Amend 0001.pdf
PDF 997 KB Posted
- Solicitation number
- N4008521R0253
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Repair Base Landfill Cell 9 CAD DWGS.zip | ZIP file | |
| Install Landfill Rain Cap Liner CAD DWGS.zip | ZIP file | |
| N4008520B0086 Dwgs.pdf | ||
| N4008520B0086 Specs.pdf | ||
| N4008518B0006 Dwgs_Part1.pdf | ||
| N4008518B0006 Dwgs_Part2.pdf | ||
| N4008518B0006 Specs.pdf | ||
| RFP 18006.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N40085-21-R-0253
Amendment 0001
CONTINUATION SHEET
1. QUESTION: Spec Section(s) 01 57 19, Paragraph(s) 1.7.1 for both projects for RFP
N40085-21-R-0253 indicates for the contractor to prepare a completed Notice of Intent (NOI) form in accordance with the requirements of the State's general permit for storm water discharges from construction sites. Submit NOI, and the appropriate permit fee to the
Contracting Office a minimum of 14 days prior to start of construction. On previous General
MACC RFP Solicitations and Task Orders, all applicable permits have been applied for and paid for by MCB Camp Lejeune. Is this correct?
ANSWER: No ESC required
2. QUESTION: Is the 12" Stone protective cover layer existing, on top of the 12" drainage layer as shown on sheet C-502 detail C.
ANSWER: Yes, detail is as per original landfill construction drawings.
3. QUESTION: Drawings indicate we are to replace &/or repair leachite pumps, risers & piping. How do we determine what to repair/replace?
ANSWER: Demolition Note #2 requires that the leachate lines be inspected after the stone is removed to determine if there is any damage. Any repairs would need to be handled by a
Change Order due to unforeseen site conditions. The same requirement would apply to the risers and the pump. There may not be any needed repairs.
4. QUESTION: Can Specifications be provided by Amendment for the leachite pumps, risers & piping that require replacement on the project
ANSWER: Leachate pipe sizes are shown on detail Sheet C501. The sump detail with pump are shown on detail Sheet C-502 with the horsepower and operating parameters. If there damage is identified upon inspection intent would be to match existing.
5. QUESTION: Can a site visit be scheduled for the project?
ANSWER: There will not be a site visit scheduled. Site is accessible to contractors.
6. QUESTION: Can the CAD files be provided by Amendment?
ANSWER: CAD files have been posted to http://sam.gov
7. All other terms and conditions remain unchanged.