RFP 1175 WHGC_Cap-con w JM Evalith Bunker Liner Detail 24Jan24.pdf

PDF 386 KB Posted

Attached to
RFP 1175 Wintonbury Hill Golf Course - Bunker, Green & Tee Renovations
Solicitation number
RFP 1175
Issued by
Hartford County, Connecticut

About this file

This is a technical specification document prepared by the Town of Bloomfield, Connecticut for RFP 1175 concerning bunker renovations at Wintonbury Hills Golf Course. The project encompasses the reconstruction and renovation of existing sand bunkers with improved drainage systems, installation of Capillary Flow technology combined with JM Evalith 013/140 bunker liners, construction of new bunkers, renovation of the putting green on Hole #16, construction and expansion of selected tees including new back tees on Holes #15 and #18, tree clearing on Hole #15, grading, drainage and irrigation adjustments, seedbed preparation, and grassing/sodding work. Proposals must be submitted prior to 1:00 p.m. on Thursday, November 5, 2026 at Town Hall, 800 Bloomfield Avenue, Bloomfield, Connecticut. Questions regarding the RFP may be submitted until 4:00 p.m. on October 19, 2026.

The modified bunker liner detail specifications require installation of a four-inch perforated drainage pipe system with laterals extending under a capillary concrete footer, a two-inch minimum gravel bed, a four-inch thick and nine-inch wide minimum concrete footer, a two-inch capillary concrete layer with four-foot minimum width, JM Evalith fabric liner, turn-down fabric along bunker edges, six inches of bunker sand over the fabric liner, and four inches of bunker sand over the capillary concrete layer, with sod installation on vertical faces. Optional drainage alternatives include two-inch by nine-inch gravel-filled trenches in select locations and four-inch perforated toe drains for long bunker slopes as necessary. The specifications detail cross-sectional requirements, minimum dimensions, and connections to existing drainage systems to ensure proper water management and bunker functionality.

View the file

Other files

File Type Posted
RFP 1175 - QandA Addendum.pdf PDF
RFP 1175_Nov_27_26_solicitation_doc.pdf PDF
RFP 1175_Nov_6_26_solicitation_doc.pdf PDF
RFP 1175_Nov_13_26_solicitation_doc.pdf PDF
RFP 1175_Nov_20_26_solicitation_doc.pdf PDF
RFP 1175_Nov_17_26_solicitation_doc.pdf PDF
VendorChangeDetailsReport_RFP 1175_v2_Oct_26_26.pdf PDF
RFP 1175_Nov_5_26_solicitation_doc.pdf PDF
RFP 1175_Nov_4_26_solicitation_doc.pdf PDF
RFP 1175_Nov_24_26_solicitation_doc.pdf PDF
RFP 1175_Nov_10_26_solicitation_doc.pdf PDF
RFP 1175 Wintonbury Hills Renovation Pricing Form October 2026 Rev. 2.pdf PDF
RFP 1175_Nov_19_26_solicitation_doc.pdf PDF
RFP 1175 - WHGC Bunker_Green_and Tee Renovation.pdf PDF
RFP 1175 WHGC Bunker Renovation and Tee Expansion Plan 18July26.pdf PDF
RFP 1175_Nov_12_26_solicitation_doc.pdf PDF
RFP 1175_Nov_11_26_solicitation_doc.pdf PDF
RFP 1175_Nov_2_26_solicitation_doc.pdf PDF
RFP 1175_Oct_6_26_solicitation_doc.pdf PDF
RFP 1175 Revised Proposal Form - Pricing - Wintonbury Hills Renovation.pdf PDF
RFP 1175 Pre-Bid Follow-up Addendum.pdf PDF
RFP 1175_Nov_26_26_solicitation_doc.pdf PDF
RFP 1175_Nov_18_26_solicitation_doc.pdf PDF
RFP 1175_Nov_9_26_solicitation_doc.pdf PDF
RFP 1175_Nov_25_26_solicitation_doc.pdf PDF
RFP 1175_Nov_3_26_solicitation_doc.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Turn Down Fabric (4") Along Edge Of CC

JM Evalith

2" Capillary Concrete Layer, 4' min Width

1"- 2" Gravel Layer

2" Capillary Concrete Layer, 4' min Width

A

(4") Perforated Pipe In Center Of Bunker & Laterals...Laterals Shall Extend Under The Capillary-Concrete Footer At Low Points In The Footer Trench

CC

JM Evalith

MODIFIED BUNKER LINER DETAIL

With Capillary Concrete (CC) & JM Evalith 013/140 (JM DuraSpun) not to scale

SECTION A - A

4" Of Bunker Sand Over CC

6" Of Bunker Sand Over Fabric Liner

Clean-out (4" Solid ADS, Cap With 4" Grate)

A

(4") Perforated Pipe (typical)(4") Solid ADS Pipe;

Connect To Existing Drainage System

4"

4" Thick & 9" Wide Minimum "Footer"

2" Minimum Gravel Bed (4") Perforated Pipe

In Gravel Per Detail

Round Edge Of Capillary-Concrete9"

Vertical Edge Per Architect's Design (6" Minimum)

Existing Turf

Sod Cut & Remove Turf. Install One Strip Of Sod Turned Down The Vertical Face. Pin The Sod On The Vertical Face & Above The Bunker's Edge4'

(4') Minimum Capillary- Concrete Width

Option: Owner May Substitute (2") By (9") Gravel-filled Trench In Lieu Of Drainage Lateral To Drain Low Points Of Capillary-concrete In Select Locations

(4") Perforated Toe Drain As Necessary To Drain Long Bunker Slopes

6"

4"

4' minimum