RFP 18006.pdf

PDF 262 KB Posted

Attached to
Base Landfill Cell #9 Repair and Install Rain Cap Liner
Solicitation number
N4008521R0253
Issued by

View the file

Other files

File Type Posted
Amend 0001.pdf PDF
Repair Base Landfill Cell 9 CAD DWGS.zip ZIP file
Install Landfill Rain Cap Liner CAD DWGS.zip ZIP file
N4008520B0086 Dwgs.pdf PDF
N4008520B0086 Specs.pdf PDF
N4008518B0006 Dwgs_Part1.pdf PDF
N4008518B0006 Dwgs_Part2.pdf PDF
N4008518B0006 Specs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Landfill Cell #9 Repair and Install Rain Cap Liner Solicitation No. N40085-21-R-0253

MCB Camp Lejeune, North Carolina Project No. 18-0006

RFP 7/5/17

ROICC CAMP LEJEUNE

POC: LT Scott Cherry scott.m.cherry@navy.mil

ONLY THE FOLLOWING LIST OF CONTRACTORS MAY SUBMIT A

PROPOSAL FOR THIS PROJECT:

N40085-16-D-6300

Blue Rock Structures, Inc.

10689 Hwy 17

Pollocksville, NC 28573

POC: Ellen Hartness

Phone: 910-743-0505 estimating@bluerockstr.com

N40085-16-D-6301

Daniels & Daniels Construction Co., Inc.

P.O. Box 10337

Goldsboro, NC 27532

POC: Damon Jones

Phone: 919-778-4525 damonj@danddcc.com

N40085-16-D-6302

Joyce & Associates Construction, Inc.

6994 Hwy 70

Newport, NC 28570

POC: Mary Caison

Phone: 252-223-3171 info@joyceandassoc.com

N40085-16-D-6303

Military & Federal Construction Co., Inc.

846 Bell Fork Road

Jacksonville, NC 28540

POC: Neil Oliver

Phone: 910-353-3797 estimating@militaryandfederal.com

N40085-16-D-6304

Quadrant Construction, Inc.

166 Center Street

Jacksonville, NC 28546

POC: Steven Kellum

Phone: 910-937-0003 chriswhaley@qcenc.com

N40085-16-D-6305

T.E. Davis Construction Co.

1175 East Davis Road

Jacksonville, NC 28546

POC: Brandon Horne

Phone: 910-353-3112 bhorne@tedavisconstruction.com mailto:estimating@bluerockstr.com mailto:damonj@danddcc.com mailto:info@joyceandassoc.com mailto:estimating@militaryandfederal.com mailto:chriswhaley@qcenc.com mailto:bhorne@tedavisconstruction.com

GENERAL REQUIREMENTS

NAVFAC Solicitation No.: N40085-21-R-0253

Public Works Project No.: 18-0006

Title: Base Landfill Cell #9 Repair and Install Rain Cap Liner

Contract Completion Date: 270 days after award

Estimated Cost Range: Between $1,000,000 and $5,000,000

Wage Determination: General Decision Number: NC20210038 01/01/2021

Liquidated Damages: $500 per Calendar Day

Notes: One person may fill the roles of Superintendent, Quality Control Manager, and Safety and Health Officer, if duly qualified for all three positions as defined in the project specification.

Special Scheduling: See design plans for project phasing notes/direction.

Basis for Award: Lowest Price

Proposal Requirement: Provide proposal as outlined in the attached Pricing Sheet.

Proposal Acceptance Period: 60 days from receipt of offers

Site Visit: N/A

Bond Requirements: Bid bonds are required in accordance with FAR 53.301-24. An electronic copy of your bid bond may be submitted with your proposal. A hard copy of your bid bond must be submitted to the ROICC office within one (1) business day after the due date and time for receipt of proposals. Failure to submit a bid bond by the deadline will result in your proposal being removed from consideration. Payment and/or performance bond(s) will be requested at the time of award per the current process.

• No bonds are required for proposals less than $40K.

• Proposals valued at $40K and greater will require a payment bond only.

• Proposals valued at $150K and greater will require a bid bond, a payment bond, and a performance bond.

Proposal Due Date: August 25, 2021

3:00 PM EST

E-Mail Address for Proposals: NAVFAC_ML_ROICCCampLejeune-Bids1@navy.mil AND scott.m.cherry@navy.mil.

Requests for Information (RFIs): RFIs must be submitted to scott.m.cherry@navy.mil. The cut off for RFIs is August 18, 2021 by 2:00 PM EST in order to process all inquiries by the proposal due date.

The specifications and drawings are posted as attachments on https://www.sam.gov/.

“OFFERORS ARE ADVISED THAT FUNDING MAY NOT BECOME AVAILABLE. IF

FUNDS ARE NOT AVILABLE, NO AWARD WILL BE MADE AS RESULT OF THIS

SOLICITATION. OFFERORS WILL NOT BE REIMBURSED FOR ANY EFFORT OR

PROPOSAL COSTS RESULTING FROM THIS SOLICITATION.”

mailto:scott.m.cherry@navy.mil mailto:scott.m.cherry@navy.mil

"General Decision Number: NC20210038 01/01/2021

Superseded General Decision Number: NC20200038

State: North Carolina

Construction Type: Building

County: Onslow County in North Carolina.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.95 for calendar year 2021 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded

(and any solicitation was issued) on or after January 1, 2015.

If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.95 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2021. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate, if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date

0 01/01/2021

IRON0848-005 07/01/2020

Rates Fringes

IRONWORKER, STRUCTURAL...........$ 26.00 15.80

* PLUM0421-003 07/01/2020

PIPEFITTER.......................$ 29.35 12.41

SUNC2011-019 08/24/2011

BRICKLAYER.......................$ 19.00 0.00

CARPENTER (Drywall Hanging

Only)............................$ 13.83 0.00

CARPENTER (Form Work Only).......$ 13.38 1.80

CARPENTER, Excludes Drywall

Hanging, and Form Work...........$ 16.39 4.26

CEMENT MASON/CONCRETE FINISHER...$ 15.80 0.00

ELECTRICIAN......................$ 20.64 6.68

HVAC MECHANIC (HVAC Duct

Installation Only)...............$ 17.37 1.82

LABORER: Common or General......$ 11.13 0.32

LABORER: Landscape &

Irrigation.......................$ 9.13 0.28

LABORER: Pipelayer..............$ 13.35 2.80

LABORER: Mason

Tender-Brick/Cement/Concrete.....$ 12.00 0.00

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 18.47 2.41

OPERATOR: Bulldozer.............$ 16.00 1.87

OPERATOR: Crane.................$ 19.77 4.48

OPERATOR: Forklift..............$ 13.86 0.00

OPERATOR: Grader/Blade..........$ 15.72 1.49

OPERATOR: Loader................$ 16.17 0.25

PAINTER: Brush, Roller and

Spray............................$ 12.35 0.00

PLUMBER..........................$ 18.48 3.93

ROOFER...........................$ 11.75 1.06

SHEET METAL WORKER, Excludes

HVAC Duct Installation...........$ 15.81 1.40

TRUCK DRIVER.....................$ 13.38 1.48

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the

Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate

(weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or

""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010

08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"

PRICING SHEET

Under the line items furnished, the offers shall state prices for each Exhibit Line Item Number

(ELIN) given hereinafter:

ELIN 0001

Price includes completing all work associated with Install Landfill Rain Cap Liner in accordance with the provided drawings and specifications, but excluding work described in

ELIN 0002. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0002

Price includes completing all work associated with Base Landfill Cell 9 Repairs in accordance with the provided drawings and specifications, but excluding work described in ELIN 0001. The price for this line item should include all applicable costs, overhead and profit for this work.

TOTAL ELIN 0001 & 0002: $______________________________________

Notes

A. Offers must be submitted on all line items. Failure to propose on all line items may result in the offer being rejected as non-responsive.

B. ELINs shall include all markups (overhead, labor burden, and profit).

C. Award will be made on the total sum of ELIN 0001 and ELIN 0002.