This is a price sheet for RFP 1100 LLM3008, an overhead transmission electrical services solicitation issued by the City of Austin, Texas, for Austin Energy. The contract encompasses labor and equipment services to support electric transmission infrastructure, with proposals due August 4, 2026. The scope includes nine labor classifications ranging from Apprentice I/Distribution Electrician I through Distribution Electrician Supervisor/General Foreman, with corresponding overtime rates calculated at 1.5 times the base wage. The contract also covers 35 equipment categories billed on hourly, daily, or weekly bases, including bucket trucks, cranes, drilling machines, trailers, and specialized electrical equipment. The initial contract term is 24 months with three optional 12-month renewal periods exercisable at the City's sole discretion. Minimum crew requirements include one daily crew lead/supervisor, one qualified operator, two Distribution Electrician III journeymen linemen, and two Distribution Electrician I grounds hands, with response time obligations of 90 minutes for emergency calls and standard business hours (7:00 AM to 7:00 PM, Monday through Friday) for non-emergency work.
All labor rates are fully inclusive of overhead, indirect expenses, and associated costs, with no additional charges permitted. Equipment rates similarly encompass all associated costs and overhead, excluding operator costs. The contract is subject to prevailing wage requirements under City of Austin Ordinance #20160324-015, with minimum compensation of $22.05 per hour and maximum rates reaching $90.03 per hour for certain classifications. Contractor qualifications include an established safety program, OSHA 29 CFR 1910.269 compliance with training records, submission of three years of OSHA 0300 incident logs, and designation of a qualified safety representative with OSHA 30-hour certification. Performance and Payment Bonds, each equal to $4 million, are required within 14 calendar days of award. The City offers optional Local Business and Small Business Preferences worth up to 10 points each. Evaluation criteria include Program (25 points), Staffing Plan (20 points), Experience and Personnel (20 points), and Price (15 points), totaling 100 points maximum. Additional compliance requirements include FEMA supplemental requirements, Davis-Bacon prevailing wage compliance, System for Award Management registration, background checks for personnel with data access, and security audit participation at no cost to the City.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP_1100_LLM3008_ATT_5_v1.pdf | ||
| RFP_1100_LLM3008_ATT_11_v1.pdf | ||
| RFP_1100_LLM3008_ATT_9_v1.pdf | ||
| RFP_1100_LLM3008_ATT_6_v1.docx | DOCX document | |
| RFP_1100_LLM3008_ATT_2_v1.pdf | ||
| RFP_1100_LLM3008_ATT_1_v1.pdf | ||
| RFP_1100_LLM3008_ATT_3_v2.pdf | ||
| RFP_1100_LLM3008_ADD_1_v1.pdf | ||
| IFB_8700_RBB1015_PAC1_v1.pdf | ||
| RFP_1100_LLM3008_ATT_7_v1.xlsx | XLSX spreadsheet | |
| RFP_1100_LLM3008_ATT_8_v1.docx | DOCX document | |
| RFP_1100_LLM3008_ADD_2_v1.pdf | ||
| RFP_1100_LLM3008_ATT_1_v5.pdf | ||
| RFP_1100_LLM3008_ADD_4_v1.pdf | ||
| RFP_1100_LLM3008_ATT_3_v1.pdf | ||
| RFP_1100_LLM3008_ATT_10_v1.docx | DOCX document | |
| RFP_1100_LLM3008_ATT_12_v1.pdf | ||
| RFP_1100_LLM3008_ADD_3_v1.pdf | ||
| RFP_1100_LLM3008_ATT_4_v1.pdf | ||
| RFP_1100_LLM3008_ATT_1_v3.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tab 1 Solicitation
PRICE SHEET
| SOLICITATION NO. | RFP 1100 LLM3008 |
| PROCUREMENT SPECIALIST | LORENA McBEE |
| CATEGORY OH1 - HOURLY LABOR RATE | |||||||
| Furnish all labor necessary to perform assigned work at the applicable hourly labor rate. The following schedule specifies the hourly billing rates for all job classifications. These rates shall be fully inclusive and shall cover all costs, fees, overhead, indirect expenses, and any other amounts associated with providing the labor. No additional charges of any kind shall be billed to the customer. Overtime rate will use a 1.50 multiplier to determine the overtime rate to be paid for personnel only. | |||||||
| ITEM NO. | DESCRIPTION | UNIT | ESTIMATED ANNUAL HOURS | UNIT PRICE | EXTENDED PRICE | WAGE RATE | |
| OH | 1.01 | Apprentice I/Distribution Electrician I | Hour | 4,500 | $ - 0 | ||
| OH | 1.01 OT | Distribution Electrician I (Overtime) | Hour | 900 | $ - 0 | $ - 0 | |
| OH | 1.02 | Apprentice II/Distribution Electrician II | Hour | 9,500 | $ - 0 | ||
| OH | 1.02 OT | Distribution Electrician II (Overtime) | Hour | 1,900 | $ - 0 | $ - 0 | |
| OH | 1.03 | Journeyman Lineman/Distribution Electrician III | Hour | 11,500 | $ - 0 | ||
| OH | 1.03 OT | Distribution Electrician III (Overtime) | Hour | 2,300 | $ - 0 | $ - 0 | |
| OH | 1.04 | Journeyman Lineman/Distribution Electrician III / Crew Leader | Hour | 10,500 | $ - 0 | ||
| OH | 1.04 OT | Distribution Electrician III / Crew Leader (Overtime) | Hour | 2,100 | $ - 0 | $ - 0 | |
| OH | 1.05 | Distribution Electrician Supervisor / General Foreman | Hour | 3,500 | $ - 0 | ||
| OH | 1.05 OT | Distribution Electrician Supervisor / General Foreman (Overtime) | Hour | 700 | $ - 0 | $ - 0 | |
| OH | 1.06 | Project Expediter | Hour | 3,200 | $ - 0 | ||
| OH | 1.06 OT | Project Expediter (Overtime) | Hour | 640 | $ - 0 | $ - 0 | |
| OH | 1.07 | Operator, Line Equipment / Hole Driller | Hour | 14,250 | $ - 0 | ||
| OH | 1.07 OT | Operator, Line Equipment / Hole Driller (Overtime) | Hour | 2,850 | $ - 0 | $ - 0 | |
| OH | 1.08 | Common / Utility Labor, Digging Crew | Hour | 7,500 | $ - 0 | ||
| OH | 1.08 OT | Common / Utility Labor, Digging Crew (Overtime) | Hour | 1,500 | $ - 0 | $ - 0 | |
| OH | 1.09 | Circuit Patroler DEIII | Hour | 1,760 | $ - 0 | ||
| OH | 1.09 OT | Circuit Patroler DEIII (Overtime) | Hour | 0 | $ - 0 | $ - 0 | |
| OH1 Subtotal = | $ - 0 |
| CATEGORY OH2 - SCHEDULE OF EQUIPMENT BILLING RATE | |||||||
| The schedule below specifies the billing rates for contractor‑maintained equipment made available to Austin Energy. These rates shall be all‑inclusive and encompass all associated costs, fees, overhead, and any other amounts to be charged. Operator costs are not included. | |||||||
| ITEM NO. | DESCRIPTION | UNIT | ESTIMATED ANNUAL HOURS | UNIT PRICE | EXTENDED PRICE | ||
| OH | 2.01 H | Backyard Bucket, 40' Minimum Working Height, Hourly | Hour | 80 | $ - 0 | ||
| OH | 2.01 D | Backyard Bucket, 40' Minimum Working Height, Daily | Day | 8 | $ - 0 | ||
| OH | 2.02 H | Drilling Machine, Tandem Axle Truck Mounted Pressure Digger, Texoma 330 or Equal, Hourly | Hour | 200 | $ - 0 | ||
| OH | 2.02 D | Drilling Machine, Tandem Axle Truck Mounted Pressure Digger, Texoma 330 or Equal, Daily | Day | 20 | $ - 0 | ||
| OH | 2.03 H | Equipment, Motor for Hydraulic Pole Jack, Hourly | Hour | 150 | $ - 0 | ||
| OH | 2.03 D | Equipment, Motor for Hydraulic Pole Jack, Daily | Day | 15 | $ - 0 | ||
| OH | 2.04 H | Equipment, 4 Drum Rope Puller 4,000 ibs., Hourly | Hour | 480 | $ - 0 | ||
| OH | 2.04 W | Equipment, 4 Drum Rope Puller 4,000 lbs., Weekly | Week | 12 | $ - 0 | ||
| OH | 2.05 H | Equipment, Wire Fiber Trailer/Tensioning Brake, Hourly | Hour | 480 | $ - 0 | ||
| OH | 2.05 W | Equipment, Wire Fiber Trailer/Tensioning Brake, Weekly | Week | 12 | $ - 0 | ||
| OH | 2.06 H | Equipment, Wire Tensioning, up to 1926 ACSS, Hourly | Hour | 480 | $ - 0 | ||
| OH | 2.06 W | Equipment, Wire Tensioning, up to 1926 ACSS, Weekly | Week | 12 | $ - 0 | ||
| OH | 2.07 H | Dozer, D6 CAT - w/ 6 Way Blade or Equal and winch, Hourly | Hour | 480 | $ - 0 | ||
| OH | 2.07 W | Dozer, D6 CAT - w/ 6 Way Blade or Equal and winch, Weekly | Week | 12 | $ - 0 | ||
| OH | 2.08 H | Vgroove puller, 10,000 LBS trailer, Hourly | Hour | 480 | $ - 0 | ||
| OH | 2.08 W | Vgroove puller, 10,000 LBS trailer, Weekly | Week | 12 | $ - 0 | ||
| OH | 2.09 H | Trailer, Material, Tandem Axle, Hourly | Hour | 2080 | $ - 0 | ||
| OH | 2.09 W | Trailer, Material, Tandem Axle, Weekly | Week | 52 | $ - 0 | ||
| OH | 2.10 H | Trailer; 4 x 6 - Utility, Single Axle, Hourly | Hour | 2080 | $ - 0 | ||
| OH | 2.10 W | Trailer; 4 x 6 - Utility, Single Axle, Weekly | Week | 52 | $ - 0 | ||
| OH | 2.11 H | Truck, 1 Ton Stake Bed with 170 CFM Air Compressor and Tools, Hourly | Hour | 200 | $ - 0 | ||
| OH | 2.11 D | Truck, 1 Ton Stake Bed with 170 CFM Air Compressor and Tools, Daily | Day | 20 | $ - 0 | ||
| OH | 2.12 H | Air Compressor and Tools, 170 CFM, Portable, Hourly | Hour | 240 | $ - 0 | ||
| OH | 2.12 W | Air Compressor and Tools, 170 CFM, Portable, Weekly | Week | 6 | $ - 0 | ||
| OH | 2.13 H | Truck, 3/4 - Ton Pickup, Hourly | |||||
| (annual quantity is an estimate for two trucks) | Hour | 2080 | $ - 0 | ||||
| OH | 2.13 W | Truck, 3/4 - Ton Pickup, Weekly | |||||
| (annual quantity is an estimate for two trucks) | Week | 52 | $ - 0 | ||||
| OH | 2.14 H | Truck, 450 or above with utlity bed, Hourly | Hour | 2080 | $ - 0 | ||
| OH | 2.14 W | Truck, 450 or above with utlity bed, Weekly | Week | 52 | $ - 0 | ||
| OH | 2.15 H | Truck, Up to 65' Bucket Minimum, Hourly | Hour | 480 | $ - 0 | ||
| OH | 2.15 W | Truck, Up to 65' Bucket Minimum, Weekly | Week | 12 | $ - 0 | ||
| OH | 2.16 H | Truck, 100' Bucket, Hourly | Hour | 480 | $ - 0 | ||
| OH | 2.16 W | Truck, 100' Bucket, Weekly | Week | 12 | $ - 0 | ||
| OH | 2.17 H | Truck , Boom, 30 Ton w/ 100' Boom, Hourly | Hour | 240 | $ - 0 | ||
| OH | 2.17 W | Truck , Boom, 30 Ton w/ 100' Boom, Weekly | Week | 6 | $ - 0 | ||
| OH | 2.18 H | Truck, Insulated Aerial Tower 50' Minimum Height, Hourly | Hour | 240 | $ - 0 | ||
| OH | 2.18 W | Truck, Insulated Aerial Tower 50' Minimum Height, Weekly | Week | 6 | $ - 0 | ||
| OH | 2.19 H | Truck, Boom Tip Digger w/ Pole Claws, Tandem Axle, Hourly | Hour | 240 | $ - 0 | ||
| OH | 2.19 W | Truck, Boom Tip Digger w/ Pole Claws, Tandem Axle, Weekly | Week | 6 | $ - 0 | ||
| OH | 2.20 H | Truck/Trailer Combo (40' Flat Bed w/ 30' bed extension) A-2, Hourly | Hour | 1410 | $ - 0 | ||
| OH | 2.20 D | Truck/Trailer Combo (40' Flat Bed w/ 30' bed extension) A-2, Daily | Day | 141 | $ - 0 | ||
| OH | 2.21 H | Adequate Haul Truck for Trailers, Hourly | Hour | 2080 | $ - 0 | ||
| OH | 2.21 W | Adequate Haul Truck for Trailers, Weekly | Week | 52 | $ - 0 | ||
| OH | 2.22 H | 60,000 ibs. Low Boy Trailer, Hourly | Hour | 480 | $ - 0 | ||
| OH | 2.22 W | 60,000 ibs. Low Boy Trailer, Weekly | Week | 12 | $ - 0 | ||
| OH | 2.23 H | Flat Bed Stretch Float Trailer, Hourly | Hour | 2080 | $ - 0 | ||
| OH | 2.23 W | Flat Bed Stretch Float Trailer, Weekly | Week | 52 | $ - 0 | ||
| OH | 2.24 H | Skid Steer w/ bucket, Forklift, Hourly | Hour | 240 | $ - 0 | ||
| OH | 2.24 W | Skid Steer w/ bucket, Forklift, Weekly | Week | 6 | $ - 0 | ||
| OH | 2.25 H | 12 x -40 Ton Crane with Jib and 155' Main Boom, Hourly | Hour | 2080 | $ - 0 | ||
| OH | 2.25 W | 12 x -40 Ton Crane with Jib and 155' Main Boom, Weekly | Week | 52 | $ - 0 | ||
| OH | 2.26 H | 12 x -45 Ton Crane, Hourly | Hour | 480 | $ - 0 | ||
| OH | 2.26 W | 12 x -45 Ton Crane, Weekly | Week | 12 | $ - 0 | ||
| OH | 2.27 H | Bucket, 2-man Aerial lift, truck-mounted, 125' class, Hourly | |||||
| (annual quantity is an estimate for two buckets, truck-mounted) | Hour | 2080 | $ - 0 | ||||
| OH | 2.27 W | Bucket, 2-man Aerial lift, truck-mounted, 125' class, Weekly | |||||
| (annual quantity is an estimate for two buckets, truck-mounted) | Week | 52 | $ - 0 | ||||
| OH | 2.28 H | 40 to 45 Ft. enclosed box trailer for tool storage, Hourly | Hour | 2080 | $ - 0 | ||
| OH | 2.28 W | 40 to 45 Ft. enclosed box trailer for tool storage, Weekly | Week | 52 | $ - 0 | ||
| OH | 2.29 H | 20,000 lbs rated trailer mounted single drum hydraulic puller with 18,000 ft. of 5/8 steel cable, Hourly | Hour | 480 | $ - 0 | ||
| OH | 2.29 W | 20,000 lbs rated trailer mounted single drum hydraulic puller with 18,000 ft. of 5/8 steel cable, Weekly | Week | 12 | $ - 0 | ||
| OH | 2.30 H | Effer EC 955 6s, Hourly | Hour | 480 | $ - 0 | ||
| OH | 2.30 W | Effer EC 955 6s, Weekly | Week | 12 | $ - 0 | ||
| OH | 2.31 H | Backyard Bucket 124' Hourly | Hour | 240 | $ - 0 | ||
| OH | 2.31 W | Backyard Bucket 124' Weekly | Week | 6 | $ - 0 | ||
| OH | 2.32 H | Bucket, 2-man Aerial lift, truck-mounted, 150' class, Hourly | Hour | 480 | $ - 0 | ||
| OH | 2.32 W | Bucket, 2-man Aerial lift, truck-mounted, 150' class, Weekly | Week | 12 | $ - 0 | ||
| OH | 2.33 H | 12 x 80 Ton Crane with 155' of Main Boom, Hourly | Hour | 480 | $ - 0 | ||
| OH | 2.33 W | 12 x 80 Ton Crane with 155' of Main Boom, Weekly | Week | 12 | $ - 0 | ||
| OH | 2.34 H | All Terrain Tele Handler Forklift 60,000 lbs. Hourly | Hour | 2080 | $ - 0 | ||
| OH | 2.34 W | All Terrain Tele Handler Forklift 60,000 lbs. Weekly | Week | 52 | $ - 0 | ||
| OH | 2.35 H | 40 Ton Trac Crane, with 155' Main Boom, Hourly | Hour | 480 | $ - 0 | ||
| OH | 2.35 W | 40 Ton Trac Crane, with 155' Main Boom, Weekly | Week | 12 | $ - 0 | ||
| OH2 Subtotal = | $ - 0 |
GRAND TOTAL (CATEGORY 1 & 2) $ - 0
| CATEGORY OH3 - NON-SPECIFIED ITEMS | ||||
| For information only. Information in this Category will not be evaluated, and the City does not guarantee the purchase of any additional services. | ||||
| ITEM No. | DESCRIPTION | UNIT | UNIT PRICE | EXTENDED PRICE |
| 3.01 | Additional Services/Equipment (Refer to SOW Section 6.1.D) | Each | ||
| 3.02 | Area Non-Truck Accessible (NTA) | Each |
| COMPANY NAME: |
| EMAIL ADDRESS: |
| CONTRACT MANAGER NAME: |
| CONTRACT MANAGER PHONE NUMBER: |
| CONTRACT MANAGER EMAIL ADDRESS: |