Addendum 1 to RFP 1100 DCM3051 – Commercial Demand Response Program Expansion
This document is a solicitation addendum issued by the City of Austin, Texas, through Austin Financial Services and Central Procurement for consulting and program management services to expand the Commercial Demand Response program. Addendum 1, dated October 13, 2026, incorporates significant revisions to the original solicitation, including updated versions of the Solicitation Cover Sheet, City of Austin Standard Terms and Conditions (with revisions to Business Automobile Liability Insurance requirements), Scope of Work, and Price Sheet, with all revisions to the Scope of Work identified by underline. The solicitation deadline has been extended to October 29, 2026, at 2:00 PM, with offer opening scheduled for October 29, 2026, at 3:00 PM, and questions due by October 16, 2026, at 5:00 PM. A pre-offer meeting was held on September 30, 2026, with attendance from Austin Energy personnel and representatives from multiple potential bidders including CPower Energy, TRC Companies, CLEAResult, Resource-Innovations, Scope Services, Inc., and EDO Energy. The contract term is 12 months with options for up to four additional 12-month renewal periods at the City's sole discretion.
The addendum clarifies key aspects of the scope and pricing structure through a comprehensive Q&A section addressing program expansion parameters, contractor responsibilities, baseline methodologies, data requirements, and reporting obligations. Task 5, related to Program Performance Growth and Bonus, has been grayed out on the Price Proposal Worksheet with performance payments capped at $78,000 per contract year based on achieved MW program capacity growth. The scope requires a complete solution from a single prime contractor, with any specialized services subcontracted under the prime. Austin Energy remains vendor agnostic regarding Virtual End Node OEMs but requires compliance with OpenADR Communication Protocol. Respondents must address how pending ERCOT changes from 4CP to 12CP will affect program design and are required to propose at least five verifiable project references completed since 2020. Insurance requirements include workers' compensation, commercial general liability, professional liability, business automobile liability, and cyber liability coverage as specified in the updated Standard Terms and Conditions Version 1.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP_1100_DCM3051_ATT_5_v1.pdf | ||
| RFP_1100_DCM3051_BID_DOC_2_v1.pdf | ||
| RFP_1100_DCM3051_BID_DOC_1_v4.pdf | ||
| RFP_1100_DCM3051_BID_DOC_3_v2.pdf | ||
| RFP_1100_DCM3051_ATT_8_v1.pdf | ||
| RFP_1100_DCM3051_BID_DOC_1_v1.pdf | ||
| RFP_1100_DCM3051_0500_4_v3.pdf | ||
| RFP_1100_DCM3051_ATT_6_v1.pdf | ||
| RFP_1100_DCM3051_ATT_7_v1.docx | DOCX document | |
| RFP_1100_DCM3051_0600_v3.xlsx | XLSX spreadsheet | |
| RFP_1100_DCM3051_ADD_2_v1.pdf | ||
| RFP_1100_DCM3051_ADD_3_v1.pdf | ||
| RFP_1100_DCM3051_BID_DOC_3_v1.pdf | ||
| RFP_1100_DCM3051_BID_DOC_4_v1.docx | DOCX document | |
| RFP_1100_DCM3051_0600_v1.xls | XLS spreadsheet | |
| RFP_1100_DCM3051_BID_DOC_1_v3.pdf | ||
| RFP_1100_DCM3051_ATT_9_v1.docx | DOCX document | |
| RFP_1100_DCM3051_0500_v1.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION ADDENDUM
AUSTIN FINANCIAL SERVICES – CENTRAL PROCUREMENT
Addendum 1 – RFP 1100 DCM3051 Page 1 of 3
Solicitation: RFP 1100 DCM3051 Addendum No: 01 Date: October 13, 2026
This addendum is to incorporate the following changes to the above referenced solicitation:
1.0 Clarifications:
1.0.1 The Solicitation Cover Sheet published with the solicitation has been deleted and replaced with the following, labeled Solicitation Cover Sheet Version 1.
1.0.2 The City of Austin Standard Terms and Conditions, published with the solicitation has been deleted and replaced with the following, labeled City of Austin Standard Terms and Conditions Version 1. (Business Automobile Liability Insurance has been revised.)
1.0.3 The Scope of Work published with the solicitation has been deleted and replaced with the following, labeled Scope of Work Version 1. (All revisions incorporated into this version are identified by underline)
1.0.4 The Price Sheet published with the solicitation, has been deleted and replaced with the following, labeled Price Sheet Version 1. (Tasks have been revised to match Tasks in Scope of Work.)
2.0 Extension:
2.0.1 The Offers Due date is hereby extended until October 29, 2026, @ 2:00 PM.
2.0.2 The Offer Opening date is hereby extended until October 29, 2026, @ 3:00 PM.
2.0.3 The Questions Due date is hereby extended until October 16, 2026 @ 5:00 PM.
3.0 Questions:
Q1: Expanding customer energy solutions– Are there customers already enrolled, are there additional target segments, that aren’t being serviced, prohibited customers, certain tariffs, parameters?
A1: There are already customers enrolled in Austin Energy’s Commercial Demand Response Program and Austin Energy is looking to expand the program to get as many MW as we can. The Commercial DR program’s enrollment is limited to customers on a commercial rate. There are always hurdles for the different types of facilities/industry types. Austin Energy would like to increase (and incentivize) participation from small businesses and master metered multi-family customers (MF on commercial rates), which has its challenges. Austin Energy would like to increase marketing to those types of market segments to increase enrollments and would also like to seek increased participation from currently participating market segments like schools, industrial, large office buildings, etc.
Q2: Price Proposal Worksheet Task 3: Design and Installation of Customer Automated Demand
Response Systems and Equipment; Are the turnkey inputs intended to capture the complete cost of installation, or T&M with program support with contractor installed.
A2: The Contractor shall assist in developing customer Auto DR implementation plans and identifying appropriate devices they can install, determining what is required of customers to implement, and providing technical support to go through the process with them. Customer installation needs vary from providing technical consulting to turn-key implementation of any necessary Demand Response system and equipment. Customers are financially responsible for procuring and implementing Auto DR through a control’s vendor. The offerors proposal shall include the T&M associated with the program support of these tasks. Reference Price Submittal V1, Items 3.1 and 3.2.
Addendum 1 – RFP 1100 DCM3051 Page 2 of 3
Q3: Offer and Certifications, Small Business Program: If subcontractors are not registered, can we still include them in this form? Do we have time to get them registered after award?
A3: Yes, Offerors can still add them to the form. Subcontractors can work with City of Austin Vendor
Registration to get registered.
Q4: Price Proposal Worksheet Task 5: Achieve Program Performance Growth and Bonus; Are the
Performance Targets limited to a cap?
A4: Reference Scope of Work V1, Section 6.1.5.5
Q5: Price Proposal Worksheet Task 5: Achieve Program Performance Growth and Bonus; Do you want us to express in T&M or would you like expressed as anticipated bonus projected attainable gross.
A5: No, there is no need to break it out. Task 5 has been grayed out on the Price Proposal Worksheet and does not need to be filled out. Performance payment will be capped at $78,000 per contract year based on achieved MW program capacity growth.
Q6: How are the end node technologies selected? Will there be a qualified product list or set of preferred vendors for enabling customers to participate?
A6: Austin Energy remains vendor agnostic when it comes to recommending specific Virtual End Node
OEMs. However, the current requirement is that the device must utilize OpenADR Communication Protocol.
Q7: Baseline Approach: The RFP references two existing baseline methodologies. Would Austin Energy permit respondents to suggest alternative baseline approaches?
A7: Austin Energy currently uses two baseline methodologies, the High 3 of 10 and Process Loads baseline methodologies depending on the facility’s load. Austin Energy will permit the Contractor to suggest recommendations and updates to our baseline methodologies.
Q8: ERCOT change from 4CP to 12 CP: Should respondents address how the pending change from 4CP to
12CP would be addressed by the proposed program design?
A8: Yes, Offerors response to Solicitation Instructions, Scenarios A and B shall address how the pending
CP change will affect the program design as well as any relevant changes and recommendations.
Q9: Data flow / Schneider dependency: For the post-event, weekly, monthly, and annual reporting requirements, will the Contractor have access to underlying interval meter data, event/DRMS data, participant/account data, and other relevant Austin Energy data independently of Schneider Electric’s Energy Profiler Online, or must some or all data first be processed through EPO before being made available to the Contractor?
A9: Reference Scope of Work V1, Sections 7.5.1.3 and 7.5.1.4.
Q10: Data availability and latency: What is the expected timing for availability of interval meter data and
Schneider settlement outputs following a DR event? Are there existing service-level expectations for when EPO settlement results become available relative to the Contractor’s required post-event and weekly reporting timelines? Data QA/QC responsibility: Where missing, delayed, invalid, or
Addendum 1 – RFP 1100 DCM3051 Page 3 of 3 inconsistent interval data or settlement results are identified, what role does Austin Energy expect the Contractor to play in identifying and resolving those issues? Should the Contractor provide automated data-quality monitoring and exception reporting?
A10: Reference Scope of Work V1, Section 7.5.1.4 and 6.1.4.1.4
Q11: Preliminary vs. settled results: If final EPO settlement results are not available within the required post-event reporting timeframe, may the Contractor calculate preliminary event performance directly from interval and event data and subsequently reconcile those results to the official EPO settlement results?
A11: Reference Scope of Work V1, Section 7.5.1.5
Q12: Specialized/subcontracted scopes: Would Austin Energy permit a respondent to propose specialized services for a discrete portion of the scope, such as meter-data analytics, measurement and verification, post-event reporting, or program performance analysis, or is a compliant proposal required to address the full scope of program implementation and management?
A12: No, Austin Energy requires that respondents propose a complete solution. Any specialized services must be included as part of the prime contractor’s proposal and subcontracted under the prime as needed.
Q13: Multiple contractors / direct analytical scope: Does Austin Energy anticipate awarding the scope to a single prime contractor, or may the City make multiple awards or otherwise contract separately for specialized analytical, M&V, technology, or program-support functions?
A13 Reference Scope of Work, V1, Section 1.0.2.
Q14: Standard Terms and Conditions, Section 1.41B.iii Automobile Insurance, Alternate acceptable limits are listed, is this applicable?
A14: Reference Standard Terms and ConditionsV1, Section 1.41.B.iii Automobile Insurance, Alternate acceptable limits have been removed.
4.0 Pre-Offer Attendance Log is attached
5.0 ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
ACKNOWLEDGED BY:
Offeror Name Offeror Authorized Signature Date
RETURN ONE COPY OF THIS ADDENDUM WITH YOUR RESPONSE PRIOR TO THE SOLICITATION CLOSING
DATE. FAILURE TO DO SO MAY CONSTITUTE GROUNDS FOR REJECTION OF YOUR OFFER.
PURCHASING PRE-OFFER
MEETING
ATTENDANCE LOG
Solicitation Description: Commercial Demand Response Program Expansion –Program Management Services.
Meeting Date: September 30, 2026
Purchasing Office Point of Contact: Diana McIntosh, Procurement Specialist III Microsoft Teams meeting Join:
https://teams.microsoft.com/meet/237651000834225?p=D9gF7iymHM4F qA7Wp8, Meeting ID: 237 651 000 834 225. Passcode: gy2tb6Jz Dial in by phone +1 512-831-7858,,152921368# United States, Austin Find a local number Phone conference ID: 152 921 368#
Name Company Email
1. Diana McIntosh City of Austin| Austin Financial Services Diana.McIntosh@austintexas.gov
2. Amelie Gonzalez Austin Energy Amelie.Gonzalez-flores@austinenergy.com
3. Brenda Morlan Villafuerte Austin Energy Brenda.MorlanVillafuerte@austinenergy.com
4. Lindsey McDougall Austin Energy Lindsey.Mcdougall@austinenergy.com
5. Christopher Fischer Austin Energy Christopher.Fischer@austinenergy.com
6. Ross Tomlin Austin Energy Ross.Tomlin@austinenergy.com
7. Claire Swingle CPower Energy Claire.Swingle@CPowerEnergy.com
8. Lindsey Wilson TRC Companies LWilson@trccompanies.com
9. Brian Johnston TRC Companies BJohnston@trccompanies.com
10. Joel McManus TRC Companies jmcmanus@trccompanies.com
11. Derrick Miller CLEAResult derrick.miller@clearesult.com
12. Drew Sutter CLEAResult drew.sutter@clearesult.com
13. Abdulhameed Owolabi CLEAResult abdulhameed.owolabi@clearesult.com
14. Thomas Anreise CLEAResult Thomas.Anreise@clearesult.com
15. Cameron Gallagher Resource-Innovations cgallagher@resource-innovations.com
16. Diana Owsley Scope Services, Inc. dowsley@scope-services.com
17. Lennon Jennings Scope Services, Inc. ljennings@scope-services.com
18. Sam Teal EDO Energy SamT@edoenergy.com
File details come from the government source that posted it. Updated .