ATT 3 DRAWINGS REVISED - A1 7292020.pdf
PDF 3 MB Posted
- Solicitation number
- 1291S820R0056
About this file
This is a solicitation for a campground renovation and improvements project at Boulder Oaks Campground within the Cleveland National Forest. The work includes demolishing and removing existing vault toilets and constructing new accessible vault toilet buildings, grading, walkways, parking areas, and other site improvements. A site visit is scheduled for July 22, 2020 at 9:00 AM at the campground location. The solicitation was posted on July 15, 2020 with proposals due by an unspecified date. The selected contractor will be responsible for all necessary site preparation, construction, and coordination related to the new toilet buildings and other site work in accordance with the drawings and specifications provided in the attachments.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLEVELAND NATIONAL FOREST
VICINITY MAP
TRAVEL DIRECTIONS:
SHEET OF
United States Department of Agriculture
Forest Service
2020 BOULDER OAKS
FROM SAN DIEGO, CA TRAVEL ON I-8 EAST, EXIT BUCKMAN SPRINGS ROAD. TURN RIGHT ONTO
BUCKMAN SPRINGS ROAD, MAKE FIRST LEFT ONTO OLD HIGHWAY 80 AND TRAVEL 3 MILES.
CAMPGROUND WILL BE ON THE RIGHT. LATITUDE: 32.729630° LONGITUDE: -116.482648°
CAMPGROUND RENOVATION
RECOMMENDED BY:
APPROVED:
FOREST ENGINEER
DISTRICT RANGER
DATE
DATE
DIRECTOR OF ENGINEERING
DATE
FOREST SUPERVISOR
DATE
RO FACILITIES PROGRAM MANAGER
DATE
CALIFORNIA
SAN DIEGO
R05 PACIFIC SOUTHWEST
CLEVELAND NATIONAL FOREST
DESCANSO RANGER DISTRICT
INDEX OF SHEETS
SHEET SHEET TITLE
BOULDER OAKS CAMPGROUND
OLD HWY 80, CAMPO 91906
4/13/2020
AutoCAD SHX Text
AutoCAD SHX Text
TITLE SHEET
AutoCAD SHX Text
AutoCAD SHX Text
LEGEND AND NOTES
AutoCAD SHX Text
AutoCAD SHX Text
OVERALL SITE PLAN
AutoCAD SHX Text
AutoCAD SHX Text BUILDING 1(site 1) - GRADING PLAN
AutoCAD SHX Text
AutoCAD SHX Text BUILDING 2 (site 2) - GRADING PLAN
AutoCAD SHX Text
AutoCAD SHX Text BUILDING 2 (site 2)- GRADING PLAN WITH ADDITIVE 2
AutoCAD SHX Text
AutoCAD SHX Text
CONSTRUCTION DETAILS A-D
AutoCAD SHX Text
AutoCAD SHX Text
CONSTRUCTION DETAILS E-G
AutoCAD SHX Text
AutoCAD SHX Text
CONSTRUCTION DETAIL H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
X
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
REVISION 1 7/27/2020
B.AUGHINBAUGH
W. HOSSEINI
W. HOSSEINI
03/30/2020
LEGEND & NOTES
DESCANSO RANGER DISTRICT
CLEVELAND NATIONAL
FOREST
2020 BOULDER
OAKS
CAMPGROUND
RENOVATION
PACIFIC SOUTHWEST
R05
AutoCAD SHX Text NOTES: THE CONTRACTOR SHALL CAREFULLY STUDY AND COMPARE THE CONTRACT DOCUMENTS WITH EACH OTHER AND WITH INFORMATION FURNISHED BY THE U.S. FOREST SERVICE AND SHALL AT ONCE REPORT TO THE CONTRACTING OFFICER ERRORS, INCONSISTENCIES OR OMISSIONS DISCOVERED. IF THE CONTRACTOR PERFORMS ANY CONSTRUCTION ACTIVITY KNOWING IT INVOLVED A RECOGNIZED ERROR, WITHOUT SUCH NOTICE TO THE CONTRACTING OFFICER, THE CONTRACTOR SHALL ASSUME APPROPRIATE RESPONSIBILITY FOR SUCH PERFORMANCE AND SHALL BEAR AN APPROPRIATE AMOUNT OF THE ATTRIBUTABLE COSTS FOR CORRECTION. ALL SECTIONS MENTIONED BELOW REFER TO THE CSI SPECIFICATIONS. THE SCHEDULE OF ITEMS IS BASED UPON ENGLISH UNITS, ENGLISH QUANTITIES, AND ENGLISH UNIT PRICES. THE CONTRACT DRAWINGS USE ENGLISH MEASUREMENTS. IT IS HIGHLY RECOMMENDED THAT CONTRACTOR VISIT THIS SITE TO CLARIFY SITE ACCESS FOR ALL EQUIPMENT AND MATERIAL DELIVERIES. CONTRACTOR SHALL CONTACT TRENCHING USA UNDERGROUND SERVICE ALERT AT (800) 227-2600 FOR UTILITIES TO BE LOCATED AND MARKED WITHIN THE PROJECT LIMITS AT LEAST 48 HOURS IN ADVANCE OF ANY EXCAVATION, CLEARING OR GRUBBING. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TRAFFIC CONTROL RELATING TO THIS PROJECT AND ALL TRAFFIC CONTROL AND TRAFFIC CONTROL DEVICES SHALL BE IN CONFORMANCE WITH MUTCD REQUIREMENTS. CONTRACTOR SHALL NOT DISTURB THE AREA BEYOND PROJECT LIMITS. ALL EXISTING SITE FEATURES ARE APPROXIMATE AND SHOULD BE VERIFIED BY CONTRACTOR. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROTECT EXISTING SITE FEATURES AND ALL UTILITIES FROM DAMAGE. CONTRACTOR SHALL REPAIR AT NO COST TO THE GOVERNMENT, ALL DAMAGES TO ANY UTILITIES CAUSED BY THE CONTRACTOR'S ACTIONS. CONTRACTOR SHALL SUBMIT A SCHEDULE OF WORK FOR APPROVAL AT THE PREWORK CONFERENCE. ALL CONSTRUCTION ACTIVITIES SHALL BE IN ACCORDANCE WITH 01 57 24 STORM WATER POLLUTION CONTROL AND 31 20 00 EARTH MOVING. IN THE EVENT OF INCLEMENT WEATHER, THIS PLAN SHALL INCLUDE ACTIONS TO PROVIDE PROTECTIVE COVERING FOR EXCAVATED AREAS, MATERIAL STOCKPILE AREAS, AND ALL WORK IN PROGRESS. ALL EQUIPMENT USED ON SITE SHALL BE WASHED PRIOR TO ENTERING THE CLEVELAND NATIONAL FOREST (CNF) TO REMOVE SOIL, SEEDS AND PLANT MATERIAL FROM NOXIOUS WEEDS TO PREVENT INTRODUCTION AND SPREAD OF WEEDS NOT ALREADY PRESENT ON THE CLEVELAND NATIONAL FOREST. EQUIPMENT INSPECTIONS SHALL BE COORDINATED WITH THE CO. TEMPORARY FIBER ROLL MATERIALS AS LISTED IN CALTRANS SC-5 ARE APPROVED FOR USE ON THIS PROJECT, AND AS A MINIMUM, SHALL BE UTILIZED WHERE SHOWN ON THE DRAWINGS. FIBER ROLLS SHALL BE CERTIFIED IN WRITING BY MANUFACTURER TO BE WEED FREE AND SEED FREE. CONCRETE WASHOUT LOCATION SHALL BE LINED WITH 12 MIL POLYETHYLENE AND BERMED IN ACCORDANCE WITH CALTRANS BEST MANAGEMENT PRACTICES. CONCRETE WASHOUT LOCATION SHALL BE DESIGNATED BY THE CONTRACTING OFFICER. THE FOREST SERVICE SHALL MAKE AVAILABLE TO THE CONTRACTOR AT NO EXPENSE, LIMITED USE OF THE EXISTING WATER AT BOULDER OAKS CAMPGROUND. THE GOVERNMENT DOES NOT ENSURE THE ADEQUACY OF THESE UTILITIES, ANY DELAY IN THE CONTRACTOR'S OPERATION RESULTING FROM THE INTERRUPTION OF THESE UTILITIES, FOR ANY REASON, SHALL NOT RESULT IN AN EXPENSE TO THE GOVERNMENT. THE CONTRACTOR IS RESPONSIBLE FOR INVESTIGATING THE SITE UTILITIES, IF AVAILABLE, FOR USE COMPATIBILITY. CONTRACTOR SHALL PROVIDE FOR ADEQUATE BACK FLOW PREVENTION (DOUBLE CHECK VALVE) AT THE TEMPORARY CONNECTION OF THE STAND PIPE. WATER SERVICE AT THE SITE SHALL NOT BE INTERRUPTED UNDER ANY CIRCUMSTANCES AND WILL BE SUBJECT TO INTERMITTENT FOREST SERVICE DEMANDS IN ORDER TO FILL FOREST SERVICE FIRE TRUCKS. ALL WATER IS CONSIDERED INCIDENTAL TO INDIVIDUAL WORK ITEMS. CONTRACTOR MAY SECURE THEIR OWN WATER SOURCE FOR USE ON THIS PROJECT. WATER SOURCES SHALL BE FREE OF ALL DELETERIOUS MATERIALS.
AutoCAD SHX Text 1.
AutoCAD SHX Text 2.
AutoCAD SHX Text 3.
AutoCAD SHX Text 4.
AutoCAD SHX Text 5.
AutoCAD SHX Text 6.
AutoCAD SHX Text 7.
AutoCAD SHX Text
CONTROL POINT AND POINT NUMBER
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
EXISTING CONTOUR
AutoCAD SHX Text
FIBER ROLL LOCATION
AutoCAD SHX Text 10.
AutoCAD SHX Text
XXXX
AutoCAD SHX Text 11.
AutoCAD SHX Text
SIGN AND POST LOCATION
AutoCAD SHX Text THE CONTRACTOR SHALL PLACE ORDER FOR NEW CXT VAULT TOILET BUILDINGS (OR EQUAL). BUILDING ORDER FORM SHALL BE REVIEWED AND ACCEPTED BY THE CO PRIOR TO THE ORDER BEING PLACED. IT IS THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE THE DELIVERY AND THE INSTALLATION OF THE NEW BUILDING. CONTRACTOR IS RESPONSIBLE FOR ALL WORK NECESSARY FOR SITE PREPARATION BEFORE AND AFTER THE DELIVERY, THIS INCLUDES BUT IS NOT LIMITED TO: CLEARING AND GRUBBING, GRADING & EXCAVATION, COMPACTION, BACKFILL, SAMPLING AND TESTING, SOIL EROSION AND STORM WATER POLLUTION CONTROL MEASURES. ALL CHARGES FOR THE BUILDING INSTALLATION DELAYS CAUSED BY THE CONTRACTOR SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. NO TELEPHONE OR SANITARY FACILITIES WILL BE AVAILABLE FOR CONTRACTOR USE. CONTRACTOR SHALL PROVIDE PORTA POTTIES WITHIN THE CAMPGROUND LOOPS ONCE EXISTING RESTROOMS ARE DEMOLISHED. THE NUMBER OF PORTA POTTIES PER SITE SHALL MATCH THE SAME NUMBER OF EXISTING SEATS. ALL PORTA POTTIES SHALL BE ACCESSIBLE UNITS. PORTA POTTIES SHALL BE PUMPED AS FREQUENT AS NECESSARY OR MORE PORTA POTTIES SHALL BE PROVIDED BY THE CONTRACTOR. LOCATION OF PORTA POTTIES SHALL BE APPROVED BY THE CO. CONTRACTOR SHALL TAKE ALL APPROPRIATE STEPS TO ENSURE THAT NO DISCHARGE OR OTHER POLLUTANTS INTO THE STREAM OR DRAINAGE AREAS SHALL TAKE PLACE AS A RESULT OF CONTRACTORS WORK ACTIVITIES, NO MECHANICAL OR MOTORIZED EQUIPMENT SHALL BE USED, OPERATED, PARKED OR STORED IN STREAM BED, DRAINAGE, MEADOW AREAS, OR SENSITIVE AREAS AT ANY TIME. PRIOR TO CONSTRUCTION CONTACTING OFFICER WILL DESIGNATED APPROPRIATE AREAS FOR PARKING, STORAGE AND MATERIAL STOCKPILE AREAS. CONTROL POINTS HAVE BEEN ESTABLISHED BY THE FOREST SERVICE. IF CONTROL POINTS ARE NO LONGER USEABLE OR CAN NOT BE FOUND THE CONTRACTOR SHALL RE-ESTABLISH CONTROL POINTS AT NO ADDITIONAL COSTS TO THE GOVERNMENT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR USING A CALIFORNIA LICENSED SURVEYOR FOR STAKING IN ACCORDANCE WITH SECTION 01 32 23 SURVEY AND LAYOUT DATA. IF NECESSARY, SURVEY DATA WILL BE AVAILABLE AS NEEDED TO RE-ESTABLISH CONTROL. ALL CONSTRUCTION STAKING FOR ELEVATION CONTROL, GRADE CONTROL, SITE LAYOUT, BUILDINGS, AND UTILITIES ARE THE RESPONSIBILITY OF THE CONTRACTOR. STAKING FOR GRADE CONTROL SHALL BE SUFFICIENT TO PROVIDE AND PRODUCE THE GRADES, SHAPES AND CONTOURS AS SHOWN ON THE DRAWINGS. CONSTRUCTION STAKING IN THE FIELD REQUIRES APPROVAL FROM THE CONTRACTING OFFICER PRIOR TO THE COMMENCEMENT OF WORK. APPROVAL OF THE CONSTRUCTION STAKING WILL NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY FOR MAINTAINING THE SURVEY WORK AND CORRECTING ERRORS, WHETHER THE ERRORS WERE DISCOVERED DURING THE ACTUAL SURVEY WORK OR IN SUBSEQUENT PHASES OF THE PROJECT. ALL WALKWAYS SHALL MEET THE ARCHITECTURAL BARRIERS ACT ACCESSIBILITY GUIDELINES (ABAAG), WITH NO RAMPS ON ANY WALKWAY. AT A MINIMUM LANDINGS SHALL BE LESS THAN TWO PERCENT IN ALL DIRECTIONS; AND, WALKWAYS SHALL BE LESS THAN FIVE PERCENT IN THE RUNNING DIRECTION WITH LESS THAN TWO PERCENT CROSS SLOPE. BLEND ALL NEW CONTOURS TO EXISTING CONTOURS FOR FINISHED GRADE AT A MAX OF 3H:1V OR AS SHOWN ON DRAWINGS. CLEARING AND GRUBBING SHALL BE IN ACCORDANCE WITH SECTION 31 10 00 SITE CLEARING. ALL BRUSH, STUMPS, AND TREES WITHIN PROJECT LIMITS THAT INTERFERE WITH CONSTRUCTION ACTIVITIES MAY BE REMOVED ONLY WITH PRIOR APPROVAL OF CONTRACTING OFFICER. CONSTRUCTION SLASH SHALL BE REMOVED AND DISPOSED OF OFF NATIONAL FOREST LAND AT A SUITABLE DISPOSAL SITE. CONTRACTOR SHALL FURNISH A SIGNED COPY OF THE DISPOSAL AGREEMENT. CARE SHALL BE TAKEN TO AVOID DAMAGING ALL LIVE TREES. ALL EXCAVATION SHALL BE IN ACCORDANCE WITH SECTION 31 20 00 EARTH MOVING. COMPACTION TESTING FOR DENSITY SHALL BE IN ACCORDANCE WITH SECTION 31 20 00 EARTH MOVING, AND A MINIMUM OF THREE (3) DENSITY TESTS SHALL BE PERFORMED EACH DAY, OR AS OTHERWISE APPROVED BY THE CONTRACTING OFFICER. IMPORTED MATERIAL SHALL BE OBTAINED BY CONTRACTOR FROM A COMMERCIAL SOURCE AND CONTRACTOR SHALL FURNISH A MATERIAL CERTIFICATE OF COMPLIANCE THAT STATES THAT THE GRADATION MEETS THE CONTRACT REQUIREMENTS. IMPORTED MATERIAL SHALL BE SUBJECT TO ADVANCE APPROVAL BY CONTRACTING OFFICER. A MINIMUM OF A 2' SHOULDER SHALL BE ALONG ALL ROADWAYS AND WALKWAYS.
AutoCAD SHX Text 8.
AutoCAD SHX Text 9.
AutoCAD SHX Text
AutoCAD SHX Text
NEW CONTOUR
AutoCAD SHX Text 13.
AutoCAD SHX Text 18.
AutoCAD SHX Text 16.
AutoCAD SHX Text 12.
AutoCAD SHX Text 17.
AutoCAD SHX Text
NEW CONTOUR LABEL
AutoCAD SHX Text
NEW CONCRETE WALKWAY
AutoCAD SHX Text
ROADWAY GATE
AutoCAD SHX Text 29.
AutoCAD SHX Text 25.
AutoCAD SHX Text
EXISTING FENCING
AutoCAD SHX Text 15.
AutoCAD SHX Text 14.
AutoCAD SHX Text CALTRANS CLASS ll AGG. BASE
AutoCAD SHX Text ALL PORTLAND CONCRETE CEMENT SHALL BE IN ACCORDANCE WITH SECTION 03 30 00 CAST-IN-PLACE CONCRETE. COURSE AGGREGATE FOR CONCRETE SHALL CONFORM TO AASHTO M43, SIZE NUMBER 467. PORTLAND CEMENT CONCRETE SHALL HAVE 1.5 LBS FIBERMIX PER CUBIC YARD. CONTROL JOINTS (TROWELED 3/4" MAXIMUM DEPTH AND 1/8"-1/4" GROOVES WITH 1/4" RADIUS EDGES) SHALL BE LOCATED APPROXIMATELY EVERY FIVE (5) FEET AND/OR AT THE END OF EACH RADIUS AND SHALL BE PERPENDICULAR TO THE RUNNING SLOPE. ALL OUTSIDE EDGES AND ALL JOINTS SHALL BE EDGED WITH A 1/4" RADIUS EDGING TOOL. 4" (FOUR INCH) THICK PORTLAND CEMENT CONCRETE WALKWAYS SHALL BE IN ACCORDANCE WITH SECTION 03 30 00 CAST-IN-PLACE CONCRETE, WITH A HEAVY BRUSHED FINISH. ALL CONCRETE WALKWAYS SHALL BE BACKFILLED TO 1/2 INCH BELOW TOP OF CONCRETE WITH A TWO FOOT SHOULDER. WALKWAY ELEVATION AT ENTRANCE TO ALL BUILDINGS SHALL BE NO GREATER THAN 1/4 INCH BELOW BUILDING FINISHED FLOOR ELEVATION WHERE FLOOR TIES INTO WALKWAY. EXPANSION JOINT (1/2" THICK EXPANDING FILLER) SHALL BE INSTALLED WHERE CONCRETE WALKWAY ABUTS TOILET BUILDING. EXPANSION JOINTS SHALL BE IN ACCORDANCE WITH SECTION 03 30 00 CAST-IN-PLACE CONCRETE. A FOREST SERVICE ARCHEOLOGICAL MONITOR SHALL BE ONSITE TO OVERSEE ANY GROUND DISTURBANCE OR CLEARING OF VEGETATION. THE CONTRACTOR SHALL WORK CLOSELY WITH THE COR TO SCHEDULE FOREST SERVICE ARCHEOLOGICAL OVERSIGHT. 6" OF TOPSOIL REMOVAL FROM THE NEW BUILDING LOCATIONS, WALKWAYS AND THE PARKING AREAS (IF AWARDED) SHALL BE STOCKPILED ONSITE WITH PROPER BMP'S. TOPSOIL SHALL BE PLACED AROUND NEW RESTROOMS, WALKWAYS AND PARKING AREAS AS APPROVED BY THE CO AND IN ACCORDANCE WITH SECTION 31 20 00 EARTH MOVING. TOPSOIL REMOVAL AND PLACEMENT IS CONSIDERED INCIDENTAL TO 31 20 00 EARTH MOVING. EXCESS DIRT SHALL BE STOCKPILED IN PARKING SPUR OF CAMP UNIT SITE 11. FINAL LOCATION SHALL BE DETERMINED BY THE COR. PROPER BMPS SHALL BE INSTALLED AND REMAIN. FIBER ROLLS SHALL BE INSTALLED WITH STAKES OR SANDBAGS. EXCESS MATERIAL SHALL BE EXCESS MATERIAL SHALL BE PLACED ON TOP OF A PLASTIC BARRIER APPROVED BY THE COR. DEMO SITE - IF A CAMP UNIT IS DESIGNATED TO BE DEMOLISHED THE CONTRACTOR SHALL REMOVE AND DISPOSE OF THE EXISTING PICNIC TABLE AND EXISTING FIRE RING. WOOD BARRIERS SHALL BE REMOVED. WOOD BARRIERS SHALL BE REMOVED. . WOOD BARRIERS WILL BE MARKED PRIOR TO REMOVAL BY THE COR. VOIDS SHALL BE FILLED WITH ONSITE MATERIAL. ROCK BARRIERS ROCK BARRIERS SHALL BE INSTALL ALONG THE PARKING SPUR AS SHOWN ON THE DRAWINGS AND IN ACCORDANCE WITH DETAIL G.AND IN ACCORDANCE WITH DETAIL G.
AutoCAD SHX Text 26.
AutoCAD SHX Text 27.
AutoCAD SHX Text 28.
AutoCAD SHX Text
EXISTING WATERLINE
AutoCAD SHX Text
EXISTING SEWER
AutoCAD SHX Text
NATIVE MATERIAL
AutoCAD SHX Text
NEW HORSE GATE
AutoCAD SHX Text
HORSE CORRALS
AutoCAD SHX Text
NEW ROCK BARRIERS
AutoCAD SHX Text
TREE
AutoCAD SHX Text
HOSE BIBB
AutoCAD SHX Text
HB
AutoCAD SHX Text
DETAIL LEADER
AutoCAD SHX Text
DRAWING REVISION
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
E
HOST SITE
6 & 78
9 & 10
18 & 19
LOW POINT DRAIN VALVE
EXISTING WATERLINE
EXISTING BARB WIRE
FENCE TO REMAIN
LEGEND
EXISTING
PUMP HOUSE,
TO REMAIN.
DEMO CAMP
UNITS 9 & 10
EXISTING VAULT
BUILDING TO BE
DEMOLISHED.
DEMO CAMP
UNIT 11
NEW VAULT BUILDING
SITE 2, SEE SHEET 5 & 6.
EXISTING VAULT
BUILDING TO BE
DEMOLISHED.
HORSE CORRAL, TYPICAL
H
I
G
H
W
A
Y
NEW VAULT BUILDING 1,
SEE SHEET 4.
DUMPSTER PAD,
ADDITIVE 3.
POINT # NORTHING EASTING ELEVATION DESCRIPTION
1 1845154.8576' 6489351.3814' 3187.27' BASE SET
INCH PIPE
2 1845065.4574' 6489939.0538' 3170.61' SET GIN SPIKE
135 1845435.4122' 6490099.6247' 3169.16' SET GIN SPIKE
136 1845369.4317 6490150.6606' 3171.63' SET GIN SPIKE
#1
#2
#136
#135
EQUESTRIAN LOOP
FAMILY LOOP
NOTES:
1. ALL UTILITIES ARE APPROXIMATE. IT IS THE CONTRACTORS RESPONSIBILITY
TO CONFIRM ALL ABOVE GROUND AND BELOW GROUND UTILITIES.
2. HORSE CORRALS SHALL REMAIN AT "DEMO SITE" #27.
3. HORSE GATE LOCATIONS ARE APPROXIMATE. THE FINAL LOCATION SHALL BE
STAKED BY THE CO. SEE DETAIL H.
4. "DEMO SITES" SHALL RECEIVE ROCK BARRIERS ACROSS THE ENTRANCE OF
THE CAMPING PARKING SPUR. REFER TO SITE IMPROVEMENT SPECIFICATION
AND DETAIL G. FINAL LOCATIONS SHALL BE APPROVED BY THE COR.
5. WOOD BARRIERS ALONG PARKING SPUR SHALL BE REMOVED AND DISPOSED
OF OFF OF NATIONAL FOREST LAND. VOIDS SHALL BE FILLED WITH ONSITE FILL
MATERIAL. WOOD BARRIERS WILL BE MARKED PRIOR TO REMOVAL BY THE
COR.
6. CAMP UNIT 18 & 19 SHALL BE CONVERTED TO A WALK-IN SITE. EXISTING PICNIC
TABLES AND FIRE RINGS SHALL REMAIN. ROCK BARRIERS SHALL BE PLACED
ACROSS THE ENTRANCE OF THE CAMPING PARKING SPUR.
7. EXISTING PIT TOILET VAULT DESIGNATED TO BE DEMOLISHED SHALL BE
REMOVED AND DISPOSED OF IN ACCORDANCE WITH THE DEMOLITION
SPECIFICATION 02 41 00
DEMO CAMP
UNIT 13
DEMO CAMP
UNIT 27
CONCRETE PAD
FEE TUBE TO REMAIN.
FLAG POLE TO
BE REMOVED
BULLETIN BOARD
TO REMAIN
DAY USE
PARKING AREA
ACCESSIBLE PARKING,
ADDITIVE 1.
APPROXIMATE LOCATION OF
NEW HORSE GATE, ADDITIVE 4.
EXISTING
UTILITY ROAD
APPROXIMATE LOCATION OF
NEW HORSE GATE, ADDITIVE 4.
DEMO
CONCRETE
PAD
HOSE BIBB AND
CONCRETE PAD
TO REMAIN.
EXISTING
UTILITY ROAD
ACCESSIBLE PARKING,
ADDITIVE 2.
DEMO CAMP
UNIT 12
35 & 36
NEW ROCK
BARRIERS,
TYPICAL
INSTALL ROCK BARRIERS, PER
DETAIL G, ALONG ROADWAY
ONCE BUILDING IS DEMOLISHED.
EXISTING PIT
TOILET VAULT TO
BE DEMOLISHED.
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
B.AUGHINBAUGH
W. HOSSEINI
W. HOSSEINI
03/30/2020
OVERALL SITE PLAN
DESCANSO RANGER DISTRICT
CLEVELAND NATIONAL
FOREST
Revision 1
2020 BOULDER
OAKS
CAMPGROUND
RENOVATION
7/27/2020
PACFICI SOUTHWEST
R05
Feet
1" = 60'
60300
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
HB
FLAG POLE
TO BE
REMOVED
EXISTING
FEE TUBE
EXISTING
BULLETIN
BOARD TO
REMAIN
FF
3168.27 FT.
1' LEVEL
SHOULDER,
TYPICAL
FROM CONCRETE WALKWAY THE
CONTRACTOR SHALL GRADE A
SMOOTH LANDING AND THEN
TRANSITION TO MEET EXISTING
CONTOURS AT 3H:1V MAX.
HOST SITE
APPROXIMATE
LOCATION OF
ADDITIVE ITEM,
DUMPSTER PAD.
5'
25'
11'
ADDITIVE ITEM 1,
ACCESSIBLE
PARKING
ASSOCIATED
WORK ITEMS.
D
C
EXISTING
SIGN
EDGE OF ROAD
HB
DEMO
CONCRETE
PAD
EXISTING ROCKS
TO BE FLAGGED
OFF
DEMO
EXISTING
BUILDING
FIBER ROLL,
BASE BID
NEW ROCK
BARRIERS,
TYPICAL
EDGE OF ROAD
ADDITIVE ITEM
1, WALKWAY
STARTS HERE.
FIBER ROLL,
ADDITIVE
ITEM 1.
ROCK
BARRIERS,
ADDITIVE
ITEM 1.
FIBER ROLL,
ADDITIVE
ITEM 1.
ROCK
BARRIERS,
ADDITIVE
ITEM 1.
EXISTING
STUMP
EXISTING
ROCKS
EXISTING
ROCKS
#2
EXISTING SEPTIC TANK
AND LEACH FIELD
NOTES:
1. THE CONTRACTOR SHALL SAVE THE 6" OF TOPSOIL. TOPSOIL SHALL BE STOCKPILED ON SITE
WITH PROPER BMPS. TOPSOIL SHALL BE PLACED AROUND WALKWAYS PARKING AREA IN
ACCORDANCE WITH EARTH MOVING SPECIFICATION.
2.IF NECESSARY, ADJUSTMENTS SHALL BE MADE IN THE FIELD TO ACHIEVE MINIMUM ACCESSIBILITY
REQUIREMENTS AND TIE TO EXISTING SITE FEATURES DESIGNATED TO REMAIN AND THE ROADWAY.
3. CONTRACTOR SHALL CLEAR VEGETATION WITHIN A 20' RADIUS OF THE NEW BUILDING. TREES TO
BE REMOVED SHALL FIRST BE APPROVED BY THE COR PRIOR TO REMOVAL.
4.COR SHALL MARK EXISTING WOOD BARRIERS TO BE REMOVED FOR WALKWAY AND PARKING
AREA.
5.CONTRACTOR MAY MOVE LOGS NEAR NEW BUILDING LOCATION UPON APPROVAL FROM THE COR.
6. IF ADDITIVE 1 IS AWARDED, THE FEE TUBE SHALL BE RELOCATED NEXT TO NEW CONCRETE
WALKWAY. THE FEE TUBE OPENING SHALL BE A MINIMUM OF 15" TO A MAX OF 48" ABOVE THE FINISH
GRADE/TOP OF CONCRETE. FINAL LOCATION OF FEE TUBE SHALL BE STAKED BY THE COR.
7.END OF WALKWAY AND EDGES OF THE ACCESSIBLE PARKING SHALL HAVE A SMOOTH
TRANSITION TO TIE TO EXISTING CONTOURS AT 3H:1V MAX.
8.THE BUILDING FLOOR SHALL SLOPE AT 1.0% OUT THE FRONT OF THE BUILDING.
6.CONCRETE MEDIAN AND PARKING SHALL HAVE A MAX SLOPE OF 2% IN ANY DIRECTION.
7.5 FOOT ACCESSIBLE MEDIAN SHALL BE 4" OF CONCRETE OVER COMPACTED NATIVE MATERIAL .
8.PARKING SPACE SHALL BE 6" CONCRETE OVER 4" COMPACTED CLASS 2 AGGREGATE BASE.
CONCRETE PERIMETER WITH THICKENED EDGE SHALL INCLUDE ONLY THE PARKING SPACE, SEE
DETAIL B.
PAVEMENT MARKINGS, SEE DETAIL A.
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
PACIFIC SOUTHWEST
R05
7/27/2020REVISION 1
2020 BOULDER
OAKS
CAMPGROUND
RENOVATION
FAMILY LOOP
BUILDING 1
DESCANSO DISTRICT
CLEVELAND NATIONAL
FOREST
B.AUGHINBAUGH
W. HOSSEINII
W. HOSSEINI
3/30/2020
Feet
1" = 10'
20100
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
FF 3184.80 FT.
CUT SLOPE =
3H:1V MAX
CONCRETE SLAB
TO REMAIN
NOTES:
1. CONTRACTOR SHALL CLEAR VEGETATION WITHIN A 20' RADIUS OF THE NEW
BUILDING. CONTRACTOR SHALL RECEIVE APPROVAL FROM THE COR PRIOR TO
REMOVING ANY TREES.
2. THE CONTRACTOR SHALL SAVE THE TOP 6" OF TOPSOIL. TOPSOIL SHALL BE
STOCKPILED ON SITE WITH PROPER BMPS. TOPSOIL SHALL BE PLACED AROUND
THE WALKWAY. PLACEMENT OF TOPSOIL SHALL BE IN ACCORDANCE WITH EARTH
MOVING SPECIFICATION.
3. COR SHALL MARK EXISTING WOOD BARRIERS TO BE REMOVED FOR WALKWAY.
4. IF NECESSARY, ADJUSTMENTS SHALL BE MADE IN THE FIELD TO ACHIEVE
MINIMUM ACCESSIBILITY REQUIREMENTS AND TO TIE TO EXISTING ROADWAY.
5. ROADWAY WIDTH SHALL BE A MINIMUM OF 12' .
6. THE BUILDING FLOOR SHALL SLOPE AT 1.00% OUT THE FRONT OF THE BUILDING.
HB
CLEAR A 20' RADIUS
OF VEGETATION
AROUND BUILDING.
1' LEVEL
SHOULDER
TIE TO EXISTING
ROADWAY CONTOURS
AT A MAX OF 3H:1V.
NEW ROCK
BARRIER, TYPICAL
FIBER ROLL
TO REMAIN
ACCESSIBLE WALKWAY
SHALL BE 3' WIDE WITH A
MAX SLOPE OF 2% IN ANY
DIRECTION.
HORSE CORRAL,
TYPICAL
EDGE OF
ROADWAY
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
PACIFIC SOUTHWEST
R05
7/27/2020REVISION 1
2020 BOULDER
OAKS
CAMPGROUND
RENOVATION
EQUESTRIAN LOOP -
BUILDING 2
DESCANSO DISTRICT
CLEVELAND NATIONAL
FOREST
B.AUGHINBAUGH
W.HOSSEINI
W.HOSSEINI
03/30/2020
Feet
1" = 10'
20100
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
FF 3185.07 FT.
ACCESSIBLE WALKWAY SHALL BE
3' WIDE WITH A MAX SLOPE OF
2% IN ANY DIRECTION.
CUT SLOPE = 3H:1V MAX
CONCRETE SLAB
TO REMAIN
NOTES:
1. CONTRACTOR SHALL CLEAR VEGETATION WITHIN A 20' RADIUS AROUND NEW
BUILDING. CONTRACTOR SHALL RECEIVE APPROVAL FROM THE COR PRIOR TO
REMOVING ANY TREES.
2. THE CONTRACTOR SHALL SAVE THE 6" OF TOPSOIL. TOPSOIL SHALL BE
STOCKPILED ON SITE WITH PROPER BMPS. TOPSOIL SHALL BE PLACED AROUND
THE WALKWAY AND PARKING AREA. PLACEMENT OF TOPSOIL SHALL BE IN
ACCORDANCE WITH EARTH MOVING SPECIFICATION.
3. COR SHALL MARK EXISTING WOOD BARRIERS TO BE REMOVED FOR WALKWAY
AND PARKING AREA.
4. IF NECESSARY, ADJUSTMENTS SHALL BE MADE IN THE FIELD TO ACHIEVE
MINIMUM ACCESSIBILITY REQUIREMENTS AND TO TIE TO EXISTING ROADWAY
5. ROADWAY WIDTH SHALL BE A MINIMUM OS 12'.
6. THE BUILDING FLOOR SHALL SLOPE AT 1.00% OUT THE FRONT OF THE BUILDING.
7. CONCRETE MEDIAN AND PARKING SHALL HAVE A MAX SLOPE OF 2% IN ANY
DIRECTION.
8. 5 FOOT ACCESSIBLE MEDIAN SHALL BE 4" OF CONCRETE OVER COMPACTED
NATIVE MATERIAL .
9. PARKING SPACE SHALL BE 6" CONCRETE OVER 4" COMPACTED CLASS 2
AGGREGATE BASE. CONCRETE PERIMETER THICKENED EDGE PERIMETER SHALL
INCLUDE ONLY THE PARKING SPACE, SEE DETAIL B.
10. PAVEMENT MARKINGS, SEE DETAIL A.
HB
25'
11'
5'
CLEAR VEGETATION AND GRADE NATIVE
MATERIAL, 3% MAX IN EACH DIRECTION. 3H:1V
TO CATCH EXISTING CONTOURS. TIE TO NEW
CONCRETE PARKING
7.5'
CLEAR A 20' RADIUS
OF VEGETATION
AROUND BUILDING.
1' LEVEL
SHOULDER
TIE TO EXISTING ROADWAY
CONTOURS AT A MAX OF
3H:1V, TYPICAL.
5'
CLEAR VEGETATION AND GRADE
NATIVE MATERIAL, 3% MAX IN EACH
DIRECTION. 3H:1V TO CATCH
EXISTING ROADWAY CONTOURS. TIE
TO NEW CONCRETE PARKING
NEW ROCK
BARRIER, TYPICAL
FIBER ROLL
TO REMAIN
D
C
8'
RELOCATE CONCRETE
SLAB TO HERE.
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
PACIFIC SOUTHWEST
R05
7/27/2020REVISION 1
2020 BOULDER
OAKS
CAMPGROUND
RENOVATION
EQUESTRIAN LOOP -
BUILDING 2 WITH
PARKING (ADDITIVE 2)
DESCANSO DISTRICT
CLEVELAND NATIONAL
FOREST
B.AUGHINBAUGH
W.HOSSEINI
W.HOSSEINI
03/30/2020
Feet
1" = 10'
20100
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
METAL SIGN SCHEDULE
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
7/2 7/2
0 1 9:
W
AH
OS
SE
IN
I C :\U
SE
RS
\W
AH
OS
SE
IN
I\B
OX
\73
BU
IL
DI
NG
SS
TR
UC
TU
RE
S\
AA
AP
RO
JE
CT
S\
RE
CR
EA
TI
ON
\B
OU
LD
ER
OA
KS
CG
\D
RA
W
IN
GS
\R
EV
IS
IO
N 1\7
9 C
ON
ST
RU
CT
IO
N
DE
TA
IL
S.
DW
G;
R05
PACIFIC SOUTHWEST
2020 BOULDER
OAKS
CAMPGROUND
RENOVATION
CLEVELAND NATIONAL
FOREST
DESCANSO RANGER DISTRICT
CONSTRUCTION DETAILS
A-D
03/30/2020
W.HOSSEINI
W.HOSSEINI
B.AUGHINBAUGH
7 9
REVISION 1 7/27/2020
PAVEMENT MARKINGS, TYPICAL
Not To Scale
A
PARKING PERIMETER THICKENED EDGE
Not To Scale
B
ACCESSIBLE EMBLEM
Not To Scale
C SIGN AND POST
Not To Scale
D
AutoCAD SHX Text
ANTI-VANDAL FASTENER ASSEMBLY
AutoCAD SHX Text
AND FLAT WASHER
AutoCAD SHX Text
REFLECTORIZED SIGN CONSTRUCTED OF PORCELAIN STEEL
AutoCAD SHX Text
4"X4" SIGN POSTS. POSTS SHALL BE PRESSURE TREATED CEDAR.
AutoCAD SHX Text
FRONT VIEW
AutoCAD SHX Text
COMPACTED SUBGRADE
AutoCAD SHX Text
SIGN POST ANCHOR
AutoCAD SHX Text
WITH BEADED TEXT OR EQUAL, SEE METAL SIGN SCHEDULE
AutoCAD SHX Text
2" MIN.
AutoCAD SHX Text
2" MIN.
AutoCAD SHX Text
7' MIN.
AutoCAD SHX Text 3'
AutoCAD SHX Text
SIGN POST
AutoCAD SHX Text 3"
AutoCAD SHX Text
ANTI-VANDAL FASTENER ASSEMBLY
AutoCAD SHX Text
FLAT WASHER AND LOCK WASHER
AutoCAD SHX Text
SIDE VIEW OF ACCESSIBLE SIGN
AutoCAD SHX Text
MACHINE BOLT
AutoCAD SHX Text 5/16 INCH x 3 INCH
AutoCAD SHX Text NOTES: 1. SIGN SHOULD BE VERTICALLY MOUNTED OR AT RIGHT ANGLES TO THE DIRECTION OF AND FACING THE
AutoCAD SHX Text
SIGN
AutoCAD SHX Text
ANTI-VANDAL FASTENER ASSEMBLY
AutoCAD SHX Text
TRAFFIC THAT THEY ARE INTENDED TO SERVE.
AutoCAD SHX Text
2. ALL POSTS AND SUPPORT TO BE FURNISHED AND INSTALLED BY CONTRACTOR. SIGNS SHALL BE
AutoCAD SHX Text INSTALLED IN ACCORDANCE WITH MUTCD GUIDELINES AND SPECIFICATIONS SECTION 10 14 53 TRAFFIC
AutoCAD SHX Text SIGNAGE, AND IN LOCATIONS AS SHOWN ON PLANS AND AS APPROVED BY THE CONTRACTING OFFICER.
AutoCAD SHX Text
# EACH
AutoCAD SHX Text
TYPE
AutoCAD SHX Text (W X H)
AutoCAD SHX Text
# POSTS
AutoCAD SHX Text
REMARKS
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
TO BOTTOM OF SIGN
AutoCAD SHX Text
HEIGHT ABOVE GRADE
AutoCAD SHX Text
AutoCAD SHX Text
ACCESSIBLE PARKING
AutoCAD SHX Text 12" X 18"
AutoCAD SHX Text
AutoCAD SHX Text
MUTCD #R7-8.
AutoCAD SHX Text 84"
AutoCAD SHX Text
POST TYPE
AutoCAD SHX Text
METAL
AutoCAD SHX Text
AutoCAD SHX Text
MUTCD #R7-8 MOD
AutoCAD SHX Text 84"
AutoCAD SHX Text
METAL
AutoCAD SHX Text
VAN ACCESSIBLE PARKING
AutoCAD SHX Text
AutoCAD SHX Text 12" X 18"
AutoCAD SHX Text
WOOD
AutoCAD SHX Text
WOOD
AutoCAD SHX Text
ACCESSIBLE EMBLEM SHALL BE CENTERED AT THE ENTRANCE OF THE STALL
AutoCAD SHX Text 4 INCH WIDE PAINTED BLUE PAVEMENT STRIPES LOCATED AT THE TOP OF STALL AND RIGHT OR LEFT OF THE STALL PER PLAN. LENGTH AND WIDTH OF STALL AS SHOWN PER PLAN.
AutoCAD SHX Text MEDIAN: 4 INCH WIDE PAINTED 4 INCH WIDE PAINTED BLUE PAVEMENT STRIPES, 3' APART AT A 45 DEGREE ANGLE.
AutoCAD SHX Text
#4 REBAR AT 16" ON CENTER
AutoCAD SHX Text
6" CONCRETE SLAB
AutoCAD SHX Text
#4 REBAR
AutoCAD SHX Text NOTE: A MINIMUM OF 2" OF CONCRETE COVERAGE SHALL BE OBTAINED ABOVE, BELOW AND ON ALL SIDES OF REBAR.
AutoCAD SHX Text
1' LEVEL SHOULDER
AutoCAD SHX Text
4" COMPACTED CALTRANS CLASS II AGGREGATE BASE
AutoCAD SHX Text
TIE TO EXISTING GROUND AT 3H:1V, TYPICAL
AutoCAD SHX Text
NATIVE MATERIAL
AutoCAD SHX Text
3" WIDE WHITE PAINTED STRIPE
AutoCAD SHX Text 4'
AutoCAD SHX Text 3'-7 1/2"
BLUE BACKGROUND
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
7/2 7/2
0 1 9:
W
AH
OS
SE
IN
I C :\U
SE
RS
\W
AH
OS
SE
IN
I\B
OX
\73
BU
IL
DI
NG
SS
TR
UC
TU
RE
S\
AA
AP
RO
JE
CT
S\
RE
CR
EA
TI
ON
\B
OU
LD
ER
OA
KS
CG
\D
RA
W
IN
GS
\R
EV
IS
IO
N 1\7
9 C
ON
ST
RU
CT
IO
N
DE
TA
IL
S.
DW
G;
R05
PACIFIC SOUTHWEST
2020 BOULDER
OAKS
CAMPGROUND
RENOVATION
CLEVELAND NATIONAL
FOREST
DESCANSO RANGER DISTRICT
CONSTRUCTION DETAILS
E-G
03/30/2020
W.HOSSEINI
W.HOSSEINI
B.AUGHINBAUGH
8 9
REVISION 1 7/27/2020
CONCRETE DUMPSTER PAD
Not To Scale
F
ROCK BARRIERS
Not To Scale
G
CONCRETE WALKWAY, TYPICAL
Not To Scale
E
AutoCAD SHX Text
FILL SLOPE TIE TO EXISTING CONTOURS 3H:1V MAX, TYPICAL
AutoCAD SHX Text
CUT SLOPE TIE TO EXISTING CONTOURS 3H:1V MAX, TYPICAL
AutoCAD SHX Text
4" PORTLAND CEMENT CONCRETE WITH FIBER REINFORCEMENT
AutoCAD SHX Text
COMPACTED NATIVE SOIL
AutoCAD SHX Text NOTES: CONCRETE WALK SHALL HAVE A MAX CROSS SLOPE OF 2% AND A MAX RUNNING SLOPE OF 2% UNLESS OTHERWISE SPECIFIED ON DRAWINGS.
AutoCAD SHX Text
6" CURB ON THREE SIDES OF PAD.
AutoCAD SHX Text
TAPERED TO 5" AT TOP OF CURB.
AutoCAD SHX Text
PLAN VIEW
AutoCAD SHX Text
FOOTING
AutoCAD SHX Text
#4 REBAR
AutoCAD SHX Text
SLAB
AutoCAD SHX Text
#4 REBAR AT 32" ON CENTER
AutoCAD SHX Text
CURB
AutoCAD SHX Text NOTE: A MINIMUM OF 2" OF CONCRETE COVERAGE SHALL BE OBTAINED ABOVE, BELOW AND ON ALL SIDES OF REBAR.
AutoCAD SHX Text
ROAD EDGE
AutoCAD SHX Text
SPACING DISTANCE SHALL BE 36", TYPICAL.
AutoCAD SHX Text
USE A VARIETY OF ROCK SIZES FROM 36" TO 48" LONG
AutoCAD SHX Text
SPACING FROM EDGE OF ROADWAY SHALL BE 18"
AutoCAD SHX Text
CREATE A MORE NATURAL LOOK
AutoCAD SHX Text
GROUND SURFACE
AutoCAD SHX Text
ROCK BARRIERS SHALL BE PLACED ON THE GROUND SURFACE
AutoCAD SHX Text
PLAN VIEW
AutoCAD SHX Text
SECTION VIEW
AutoCAD SHX Text
LAY ROCKS ON THEIR LONG DIMENSION TO LOOK MORE NATURAL
AutoCAD SHX Text
NOTE: THE PURPOSE OF THE ROCKS ARE TO KEEP VEHICLES ON THE ROADWAY
AutoCAD SHX Text
REFER TO SITE IMPROVEMENTS SPECIFICATION FOR MORE GUIDANCE.
COR SHALL APPROVE FINAL ROCK BARRIER LOCATIONS.
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
7/2 7/2
0 1 9:
W
AH
OS
SE
IN
I C :\U
SE
RS
\W
AH
OS
SE
IN
I\B
OX
\73
BU
IL
DI
NG
SS
TR
UC
TU
RE
S\
AA
AP
RO
JE
CT
S\
RE
CR
EA
TI
ON
\B
OU
LD
ER
OA
KS
CG
\D
RA
W
IN
GS
\R
EV
IS
IO
N 1\7
9 C
ON
ST
RU
CT
IO
N
DE
TA
IL
S.
DW
G;
R05
PACIFIC SOUTHWEST
2020 BOULDER
OAKS
CAMPGROUND
RENOVATION
CLEVELAND NATIONAL
FOREST
DESCANSO RANGER DISTRICT
CONSTRUCTION DETAIL
H
03/30/2020
W.HOSSEINI
W.HOSSEINI
B.AUGHINBAUGH
9 9
REVISION 1 7/27/2020
HORSE GATE
Not To Scale
H
AutoCAD SHX Text NOTES: 1. THESE DRAWINGS ARE TYPICAL DRAWINGS AND MAY REQUIRE MINOR THESE DRAWINGS ARE TYPICAL DRAWINGS AND MAY REQUIRE MINOR MODIFICATION FOR INSTALLATION. 2. PRIOR TO CONTRACT AWARD THE CONTRACTOR SHALL INVESTIGATE PRIOR TO CONTRACT AWARD THE CONTRACTOR SHALL INVESTIGATE ONSITE TERRAIN AND CONDITIONS TO DETERMINE IF LENGTH ADJUSTMENTS TO THE POSTS ARE NECESSARY TO ACHIEVE MINIMUM EMBEDMENT AND ALL POSTS AND RAILS ARE LEVEL. 3. REQUIRED BARRICADE MARKERS SHALL FOLLOW THE SIGN AND POSTER REQUIRED BARRICADE MARKERS SHALL FOLLOW THE SIGN AND POSTER GUIDANCE FOR THE FOREST SERVICE EM 7100-15. 4. CONCRETE SUPPORTS SHALL BE USED TO SET ALL POSTS BEFORE CONCRETE SUPPORTS SHALL BE USED TO SET ALL POSTS BEFORE CONCRETE PLACEMENT TO PROVIDE A MINIMUM 3 INCH GAP BETWEEN BOTTOM OF FOOTING HOLE AND POST. 5. ALL PIPE RAIL, POSTS, AND WELDS SHALL BE GROUND SMOOTH. ALL PIPE RAIL, POSTS, AND WELDS SHALL BE GROUND SMOOTH. 6. CENTER POSTS WITHIN POST HOLES. CENTER POSTS WITHIN POST HOLES. 7. CONCRETE FOOTING SHALL BE A CONTINUOUS POUR FOR FULL FOOTING CONCRETE FOOTING SHALL BE A CONTINUOUS POUR FOR FULL FOOTING DEPTH. 8. 1/4" CONTINUOUS FILLET WELDING AT ALL CONNECTIONS.1/4" CONTINUOUS FILLET WELDING AT ALL CONNECTIONS.
AutoCAD SHX Text
ELEVATION VIEW
AutoCAD SHX Text
PLAN VIEW
AutoCAD SHX Text
12" #4 REBAR, TYPICAL
AutoCAD SHX Text 3 1/2" Sch 10
12" LONG #4 REBAR
| Sheets and Views |
| 36X24 EXPANDED |
| 2020BoulderOaksCGRenovations 36x24 _ SIGNED.pdf |
| Sheets and Views |
| PLOT |
| 2 Notes and Legend 36X24.pdf |
| Sheets and Views |
| 36X24 EXPANDED |
| 3 Overall SitePlan 36x24.pdf |
| Sheets and Views |
| SitePlan |
| 4 Site 1 36x24.pdf |
| Sheets and Views |
| BUILDING 1 |
| 5 Building 2 No Parking 36X24.pdf |
| Sheets and Views |
| BUILDING 2 |
| 6 Site 2 with parking 36x24.pdf |
| Sheets and Views |
| BUILDING 2 |
| 7 Construction Details A-D 36x24.pdf |
| Sheets and Views |
| DETAILS A-D |
| 8 Construction Details E-G 36x24.pdf |
| Sheets and Views |
| DETAILS E-G |
| 9 Construction Detail H 36x24.pdf |
| Sheets and Views |
| DETAIL H |
| 3 Site Plans-SitePlan.pdf |
| Sheets and Views |
| SitePlan |
| 4 Site Plans-BUILDING 1.pdf |
| Sheets and Views |
| BUILDING 1 |
| 5 Building 2 No Parking-BUILDING 2.pdf |
| Sheets and Views |
| BUILDING 2 |
| 6 Site Plans-BUILDING 2.pdf |
| Sheets and Views |
| BUILDING 2 |
| 7 Construction Details-DETAILS A-D.pdf |
| Sheets and Views |
| DETAILS A-D |
| 8 Construction Details-DETAILS E-G.pdf |
| Sheets and Views |
| DETAILS E-G |
| 9 Construction Details-DETAIL H.pdf |
| Sheets and Views |
| DETAIL H |
File details come from the government source that posted it. Updated .