AMENDMENT 2 7302020 - CNF BO CG RENO.pdf
PDF 330 KB Posted
- Solicitation number
- 1291S820R0056
About this file
This document is an amendment to a solicitation for campground renovation and improvements at Boulder Oaks Campground in the Cleveland National Forest. The amendment revises the license requirement from a Class B General Contracting license to a Class A General Engineering license, as the project involves civil site work and concrete rather than building construction. Bids are due no later than August 11, 2020 at 3:00 PM Pacific Time. The work includes renovations and improvements to campground facilities and campsites. The selected contractor must have the required California state license and coordinate with the Contracting Officer Representative and Project Engineer. The amendment provides replacement pages to the original solicitation document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NUMBER
A0002
3. EFFECTIVE DATE
07/30/2020
4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
USDA FOREST SERVICE
PACIFIC SOUTHWEST REGION
1323 CLUB DRIVE
VALLEJO, CA 94592-1110
SAME AS ITEM 6.
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code)
(X) 9A. AMENDMENT OF SOLICITATION NUMBER
1291S820R0056
9B. DATED (SEE ITEM 11)
07/15/2020
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Campground Renovations and Improvements, Boulder Oaks Campground. Descanso Ranger District, Cleveland National Forest.
Amendment 2 revises the license requirement from Class B to Class A. RFP Section C.7 no. 4 revised; replacement page 12 attached. Refer to continuation page for associated RFI and answer.
Refer to continuation pages. Proposal due date is unchanged. Proposal due NLT August 11, 2020. 3pm (1500) PST.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Jeremy Bedner, Contracting Officer
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
07/30/2020 (Signature of person authorized to sign)
Previous edition unusable STANDARD FORM 30 (REV. 11/2016)
AMENDMENT 2 07/30/2020
RFP no. 1291S820R0062 Campground Renovation and Improvements, Boulder Oaks
Cleveland National Forest
Requests for Information [RFI] and Answer:
20. Paragraph C.7 – Item 4 (Page 12) calls for a “B” General Contracting license.
Since the project is civil work – site work and concrete – and the buildings are pre-manufactured, would bids be accepted from contractors with an “A” General Engineering license?
ANSWER: Class B General Building Contractor license is not required. Class A General Engineering license is required. Bids from Class A licensed contractors are acceptable.
RFP Section C.7 no. 4 revised and replacement page 12 attached. License requirement for Class B General Building Contractor has been removed. Replaced with requirement for Class A General Engineering Contractor.
REPLACEMENT Page 12 of 46
AMENDMENT 2 07/30/2020
RFP no. 1291S820R0062 Campground Renovation and Improvements, Boulder Oaks
Cleveland National Forest
4. CONTRACTOR QUALIFICATIONS AND LICENSES
Contractor must possess a current and valid Class B “General Building Contractor” Class A “General Engineering Contractor” issued by the State of California to perform the applicable contract work.
Surveyor shall be licensed in the State of California.
Prior to commencing work, the contractor shall present a copy of his/her current license to the Contracting Officer.
Required Qualifications and Lisence are subject to change as new Federal, State and local laws and regulations are implemented and existing Federal, State and local laws are revised.
5. NOTIFICATION AND PERMITS
Contractor is responsible to provide all regulatory notifications and obtain all applicable permits in order to perform work under this contract.
The Contractor shall, without additional expense to the Forest Service, be responsible for obtaining any necessary licenses and permits, and for complying with any applicable Federal, State and local laws, codes, and regulations in connection with the execution of the work.
Required Notifications and Permits are subject to change as new Federal, State and local laws and regulations are implemented and existing Federal, State and local laws are revised.
6. WORK HOURS
Construction activity may be performed Monday through Friday and shall be limited to the hours between 8am (0800) and 5p (1700) unless other hours are approved in writing by the COR. No work will be allowed on weekends or Federal Holidays unless approved by the COR and CO in writing.
7. CONTRACTOR-DESIGNATED SITE SUPERINDENTENT
IAW FAR 52.236-6, Superintendence by the Contractor (APR 1984)
The Contractor shall designate in writing a Site Superintendent/Project Manager to coordinate all contractor activities during construction and to liaise with the Contracting Officer Representative and Project Engineer for the Forest Service.
Contractors Site Superintendent shall be on site at all times any work is being performed.
In addition to Clause 52.236-6, the following applies: The name and the specific authorities of the foreman or superintendent must be designated in writing to the Contracting Officer. The Contractor may use his/her own prepared letterhead stationery or a "Designation of Contractor's Representative" form available from the Contracting Officer. If the Contractor or the designee is not present when work is being performed on the contract, a Suspend Work Order may be issued with contract time continuing to run. The Contractor shall have a person on-site that is fully conversant in the English language.
| SF-30 A2 |
| 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS |
| 13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14. |
| A2 CONT |
| REPLACEMENT PAGE A2 |
File details come from the government source that posted it. Updated .