This Solicitation Addendum No. 2, dated July 21, 2026, modifies RFP 1100 LLM3008 issued by the City of Austin Financial Services - Central Procurement for overhead transmission electrical services to support Austin Energy's electric transmission infrastructure. The contract encompasses labor, equipment, materials, and supervision for routine capital improvement projects and emergency transmission and distribution service work. The proposal submission deadline is August 4, 2026. The initial contract term is 24 months with three optional 12-month renewal periods at the City's sole discretion. The contractor must maintain a minimum crew of six members working 40 hours per week, consisting of one daily crew lead/supervisor, one qualified operator, two Distribution Electrician III qualified journeymen linemen, and two Distribution Electrician I grounds hands/trainees/apprentices, with the ability to respond to emergency calls within 90 minutes and non-emergency calls during standard business hours (7:00 AM to 7:00 PM, Monday through Friday).
The addendum addresses pricing clarifications and bond requirements through a series of questions and answers. Equipment is billed hourly or daily depending on the length of time needed, with a standard workday defined as ten hours, while required equipment is paid on a weekly basis. A bid bond is required at submission; however, Payment and Performance Bonds in the amount of $4 million each are required within 14 calendar days of award and may be renewed annually. The addendum corrects formula calculations in the price sheet for rows 24 and 26 and confirms that no specific bond forms are mandated. Prevailing wage requirements apply under City of Austin Ordinance #20160324-015 with minimum cash compensation of $22.05 per hour. Evaluation criteria include Program (25 points), Staffing Plan (20 points), Experience and Personnel (20 points), and Price (15 points), for a maximum of 100 points. The City reserves the right to award one or more contracts, though a single award is anticipated, and contractors must provide SMBR-compliant subcontractors for projects as the City does not maintain a list of approved or preferred subcontractors.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IFB_8700_RBB1015_PAC1_v1.pdf | ||
| RFP_1100_LLM3008_ATT_7_v1.xlsx | XLSX spreadsheet | |
| RFP_1100_LLM3008_ATT_8_v1.docx | DOCX document | |
| RFP_1100_LLM3008_ATT_1_v5.pdf | ||
| RFP_1100_LLM3008_ADD_4_v1.pdf | ||
| RFP_1100_LLM3008_ATT_5_v1.pdf | ||
| RFP_1100_LLM3008_ATT_11_v1.pdf | ||
| RFP_1100_LLM3008_ATT_9_v1.pdf | ||
| RFP_1100_LLM3008_ATT_6_v1.docx | DOCX document | |
| RFP_1100_LLM3008_ATT_2_v1.pdf | ||
| RFP_1100_LLM3008_ATT_1_v1.pdf | ||
| RFP_1100_LLM3008_ATT_3_v2.pdf | ||
| RFP_1100_LLM3008_ADD_1_v1.pdf | ||
| RFP_1100_LLM3008_ATT_3_v1.pdf | ||
| RFP_1100_LLM3008_ATT_10_v1.docx | DOCX document | |
| RFP_1100_LLM3008_ATT_7_v2.xlsx | XLSX spreadsheet | |
| RFP_1100_LLM3008_ATT_12_v1.pdf | ||
| RFP_1100_LLM3008_ADD_3_v1.pdf | ||
| RFP_1100_LLM3008_ATT_4_v1.pdf | ||
| RFP_1100_LLM3008_ATT_1_v3.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION ADDENDUM
AUSTIN FINANCIAL SERVICES – CENTRAL PROCUREMENT
Revised 10/01/2024
Solicitation: RFP 1100 LLM3008 Addendum No: 2 Date: 7/21/2026
This addendum is to incorporate the following changes to the above-mentioned solicitation:
1. Questions and Answers:
PRICE SHEET QUESTIONS
1.1. Question: For the pricing sheet, Category OH2 – Schedule of Equipment billing rate, is the contractor required to supply both rates for equipment or is it just one or the other? For example, the “Backyard Bucket, 40' Minimum Working Height” the pricing sheet has an hourly rate and a daily rate.
Answer: Equipment is paid hourly or daily depending on the length of time that it is needed. The standard workday is ten (10) hours.
1.2. Question: Does the equipment that is required get billed daily or is it billed just for hours used.
Answer: Required equipment is paid on a weekly basis with crew time because it is anticipated that it will be needed throughout the work week.
1.3. Question: In Category OH1- Hourly Labor Rate:
Row 24 “Common / Utility Labor, Digging Crew (Overtime)” Unit Price (Cell F24) references Row 21 “Operator, Line Equipment / Hole Driller” Unit Price Row 26 “Circuit Patroller DEIII (Overtime)” Unit Price (Cell F26) references Row 23 “Common / Utility Labor, Digging Crew” unit price.
Can you confirm all other rows are referencing the description directly above, except these two descriptions are not?
Answer: The Pricing Sheet has been replaced to correct the formula calculation.
BOND QUESTIONS
1.4. Question: Is a bid bond, payment bond, and performance bond required for submission of a proposal?
If a bid bond is required, should we base the bid bond on the required amount of $4,000,000?
Answer: Yes, a Bid Bond is required to be submitted with the Offer. See section 4.9 of the Solicitation Instructions which states the required amount.
1.5. Question: If a bid bond is required, can you please confirm what client the bid bond should be provided to City of Austin or Austin Energy?
Answer: The Contract does require a Payment and Performance Bond but that is not required with the submission of the Offer. (See Section 4.10 and 4.11 of the Solicitation Instructions). The Bond should be to the City of Austin.
1.6. Question: Do you have forms you would like us to use for the bid bond, performance bond, and payment bond?
Answer: There are no specific forms. Refer to Solicitation Terms and Conditions Section 1.44.A.ii
1.7. Question: Are the performance bond and payment bond for $4,000,000 to be annually renewable or would it cover the initial contract term in its entirety?
Answer: Refer to Solicitation Terms and Conditions Section 1.44.A.iii, these can be renewed annually.
1.8. Question: Will turnkey projects be bonded separately from the $4,000,000 P&P bonds?
Answer: No, there will not be an additional bond requirement specific to projects.
1.9. Question: Are the performance bond and payment bond for $4,000,000 to be annually renewable or would it cover the initial contract term in its entirety?
Answer: Refer to Solicitation Terms and Conditions Section 1.44.A.iii, these can be renewed annually.
1.10. Question: In lieu of a bid bond, would you accept a consent of surety or agreement to bond?
Answer: Yes, a consent of surety or agreement to bond would be accepted.
SCOPE OF WORK QUESTIONS
1.11. Question: What is the annual anticipated spend under this contract?
Answer: AE will guarantee the 6 crew members 40 Hrs. a week. Anything above that is to be determined by project scope and needs.
1.12. Question: Do you have an outlook of projects to be completed over the next 2-4 years?
Answer: We are anticipating work but because of easement acquisitions and budget we are not certain.
Also, we guarantee 6 crew members for a 40 Hrs. work week, anything above that is to be determined.
1.13. Question: Will contracts be awarded to multiple contractors?
Answer: The City has a right to award one or more contracts, but it is anticipated that this will result in a single award.
1.14. Question: Do you have a list of approved/preferred subcontractors?
Answer: No, that is the contractor’s responsibility to provide those services or provide an SMBR compliant subcontractor for projects.
1.15. Question: Approximately what percentage of the work will be transmission and what percentage will be distribution?
1.16. Answer: The contractor shall have the ability to provide distribution services for Turnkey projects and/or storm work supporting transmission work if needed. On a day to day, the only distribution service that will be needed is to cover up primary, but the journeymen must be familiar with distribution work.
2. Changes:
2.1. The Solicitation Cover Sheet has been updated to reflect:
2.1.1. Version (Addenda) 2
2.2. The SUBMITTAL – Price Sheet LLM3008 has been deleted and replaced with Version 1:
2.2.1. Formula calculations for rows 24 and 26 have been corrected.
3. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
ACKNOWLEDGED BY:
Offeror Name Offeror Authorized Signature Date
RETURN ONE COPY OF THIS ADDENDUM WITH YOUR RESPONSE PRIOR TO THE SOLICITATION CLOSING
DATE. FAILURE TO DO SO MAY CONSTITUTE GROUNDS FOR REJECTION OF YOUR OFFER.
Solicitation: RFP 1100 LLM3008 Addendum No: 2 Date: 7/21/2026