** | ADDED QUANTITY | COST PER UNIT AFTER ADDITION (PROPOSED) | TOTAL COST FOR ADDED UNITS (PROPOSED) |
| Phase 2 Implementation SetUp Fees (one time per implementation) | ||||||
| Local Numbers Ported | SUPF | 150 | 0.9500 | 142.5000 | ||
| Web Portal Setup and addition (per user) | SUPF | 950 | 0.8000 | 760.0000 | ||
| ATA (or other) Hardware Adapters (physical – not virtual) | SUPF | 75 | 39.0000 | 2925.0000 | Cumulatve Total # of Units after Imeplementation of Phase 2 | Monthly Total |
During Phase 2 only
| Setup Fee Per Added Department | SUPF | 35 | 30.0000 | 1050.0000 | ||
| Phase 2 - Montly Fees Lifespan of Recurring Costs: 27 Months if No Phase 3, otherwise 12 mos | ||||||
| Local ADDED Numbers Monthly Fee | RIC | 150 | 0.7000 | 105.0000 | 300 | 210.0000 |
| Web Portal ADDED Monthly User Fee | RIC | 950 | 1.0000 | 950.0000 | 1000 | 1000.0000 |
| Inbound Faxes ADDED Monthly Fee | RIC | 60000 | 0.0190 | 1140.0000 | 120000 | 2280.0000 |
| Outbound Faxes ADDED Monthly Fee | RIC | 30000 | 0.0250 | 750.0000 | 60000 | 1500.0000 |
| ATA Hardware Adapters ADDED Monthly Fee | RIC | 75 | 1.9000 | 142.5000 | 175 | 332.5000 |
| Phase 2 SUPF Costs: | $4,878 | |||||
| Phase 2 only RIC Costs if Phase 3 is implemented: | $37,050 | (Phase 2 RIC costs multiplied by number of months until the next hypothetical Implementation Phase. |
| Phase 3 (Note: Phase lengths and quantities used here are for scoring purposes only and are not contractual commitments.) | |||||
| ITEM | COST TYPE?** | ADDED QUANTITY | COST PER UNIT AFTER ADDITION (PROPOSED) | TOTAL COST FOR ADDED UNITS (PROPOSED) |
| Phase 3 Implementation SetUp Fees (one time per implementation) | ||||||
| Local Numbers Ported | SUPF | 550 | 0.9200 | 506.0000 | ||
| Web Portal Setup and addition (per user) | SUPF | 4000 | 0.7500 | 3000.0000 | ||
| ATA (or other) Hardware Adapters (physical – not virtual) | SUPF | 400 | 37.0000 | 14800.0000 | Cumulatve Total # of Units after implementation of Phase 3 | Monthly Total |
During Phase 3 ONLY
| Setup Fee Per Added Department | SUPF | 35 | 25.0000 | 12705.0000 | |||
| Phase 3 - Montly Fees Lifespan of Recurring Costs: 15 Months if No Phase 4, otherwise 12 months | |||||||
| Local Numbers ADDED Monthly Fee | RIC | 550 | 0.6900 | 379.5000 | 850 | 586.5000 | |
| Web Portal ADDED Monthly User Fee | RIC | 4000 | 0.9000 | 3600.0000 | 5000 | 4500.0000 | |
| Inbound Faxes ADDED Monthly Fee | RIC | 220000 | 0.0140 | 3080.0000 | 340000 | 4760.0000 | |
| Outbound Faxes ADDED Monthly Fee | RIC | 110000 | 0.0220 | 2420.0000 | 170000 | 3740.0000 | |
| ATA Hardware Adapters ADDED Monthly Fee | RIC | 400 | 1.8000 | 720.0000 | 575 | 1035.0000 | |
| Phase 3 SUPF Costs: | $31,011 | ||||||
| Phase 3 ONLY RIC Costs if Phase 4 is implemented: | $122,394 | (Phase 3 RIC costs multiplied by number of months until the next hypothetical Implementation Phase. | |||||
| Phase 4 (Note: Phase lengths and quantities used here are for scoring purposes only and are not contractual commitments.) | |||||||
| ITEM | COST TYPE?** | ADDED QUANTITY | COST PER UNIT AFTER ADDITON (PROPOSED) | TOTAL COST FOR ADDED UNITS (PROPOSED) |
| Phase 4 Implementation SetUp Fees (one time per implementation) | ||||||
| Local Numbers Ported | SUPF | 4150 | 0.9000 | 3735.0000 | ||
| Web Portal Setup and addition (per user) | SUPF | 5000 | 0.6000 | 3000.0000 | ||
| ATA (or other) Hardware Adapters (physical – not virtual) | SUPF | 500 | 35.0000 | 17500.0000 | Cumulatve Total # of Units after implementation of Phase 4 | Monthly Total |
During Phase 4 ONLY
| Setup Fee Per Added Department | SUPF | 55 | 17.5000 | 962.5000 | ||
| Phase 4 - Montly Fees Lifespan of Recurring Costs: 3 months | ||||||
| Local Numbers ADDED Monthly Fee | RIC | 4150 | 0.6500 | 2697.5000 | 5000 | 3250.0000 |
| Web Portal ADDED Monthly User Fee | RIC | 5000 | 0.8000 | 4000.0000 | 10000 | 8000.0000 |
| Inbound Faxes ADDED Monthly Fee | RIC | 1660000 | 0.0110 | 18260.0000 | 2000000 | 22000.0000 |
| Outbound Faxes ADDED Monthly Fee | RIC | 830000 | 0.0200 | 16600.0000 | 1000000 | 20000.0000 |
| ATA Hardware Adapters ADDED Monthly Fee | RIC | 425 | 1.7500 | 743.7500 | 1000 | 1750.0000 |
| Phase 4 SUPF Costs: | $25,198 | (Phase 4 RIC costs multiplied by full remaining contract length if Phase 4 is the last Phase implemented) | ||||
| Phase 4 ONLY RIC Costs: | $126,904 | (Phase 4 RIC costs multiplied by number of months remaining in the contract |
SCORE CALCULATIONS
| FINAL COST PROPOSAL SCORES (FICTIOUS BIDDERS and FICTICIOUS BIDS) | |||||
| Bidder | OTF SCORE | SUPF SCORE | RIC SCORE | TOTAL CP SCORE | |
| FaxexRUs | 9.6306471306 | 23.9447665462 | 232.1922768557 | 265.7676905326 | |
| FutureFax | 15.0793650794 | 21.2301587302 | 172.2007006923 | 208.5102245018 | |
| JustTheFax | 12.78998779 | 24.2815729771 | 345.607022452 | 382.6785832191 |
| Details: | |||||||||
| MEAN OTF Costs: | (POSSIBLE SCORES: 0 - 25; MEAN SCORE = 12.5) | ||||||||
| Bidder | OTF COST | Δ from MEAN | % above or below mean | CALCULATED SUPF SCORE | |||||
| FaxesRUs | 5,035.00 | 940.00 | 22.9548229548 | 9.6306471306 | |||||
| FutureFax | 3,250.00 | -845.00 | -20.6349206349 | 15.0793650794 | |||||
| JustTheFax | 4,000.00 | -95.00 | -2.3199023199 | 12.78998779 | |||||
| MEAN | 4,095.00 | ||||||||
| MEAN SUPF Costs: | (POSSIBLE SCORES: 0 - 50; MEAN SCORE = 25) | ||||||||
| Bidder | Phase 1 SUPF | Phase 2 SUPF | Phase 3 SUPF | Phase 4 SUPF | TOTAL SUPF | Δ from MEAN | % above or below mean | CALCULATED SUPF SCORE | |
| FaxesRUs | 6545.00 | 5942.50 | 29037.50 | 31735.00 | 73260 | 2,919.25 | 4.1501547823 | 23.9624613044 | |
| FutureFax | 6355.00 | 5837.50 | 27711.25 | 31900.00 | 71803.75 | 1,463.00 | 2.0798754634 | 24.4800311342 | |
| JustTheFax | 4872.50 | 4877.50 | 31011.00 | 25197.50 | 65958.5 | -4,382.25 | -6.2300302456 | 26.5575075614 | |
| MEAN | 70340.75 | ||||||||
| Phase RIC Costs - For scoring purposes, this assumes all four phases are implemented | |||||||||
| Phase 1 | (Possible Scores: 0 - 200; MEAN SCORE = 100) | ||||||||
| Bidder | Phase 1 RIC | Δ from MEAN | % above or below mean | CALCULATED PHASE 2 SCORE | |||||
| FaxesRUs | 30591.00 | -4626.00 | -13.14 | 113.14 | |||||
| FutureFax | 52852.50 | 17635.50 | 50.08 | 49.92 | |||||
| JustTheFax | 22207.50 | -13009.50 | -36.94 | 136.94 | |||||
| MEAN | 35,217.0000 | ||||||||
| Phase 2 | Possible Scores: 0 - 150; MEAN SCORE = 75) | ||||||||
| Bidder | Phase 2 RIC | Δ from MEAN | % above or below mean | CALCULATED PHASE 2 SCORE | |||||
| FaxesRUs | 68295.00 | 10,644.00 | 18.4628193787 | 61.152885466 | |||||
| FutureFax | 67608.00 | 9,957.00 | 17.271166155 | 62.0466253838 | |||||
| JustTheFax | 37050.00 | -20,601.00 | -35.7339855336 | 101.8004891502 | |||||
| MEAN | 57,651.00 | ||||||||
| Phase 3 | (Possible Scores: 0 - 100; MEAN SCORE =50) | ||||||||
| Bidder | Phase 3 RIC | Δ from MEAN | % above or below mean | CALCULATED PHASE 3 SCORE | |||||
| FaxesRUs | 218052.00 | 34,730.00 | 18.9448074972 | 40.5275962514 | |||||
| FutureFax | 209520.00 | 26,198.00 | 14.290701607 | 42.8546491965 | |||||
| JustTheFax | 122394.00 | -60,928.00 | -33.2355091042 | 66.6177545521 | |||||
| MEAN | 183,322.00 | ||||||||
| Phase 4 | (Possible Scores: 0 - 50; MEAN SCORE=25) | ||||||||
| Bidder | Phase 4 RIC | Δ from MEAN | % above or below mean | CALCULATED PHASE 4 SCORE | |||||
| FaxesRUs | 424,530.00 | 99,208.75 | 30.4956254779 | 17.3760936305 | |||||
| FutureFax | 424,530.00 | 99,208.75 | 30.4956254779 | 17.3760936305 | |||||
| JustTheFax | 126,903.75 | -198,417.50 | -60.9912509558 | 40.2478127389 | |||||
| MEAN | 325,321.25 |
File details come from the government source that posted it. Updated .