This solicitation requests proposals for campground renovation and improvements at Boulder Oaks Campground within the Descanso Ranger District of the Cleveland National Forest. Work includes demolition of two vault toilet buildings, camp units, and site features; installation of new precast vault toilet buildings and associated site work; and optional bid items such as accessible parking, walkways, a concrete dumpster pad, and horse gates. Proposals are due by August 11, 2020. Evaluation will be based on relevant prior experience, technical approach, past performance, and price. The contract is expected to be awarded by September 2020 with work to be completed within 48 calendar days of the notice to proceed.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
USDA FOREST SERVICE
PACIFIC SOUTHWEST REGION
1323 CLUB DR
VALLEJO CA 94592-1110
91S8
Jeremy Bedner, Contracting Officer
VIA EMAIL ONLY
JEREMY.BEDNER@USDA.GOV
JEREMY BEDNER 707-562-8756
1x 07/15/2020
1291S820R0056
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
Campground Renovation and Improvements, Boulder Oaks Campground. Descanso Ranger
District, Cleveland National Forest.
Refer to complete SF1442 continuation for scope, specifications, dates, and site visit information.
SITE VISIT SCHEDULED SEE SECTION C.5
Refer to Section L Instruction to Offerors, L.7 PROPOSAL SUBMISSION INSTRUCTIONS AND
REQUIREMENTS and Section M for Evaluation information.
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 48 calendar days and complete it within ________________ ________________ calendar days after receiving
08/11/2020
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
USDA FOREST SERVICE
PACIFIC SOUTHWEST REGION
1323 CLUB DR
VALLEJO CA 94592-1110
91S8
JEREMY B. BEDNER
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
RFP no. 1291S820R0056 Campground Renovation and Improvements, Boulder Oaks
Cleveland National Forest
PART I – SCHEDULE
SECTION B – SCHEDULE OF SUPPLIES AND SERVICES / BID SCHEDULE
B.1 BID SCHEDULE
SPEC NO. DESCRIPTION
MSMT UNIT UNIT
PRICE
QUAN AMOUNT
Campground Renovation and Improvements. Boulder Oaks. Cleveland National Forest.
BASE BID
01 71 13 Mobilization
LSQ JOB $ 1 $
01 32 23 Survey and Layout Data LSQ JOB $ 1 $
02 41 00
DEMOLITION
A. Remove and Dispose Vault Toilet Buildings
AQ EA $ 2 $
DEMOLITION
B. Misc Site Features
03 30 00 Cast In Place Concrete Furnish and Install Accessible Walkway 4"
DQ CY $ 8.5 $
31 20 00 EARTH MOVING
A. Excavation & Placement LSQ JOB $ 1 $
B. Furnish and Install Fiber Rolls LSQ JOB $ 1 $
31 10 00 Site Clearing LSQ JOB $ 1 $
32 30 00 SITE IMPROVEMENTS
A. CXT TiogaVault Toilet Building (w/Chase) LSQ JOB $ 1 $
B. CXT TiogaVault Toilet Building LSQ JOB $ 1 $
C. Rock Barriers (Demo Sites and New Buildings) LSQ JOB $ 1 $
TOTAL BASE BID
Additive (optional) Bid Item 1.
Accessible Walkway & Parking Site 1
07 71 13 Mobilization
Furnish and Install Accessible Walkway 4" and Parking 6"
DQ CY $ 12 $
10 14 53 Traffic Signage - Sign and Post AQ EA $ 1 $
Campground Renovation and Improvements, Boulder Oaks
Cleveland National Forest
A. Excavation & Placement
B. Furnish and Install Aggregate Base, 4" Compacted Thickness
DQ CY $ 5 $
C. Fiber Rolls
32 10 00 Bases Ballast and Paving Pavement Markings
32 30 00 SITE IMPROVEMENTS
A. Relocate Fee Tube
B. Rock Barriers LSQ JOB $ 1 $
TOTAL ALT BID ITEMS 1.
Additive (optional) Bid Item 2.
Accessible Parking Site 2
07 71 13 Mobilization
Furnish and Install Accessible Walkway 4" and Parking 6"
DG CY $ 8 $
10 14 53 Traffic Signage - Sign and Post AQ EA $ 1 $
A. Excavation & Placement
B. Furnish and Install Aggregate Base, 4" Compacted Thickness
DQ CY $ 5 $
C. Fiber Rolls
32 10 00 Bases Ballast and Paving Pavement Markings
Rock Barriers.
TOTAL ALT BID ITEMS 2.
Additive (optional) Bid Item 3.
Concrete Dumpster Pad.
07 71 13 Mobilization LSQ JOB $ 1 $
32 20 00 Site Improvements. Dumpster Pad. AQ JOB $ 1 $
TOTAL ALT BID ITEMS 3.
Additive (optional) Bid Item 4.
Horse Gates
07 71 13 Mobilization LSQ JOB $ 1 $
32 20 00 Site Improvements. Furnish and Install Horse Gates
AQ JOB $ 2 $
TOTAL ALT BID ITEMS 4.
COMPLETE TOTAL BASE + ALT BIDS 1-4
NOTES
1. The Offeror must submit a price on all items. If Offeror does not intend to charge for a bid Item, a price of "0" or "NO COST" should be shown. Offers submitted without pricing on all items will be considered non-responsive. Offers submitting proposals without pricing for ALTERNATIVE BID ITEMS will be considered non-responsive.
2. Alternative Bid Items – single, all, or combination – may be awarded with the Base Bid IAW FAR 52.217-7 Option for Increased Quantity -- Separately Priced Line Item (MAR 1989)
3. Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under Mobilization.
4. IAW 52.228-1 Bid Guarantee (SEPT 1996), Bid Guarantee is required for offers/proposals exceeding $150K.
5. IAW FAR 36.204 – Disclosure of the Magnitude of Construction Projects, the Government has estimated price range of
(d) Between $100,000 and $250,000.
6. ACRONYMS
AQ ACTUAL QUANTITY
CY CUBIC YARD
DQ DESIGNATED QUANITY
EA EACH
JC JOB
LSQ LUMP SUM QUANTITY
(END OF SECTION)
Campground Renovation and Improvements, Boulder Oaks
Cleveland National Forest
SECTION C – STATEMENT OF WORK
C.1 PROJECT SCOPE
The project is Campround Renovation and Improvements, Boulder Oaks Campground located within the Descanso Ranger District, Cleveland National Forest.
The project work includes demolition of two (2) masonry vault toilet buildings, designated camp units and site features, and other miscellaneous demolition; and the ordering, delivery coordination, site preparation, and installation of new precast vault buildings (CXT brand or approved equal substitute).
BASE BID
Other work includes installation of accessible parking and walkways, concrete dumpster pad, steel horse gates.
ALTERNATIVE (OPTION) BID ITEMS 1-4.
Construction elements include, but are not limited to: site work, surveying, demolition, clearing and grubbing, excavation and placement, best management practices, aggregate base, portland cement concrete, concrete reinforcement, sampling and testing, and rock barriers.
The contractor shall provide all labor, materials, equipment, and supervision to perform work requirements for this project. All work will be performed in accordance with contract and applicable regulatory requirements.
ALTERNATIVE (OPTION) BID ITEM 1 – Accessible parking and walkway, site 1
Includes but is not limited to the following work items:
Accessible parking and new walkway path to connect the parking to the building and tie to existing site features (bulletin board and relocation of fee tube). Accessible parking and walkway shall meet the ABAAS and shall be constructed AS SHOWN ON THE DRAWINGS and in accordance with contract specifications. Also includes the installation of rock barriers, pavement markings, fiber rolls, excavation and placement, clearing and grubbing, demolition, concrete reinforcement, portland cement, aggregate base, and sampling and testing.
ALTERNATIVE (OPTION) BID ITEM 2 – Accessible parking, site 2
Includes but is not limited to the following work items:
Accessible parking shall meet the ABAAS and shall be constructed AS SHOWN ON THE DRAWINGS and in accordance with contract specifications. Also includes the installation of rock barriers, pavement markings, fiber rolls, excavation and placement, clearing and grubbing, demolition, concrete reinforcement, portland cement, aggregate base, and sampling and testing.
ALTERNATIVE (OPTION) BID ITEM 3 – Concrete Dumpster Pad
Includes but is not limited to the following work items:
Concrete dumpster pad shall be installed AS SHOWN ON THE DRAWINGS and in accordance with contract specifications.
The location of the concrete dumpster pad shall be approved by the contracting officer Representative. Also includes clearing and grubbing, concrete reinforcement, portland cement and sampling and testing.
Campground Renovation and Improvements, Boulder Oaks
Cleveland National Forest
ALTERNATIVE (OPTION) BID ITEM 4 – Horse Gates
Contractor shall furnish and install steel horse gates and all associated features AS SHOWN IN THE DRAWINGS and in accordance with contract specification, Site Improvements 32 30 00. The final location of horse gates shall be approved by the Contracting Officer Representative (COR). Also includes clearing and grubbing, portland cement and concrete reinforcement.
C.2 PROJECT LOCATION
Location
Forest Cleveland National Forest District Descanso Ranger District County San Diego
Work will take place within the Descanso Range District located within the Cleveland National Forest and Campo, California (San Diego County).
The Descanso Ranger District Office is located at:
3348 Alpine Blvd, Alpine, CA 91901
Directions as follows:
Travel on I-8 East, Exit Buckman Springs Road. Turn Right onto Buckman Springs Road. Make a left on Old Hwy 80 and travel approximately 3 miles, the campground is on the right.
Refer to ATTACHMENT 2 DRAWINGS for Vicinity Map.
C.3 PERIOD OF PERFORMANCE
The project contract duration is shall have period of performance of no greater than 48 calendar days from the issuance of the Notice to Proceed [NTP]. Work is anticipated to begin in October 2020.
*No work shall commence/be scheduled sooner than October 5, 2020. Therefore, the NTP will be issued after October 5, 2020.
**New vault building may be ordered prior to the issuance of the NTP. The purchase order form for the new buildings shall be submitted to the Contracting Officer (CO) for review and acceptance prior to placement of order.
Campground Renovation and Improvements, Boulder Oaks
Cleveland National Forest
C.4 SITE VISIT
The Forest Service highly recommends that bidders visit the project site / work area to ensure complete understanding of the requirement and knowledge of site conditions and operational challenges.
IAW FAR 52.236-27 SITE VISIT (CONSTRUCTION) (APR 1984)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract award resulting from this solicitation. Accordingly, offerors are urged and expected to inspect the site where the work will be performed.
(b) An organized guided site visit has been scheduled for-
DATE Wednesday, July 22, 2020
TIME 9:00AM / 0900
LOCATION Boulder Oaks Campground Old Hwy 80, Campo, CA, 91906
POC: Whitney Hosseini 619-823-0117 / whitney.hosseini@usda.gov
Interested contractors shall RSVP intent attend the site visit in advance to the Cleveland National Forest Supervisor’s Office designated point-of-contact and project Contracting Officer’s Representative [COR] listed above. This notification is required for the purpose of providing advanced notification to the District Ranger Office of contractors traveling to the site.
For information regarding site conditions and/or to RSVP for the Site Visit, contact the above POC at 619-823-0117 between the hours of 8:00 am and 4:00 pm, Monday through Friday, except legal holidays.
Site Visit attendees shall practice health and safety mitigation measures related to Coronavirus/COVID-19 including social distancing and the wear of PPE such as face masks.
All questions – those generated during or as a result of the site visit – shall be addressed in-writing (via email) to the Contracting Officer [CO] and Contracting Officer Representative [COR]. Responses to questions will be provided in the form of a soliciation amendment posted to the solicitation announcement on Contract Opportunities.
NOTE 1. Questions / Requests for Information must be submitted within five (5) business days of the proposal due date.
Questions submitted after this due date may not be considered by the Government for review and answer.
NOTE 2. Answers to all technical questions submitted timely shall be posted as an amendment to the solicitation/RFP announcement on Contract Opportunities.
C.6 SPECIFICATIONS AND DRAWINGS
REFER TO ATTACHMENTS 1 AND 2.
A.
The Construction Specification Institute [CSI] specifications are included by reference. The requirements contained in these specifications are hereby made a part of this solicitation and any resultant contract. CSI specifications applicable to this contract are listed below and are contained in this contract.
00 01 10 TABLE OF CONTENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 31 00 PROJECT MANAGEMENT AND COORDINATION
01 32 23 SURVEY AND LAYOUT DATA
01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SUBMITTALS
01 40 00 QUALITY REQUIREMENTS
01 41 00 REGULATORY REQUIREMENTS
01 57 24 STORMWATER POLLUTION CONTROL
01 71 13 MOBILIZATION
01 74 00 CLEANING AND WASTE MANAGEMENT
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
02 41 00 DEMOLITION
03 11 00 CONRETE FORMING
03 20 00 CONCRETE REINFORCEMENT
03 30 00 CAST-IN-PLACE CONCRETE
10 14 53 TRAFFIC SIGNAGE
31 10 00 SITE CLEARING
31 20 00 EARTH MOVING
32 10 00 BASES BALLAST AND PAVING (PAVEMENT MARKINGS)
B.
Statement of Work/Specifications
AGAR 452.211-3 (FEB 1988)
The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
C.
Attachments to Statement of Work/Specifications
AGAR 452.211-4 (FEB 1988)
The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
Campground Renovation and Improvements, Boulder Oaks
Cleveland National Forest
C.7 DELIVERABLES
1. WORK PLAN
The Contractor shall submit to the Government the Work Plan for the project prior to Mobilizations.
This Work Plan shall include, but is not limited to, the following:
• A description of how the work will be performed.
• Specific exclusions/ assumptions regarding the specific work to be performed.
• A listing of personnel, including subcontractor(s), working on the project.
• Project Work Schedule.
• Project specific Safety & Health Plan.
• A list of equipment proposed for use on the project.
• Detailed cost estimate of work to be performed that can be used for partial payments as work is completed and accepted
• Description of what material(s) or method of concrete washout will be used on the project.
2. Erosion Control / Stormwater Control Plan.
Contractor shall identify all types and specific locations of erosion control measures.
The Contractor shall prepare and submit a basic Stormwater Control Plan in accordance with Specification Section 01 57 24, Stormwater Pollution Control, prior to commencing work. The plan shall be submitted to the Contracting Officer and Contracing Officer Representative for review and approval.
3. Construction Waste Management Plan
Contractor shall develop a proposal on how to collect, segregate, and dispose of all construction wastes and debris produced by the work of this contract. Include description of on-site reprocessing and re-use opportunities.
3. Spill Prevention Control and Countermeasures (SPCC) Spill Response Plan Emergency Response Plan for refueling and servicing vehicles.
Identify and use suitable measures around vehicle service, storage and refueling areas, and waste dumps to fully contain spills and avoid or minimize soil contamination and seepage to groundwater. Use suitable measures to avoid spilling fuels, lubricants, cleaners, and other chemicals during handling and transporting. Report spills to the Contracting Officer’s Representative and initiate suitable cleanup action in accordance with applicable State and Federal laws, rules, and regulations.
4. SAFETY PLAN
The Contractor shall submit a SAFETY PLAN to the Contracting Officer for review prior to commencement of work. The project safety plan shall comply with the appropriate California OSHA and Federal OSHA rules and regulations and must include a medical evacuation and emergency communications plan.
Campground Renovation and Improvements, Boulder Oaks
Cleveland National Forest
C.7 GENERAL REQUIREMENTS OF AND RESTRICTIONS TO WORK
1. GENERAL
The Contractor shall comply with all applicable Federal, State, interstate and local laws, environmental regulations, and requirements.
The Contractor shall provide all labor, materials, equipment, testing and incidentals to complete the contract as shown on the drawings and included in the specifications.
All work shall be done in accordance with governing codes and regulations and applicable Specifications and Industry Standards. Where one or more of these conflict, the most stringent shall apply to the prosecution of work.
The contractor is responsible for securing all permits or other requirements from Federal, state, city, county and local county offices.
The Contractor shall, without additional expense to the Government, pay all Federal, State, County, Municipal, or Utility Company fees applicable to the performance of the work.
The contractor shall field verify all material measurements and quantities before ordering supplies. Contract Drawings shall be used as illustrating purposes. The contractor shall provide temporary traffic safety control in areas that have high traffic usage during the life expectancy of the project.
Existing utilities shall not be disrupted or turned off without written approval from the Contracting Officer. Unless otherwise noted, the Contractor shall provide temporary utility service prior to the interruption of service. Temporary service shall be provided until the permanent service is restored.
The contractor’s material and equipment storage site shall be determined at the pre-construction meeting. The area shall be kept clean and free of litter.
Areas adjacent to the site may be utilized for temporary stockpiling of materials as approved by the Contracting Officer Representative [COR] and Contracting Officer [CO].
2. FIRE PLAN AND PREVENTION
Contractor is required to adhere to the work restrictions in accordance with the attached Fire Plan. Refer to Attachment 3.
All welding and cutting (spark producing) activities will require a permit from the Descanso Ranger District Office/ Station. All equipment must have approved spark arrestors and be inspected by a Forest Service Fire Prevention Officer.
3. ARCHAELOGICAL SITES AND MONITORING
A Forest Service archeological monitor shall be onsite during all ground disturbance and vegetation clearance. The contractor shall work closely with the Contracting Officer Representative (COR) to schedule required archeological oversight.
4. CONTRACTOR QUALIFICATIONS AND LICENSES
Contractor must possess a current and valid Class B “General Building Contractor” issued by the State of California to perform the applicable contract work.
Surveyor shall be licensed in the State of California.
Prior to commencing work, the contractor shall present a copy of his/her current license to the Contracting Officer.
Required Qualifications and Lisence are subject to change as new Federal, State and local laws and regulations are implemented and existing Federal, State and local laws are revised.
5. NOTIFICATION AND PERMITS
Contractor is responsible to provide all regulatory notifications and obtain all applicable permits in order to perform work under this contract.
The Contractor shall, without additional expense to the Forest Service, be responsible for obtaining any necessary licenses and permits, and for complying with any applicable Federal, State and local laws, codes, and regulations in connection with the execution of the work.
Required Notifications and Permits are subject to change as new Federal, State and local laws and regulations are implemented and existing Federal, State and local laws are revised.
6. WORK HOURS
Construction activity may be performed Monday through Friday and shall be limited to the hours between 8am (0800) and 5p (1700) unless other hours are approved in writing by the COR. No work will be allowed on weekends or Federal Holidays unless approved by the COR and CO in writing.
7. CONTRACTOR-DESIGNATED SITE SUPERINDENTENT
IAW FAR 52.236-6, Superintendence by the Contractor (APR 1984)
The Contractor shall designate in writing a Site Superintendent/Project Manager to coordinate all contractor activities during construction and to liaise with the Contracting Officer Representative and Project Engineer for the Forest Service.
Contractors Site Superintendent shall be on site at all times any work is being performed.
In addition to Clause 52.236-6, the following applies: The name and the specific authorities of the foreman or superintendent must be designated in writing to the Contracting Officer. The Contractor may use his/her own prepared letterhead stationery or a "Designation of Contractor's Representative" form available from the Contracting Officer. If the Contractor or the designee is not present when work is being performed on the contract, a Suspend Work Order may be issued with contract time continuing to run. The Contractor shall have a person on-site that is fully conversant in the English language.
8. PARKING AND STORAGE
The Contractor shall coordinate parking of Contractors vehicles and temporary storage of equipment and materials with the Contracting Officer’s Representative. All heavy equipment used on site shall be washed prior to entering the project area to remove seeds and plant material from noxious weeds to prevent the introduction and spread of weeds not already present on the Cleveland National Forest. The Forest Service shall inspect equipment prior to moving on site.
Inspections shall be coordinated and scheduled with the Contracting Officer’s Representative.
9. HEALTH AND SAFETY
The Contractor shall perform all operations in a prudent, conscientious, safe and professional manner. At a minimum, the Contractor’s personnel and equipment shall comply with applicable Federal, state, and local laws, safety and health regulations and procedures, as well as Forest Service regulations, rules and procedures. The Contractor shall ensure that its agents, employees and subcontractors perform in a safe manner. Contractor shall be responsible for the safety of the Contractor’s employees, Subcontractor’s employees, Government employees associated with the project, and any visitors to the site both Government and private.
The Contractor shall ensure that all personnel involved in handling hazardous materials/waste and conducting emergency response and site cleanup activities are trained in the level of expertise required for the proper performance of the work activities.
10. ENVIRONMENTAL PROTECTION AND PROJECT SITE CLEAN-UP
Contractor shall thoroughly clean all equipment prior to delivery to the project site to remove weeds, mud, grease and oil buildup from the tires, wheels, tracks, engines and engine compartments, and other surfaces. Spills of petroleum products and other hazardous substances shall be reported, contained, and removed in accordance with all applicable Local, State and Federal laws and regulations.
Project site cleanup includes the daily removal and proper disposal of all trash, debris, and residue off of National Forest Land. On Fridays all construction debris, trash, and refuse shall be properly stored in dumpsters or trash bins or removed from the site. All spills of petroleum products including leak spots from parked vehicles shall be removed and properly disposed of according to all Local, State, and Federal regulations and laws governing such disposal. The Contractor is required to dispose of all construction debris and removed equipment off of Forest Service lands in accordance with Federal, State, and local requirements.
A. CONTRACTOR CAUSED SPILLS AND RELEASES
The Contractor is solely responsible for any and all spills or leaks and subsequent clean up that may be required during the performance of this contract which occur as a result of or are contributed to by the actions of its agents, employees, or subcontractors. The Contractor agrees to clean up such spills or leaks to the satisfaction of the Forest Service and in a manner that complies with applicable Federal, state, and local laws and regulations. The clean up shall be at no cost to the Forest Service. The contractor shall provide spill response materials including, but not limited to, containers, shovels
Campground Renovation and Improvements, Boulder Oaks
Cleveland National Forest and personal protective equipment. Spill response materials shall be available at all times in which hazardous materials and hazardous wastes are being handled or transported. Spill response materials shall be compatible with the type of material being handled or transported.
The contractor shall report all such spills or leaks, regardless of their quantity, to the Forest Service immediately upon discovery. A written follow-up report shall be submitted to the Forest Service no later than 24 hours after the initial telephonic report. The written report shall be in narrative form and, as a minimum, include the following:
• Description of the item spilled (including identity, quantity, manifest no., etc).
• Whether amount spilled is EPA/state reportable, and if so whether it was reported, and to whom.
• Exact time and location of spill including a description of the area involved.
• Containment procedures initiated.
• Summary of any communications contractor has with press, Federal, state and local regulatory agencies and officials, or Forest Service officials.
Upon completion of the clean-up activities for contractor caused spills and releases, the contractor shall submit a final clean-up certification report to the Forest Service. The report shall include a description of clean-up procedures employed at the site, the final disposition and disposal location of spill residue. Include also copies of all spill related cleanup and closure documentation and correspondence from the regulatory agencies.
SECTION D – PACKAGING AND MARKING
N/A
SECTION E – INSPECTION AND ACCEPTANCE
E.1 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
Federal Acquisition Regulations http://www.acquisition.gov/far Agriculture Acquisition Regulations http://www.usda.gov/procurement/policy/agar.html
Clauses requiring information to be filled-in shall be included in individual task orders in full text with the appropriate information added.
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246-12 Inspection of Construction (AUG 1996) 52.246-13 Inspection—Dismantling, Demolition, or Removal of Improvements (AUG 1996)
E.2 AGAR 452.246-70 INSPECTION AND ACCEPTANCE (FEB 1988)
(a) The Contracting Officer or the Contracting Officer's duly authorized representative will inspect and accept the supplies and/or services to be provided under this contract.
(b) Inspection and acceptance will be performed at the project site.
E.3 INSPECTION AND TESTING PERFORMED BY GOVERNMENT
The Government will perform sampling, testing and inspection of work in progress where these responsibilities are not expressly assigned to the Contractor by the Forest Service specifications or by the Special Project Specifications.
E.4 CONFORMITY WITH DRAWINGS AND SPECIFICATIONS
Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the Drawings, indicated in the specifications, or designated on the ground. "Reasonably close conformity" is in compliance with reasonable and customary manufacturing and construction tolerances.
SECTION F – DELIVERIES OR PERFORMANCE
F.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
Federal Acquisition Regulations http://www.acquisition.gov/far
Agriculture Acquisition Regulations http://www.usda.gov/procurement/policy/agar.html
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.242-14 Suspension of Work (APR 1984)
F.2 FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the project within 48 calendar days. The time stated for completion shall include final cleanup of the premises.
F.3 AGAR 452.211-5 PERIOD OF PERFORMANCE (FEB 1988)
The period of performance for this project/contract is 48 calendars days from the date of the issuance of the Notice to Proceed.
F.4 POST-AWARD CONFERENCE / PRE-CONSTRUCTION MEETING
IAW AGAR 452.215-73 (FEB 1988) and FAR 52.236-26 (FEB 1995)
A post-award conference / pre-construction meeting with the successful offeror/contract awardee is required. Meeting shall include Contracting Officer [CO] and Contracting Officer Representative [COR]. The conference will be held at a mutually agreeable date/time and location. Routinely held within 10 days following date of the contract award.
The Notice to Proceed shall be provided at or immediately following the post award conference.
http://www.acquisition.gov/far http://www.acquisition.gov/far http://www.usda.gov/procurement/policy/agar.html http://www.usda.gov/procurement/policy/agar.html
SECTION G – CONTRACT ADMINISTRATION DATA
G.1 GOVERNMENT CONTRACT REPRESENTATIVES
Contracting Officer (CO) responsible for this contract Jeremy Bedner 1323 Club Drive Vallejo, CA 94592 707-562-8756 Jeremy.bedner@usda.gov
Contracting Officer’s Representative (COR) for this contract Whitney Hosseini Civil Engineer Cleveland National Forest Supervisor’s Office 10845 Rancho Bernardo Road #200 San Diego, CA 92127 858-674-2925 whitney.hosseini@usda.gov
G.2 DESIGNATION OF CONTRACTING OFFICER’S REPRESENTATIVE
The Contracting Officer will designate a Contracting Officer's Representative (COR) at the time of contract award.
The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract.
The COR will act as a liaison between the U.S. Forest Service herein referred to as "Service" and the Contractor, and, when necessary, will provide technical direction to the Contractor. The COR, however, is not authorized to change any of the terms and conditions of the contract, issue new assignments of work, make decisions concerning disputes arising under the contract, or resolve differing site condition matters. Neither the presence nor absence of a government representative shall relieve the Contractor of its responsibilities under the contract.
The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual task assignments which were issued by the COR provided they do not affect the delivery schedule or performance period stated in the contract).
On all matters that pertain to the contract terms the Contractor must communicate with the Contracting Officer.
Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.
G.3 Technical Direction
The performance of the work required herein shall be subject to the technical direction and surveillance of the COR. As used herein, "technical direction" is direction to the Contractor which requires pursuit of certain lines of inquiry, filling in details or otherwise serving to accomplish the contract specifications. The technical direction, to be valid:(a) Must be issued in writing consistent with the general scope of the work set forth in the contract;(b) May not constitute a new assignment of work or changes to the expressed terms, conditions, or specifications incorporated into this contract; (c) Shall not constitute a basis for extension of the contract delivery schedule. Nothing contained in this part authorizes the Contractor to incur costs in excess of the contract price or other limitation of funds set forth in the contract due to extra work performed in response to informal directions, suggestions, or instructions (oral or written) given by representatives of the CO, unless prior to commencing such work, the Contractor: 1) directly notifies the CO; 2) requests a formal contract modification; and 3) receives written authorization to proceed from the CO.
The Government may designate a Construction Inspector (CI) (if applicable) who will be available at the site to inspect the work as it progresses. The CI will prepare an Inspector's Daily Log, beginning with the first day of the contract, detailing ground and weather conditions, work being performed, materials delivered, and notes of any problems or difficulties. Government inspections do not relieve the Contractor of responsibility for providing adequate quality control measures. At the end of every day of work on this contract, the Contractor's Superintendent, as defined below, shall contact the CI, review the daily log, and sign as the Contractor's representative. Unless the Contractor's Superintendent makes notations to the contrary on the daily log, the log shall be presumed to be accurate. The CI is not authorized to make technical decisions or give technical directions; the Contractor or the Contractor's Superintendent must contact the COR regarding such decisions and directions. The Contractor shall have a competent superintendent (hereinafter referred to as the "Contractor's Superintendent") who is (i) deemed acceptable to the Government; (ii) authorized to act on the Contractor's behalf; and (iii) be present on the job site at all times when contract work is being performed. (See Superintendence by the Contractor, Section I, Federal Acquisition Regulation (FAR) Clause 52.236-6.)
G.4 Contract Administration
Only a U.S. Forest Service warranted Contracting Officer may change or modify the terms of this contract. All such actions must be formalized by a proper contractual document executed by the Contracting Officer.
G.5 ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS
INTERNET PAYMENT PLATFORM [IPP]
Payment requests must be submitted electronically through the U.S. Department of the Treasury’s Invoice Processing Platform (IPP) System. “Payment request” means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions – Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:
Prime contractor and subcontract payrolls (if applicable) Payment Request Certification Release of Claims (Final) SF 1413 – Statement and Acknowledgment Construction Schedule (Microsoft Project or other Industry Standard Software (if applicable) Schedule of Values Owner/Operator manuals (if applicable) Warranty Certificates (if applicable) https://www.ipp.gov/
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) prior to the contract award date, but no more than 3 – 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via e-mail ippgroup@bos.frb.org or phone (866) 973-3131.
Invoices shall be submitted not more frequently than once every two weeks.
G.6 CONTRACT RELEASE
When submitting final payment, Contractor shall provide a signed and dated contract release that includes the following information: "In consideration of receipt of final payment in the amount of $ Contractor hereby releases the United States of America from any and all obligations arising under this contract and any modifications thereof except as reserved herein.
Reservations: "
G.7 KEY PERSONNEL AGAR 452.237-74 (FEB 1988)
The Contractor shall assign to this contract the following key personnel:
Principal
NAME
ADDRESS
PHONE
Project Manager NAME
ADDRESS
PHONE
The key personnel specified in the Offeror’s Technical Proposal are considered to be essential to the work being performed hereunder. Prior to diverting any of the specified individuals to other programs, the Contractor shall notify the Contracting Officer reasonably in advance and shall submit justification (including proposed substitutions) in sufficient detail to permit evaluation of the impact on the contract. No diversion shall be made by the Contractor without the written consent of the Contracting Officer: Provided that the Contracting Officer may ratify in writing such diversion and such ratification shall constitute the consent of the Contracting Officer required by this clause. The contract may be amended from time to time during the course of the contract to either add or delete personnel, as appropriate.
SECTION H – SPECIAL CONTRACT REQUIREMENTS
H.1 Emergency Control
IAW AGAR 452.236-77 (JUL 1985)
Maintenance of Existing Facilities – The Contractor shall conduct his operations to minimize disruptions to the Government employees and public using the existing facilities. Operations are permissible Monday – Friday.
H.2 Use of Premises
General.
During the construction period the Contractor will have full access to all construction areas. The existing Buildings and compound will continue to be used by USFS personnel and shall remain accessible to USFS staff throughout the course of construction. Contractor storage areas are to be approved by the CO prior to the start of construction.
Provide access to and from site as required by law and by the Government:
1. Emergency Building Exits During Construction: Keep all exits required by code open during construction period;
provide temporary exit signs if exit routes are temporarily altered.
2. Do not obstruct roadways, sidewalks, or other public ways without permit.
Sanitation: Sanitation facilities are available to use at two existing shower buildings.
Utilities.
Water is available and may be used by the Contractor’s personnel at the campground.
If water at the campground needs to be shut off, water will be available at the the nearest FS Fire Station. A backflow device shall be connected prior to the contractor making their connection. And at any time the contractor may be bumped off the source for fire purposes or if the contractor is depleting water tank. In this case, contractor will be responsible for finding their own source of water.
H.3 Loss, Damage or Destruction
Equipment Furnished with Operator. The Government shall not be liable for loss, damage, or destruction of equipment furnished under this contract except for such loss, damage, or destruction resulting from the negligent or wrongful act(s) of Government employee(s) while acting within the scope of their employment.
Other. Even though this contract may provide for performing services at the direction of Government personnel, the contract is not for personal services, and neither the Contractor nor his or her personnel are Government employees.
The Government assumes no liability for injury occurring to Contractor personnel or to third parties, or for loss, damage, or destruction involving third parties' property as a result of the Contractor's operation. Except that the Government is liable for such loss, damage, or destruction resulting from the negligent or wrongful act(s) of Government employee(s) acting within the scope of their employment.
Campground Renovation and Improvements, Boulder Oaks
Cleveland National Forest
H.4 Archaeological and Historic Sites
Location of known archaeological, historic, or pre-historic materials--such as Amerind artifacts and/or historic mining, logging, or fur trapping remains protected by the American Antiquities Act (l6 USC 433)--will be identified for the contractor before work commences.
H.5 Spill Plan
If the total oil or oil products storage exceeds 1,320 gallons or if any single container exceeds a capacity of 660 gallons, the Contractor shall prepare and implement a Spill Prevention and Countermeasures (SPCC) Plan. Such plan shall meet applicable EPA requirements (40 CFR 112), including certification by a registered professional engineer. The Contractor under the direction of the Contracting Officer, or in the absence of said officer, acting independently, shall immediately take action to contain and clean up, without expense to the Government, all petroleum products spills on or in the vicinity of the project which are caused by the Contractor's employees directly or indirectly as a result of contract operations. The Contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation deemed necessary by the Government for the containment and clean up of petroleum products spills caused by Contractor's employees or resulting from contract operations. The Contractor shall immediately report all petroleum products spills to the Contracting Officer.
H.6 Equipment Cleaning
All off-road equipment used on this project shall be washed before moving into the project area so that the equipment is free of soil, seeds, vegetative material, or other debris that could contain or hold seeds of noxious weeds. “Off-road equipment” includes all logging and construction equipment and such brushing equipment as brush hogs, masticators, and chippers; it does not include log trucks, chip vans, service vehicles, water trucks, pickup trucks, and similar vehicles not intended for off-road use.
Equipment will be considered clean when visual inspection does not reveal soil, seeds, plant material, or other such debris. Disassembly of equipment components or specialized inspection equipment is not required. Contractor shall notify the Contracting Officer at least five days in advance of moving equipment in so that arrangements can be made for inspection.
If the project area is known to contain noxious weeds, the equipment shall be cleaned before moving to other Forest Service system lands which do not contain noxious weeds.
Campground Renovation and Improvements, Boulder Oaks
PART II – CONTRACT CLAUSES
SECTION I – CONTRACT CLAUSES
I.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address (es): https://www.acquisition.gov/?q=browsefar http://www.dm.usda.gov/procurement/policy/agar.html
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.202-1 Definitions (NOV 2013) 52.203-3 Gratuities (APR 1984) 52.203-5 Covenant Against Contingent Fees (MAY 2014) 52.203-6 Restrictions on Subcontractor Sales to the Government (SEP 2006) 52.203-7 Anti-Kickback Procedures (MAY 2014) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (MAY 2014) 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (MAY 2014) 52.203-12 Limitation on Payments to Influence Certain Federal Transactions (OCT 2010) 52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights (APR 2014) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2014) 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (MAY 2011) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (OCT 2018) 52.204-13 System for Award Management Maintenance (OCT 2018) 52.204-14 Service Contract Reporting Requirements (OCT 2016) 52.204-16 Commercial and Government Entity Code Reporting (JUL 2016) 52.204-19 Incorporation by Reference of Representations and Certifications (DEC 2014) 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (JUL 2018) 52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (OCT 2015) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015) 52.219-6 Notice of Total Small Business Set-Aside (MAR 2020) 52.219-8 Utilization of Small Business Concerns (NOV 2011) 52.219-14 Limitations on Subcontracting (JAN 2017) 52.219-28 Post-Award Small Business Program Rerepresentation (JULY 2013) 52.222-3 Convict Labor (JUNE 2003) 52.222-4 Contract Work Hours and Safety Standards —Overtime Compensation (MAY 2018) 52.222-6 Construction Wage Rate Requirements (AUG 2018) 52.222-7 Withholding of Fund (MAY 2014) 52.222-8 Payrolls and Basic Records (AUG 2018) 52.222-9 Apprentices and Trainees (JULY 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (MAY 2014) 52.222-12 Contract Termination – Debarment (May 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations
(MAY 2014)
52.222-14 Disputes Concerning Labor Standards (FEB 1988) https://www.acquisition.gov/?q=browsefar http://www.dm.usda.gov/procurement/policy/agar.html
Campground Renovation and Improvements, Boulder Oaks
Cleveland National Forest
52.222-15 Certification of Eligibility (MAY 2014) 52.222-21 Prohibition of Segregated Facilities (APR 2015) 52.222-26 Equal Opportunity (SEPT 2016) 52.222-27 Affirmative Action Compliance Requirements for…