Text version
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
CODE
6. PROJECT NUMBER
8. ADDRESS OFFER TO
4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
See Attached
STANDARD FORM 1442 (REV. )
Prescribed by GSA - FAR (48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE.
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
27. PAYMENT WILL BE MADE BY
10 U.S.C. 2304(c) ( )
20b. SIGNATURE 20c. OFFER DATE
STANDARD FORM 1442 (REV. ) BACK
SCHEDULE Continued
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 Ordering Period 1 (NOT OPTION) - General Construction
Single Award Task Order Contract (SATOC), Firm Fixed Price, Indefinite-Delivery/Indefinite-Quantity (IDIQ) for renovations, alterations, and repairs to facilities and utilities for NCNR on NIST Gaithersburg, MD Campus
Contractor to provide labor, material, equipment, and supervision to complete construction projects.
PR NUMBER: NB195000-21-00473
Period of Performance: 07/01/2021 to 06/30/2022
1.00 JB
0002 Task Order 001 (NOT OPTION): B235 Bring Fixed
Ladder Up to Code. Remove existing fixed ladders and install new fixed ladders for Building 235 Roof Access on NIST Gaithersburg, MD Campus.
PR NUMBER: NB195000-21-00473
1.00 EA
OPT
1001 Ordering Period 2 - General Construction Single
Award Task Order Contract (SATOC), Firm Fixed Price, Indefinite-Delivery/Indefinite-Quantity (IDIQ) for renovations, alterations, and repairs to facilities and utilities for NCNR on NIST Gaithersburg, MD Campus.
Contractor to provide labor, material, equipment, and supervision to complete construction projects.
PR NUMBER: NB195000-21-00473
Period of Performance: 07/01/2022 to 06/30/2023
1.00 JB
OPT
2001 Ordering Period 3 - General Construction Single
Award Task Order Contract (SATOC), Firm Fixed Price, Indefinite-Delivery/Indefinite-Quantity (IDIQ) for renovations, alterations, and repairs to facilities and utilities for NCNR on NIST Gaithersburg, MD Campus.
Contractor to provide labor, material, equipment, and supervision to complete construction projects.
PR NUMBER: NB195000-21-00473
Period of Performance: 07/01/2023 to 06/30/2024
1.00 JB
OPT
3001 Ordering Period 4 - General Construction Single
Award Task Order Contract (SATOC), Firm Fixed Price, Indefinite-Delivery/Indefinite-Quantity (IDIQ) for renovations, alterations, and repairs to facilities and utilities for NCNR on NIST Gaithersburg, MD Campus.
Contractor to provide labor, material, equipment, and supervision to complete construction projects.
PR NUMBER: NB195000-21-00473
Period of Performance: 07/01/2024 to 06/30/2025
1.00 JB
OPT
4001 Ordering Period 5 - General Construction Single
Award Task Order Contract (SATOC), Firm Fixed Price, Indefinite-Delivery/Indefinite-Quantity (IDIQ) for renovations, alterations, and repairs to facilities and utilities for NCNR on NIST Gaithersburg, MD Campus.
1.00 JB
PAGE 3 OF 268 1333ND21RNB190010
SCHEDULE Continued
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Contractor to provide labor, material, equipment, and supervision to complete construction projects.
PR NUMBER: NB195000-21-00473
Period of Performance: 07/01/2025 to 06/30/2026
PAGE 4 OF 268 1333ND21RNB190010
Table of Contents
SECTION C DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C.1 IDIQ Base Statement of Work
C.2 Seed Task Order - Statement or Work
SECTION E INSPECTION AND ACCEPTANCE
E.1 52.246-4 INSPECTION OF SERVICES--FIXED-PRICE (AUG 1996)
SECTION F DELIVERIES OR PERFORMANCE
F.1 52.242-15 STOP-WORK ORDER (AUG 1989)
F.2 52.242-17 GOVERNMENT DELAY OF WORK (APR 1984)
F.3 1352.270-70 PERIOD OF PERFORMANCE (APR 2010)
SECTION G CONTRACT ADMINISTRATION DATA
G.1 1352.201-70 CONTRACTING OFFICER?s AUTHORITY (APR 2010)
G.2 1352.201-72 CONTRACTING OFFICER`S REPRESENTATIVE (COR) (APR 2010)
G.3 1352.216-76 PLACEMENT OF ORDERS (APR 2010)
G.4 NIST LOCAL-53CONTRACT PERFORMANCE DURING CHANGES IN NIST OPERATING STATUS
SECTION H SPECIAL CONTRACT REQUIREMENTS
H.1 1352.208-70 RESTRICTIONS ON PRINTING AND DUPLICATING (APR 2010)
H.2 1352.209-72 RESTRICTIONS AGAINST DISCLOSURE (APR 2010)
H.3 1352.209-73 COMPLIANCE WITH THE LAWS (APR 2010)
H.4 1352.209-74 ORGANIZATIONAL CONFLICT OF INTEREST (APR 2010)
H.5 1352.216-74 TASK ORDERS (APR 2010)
H.6 1352.231-71 DUPLICATION OF EFFORT (APR 2010)
H.7 1352.237-71 SECURITY PROCESSING REQUIREMENTS - LOW RISK CONTRACTS (APR 2010)
H.8 1352.237-75 KEY PERSONNEL (APR 2010)
H.9 1352.239-71 ELECTRONIC AND INFORMATION TECHNOLOGY (APR 2010)
H.10 NIST LOCAL-55ELECTRONIC BILLING INSTRUCTIONS FOR DELIVERY/TASK ORDERS
SECTION I CONTRACT CLAUSES
I.1 52.202-1DEFINITIONS (JUN 2020)
I.2 52.203-3 GRATUITIES (APR 1984)
I.3 52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)
I.4 52.203-6RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (JUN 2020)
I.5 52.203-7ANTI-KICKBACK PROCEDURES (JUN 2020)
I.6 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)
I.7 52.203-12LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (JUN 2020)
I.8 52.203-17CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO INFORM EMPLOYEES OF
WHISTLEBLOWER RIGHTS (JUN 2020)
I.9 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT PAPER (MAY 2011)
I.10 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)
I.11 52.204-10REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS (JUN 2020)
I.12 52.204-14 SERVICE CONTRACT REPORTING REQUIREMENTS (OCT 2016)
I.13 52.209-6PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (JUN 2020)
I.14 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) 34
I.15 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS (NOV 2015)
I.16 52.209-11 REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX LIABILITY OR A FELONY
CONVICTION UNDER ANY FEDERAL LAW (FEB 2016)
I.17 52.215-2AUDIT AND RECORDS--NEGOTIATION (JUN 2020)
PAGE 5 OF 268 1333ND21RNB190010
I.18 52.215-8 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT (OCT 1997)
I.19 52.216-18ORDERING (AUG 2020)
I.20 52.216-19 ORDER LIMITATIONS (OCT 1995)
I.21 52.216-22 INDEFINITE QUANTITY (OCT 1995)
I.22 52.216-27 SINGLE OR MULTIPLE AWARDS (OCT 1995)
I.23 52.216-32 TASK-ORDER AND DELIVERY-ORDER OMBUDSMAN (SEPT 2019)
I.24 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)
I.25 52.219-6NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2020)
I.26 52.219-28POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (NOV 2020)
I.27 52.222-3 CONVICT LABOR (JUN 2003)
I.28 52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS --OVERTIME COMPENSATION (MAY 2018)
I.29 52.222-5 Construction Wage Rate Requirements Secondary Site of the Work (May 2014)
I.30 52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS (AUG 2018)
I.31 52.222-7 WITHHOLDING OF FUNDS (MAY 2014)
I.32 52.222-8 PAYROLLS AND BASIC RECORDS (AUG 2018)
I.33 52.222-9 APPRENTICES AND TRAINEES (JUL 2005)
I.34 52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS (FEB 1988)
I.35 52.222-11 SUBCONTRACTS (LABOR STANDARDS) (MAY 2014)
I.36 52.222-12 CONTRACT TERMINATION--DEBARMENT (MAY 2014)
I.37 52.222-13 COMPLIANCE WITH CONSTRUCTION WAGE RATE REQUIREMENTS AND RELATED REGULATIONS (MAY
2014)
I.38 52.222-14 DISPUTES CONCERNING LABOR STANDARDS (FEB 1988)
I.39 52.222-15 CERTIFICATION OF ELIGIBILITY (MAY 2104)
I.40 52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015)
I.41 52.222-26 EQUAL OPPORTUNITY (SEPT 2016)
I.42 52.222-32 CONSTRUCTION WAGE RATE REQUIREMENTS--PRICE ADJUSTMENT (ACTUAL METHOD) (AUG 2018)..49
I.43 52.222-35EQUAL OPPORTUNITY FOR VETERANS. (JUN 2020)
I.44 52.222-37EMPLOYMENT REPORTS ON VETERANS (JUN 2020)
I.45 52.222-38 COMPLIANCE WITH VETERANS` EMPLOYMENT REPORTING REQUIREMENTS (FEB 2016)
I.46 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010). 51
I.47 52.222-50COMBATING TRAFFICKING IN PERSONS (OCT 2020)
I.48 52.222-55MINIMUM WAGES UNDER EXECUTIVE ORDER 13658 (NOV 2020)
I.49 52.223-6 DRUG-FREE WORKPLACE (MAY 2001)
I.50 52.223-18ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING (JUN 2020)
I.51 52.227-1AUTHORIZATION AND CONSENT (JUN 2020)
I.52 52.227-2NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT (JUN 2020)
I.53 52.227-3 PATENT INDEMNITY (APR 1984)
I.54 52.228-1 BID GUARANTEE (SEP 1996)
I.55 52.228-5 INSURANCE--WORK ON A GOVERNMENT INSTALLATION (JAN 1997)
I.56 52.228-15PERFORMANCE AND PAYMENT BONDS--CONSTRUCTION (JUN 2020)
I.57 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)
I.58 52.232-1 PAYMENTS (APR 1984)
I.59 52.232-8 DISCOUNTS FOR PROMPT PAYMENT (FEB 2002)
I.60 52.232-11 EXTRAS (APR 1984)
I.61 52.232-17 INTEREST (MAY 2014)
I.62 52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)
I.63 52.232-25 PROMPT PAYMENT (JAN 2017)
I.64 52.233-1 DISPUTES (MAY 2014)
I.65 52.233-2 SERVICE OF PROTEST (SEP 2006)
I.66 52.233-3 PROTEST AFTER AWARD (AUG 1996)
I.67 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)
PAGE 6 OF 268 1333ND21RNB190010
I.68 52.236-2 DIFFERING SITE CONDITIONS (APR 1984)
I.69 52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APR 1984)
I.70 52.236-5 MATERIAL AND WORKMANSHIP (APR 1984)
I.71 52.236-6 SUPERINTENDENCE BY THE CONTRACTOR (APR 1984)
I.72 52.236-7 PERMITS AND RESPONSIBILITIES (NOV 1991)
I.73 52.236-8 OTHER CONTRACTS (APR 1984)
I.74 52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS
(APR 1984)
I.75 52.236-10 OPERATIONS AND STORAGE AREAS (APR 1984)
I.76 52.236-12 CLEANING UP (APR 1984)
I.77 52.236-13 ACCIDENT PREVENTION (NOV 1991)
I.78 52.236-13 I ACCIDENT PREVENTION (NOV 1991)--ALTERNATE I (NOV 1991)
I.79 52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES (APR 1984)
I.80 52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS (APR 1984)
I.81 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997)
I.82 52.236-26 PRECONSTRUCTION CONFERENCE (FEB 1995)
I.83 52.236-28 PREPARATION OF PROPOSALS--CONSTRUCTION (OCT 1997)
I.84 52.242-13 BANKRUPTCY (JUL 1995)
I.85 52.245-1 GOVERNMENT PROPERTY (JAN 2017)
I.86 52.245-9 USE AND CHARGES (APR 2012)
I.87 52.246-25 LIMITATION OF LIABILITY--SERVICES (FEB 1997)
I.88 52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) (APR 2012)
I.89 52.249-14 EXCUSABLE DELAYS (APR 1984)
I.90 1352.228-70 INSURANCE COVERAGE (APR 2010)
I.91 1352.228-72 DEDUCTIBLES UNDER REQUIRED INSURANCE COVERAGE- FIXED PRICE (APR 2010)
I.92 1352.233-70 AGENCY PROTESTS (APR 2010)
I.93 1352.233-71 GAO AND COURT OF FEDERAL CLAIMS PROTESTS (APR 2010)
I.94 NIST LOCAL-53CONTRACT PERFORMANCE DURING CHANGES IN NIST OPERATING STATUS
I.95 NIST LOCAL-55ELECTRONIC BILLING INSTRUCTIONS FOR DELIVERY/TASK ORDERS
I.96 1352.216-75 MINIMUM AND MAXIMUM CONTRACT AMOUNTS (APR 2010)
SECTION J LIST OF ATTACHMENTS
J.1 Seed Task Order Attachment 1 - Specifications
J.2 Seed Task Order Attachment 2 - Drawings
J.3 Attachment - Wage Determination
SECTION L INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
L.1 Addendum to FAR 52.215-1 -Instructions to Offerors
L.2 52.204-13SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)
L.3 52.216-1 TYPE OF CONTRACT (APR 1984)
L.4 52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2018)
L.5 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)
L.6 52.237-1 SITE VISIT (APR 1984)
L.7 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
L.8 52.215-1 INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (JAN 2017)
L.9 Addendum to FAR 52.237-1 - Site Visit Instructions
L.10 36.204 - Disclosure of the Magnitude
SECTION M EVALUATION FACTORS FOR AWARD
M.1 Evaluation Criteria
M.2 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
PAGE 7 OF 268 1333ND21RNB190010
PAGE 8 OF 268 1333ND21RNB190010
SECTION C
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C.1 IDIQ Base Statement of Work
PAGE 9 OF 268 1333ND21RNB190010
NCNR Construction - Single Award Task Order Contract -
STATEMENT OF WORK
BACKGROUND
The National Institute of Standards and Technology (NIST) Gaithersburg, Maryland campus is a Research and Development (R&D) facility with 52 buildings located on a 578-acre campus.
Other facilities are located within Montgomery County, Maryland.
The NIST Center for Neutron Research (NCNR) owns and operates a nuclear test reactor to provide neutron radiation for experiments. This is housed in Building 235. The original building was built in the 1960s with various expansions occurring to the building along with added support buildings dedicated to NCNR. Additions and expansions are 10 to 50 years old and generally steel superstructure with block and brick wall construction. Building 235 has specialized layout with below grade concrete basement and/or combination window/panelized storefront façade.
Utilities are distributed to NCNR by underground pipe and electrical distribution systems from central plant services owned and operated by NIST.
Facility interior and exterior rehabilitation and renovations are continuous as buildings and systems age, or scientific projects require new layouts to accommodate on-going research.
OBJECTIVES
An IDIQ construction contract with a 5 year duration to a single contractor. Construction will be considered “design-bid-build”. Architect/engineering services are not included in this contract.
SCOPE
Contractor shall provide construction services performed for NCNR. This may include building renovations, additions, reconfiguration and repairs within the NCNR complex on the Gaithersburg Campus. Building 235 of the NCNR complex has an operating nuclear test reactor.
Some work may occur within Building 235 while the reactor is in operation.
Construction tasks may include new installations, repairs, replacement, modifications, or renovations to NCNR facilities which may include
• Laboratory and scientific research spaces
• Industrial spaces containing and/or utilizing compressed gases, cryogenic fluids, or heating and cooling equipment.
• Administrative and common spaces.
• HVAC systems and equipment including direct digital controls and underground steam and chilled water piping.
• Process gas systems (nitrogen, compressed air, helium, etc.) including monitoring and safety controls.
• Electrical systems and equipment including switchgear, panel boards, and uninterruptible power systems
• Fire alarm systems
• Fire suppression systems
• Generators
• Communication Systems (Phone, Page Phone)
PAGE 10 OF 268 1333ND21RNB190010
NCNR Construction Services Statement of Work
• Security System (Card Readers)
• Wall Penetrations with air and fire seal
• Modification of campus utility system and supporting underground structures to include steam and chilled water piping and electrical systems in support of NCNR
• Excavating, trenching, and backfilling
• Surveying
• Roads/sidewalks,
• Earthwork and landscaping,
• Gates/fences,
• Permit applications to regulatory authorities
• Environmental compliance (State or Federal) to include permit application completion that involve engineering calculations
• Hazardous and radioactive material and abatement
• Lead paint and asbestos abatement
• Elevators
• Fixed equipment such as ladders and stairs
• Building envelope systems such as roofs, rollup doors, and windows
• Cooling towers
TASKS
Task Orders are the individual contract actions to perform work within the structure of this contract. A specific Scope of Work (SOW) will be issued for each Task Order.
The SOW for each task order will include documentation specifying the general and specific requirements of the particular task. Where specific scope details cannot be provided, the Contractor and the Government will reach an agreement on scope, quantity, and performance period to fulfill the intent of the task order.
Tasks orders will have a period of performance identified in the SOW and/or RFP.
• Maximum Contract Value: $9,5000,000
• Maximum Task Order Value: $3,000,000
• Minimum Task Order Value: $10,000
TRAVEL
No travel beyond the limits of Montgomery County, Maryland is required for this SOW.
PLACE OF PERFORMANCE
The services required for this contract will support NCNR on the NIST Campus within Montgomery County Maryland. NIST is NOT providing any office or related support services for the Contractor at NIST facilities or any other facility.
SECURITY
Contractor shall follow badging procedures noted in the solicitation for Foreign Nationals. All other contractor personnel shall follow HSPD-12 https://www.dhs.gov/homeland-security-presidential-directive-12 and NIST Directive PR 2401.01 ver 2 (Dated 06/08/2016).
PAGE 11 OF 268 1333ND21RNB190010
NCNR Construction Services Statement of Work
Reference Guidelines to Contractors and A-E firms (June 4, 2018) for additional security procedures.
NCNR has additional access requirements. NCNR Orange Badge is required for unescorted access in Building 235 and for access to Building 235 for more than 10 days. For additional information and requirements to obtain a NCNR Orange badge:
https://www.nist.gov/ncnr/arrange-visit-ncnr/obtaining-access-ncnr Required training with required Health Physics tour for an Orange Badge averages 4 hours for each individual acquiring the badge. A NIST Site Access (Green Badge) is required prior to obtained an Orange Badge.
PERIOD OF PERFORMANCE
Base year and four option years.
ATTACHMENTS:
- Sample Task Order 001 Statement of Work (see Section C)
- Sample Task Order 00attachments (see section J)
- Wage Determination
- Covid 19 safety attachments (see SamBeta.gov attachment section)
END OF SOW
C.2 Seed Task Order - Statement or Work
PAGE 12 OF 268 1333ND21RNB190010
Task Order 1 - Statement of Work
Background
The National Institute of Standards and Technology (NIST) Acquisition Management Division intends to procure construction services to bring fixed ladder roof access at Building 235, NIST Center for Neutron Research (NCNR) up to code requirements.
Supplemental information attached to this Statement of Work include the following:
1. Guidelines for Contractors and A/E Firms Performing Site Investigations and Fieldwork (Including Construction) at the National Institute of Standards and Technology, Gaithersburg, MD, Dated 06/04/2018. (see SamBeta.gov attachments)
2. 100% Submission Drawings, Dated 08/28/2020.
3. Task 2 - Building 235 Ladders Specifications.
Objectives
This contract is to improve the safety of roof access to Building 235 by installing new fixed ladders compliant with current codes and standards.
Scope
The Contractor shall provide labor, material, tools, equipment, project management and coordination to perform the work described in attached 100% Submission Drawings to the requirements of Task 2 - Building 235 Ladders Specifications.
Tasks
1 Demolition: Remove existing fixed ladders at Building 235 as shown on 100% Submission Drawings.
2 New Work: Provide and install new fixed ladders as shown on 100% Submission Drawings and described by the requirements of Task 2 - Building 235 Ladders Specifications..
Deliverables
1 Schedule:
1.1 The contractor shall submit to NIST within 5 working days from Award a detailed Project Schedule.
PAGE 13 OF 268 1333ND21RNB190010
Statement of Work B235 Bring Fixed Ladder Up to Code
1.2 Refer to Specification Section 01 32 00 for additional information.
2 Safety Plan
2.1 The Contractor shall submit to NIST within 7 working days from Award a project specific life and safety plan for review and approval. Notice To Procced will not be issued until the Contractor's Safety Plan is returned without comment or exception.
3 Narrative
3.1 The Contractor shall describe in a written narrative its plans for phasing the work to minimize disruptions to the area of work. The narrative will also detail how the contractor intends to prepare the site, disassemble, relocate, reassemble, and reactivate utility services.
3.1.1 Construction phasing shall be constrained by the need to maintain current operations in the building and areas adjacent to the area of work.
3.1.2 Contractor shall propose phasing to minimize disruptions to occupants.
3.1.3 While it is also required that any disturbance in or around the area of work be kept to a minimum, the Contractor shall highlight in the Schedule specific tasks that require execution outside of normal working hours, as necessary, to minimize the overall impact or disturbance on ongoing operations in areas affected.
3.2 The Contractor shall clarify its intended uses of portions of the site for materials staging, temporary trailer offices, employee parking, and other activities.
4 Submittals and Shop Drawings
4.1 Submittals of materials shall be provided for review prior to Contractor's purchase of materials for this project.
4.1.1 Refer to Specification Section 01 33 00 for Submittal Procedures.
4.1.2 Individual sections of the attached Task 2 - Building 235 Ladders Specification have specific submittal requirements for material and work described therein
4.2 Attached 100% Submission Drawings illustrate a diagrammatic concept of the project needs. The Contractor shall provide complete shop drawings showing proposed routing, sizes, means, and methods for NIST review prior to start of installation.
5 Closeout Documentation
5.1 Refer to Specification Section 01 77 00.
Government-Furnished Property (GFP)
None.
PAGE 14 OF 268 1333ND21RNB190010
Statement of Work B235 Bring Fixed Ladder Up to Code
Security Considerations
Refer to Guidelines for Contractors and A/E Firms Performing Site Investigations and Fieldwork (Including Construction) at the National Institute of Standards and Technology, Gaithersburg, MD, Dated 06/04/2018 attached to this document.
Gate and building access must be coordinated with COR and Reactor Operations Group.
Travel
Not Applicable.
Special Material Requirements
1 Materials indicated on 100% Submission Drawings and in Task 2 - Building 235 Ladders Specifications are to establish a minimum level of quality to adequately interface with the existing building. The Contractor may propose alternative approaches for NIST review prior to material purchase and start of installation.
2 Refer to Specification Section 01 60 00 for additional information.
Other Unique Requirements and Considerations
The Building will be occupied and in use while construction occurs. Outages of utilities shall be coordinated a minimum of seven business days in advance.
Place of Performance
1 The construction work of this project occurs at Building 235 on the NIST Campus in Gaithersburg, Maryland.
Period of Performance
The Period of Performance for this project is 90 days from Notice to Proceed.
PAGE 15 OF 268 1333ND21RNB190010
SECTION E
INSPECTION AND ACCEPTANCE
E.1 52.246-4 INSPECTION OF SERVICES--FIXED-PRICE (AUG 1996)
(a) "Definitions." "Services," as used in this clause, includes services performed, workmanship, and material furnished or utilized in the performance of services.
(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering the services under this contract. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires.
(c) The Government has the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.
(d) If the Government performs inspections or tests on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties.
(e) If any of the services do not conform with contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. When the defects in services cannot be corrected by reperformance, the Government may--
(1) Require the Contractor to take necessary action to ensure that future performance conforms to contract requirements; and
(2) Reduce the contract price to reflect the reduced value of the services performed.
(f) If the Contractor fails to promptly perform the services again or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may--
(1) By contract or otherwise, perform the services and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service; or
(2) Terminate the contract for default.
(End of Clause)
PAGE 16 OF 268 1333ND21RNB190010
SECTION F
DELIVERIES OR PERFORMANCE
F.1 52.242-15 STOP-WORK ORDER (AUG 1989)
(a) The Contracting Officer may, at any time, by written order to the Contractor, require the Contractor to stop all, or any part, of the work called for by this contract for a period of 90 days after the order is delivered to the Contractor, and for any further period to which the parties may agree. The order shall be specifically identified as a stop-work order issued under this clause. Upon receipt of the order, the Contractor shall immediately comply with its terms and take all reasonable steps to minimize the incurrence of costs allocable to the work covered by the order during the period of work stoppage. Within a period of 90 days after a stop-work is delivered to the Contractor, or within any extension of that period to which the parties shall have agreed, the Contracting Officer shall either--
(1) Cancel the stop-work order; or
(2) Terminate the work covered by the order as provided in the Default, or the Termination for Convenience of the Government, clause of this contract.
(b) If a stop-work order issued under this clause is canceled or the period of the order or any extension thereof expires, the Contractor shall resume work. The Contracting Officer shall make an equitable adjustment in the delivery schedule or contract price, or both, and the contract shall be modified, in writing, accordingly, if--
(1) The stop-work order results in an increase in the time required for, or in the Contractor`s cost properly allocable to, the performance of any part of this contract; and
(2) The Contractor asserts its right to the adjustment within 30 days after the end of the period of work stoppage; provided, that, if the Contracting Officer decides the facts justify the action, the Contracting Officer may receive and act upon the claim submitted at any time before final payment under this contract.
(c) If a stop-work order is not canceled and the work covered by the order is terminated for the convenience of the Government, the Contracting Officer shall allow reasonable costs resulting from the stop-work order in arriving at the termination settlement.
(d) If a stop-work order is not canceled and the work covered by the order is terminated for default, the Contracting Officer shall allow, by equitable adjustment or otherwise, reasonable costs resulting from the stop-work order.
F.2 52.242-17 GOVERNMENT DELAY OF WORK (APR 1984)
(a) If the performance of all or any part of the work of this contract is delayed or interrupted
(1) by an act of the Contracting Officer in the administration of this contract that is not expressly or implied authorized by this contract, or
(2) by a failure of the Contracting Officer to act within the time specified in this contract, or within a reasonable time if not specified, an adjustment (excluding profit) shall be made for any increase in the cost of performance of this contract caused by the delay or interruption and the contract shall be modified in writing accordingly. Adjustment shall also be made in the delivery or performance dates and any other contractual term or condition affected by the delay or interruption.
However, no adjustment shall be made under this clause for any delay or interruption to the extent that performance would have been delayed or interrupted by any other cause, including the fault or negligence of the Contractor, or for which an adjustment is provided or excluded under any other term or condition of this contract.
(b) A claim under this clause shall not be allowed--
(1) For any costs incurred more than 20 days before the Contractor shall have notified the Contracting Officer in writing of the act or failure to act involved; and
(2) Unless the claim, in an amount stated, is asserted in writing as soon as practicable after the termination of the delay or interruption, but not later than the day of final payment under the contract.
F.3 1352.270-70 PERIOD OF PERFORMANCE (APR 2010)
(a) The base period of performance of this contract is from 07/01/2021 through 06/30/2022 . If an option is exercised, the period of performance shall be extended through the end of that option period.
PAGE 17 OF 268 1333ND21RNB190010
(b) The option periods that may be exercised are as follows:
Period Start Date End Date Option I 07/01/2022 06/30/2023 Option II 07/01/2023 06/30/2024 Option III 07/01/2024 06/30/2025 Option IV 07/01/2025 06/30/2026
(c) The notice requirements for unilateral exercise of option periods are set out in FAR 52.217-9.
(End of clause)
PAGE 18 OF 268 1333ND21RNB190010
SECTION G
CONTRACT ADMINISTRATION DATA
G.1 1352.201-70 CONTRACTING OFFICER?s AUTHORITY (APR 2010)
The Contracting Officer is the only person authorized to make or approve any changes in any of the requirements of this contract, and, notwithstanding any provisions contained elsewhere in this contract, the said authority remains solely in the Contracting Officer. In the event the contractor makes any changes at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract terms and conditions, including price.
G.2 1352.201-72 CONTRACTING OFFICER`S REPRESENTATIVE (COR) (APR 2010)
(a) Kevin Gustin is hereby designated as the Contracting Officer`s Representative (COR). The COR may be changed at any time by the Government without prior notice to the contractor by a unilateral modification to the contract. The COR is located at:
100 Bureau Drive, Gaithersburg, MD 2899
Phone Number:
Email: kevin.gustin@nist.gov
(b) The responsibilities and limitations of the COR are as follows:
(1) The COR is responsible for the technical aspects of the contract and serves as technical liaison with the contractor. The COR is also responsible for the final inspection and acceptance of all deliverables and such other responsibilities as may be specified in the contract.
(2) The COR is not authorized to make any commitments or otherwise obligate the Government or authorize any changes which affect the contract price, terms or conditions. Any contractor request for changes shall be referred to the Contracting Officer directly or through the COR. No such changes shall be made without the express written prior authorization of the Contracting Officer. The Contracting Officer may designate assistant or alternate COR(s) to act for the COR by naming such assistant/alternate(s) in writing and transmitting a copy of such designation to the contractor.
G.3 1352.216-76 PLACEMENT OF ORDERS (APR 2010)
(a) The contractor shall provide goods and/or services under this contract only as directed in orders issued by authorized individuals. In accordance with FAR 16.505, each order will include:
(1) Date of order;
(2) Contract number and order number;
(3) Item number and description, quantity, and unit price or estimated cost or fee;
(4) Delivery or performance date;
(5) Place of delivery or performance (including consignee);
(6) Packaging, packing, and shipping instructions, if any;
(7) Accounting and appropriation data;
(8) Method of payment and payment office, if not specified in the contract;
(9) Any other pertinent information.
(b) In accordance with FAR 52.216-18, Ordering, the following individuals (or activities) are authorized to place orders against this contract:
Designated Contracting Officer Designated Contracting Officer
(c) If multiple awards have been made, the contact information for the DOC task and delivery order ombudsman is OAM_Mailbox@doc.gov
G.4 NIST LOCAL-53 CONTRACT PERFORMANCE DURING CHANGES IN NIST OPERATING STATUS
Unless otherwise stated in the contract terms and conditions, normal days of business operation are Monday through Friday, excluding Federal Holidays. However, throughout the contract period
PAGE 19 OF 268 1333ND21RNB190010
of performance, there may be circumstances beyond the control of the U.S. Department of Commerce, National Institute of Standards and Technology (NIST), that will impact normal days of business operation, such as inclement weather, power outages, etc. In circumstances such as these, the Contractor must call the appropriate NIST campus status line to verify the operating status:
Gaithersburg Campus Operating Status Line:
(301) 975-8000
(800) 437-4385 x8000 (toll free) Boulder Campus Operating Status Line:
(303) 497-4000 During a lapse in appropriation, access to Government facilities and resources, including equipment and systems, will be limited to excepted personnel for both Federal employees and Contractor personnel. If performance of the contract is onsite and/or requires Government interaction, unless you have been, or are notified that you are to work under an excepted status, you will automatically enter a temporary work stoppage. The work stoppage shall remain in effect until the lapse is resolved and notification is provided via the NIST website at https://www.nist.gov/ and/or the NIST operating status lines. Additionally, Contractors are encouraged to monitor public broadcasts or the Office of Personnel Management?s website at www.opm.gov for the Federal Government operating status.
NIST will provide notification to all contractors that are determined to have excepted status.
All excepted contractors are required to continue performance and communicate with the appointed Contracting Officer?s Representative (COR) for further guidance, or NIST Contracting Officer if a COR is not appointed.
Contractors with supply or service contracts that are fully funded at the time of contract award and do not require access to Government facilities, resources, or active administration by Government personnel in a manner that would cause the government to incur additional obligations during the lapse in appropriation may continue performance.
PAGE 20 OF 268 1333ND21RNB190010
SECTION H
SPECIAL CONTRACT REQUIREMENTS
H.1 1352.208-70 RESTRICTIONS ON PRINTING AND DUPLICATING (APR 2010)
(a) The contractor is authorized to duplicate or copy production units provided the requirement does not exceed 5,000 production units of any one page or 25,000 production units in the aggregate of multiple pages. Such pages may not exceed a maximum image size of 10-3/4 by 14-1/4 inches. A "production unit" is one sheet, size 8-1/2 x 11 inches (215 x 280 mm), one side only, and one color ink. Production unit requirements are outlined in the Government Printing and Binding Regulations.
(b) This clause does not preclude writing, editing, preparation of manuscript copy, or preparation of related illustrative material as a part of this contract, or administrative duplicating/copying (for example, necessary forms and instructional materials used by the contractor to respond to the terms of the contract).
(c) Costs associated with printing, duplicating, or copying in excess of the limits in paragraph
(a) of this clause are unallowable without prior written approval of the Contracting Officer.
If the contractor has reason to believe that any activity required in fulfillment of the contract will necessitate any printing or substantial duplicating or copying, it shall immediately provide written notice to the Contracting Officer and request approval prior to proceeding with the activity. Requests will be processed by the Contracting Officer in accordance with FAR 8.802.
(d) The contractor shall include in each subcontract which may involve a requirement for any printing, duplicating, and copying in excess of the limits specified in paragraph (a) of this clause, a provision substantially the same as this clause, including this paragraph (d).
H.2 1352.209-72 RESTRICTIONS AGAINST DISCLOSURE (APR 2010)
(a) The contractor agrees, in the performance of this contract, to keep the information furnished by the Government or acquired/developed by the contractor in performance of the contract and designated by the Contracting Officer or Contracting Officer?s Representative, in the strictest confidence. The contractor also agrees not to publish or otherwise divulge such information, in whole or in part, in any manner or form, nor to authorize or permit others to do so, taking such reasonable measures as are necessary to restrict access to such information while in the contractor?
s possession, to those employees needing such information to perform the work described herein, i.e., on a "need to know" basis. The contractor agrees to immediately notify the Contracting Officer in writing in the event that the contractor determines or has reason to suspect a breach of this requirement has occurred.
(b) The contractor agrees that it will not disclose any information described in subsection (a) to any person unless prior written approval is obtained from the Contracting Officer. The contractor agrees to insert the substance of this clause in any consultant agreement or subcontract hereunder.
H.3 1352.209-73 COMPLIANCE WITH THE LAWS (APR 2010)
The contractor shall comply with all applicable laws, rules and regulations which deal with or relate to performance in accord with the terms of the contract.
H.4 1352.209-74 ORGANIZATIONAL CONFLICT OF INTEREST (APR 2010)
(a) Purpose. The purpose of this clause is to ensure that the contractor and its subcontractors:
(1) Are not biased because of their financial, contractual, organizational, or other interests which relate to the work under this contract, and
(2) Do not obtain any unfair competitive advantage over other parties by virtue of their performance of this contract.
(b) Scope. The restrictions described herein shall apply to performance or participation by the contractor, its parents, affiliates, divisions and subsidiaries, and successors in interest (hereinafter collectively referred to as "contractor") in the activities covered by this clause as a prime contractor, subcontractor, co-sponsor, joint venturer, consultant, or in any similar capacity. For the purpose of this clause, affiliation occurs when a business concern is controlled by or has the power to control another or when a third party has the power to control both.
PAGE 21 OF 268 1333ND21RNB190010
(c) Warrant and Disclosure. The warrant and disclosure requirements of this paragraph apply with full force to both the contractor and all subcontractors. The contractor warrants that, to the best of the contractor?s knowledge and belief, there are no relevant facts or circumstances which would give rise to an organizational conflict of interest, as defined in FAR Subpart 9.5, and that the contractor has disclosed all relevant information regarding any actual or potential conflict. The contractor agrees it shall make an immediate and full disclosure, in writing, to the Contracting Officer of any potential or actual organizational conflict of interest or the existence of any facts that may cause a reasonably prudent person to question the contractor?s impartiality because of the appearance or existence of bias or an unfair competitive advantage. Such disclosure shall include a description of the actions the contractor has taken or proposes to take in order to avoid, neutralize, or mitigate any resulting conflict of interest.
(d) Remedies. The Contracting Officer may terminate this contract for convenience, in whole or in part, if the Contracting Officer deems such termination necessary to avoid, neutralize or mitigate an actual or apparent organizational conflict of interest. If the contractor fails to disclose facts pertaining to the existence of a potential or actual organizational conflict of interest or misrepresents relevant information to the Contracting Officer, the Government may terminate the contract for default, suspend or debar the contractor from Government contracting, or pursue such other remedies as may be permitted by law or this contract.
(e) Subcontracts. The contractor shall include a clause substantially similar to this clause, including paragraphs (f) and (g), in any subcontract or consultant agreement at any tier expected to exceed the simplified acquisition threshold. The terms "contract," "contractor," and "Contracting Officer" shall be appropriately modified to preserve the Government?s rights.
(f) Prime Contractor Responsibilities. The contractor shall obtain from its subcontractors or consultants the disclosure required in FAR Part 9.507-1, and shall determine in writing whether the interests disclosed present an actual, or significant potential for, an organizational conflict of interest. The contractor shall identify and avoid, neutralize, or mitigate any subcontractor organizational conflict prior to award of the contract to the satisfaction of the Contracting Officer. If the subcontractor?s organizational conflict cannot be avoided, neutralized, or mitigated, the contractor must obtain the written approval of the Contracting Officer prior to entering into the subcontract. If the contractor becomes aware of a subcontractor?s potential or actual organizational conflict of interest after contract award, the contractor agrees that the Contractor may be required to eliminate the subcontractor from its team, at the contractor?s own risk.
(g) Waiver. The parties recognize that this clause has potential effects which will survive the performance of this contract and that it is impossible to foresee each circumstance to which it might be applied in the future. Accordingly, the contractor may at any time seek a waiver from the Head of the Contracting Activity by submitting such waiver request to the Contracting Officer, including a full written description of the requested waiver and the reasons in support thereof.
H.5 1352.216-74 TASK ORDERS (APR 2010)
(a) In task order contracts, all work shall be initiated only by issuance of fully executed task orders issued by the Contracting Officer. The work to be performed under these orders must be within the scope of the contract. The Government is only liable for labor hours and costs expended under the terms and conditions of this contract to the extent that a fully executed task order has been issued and covers the required work and costs. Charges for any work not authorized shall be disallowed.
(b) For each task order under the contract, the Contracting Office shall send a request for proposal to the contractor(s). The request will contain a detailed description of the tasks to be achieved, a schedule for completion of the task order, and deliverables to be provided by the contractor.
(c) The contractor shall submit a proposal defining the technical approach to be taken to complete the task order, work schedule and proposed cost/price.
(d) After any necessary negotiations, the contractor shall submit a final proposal.
(e) Task orders will be considered fully executed upon signature of the Contracting Officer. The contractor shall begin work on the task order in accordance with the effective date of the order.
(f) The contractor shall notify the Contracting Officer of any instructions or guidance given that may impact the cost, schedule or deliverables of the task order. A formal modification to the task order must be issued by the Contracting Officer before any changes can be made.
(g) Task orders may be placed during the period of performance of the contract. Labor rates applicable to hours expended in performance of an order will be the contract rates that are in effect at the time the task order is issued.
PAGE 22 OF 268 1333ND21RNB190010
(h) If multiple awards are made by the Government, the CO shall provide each awardee a fair opportunity to be considered for each task order over the micro-purchase threshold unless one of the exceptions at FAR 16.505(b) applies.
H.6 1352.231-71 DUPLICATION OF EFFORT (APR 2010)
The contractor hereby certifies that costs for work to be performed under this contract and any subcontract hereunder are not duplicative of any costs charged against any other Government contract, subcontract, or other Government source. The contractor agrees to advise the Contracting Officer, in writing, of any other Government contract or subcontract it has performed or is performing which involves work directly related to the purpose of this contract. The contractor also certifies and agrees that any and all work performed under this contract shall be directly and exclusively for the use and benefit of the Government, and not incidental to any other work, pursuit, research, or purpose of the contractor, whose responsibility it will be to account for it accordingly.
H.7 1352.237-71 SECURITY PROCESSING REQUIREMENTS - LOW RISK CONTRACTS (APR 2010)
(a) Investigative Requirements for Low Risk Contracts. All contractor (and subcontractor) personnel proposed to be employed under a Low Risk contract shall undergo security processing by the Department?s Office of Security before being eligible to work on the premises of any Department of Commerce owned, leased, or controlled facility in the United States or overseas, or to obtain access to a Department of Commerce IT system. All Department of Commerce security processing pertinent to this contract will be conducted at no cost to the contractor.
(b) Investigative requirements for Non-IT Service Contracts are:
(1) Contracts more than 180 days - National Agency Check and Inquiries (NACI)
(2) Contracts less than 180 days - Special Agency Check (SAC)
(c) Investigative requirements for IT Service Contracts are:
(1) Contracts more than 180 days - National Agency Check and Inquiries (NACI)
(2) Contracts less than 180 days - National Agency Check and Inquiries (NACI)
(d) In addition to the investigations noted above, non-U.S. citizens must have a background check that includes an Immigration and Customs Enforcement agency check.
(e) Additional Requirements for Foreign Nationals (Non-U.S. Citizens). Non-U.S. citizens (lawful permanent residents) to be employed under this contract within the United States must have:
(1)…