RFP_1100_LLM3008_ATT_7_v2.xlsx

XLSX spreadsheet 50 KB Posted

Attached to
Overhead Transmission Electrical Services
Solicitation number
RFP 1100 LLM3008
Issued by
Texas

About this file

This is a price sheet for RFP 1100 LLM3008, an overhead transmission electrical services solicitation issued by the City of Austin, Texas, for Austin Energy. The contract encompasses labor and equipment services to support electric transmission infrastructure, with proposals due August 4, 2026. The scope includes nine labor classifications ranging from Apprentice I/Distribution Electrician I through Distribution Electrician Supervisor/General Foreman, with corresponding overtime rates calculated at 1.5 times the base wage. The contract also covers 35 equipment categories billed on hourly, daily, or weekly bases, including bucket trucks, cranes, drilling machines, trailers, and specialized electrical equipment. The initial contract term is 24 months with three optional 12-month renewal periods exercisable at the City's sole discretion. Minimum crew requirements include one daily crew lead/supervisor, one qualified operator, two Distribution Electrician III journeymen linemen, and two Distribution Electrician I grounds hands, with response time obligations of 90 minutes for emergency calls and standard business hours (7:00 AM to 7:00 PM, Monday through Friday) for non-emergency work.

All labor rates are fully inclusive of overhead, indirect expenses, and associated costs, with no additional charges permitted. Equipment rates similarly encompass all associated costs and overhead, excluding operator costs. The contract is subject to prevailing wage requirements under City of Austin Ordinance #20160324-015, with minimum compensation of $22.05 per hour and maximum rates reaching $90.03 per hour for certain classifications. Contractor qualifications include an established safety program, OSHA 29 CFR 1910.269 compliance with training records, submission of three years of OSHA 0300 incident logs, and designation of a qualified safety representative with OSHA 30-hour certification. Performance and Payment Bonds, each equal to $4 million, are required within 14 calendar days of award. The City offers optional Local Business and Small Business Preferences worth up to 10 points each. Evaluation criteria include Program (25 points), Staffing Plan (20 points), Experience and Personnel (20 points), and Price (15 points), totaling 100 points maximum. Additional compliance requirements include FEMA supplemental requirements, Davis-Bacon prevailing wage compliance, System for Award Management registration, background checks for personnel with data access, and security audit participation at no cost to the City.

View the file

Other files

File Type Posted
RFP_1100_LLM3008_ATT_5_v1.pdf PDF
RFP_1100_LLM3008_ATT_11_v1.pdf PDF
RFP_1100_LLM3008_ATT_9_v1.pdf PDF
RFP_1100_LLM3008_ATT_6_v1.docx DOCX document
RFP_1100_LLM3008_ATT_2_v1.pdf PDF
RFP_1100_LLM3008_ATT_1_v1.pdf PDF
RFP_1100_LLM3008_ATT_3_v2.pdf PDF
RFP_1100_LLM3008_ADD_1_v1.pdf PDF
IFB_8700_RBB1015_PAC1_v1.pdf PDF
RFP_1100_LLM3008_ATT_7_v1.xlsx XLSX spreadsheet
RFP_1100_LLM3008_ATT_8_v1.docx DOCX document
RFP_1100_LLM3008_ADD_2_v1.pdf PDF
RFP_1100_LLM3008_ATT_1_v5.pdf PDF
RFP_1100_LLM3008_ADD_4_v1.pdf PDF
RFP_1100_LLM3008_ATT_3_v1.pdf PDF
RFP_1100_LLM3008_ATT_10_v1.docx DOCX document
RFP_1100_LLM3008_ATT_12_v1.pdf PDF
RFP_1100_LLM3008_ADD_3_v1.pdf PDF
RFP_1100_LLM3008_ATT_4_v1.pdf PDF
RFP_1100_LLM3008_ATT_1_v3.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tab 1 Solicitation

PRICE SHEET

SOLICITATION NO.RFP 1100 LLM3008
PROCUREMENT SPECIALISTLORENA McBEE
CATEGORY OH1 - HOURLY LABOR RATE
Furnish all labor necessary to perform assigned work at the applicable hourly labor rate. The following schedule specifies the hourly billing rates for all job classifications. These rates shall be fully inclusive and shall cover all costs, fees, overhead, indirect expenses, and any other amounts associated with providing the labor. No additional charges of any kind shall be billed to the customer. Overtime rate will use a 1.50 multiplier to determine the overtime rate to be paid for personnel only.
ITEM NO.DESCRIPTIONUNITESTIMATED ANNUAL HOURSUNIT PRICEEXTENDED PRICEWAGE RATE
OH1.01Apprentice I/Distribution Electrician IHour4,500$ - 0
OH1.01 OTDistribution Electrician I (Overtime)Hour900$ - 0$ - 0
OH1.02Apprentice II/Distribution Electrician IIHour9,500$ - 0
OH1.02 OTDistribution Electrician II (Overtime)Hour1,900$ - 0$ - 0
OH1.03Journeyman Lineman/Distribution Electrician IIIHour11,500$ - 0
OH1.03 OTDistribution Electrician III (Overtime)Hour2,300$ - 0$ - 0
OH1.04Journeyman Lineman/Distribution Electrician III / Crew LeaderHour10,500$ - 0
OH1.04 OTDistribution Electrician III / Crew Leader (Overtime)Hour2,100$ - 0$ - 0
OH1.05Distribution Electrician Supervisor / General ForemanHour3,500$ - 0
OH1.05 OTDistribution Electrician Supervisor / General Foreman (Overtime)Hour700$ - 0$ - 0
OH1.06Project ExpediterHour3,200$ - 0
OH1.06 OTProject Expediter (Overtime)Hour640$ - 0$ - 0
OH1.07Operator, Line Equipment / Hole DrillerHour14,250$ - 0
OH1.07 OTOperator, Line Equipment / Hole Driller (Overtime)Hour2,850$ - 0$ - 0
OH1.08Common / Utility Labor, Digging CrewHour7,500$ - 0
OH1.08 OTCommon / Utility Labor, Digging Crew (Overtime)Hour1,500$ - 0$ - 0
OH1.09Circuit Patroler DEIIIHour1,760$ - 0
OH1.09 OTCircuit Patroler DEIII (Overtime)Hour0$ - 0$ - 0
OH1 Subtotal =$ - 0
CATEGORY OH2 - SCHEDULE OF EQUIPMENT BILLING RATE
The schedule below specifies the billing rates for contractor‑maintained equipment made available to Austin Energy. These rates shall be all‑inclusive and encompass all associated costs, fees, overhead, and any other amounts to be charged. Operator costs are not included.
ITEM NO.DESCRIPTIONUNITESTIMATED ANNUAL HOURSUNIT PRICEEXTENDED PRICE
OH2.01 HBackyard Bucket, 40' Minimum Working Height, HourlyHour80$ - 0
OH2.01 DBackyard Bucket, 40' Minimum Working Height, DailyDay8$ - 0
OH2.02 HDrilling Machine, Tandem Axle Truck Mounted Pressure Digger, Texoma 330 or Equal, HourlyHour200$ - 0
OH2.02 DDrilling Machine, Tandem Axle Truck Mounted Pressure Digger, Texoma 330 or Equal, DailyDay20$ - 0
OH2.03 HEquipment, Motor for Hydraulic Pole Jack, HourlyHour150$ - 0
OH2.03 DEquipment, Motor for Hydraulic Pole Jack, DailyDay15$ - 0
OH2.04 HEquipment, 4 Drum Rope Puller 4,000 ibs., HourlyHour480$ - 0
OH2.04 WEquipment, 4 Drum Rope Puller 4,000 lbs., WeeklyWeek12$ - 0
OH2.05 HEquipment, Wire Fiber Trailer/Tensioning Brake, HourlyHour480$ - 0
OH2.05 WEquipment, Wire Fiber Trailer/Tensioning Brake, WeeklyWeek12$ - 0
OH2.06 HEquipment, Wire Tensioning, up to 1926 ACSS, HourlyHour480$ - 0
OH2.06 WEquipment, Wire Tensioning, up to 1926 ACSS, WeeklyWeek12$ - 0
OH2.07 HDozer, D6 CAT - w/ 6 Way Blade or Equal and winch, HourlyHour480$ - 0
OH2.07 WDozer, D6 CAT - w/ 6 Way Blade or Equal and winch, WeeklyWeek12$ - 0
OH2.08 HVgroove puller, 10,000 LBS trailer, HourlyHour480$ - 0
OH2.08 WVgroove puller, 10,000 LBS trailer, WeeklyWeek12$ - 0
OH2.09 HTrailer, Material, Tandem Axle, HourlyHour2080$ - 0
OH2.09 WTrailer, Material, Tandem Axle, WeeklyWeek52$ - 0
OH2.10 HTrailer; 4 x 6 - Utility, Single Axle, HourlyHour2080$ - 0
OH2.10 WTrailer; 4 x 6 - Utility, Single Axle, WeeklyWeek52$ - 0
OH2.11 HTruck, 1 Ton Stake Bed with 170 CFM Air Compressor and Tools, HourlyHour200$ - 0
OH2.11 DTruck, 1 Ton Stake Bed with 170 CFM Air Compressor and Tools, DailyDay20$ - 0
OH2.12 HAir Compressor and Tools, 170 CFM, Portable, HourlyHour240$ - 0
OH2.12 WAir Compressor and Tools, 170 CFM, Portable, WeeklyWeek6$ - 0
OH2.13 HTruck, 3/4 - Ton Pickup, Hourly
(annual quantity is an estimate for two trucks)Hour2080$ - 0
OH2.13 WTruck, 3/4 - Ton Pickup, Weekly
(annual quantity is an estimate for two trucks)Week52$ - 0
OH2.14 HTruck, 450 or above with utlity bed, HourlyHour2080$ - 0
OH2.14 WTruck, 450 or above with utlity bed, WeeklyWeek52$ - 0
OH2.15 HTruck, Up to 65' Bucket Minimum, HourlyHour480$ - 0
OH2.15 WTruck, Up to 65' Bucket Minimum, WeeklyWeek12$ - 0
OH2.16 HTruck, 100' Bucket, HourlyHour480$ - 0
OH2.16 WTruck, 100' Bucket, WeeklyWeek12$ - 0
OH2.17 HTruck , Boom, 30 Ton w/ 100' Boom, HourlyHour240$ - 0
OH2.17 WTruck , Boom, 30 Ton w/ 100' Boom, WeeklyWeek6$ - 0
OH2.18 HTruck, Insulated Aerial Tower 50' Minimum Height, HourlyHour240$ - 0
OH2.18 WTruck, Insulated Aerial Tower 50' Minimum Height, WeeklyWeek6$ - 0
OH2.19 HTruck, Boom Tip Digger w/ Pole Claws, Tandem Axle, HourlyHour240$ - 0
OH2.19 WTruck, Boom Tip Digger w/ Pole Claws, Tandem Axle, WeeklyWeek6$ - 0
OH2.20 HTruck/Trailer Combo (40' Flat Bed w/ 30' bed extension) A-2, HourlyHour1410$ - 0
OH2.20 DTruck/Trailer Combo (40' Flat Bed w/ 30' bed extension) A-2, DailyDay141$ - 0
OH2.21 HAdequate Haul Truck for Trailers, HourlyHour2080$ - 0
OH2.21 WAdequate Haul Truck for Trailers, WeeklyWeek52$ - 0
OH2.22 H60,000 ibs. Low Boy Trailer, HourlyHour480$ - 0
OH2.22 W60,000 ibs. Low Boy Trailer, WeeklyWeek12$ - 0
OH2.23 HFlat Bed Stretch Float Trailer, HourlyHour2080$ - 0
OH2.23 WFlat Bed Stretch Float Trailer, WeeklyWeek52$ - 0
OH2.24 HSkid Steer w/ bucket, Forklift, HourlyHour240$ - 0
OH2.24 WSkid Steer w/ bucket, Forklift, WeeklyWeek6$ - 0
OH2.25 H12 x -40 Ton Crane with Jib and 155' Main Boom, HourlyHour2080$ - 0
OH2.25 W12 x -40 Ton Crane with Jib and 155' Main Boom, WeeklyWeek52$ - 0
OH2.26 H12 x -45 Ton Crane, HourlyHour480$ - 0
OH2.26 W12 x -45 Ton Crane, WeeklyWeek12$ - 0
OH2.27 HBucket, 2-man Aerial lift, truck-mounted, 125' class, Hourly
(annual quantity is an estimate for two buckets, truck-mounted)Hour2080$ - 0
OH2.27 WBucket, 2-man Aerial lift, truck-mounted, 125' class, Weekly
(annual quantity is an estimate for two buckets, truck-mounted)Week52$ - 0
OH2.28 H40 to 45 Ft. enclosed box trailer for tool storage, HourlyHour2080$ - 0
OH2.28 W40 to 45 Ft. enclosed box trailer for tool storage, WeeklyWeek52$ - 0
OH2.29 H20,000 lbs rated trailer mounted single drum hydraulic puller with 18,000 ft. of 5/8 steel cable, HourlyHour480$ - 0
OH2.29 W20,000 lbs rated trailer mounted single drum hydraulic puller with 18,000 ft. of 5/8 steel cable, WeeklyWeek12$ - 0
OH2.30 HEffer EC 955 6s, HourlyHour480$ - 0
OH2.30 WEffer EC 955 6s, WeeklyWeek12$ - 0
OH2.31 HBackyard Bucket 124' HourlyHour240$ - 0
OH2.31 WBackyard Bucket 124' WeeklyWeek6$ - 0
OH2.32 HBucket, 2-man Aerial lift, truck-mounted, 150' class, HourlyHour480$ - 0
OH2.32 WBucket, 2-man Aerial lift, truck-mounted, 150' class, WeeklyWeek12$ - 0
OH2.33 H12 x 80 Ton Crane with 155' of Main Boom, HourlyHour480$ - 0
OH2.33 W12 x 80 Ton Crane with 155' of Main Boom, WeeklyWeek12$ - 0
OH2.34 HAll Terrain Tele Handler Forklift 60,000 lbs. HourlyHour2080$ - 0
OH2.34 WAll Terrain Tele Handler Forklift 60,000 lbs. WeeklyWeek52$ - 0
OH2.35 H40 Ton Trac Crane, with 155' Main Boom, HourlyHour480$ - 0
OH2.35 W40 Ton Trac Crane, with 155' Main Boom, WeeklyWeek12$ - 0
OH2 Subtotal =$ - 0

GRAND TOTAL (CATEGORY 1 & 2) $ - 0

CATEGORY OH3 - NON-SPECIFIED ITEMS
For information only. Information in this Category will not be evaluated, and the City does not guarantee the purchase of any additional services.
ITEM No.DESCRIPTIONUNITUNIT PRICEEXTENDED PRICE
3.01Additional Services/Equipment (Refer to SOW Section 6.1.D)Each
3.02Area Non-Truck Accessible (NTA)Each
COMPANY NAME:
EMAIL ADDRESS:
CONTRACT MANAGER NAME:
CONTRACT MANAGER PHONE NUMBER:
CONTRACT MANAGER EMAIL ADDRESS: