U.S. Department of Transportation Federal Aviation Administration

Request for Offers (RFO) Cover Letter Solicitation Package

Project Name:

Location:

Solicitation No.:

Issue Date:

Submit Offers to:

Boiler Stack Replacement Project Air Route Traffic Control Center (ARTCC) in Auburn, Washington

697DCK-22-R-00004

October 1, 2021 cindi.tjelde@faa.gov

Offer Deadline Date: Offers must be received by Thursday, October 28, 2021, 5:00 PM (Pacific time)

Special Instructions:

1) Set Aside: This procurement is being set aside for a small business.

2) NAICS Code: 236220 Commercial and Institutional Building Construction, which as a small business size standard of $39.5 Million.

3) Estimated Size of Project: Between $150,000 and $250,000

4) Insurance & Bonds Required. See contract clauses 3.4.1-12 Insurance, 3.4.1-4 Performance Bond Requirements, and 3.4.1-5 Payment Bond Requirements.

5) Site Visit: A site visit for this project will be held on Wednesday, October 13, 2021, at 9:00 a.m. Pacific Time. The site visit is not mandatory, but is highly encouraged, so that the offeror and potential subcontractors can verify existing conditions, quantities of materials, and amount of work required. The contractor is responsible for ensuring that their offer reflects all work and time required to accomplish this project. The dimensions, measurements, and quantities of materials list in the the specifications and contract drawings are estimated and are presented to give the contractor an idea of the total scope of work.

6) RSVP for the site visit by contacting Matthew Beck at matthew.m.beck@faa.gov or (206)231-2715 or (206)592-7260 by 3p.m. on Monday, October 11, 2021. Any attempts to RSVP past the deadline date may not be approved.

7) Questions: See page 49 of the attached RFO for instructions for requesting clarification of any of the information in the specifications, drawings, within the Request for Offers (RFO), or resulting from the site visit. Questions asked at the site visit will not be answered verbally. Questions and their applicable answers will be posted on a formal amendment and incorporated into the RFO. Questions are due by close of business on Wednesday, October 20, 2021.

SOLICITATION, OFFER

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

A. NAME B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" means "bid" and "bidder"

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED BID (RFP)

FEDERAL AVIATION ADMINISTRATION

AAQ-500 - REGIONAL ACQUISITIONS

2200 S. 216TH STREET

DES MOINES WA 98198-6547

AAQ530ANM-AFN

cindi.tjelde@faa.gov

Cynthia Tjelde 206-231-3026 x

10/01/2021 2

PURCHASE REQUEST NO.

697DCK-22-R-00004

10. THE CONTRACT AUTHORITY REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

Boiler Stack Replacement Project at FAA's Seattle Air Route Traffic Control Center

(ZSE ARTCC) located in Auburn, Washington.

11. The Contractor shall begin performance within

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award notice to proceed. The performance period is mandatory, negotiable. (See ________________________________________________ .)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and is not required.is, B. An offer guarantee

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers must be publicly opened at that time . Sealed envelopes containing offers shall be marked to show the offeror's name and address. The solicitation number, and the date and time offers are due.

D. Offers providing less than

12B. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in item 12B.)

5 45 calendar days and complete it within ________________ ________________ calendar days after receiving

10/28/2021 x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Contract Authority acceptance after the date offers are due will not be considered and will _________________ be rejected.

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Contract Authority in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13D. Failure to insert any number means the offeror accepts the minimum in item 13D.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (MUST BE FULLY COMPLETED BY OFFEROR)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20B. SIGNATURE 20C. OFFER DATE

AWARD (To be completed by Contract Authority)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Contract Authority solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE 30C. DATE 31B. CONTRACT AUTHORITY 31C. AWARD DATE

BY

2PAGE OF

FEDERAL AVIATION ADMINISTRATION

AAQ-500 - REGIONAL ACQUISITIONS

2200 S. 216TH STREET

DES MOINES WA 98198-6547

AAQ530ANM-AFN

Cynthia A. Tjelde

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.)

Section A - Solicitation/Contract Form

A001 SOLICITATION INDEX

The Federal Aviation Administration (FAA) is soliciting competitive proposals through the use of this Request for Offers (RFO) for the award of a firm, fixed price construction contract.

The RFO consists of the following Parts / Sections:

Part I - The Schedule Section A: Solicitation / Contract Form Section B: Supplies or Services / Prices Section C: Descriptions / Specifications Section D: Packaging and Marking Section E: Inspection and Acceptance Section F: Deliveries or Performance Section G: Contract Administration Data Section H: Special Contract Requirements

Part II - Contract Clauses Section I: Contract Clauses

Part III - List of Documents, Exhibits, and Other Attachments Section J: List of Documents, Exhibits, and Other Attachments

Part IV - Representations and Instructions Section K: Representations, Certifications, and Other Statements of Bidders Section L: Instructions, Conditions, and Notice to Bidders Section M: Evaluation Factors for Award

End of Clause

Section B - Supplies or Services/Prices Section B - Schedule

Clause List

3.2.2.3-43 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (JUL 2004)

(a) The Contractor (you) acknowledges that you have taken reasonable steps to determine the nature and location of the work, and you have investigated and are satisfied about the general and local conditions which can affect the work or its cost, including but not limited to:

(1) Conditions bearing upon transportation, disposal, handling, and storage of materials;

(2) The availability of labor, water, electric power, and roads;

(3) Uncertainties of weather, river stages, tides, or similar physical conditions at the site;

(4) The conformation and conditions of the ground; and

(5) The character of equipment and facilities needed before and during the work.

You also acknowledge that you are satisfied as to the character, quality, and quantity of surface and subsurface materials or obstacles you might find, to the extent you can, from an inspection of the site, including all exploratory work done by FAA (we, us), as well as from the drawings and specifications that are a part of this contract. If you do not take the actions described and acknowledged in this paragraph, you will still be responsible for properly estimating the difficulty and cost of successfully performing the work, and for proceeding to successfully perform the work without additional expense to us.

(b) We are not responsible for your conclusions or interpretations of information we provided before contract award.

We are not responsible for your understanding of conditions you get from any of our officers or agents before contract award. You can rely on representations we make about conditions that we put into the contract.

(End of clause)

B001 PRICE/COST

The contractor is required to furnish all labor, materials, services, equipment, transportation, insurance, bonds, security notifications, submittals, supervision, licenses, permits, states sales taxes and fees in accordance with federal, state, and local regulatory requirements, for the Boiler Stack Replacement project at the Seattle Air Route Traffic Control Center (ARTCC), located at 3101 Auburn Way South, Auburn, Washington 98092-7950, in accordance with the contract clauses, specifications, drawings, and applicable wage rates.

CONTRACT LINE ITEM (CLIN) DESCRIPTION TOTAL

1 JOB

The offered price must encompass all costs related to (a) direct and indirect labor, fringe benefits, overhead, G&A expenses, profit, material, equipment, other direct costs, insurance, bonds, freight, handling, transportation, inspection, testing, operation and maintenance manuals, etc., (b) federal, state, and local taxes, (c) all applicable fees, permits, licenses, and (d) any miscellaneous charges.

Effective April 1, 1996, the Federal Aviation Administration (FAA) began operating under the FAA Acquisition Management System (AMS). The 1996 DOT Appropriations Act, Public Law 104-50, mandated that the FAA rewrite its acquisition regulations and granted legislative relief from certain laws. The Federal Acquisition Regulations (FAR), Federal Acquisition Streamlining Act of 1994, Small Business Act, and Competition in Contracting Act, are some of these laws.

B002 ESTIMATED PERIOD OF PERFORMANCE / CONTRACT TIMELINES

From contract award the FAA estimates the following timelines:

45 days for submittals, including submission, review, and approval 45 days for onsite physical work, including cleanup, and any required punchlist items 45 days for all required closeout docs

These timelines are estimates only and are negotiable based upon the contractor’s means and methods. Contractor will be required to submit a practicable schedule for approval after contract award.

The remainder of this page has been intentionally left blank.

Section C - Description/Specifications Scope of Work

Clause List

C001 SCOPE OF WORK

See Attachment 1 – Specifications, and Attachment 1(a) Drawings (as an attachment to the Specifications).

Section D - Packaging and Marking Clause List

Section E - Inspection and Acceptance Clause List

3.1-1 CLAUSES AND PROVISIONS INCORPORATED BY REFERENCE (JUL 2019)

This screening information request (SIR) or contract, as applicable, incorporates by reference the provisions or clauses listed below with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make the full text available, or offerors and contractors may obtain the full text via Internet at:

https://fast.faa.gov/contractclauses.cfm.

(End of clause)

3.10.4-10 INSPECTION OF CONSTRUCTION (SEP 2009)

3.10.4-11 INSPECTION - DISMANTLING, DEMOLITION, OR REMOVAL OF IMPROVEMENTS

(APR 1996)

Section F - Deliveries or Performance Clause List

3.1-1 CLAUSES AND PROVISIONS INCORPORATED BY REFERENCE (JUL 2019)

This screening information request (SIR) or contract, as applicable, incorporates by reference the provisions or clauses listed below with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make the full text available, or offerors and contractors may obtain the full text via Internet at:

https://fast.faa.gov/contractclauses.cfm.

(End of clause)

3.10.1-11 GOVERNMENT DELAY OF WORK (APR 1996)

3.10.1-24 NOTICE OF DELAY (MAR 2009)

F001 FEDERAL HOLIDAYS OBSERVED / HOLIDAY MORATORIUMS

The following federal holidays are observe by the Federal Aviation Administration. No work will take place on holidays.

-New Year’s Day -Martin Luther King Jr.’s Birthday -Washington’s Birthday -Memorial Day -Juneteenth -Independence Day -Labor Day -Columbus Day -Veterans Day -Thanksgiving week -Christmas week

If a Federal holiday falls on a Saturday, the holiday is observed on the preceding Friday. If the Federal holiday falls on a Sunday, the holiday is observed on the following Monday.

Section G - Contract Administration Data Clause List

3.10.1-23 CONTRACTING OFFICER'S REPRESENTATIVE-CONSTRUCTION CONTRACTS (APR

2012)

(a) The Contracting Officer may appoint other Government personnel to accomplish certain contract administration matters. While there shall be various titles and divisions of duties for these individuals, generically they are known as Contracting Officer's Representatives (CORs). The Contracting Officer will provide written notice of COR appointment(s), setting forth the authorities and limitations, to the Contractor within 5 calendar days prior to the notice to proceed. COR duties may include, but are not limited to:

(1) Perform as the authorized representative of the Contracting Officer for technical matters, including interpretation of specifications and drawings, and inspection and review of work performed.

(2) Perform as the authorized representative of the Contracting Officer for administrative matters, including reviewing payments, and updated delivery schedules.

(b) These representatives are authorized to act for the Contracting Officer in all specifically delegated matters pertaining to the contract, except:

(1) contract modifications that change the contract price or cost, technical requirements or time for performance, unless delegated field change order authority;

(2) suspension or termination of the Contractor's right to proceed, either for default or for convenience;

(3) final decisions on any matters subject to appeal, e.g., disputes under the "Contract Disputes" clause; and

(4) final acceptance under the contract.

(End of clause)

Section H - Special Contract Requirements Clause List

3.1.9-1 ELECTRONIC COMMERCE AND SIGNATURE (JUL 2020)

(a) The Electronic Signatures in Global and National Commerce Act (E-SIGN) establishes a legal equivalence between:

(1) Contracts written on paper and contracts in electronic form;

(2) Pen-and-ink signatures and electronic signatures; and

(3) Other legally-required written records and the same information in electronic form.

(b) With the submission of an offer, the offeror acknowledges and accepts the utilization of electronic commerce as part of the requirements of this solicitation and the resultant contract.

(c) Certain documents may need to be provided or maintained in original form, such as large-scale drawings impractical to convert to electronic format or a document with a raised seal signifying authenticity. This clause does not change or affect any other requirements that a document must be in paper format to satisfy legal requirements such as for certain real estate transactions.

(d) The use of electronic signature technology is authorized under this solicitation and the resulting contract.

(e) Contractors must not digitally sign any documents with software that uses the Secure Hash Algorithm 1 (SHA- 1). All digitally signed documents and contracts sent to the FAA must use a SHA-256 or higher hash algorithm. This is based on the National Institute of Standards and Technology (NIST) Policy Statement on Hash Functions dated August 5, 2015. Further guidance on the use of SHA-256 is in NIST Special Publication (SP) 800-57 Part 1, section

5.6.2 as amended and SP 800-131A, Revision 1 dated November 6, 2015. Additional guidance on the use of SHA-3 is in NIST SP 800-185 as amended.

(f) Contractors do not have to update documents previously digitally signed using SHA-1 hash algorithms unless the document requires updating. The FAA and contractors may continue to use SHA-1 for the following applications:

Verifying old digital signatures and time stamps, generating and verifying hash-based message authentication codes (HMACs), key derivation functions (KDFs), and random bit/number generation.

(End of Clause)

3.8.2-17 KEY PERSONNEL AND FACILITIES (JUL 2019)

(a) The personnel and/or facilities as specified below are considered essential to the work being performed hereunder and may, with the consent of the contracting parties, be changed from time to time during the course of the contract.

(b) Prior to removing, replacing, or diverting any of the specified personnel and/or facilities, the Contractor must notify in writing, and receive consent from, the Contracting Officer reasonably in advance of the action and must submit justification (including proposed substitutions) in sufficient detail to permit evaluation of the impact on this contract.

(c) No diversion will be made by the Contractor without the written consent of the Contracting Officer.

(d) The key personnel and/or facilities under this contract are:

Project Manager [ ] Onsite Superintendent [ ]

(List key personnel and/or facilities)

(End of clause)

H001 STATE REGULATION OF FEDERAL CONSTRUCTION PROJECTS

FAA contractors may encounter requests from State and local governments for FAA’s contractors to obtain building permits, zoning approval, sanitation approval, etc. Based on the “Supremacy Clause” set forth in Article 6 of the U.S. Constitution, construction contractors may not be required to obtain permits or approval from State or local governments for work done on federal contracts. However, State and local governments do have enforcement authority for safety and environmental protection as specified in Occupational Safety and Health Administration (OSHA), the Comprehensive Environmental Response, Compensation and Liability (Superfund) Act (CERCLA), and the Resource Conservation and Recovery Act (RCRA).

Contractors who encounter attempts by State and local government entities to assess various types of fees, permits, or approvals are advised to inform the Contracting Officer immediately if the assessing entity attempts in any way to prevent or hinder the contractor at the job site.

H002 APPLICABLE MINIMUM HOURLY WAGE RATES

(a) The wage determination decision of the Secretary of Labor in this contract specifies the minimum hourly rate of wages which must be paid to the laborers and mechanics employed or work at the job site. The rates have been determined by the Secretary of Labor in accordance with the provisions of the Davis Bacon Act, as amended, to be prevailing rates for the corresponding classes of laborers employed on contracts of a similar character in the locality where the work is performed.

(b) While the wage rates given in the decision are the MINIMUM rates required to be paid during the life of the contract, it is the responsibility of offerors to inform themselves as to local labor conditions, such as the prevailing wage rates, the length of the work day and work week, overtime compensation, fringe benefits payments, available labor supply, and prospective changes or adjustments to wage rates. The contractor must abide by and conform to all applicable laws, Executive Orders, and rules, regulations, and orders of the Secretary of Labor. No increase in contract price will be allowed or authorized for the payment of wage rates in excess of those listed in the contract wage determination decision.

(c) The wage determination decision of the Secretary of Labor in this contract is solely for the purpose of setting for the minimum hourly wage rates required to be paid during the life of the contract and is not to be accepted as a guarantee, warranty, or representation of the wage rates indicated.

NOTE: THE DAVIS BACON ACT IS APPLICABLE (SEE CONTRACT CLAUSES). REFERENCE THE

ATTACHED GENERAL WAGE DECISION NO. WA20210011, dated 4/02/2021, FOR THE STATE OF

WASHINGTON (SEE SECTION “J”). THE WAGE DETERMINATION IS HEREBY INCORPORATED INTO

THIS REQUEST FOR OFFERS (RFO) AND WILL BE PART OF ANY RESULTANT CONTRACT.

Section I - Contract Clauses Clause List

3.1-1 CLAUSES AND PROVISIONS INCORPORATED BY REFERENCE (JUL 2019)

This screening information request (SIR) or contract, as applicable, incorporates by reference the provisions or clauses listed below with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make the full text available, or offerors and contractors may obtain the full text via Internet at:

https://fast.faa.gov/contractclauses.cfm.

(End of clause)

3.1.7-2 ORGANIZATIONAL CONFLICTS OF INTEREST (JUL 2018)

3.2.2.3-33 ORDER OF PRECEDENCE (MAR 2009)

3.2.2.3-46 SUPERVISING THE CONTRACT WORK (JUL 2004)

3.2.2.3-48 OTHER CONTRACTS (MAR 2009)

3.2.2.3-49 PROTECTING EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES,

AND IMPROVEMENTS (JUL 2004)

3.2.2.3-50 PROPERTY PROTECTION (OCT 2014)

3.2.2.3-51 OPERATIONS AND STORAGE AREAS (APR 2012)

3.2.2.3-52 USE AND POSSESSION BEFORE THE PROJECT IS COMPLETE (JUL 2004)

3.2.2.3-53 CLEANING UP AND ROADWAY MAINTENANCE (JUL 2004)

3.2.2.3-54 PREVENTING ACCIDENTS (JUL 2004)

3.2.2.3-55 AVAILABILITY AND USE OF UTILITY SERVICES (JUL 2004)

3.2.2.3-56 SCHEDULES FOR CONSTRUCTION CONTRACTS (JUL 2004)

3.2.2.3-58 LAYOUT OF WORK (MAR 2009)

3.2.2.3-83 PROHIBITION AGAINST CONTRACTING WITH INVERTED DOMESTIC

CORPORATIONS (OCT 2015)

3.2.2.7-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH

CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (APR 2011)

3.2.2.7-8 DISCLOSURE OF TEAM ARRANGEMENTS (APR 2008)

3.2.5-1 OFFICIALS NOT TO BENEFIT (APR 2021)

3.2.5-3 GRATUITIES OR GIFTS (OCT 2019)

3.2.5-4 CONTINGENT FEES (OCT 1996)

3.2.5-5 ANTI-KICKBACK PROCEDURES (OCT 2019)

3.2.5-8 WHISTLEBLOWER PROTECTION FOR CONTRACTOR EMPLOYEES (APR 1996)

3.3.1-2 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (JUL 2018)

3.3.1-9 INTEREST (JUL 2018)

3.3.1-15 ASSIGNMENT OF CLAIMS (JUL 2018)

3.3.1-19 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (JAN 2021)

3.3.1-20 PROVIDING ACCELERATED PAYMENT TO SMALL BUSINESS SUBCONTRACTORS

(OCT 2012)

3.3.1-34 PAYMENT BY ELECTRONIC FUNDS TRANSFER- SYSTEM FOR AWARD

MANAGEMENT (JUL 2018)

3.3.2-1 FAA COST PRINCIPLES (OCT 2019)

3.4.1-7 NOTICE TO PROCEED (OCT 2019)

3.4.1-10 INSURANCE - WORK ON A GOVERNMENT INSTALLATION (OCT 2020)

3.4.1-12 INSURANCE (OCT 2019)

3.4.2-6 TAXES - CONTRACTS PERFORMED IN U.S. POSSESSIONS OR PUERTO RICO (OCT

1996)

3.4.2-8 FEDERAL, STATE, AND LOCAL TAXES - FIXED PRICE CONTRACT (JUL 2019)

3.5-1 AUTHORIZATION AND CONSENT (JAN 2019)

3.6.1-1 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2019)

3.6.1-3 UTILIZATION OF SMALL, SMALL DISADVANTAGED, WOMEN-OWNED, SERVICE-

DISABLED VETERAN OWNED, AND HUBZONE SMALL BUSINESS CONCERNS (JAN 2021)

3.6.1-7 LIMITATIONS ON SUBCONTRACTING (JUL 2021)

3.6.2-1 CONTRACT WORK HOURS AND SAFETY STANDARDS ACT-OVERTIME

COMPENSATION (OCT 2018)

3.6.2-2 CONVICT LABOR (APR 1996)

3.6.2-9 EQUAL OPPORTUNITY (JUL 2020)

3.6.2-12 EQUAL OPPORTUNITY FOR VETERANS (JUL 2020)

3.6.2-13 AFFIRMATIVE ACTION FOR WORKERS WITH DISABILITIES (JUL 2020)

3.6.2-16 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (OCT 2018)

3.6.2-18 DAVIS BACON ACT (OCT 2018)

3.6.2-19 WITHHOLDING-LABOR VIOLATIONS (JUL 2017)

3.6.2-20 PAYROLLS AND BASIC RECORDS (APR 2017)

3.6.2-21 APPRENTICES, TRAINEES, AND HELPERS (JAN 2019)

3.6.2-22 SUBCONTRACTS (LABOR STANDARDS) (JAN 2019)

3.6.2-23 CERTIFICATION OF ELIGIBILITY (JAN 2019)

3.6.2-35 PREVENTION OF SEXUAL HARASSMENT (OCT 2018)

3.6.2-39 TRAFFICKING IN PERSONS (APR 2019)

3.6.2-46 PAID SICK LEAVE (OCT 2020)

3.6.3-13 AFFIRMATIVE PROCUREMENT OF RECYCLED CONTENT AND PRODUCTS UNDER

SERVICE AND CONSTRUCTION CONTRACTS (JAN 2020)

3.6.3-14 USE OF ENVIRONMENTALLY PREFERABLE PRODUCTS (JAN 2020)

3.6.3-16 DRUG FREE WORKPLACE (MAR 2009)

3.6.3-23 DELIVERY OF ELECTRONIC AND PAPER DOCUMENTS (JAN 2020)

3.6.3-24 ASBESTOS NESHAP COMPLIANCE (OCT 2015)

3.6.4-5 BUY AMERICAN - STEEL AND MANUFACTURED PRODUCTS (JUL 2010)

3.6.4-10 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JAN 2010)

3.6.4-23 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND

VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (JAN 2021)

3.9.1-1 CONTRACT DISPUTES (JAN 2020)

3.9.1-2 PROTEST AFTER AWARD (AUG 1997)

3.10.1-7 BANKRUPTCY (APR 1996)

3.10.1-8 SUSPENSION OF WORK (SEP 1998)

3.10.1-15 CHANGES-CONSTRUCTION, DISMANTLING, DEMOLITION, OR REMOVAL OF

IMPROVEMENTS (JUL 1996)

3.10.1-16 CHANGES AND CHANGED CONDITIONS (APR 1996)

3.10.1-20 WARRANTY-CONSTRUCTION (JUL 1996)

3.10.1-25 NOVATION AND CHANGE-OF-NAME AGREEMENTS (OCT 2007)

3.10.4-23 CONTRACTOR AND SUBCONTRACTOR COMPLIANCE WITH FASTENER ACT (NOV

1997)

3.10.6-1 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED PRICE) (OCT

1996)

3.10.6-6 DEFAULT (FIXED PRICE CONSTRUCTION) (OCT 1996)

3.13-5 SEAT BELT USE BY CONTRACTOR EMPLOYEES (OCT 2001)

3.13-13 CONTRACTOR POLICY TO BAN TEXT MESSAGING WHILE DRIVING (JAN 2011)

3.13-14 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT

AWARDS (JAN 2018)

3.13-16 RECORDS MANAGEMENT (JAN 2020)

3.14-3 FOREIGN NATIONALS AS CONTRACTOR EMPLOYEES (JAN 2019)

3.2.2.3-41 PERFORMING WORK (JUL 2004)

The Contractor (you) must perform, using your own organization, work equivalent to at least 15 percent of the total amount of work under the contract on the site. The CO may modify this contract to reduce this percentage if you request a reduction and the CO determines that it would be to the Government's advantage to do so.

(End of clause)

3.2.2.3-42 DIFFERING SITE CONDITIONS (JUL 2004)

(a) Before the conditions are disturbed, the Contractor (you) must promptly notify the Contractor Officer (CO) in writing of either or both of the following conditions:

(1) Subsurface or latent physical conditions at the site which differ materially from those described in this contract.

(2) Unknown physical conditions at the site, of an unusual nature, which differ materially from those ordinarily encountered and generally recognized as inherent to the type of work the contract covers.

(b) FAA (we) will investigate the site conditions promptly after receiving the notice. If the CO determines that the conditions do materially differ and cause an increase or decrease in your cost of, or the time required for, performing any part of the work under this contract, the CO will make an equitable adjustment under this clause and modify the contract accordingly in writing.

(c) The CO will not accept your request for an equitable adjustment to the contract unless you give the written notice. However, the CO may extend the time for giving written notice.

(d) The CO will not accept your request for an equitable adjustment for differing site conditions after we make final payment under this contract.

(End of clause)

3.2.2.3-50 PROPERTY PROTECTION (OCT 2014) - ALTERNATE I (JUL 2009)

(a) The Contractor (you) must construct and maintain any temporary fences, gates and other facilities needed to preserve crops, control livestock, and protect property. Before cutting a fence, you must take necessary precautions to prevent livestock from straying. You must also prevent loss of tension in or damage to adjacent portions of the fence. You must immediately replace all fencing and gates you cut, remove, damage, or destroy with new materials to the original standard. You may reuse undamaged gates.

(b) You must comply with the property owner's requests to leave gates open or closed.

(c) You must use all necessary precautions to avoid destroying surveying markers such as section corners, witness trees, property corners, mining claim markers, bench markers, triangulation stations, and the like. If you must destroy any marker, you must first notify the agency responsible for the marker, as well as the Contracting Officer's (CO) representative, and replace the markers.

(d) You must use care to prevent unnecessary damage to property in or near the work area caused by your work.

Unnecessary damage is that which you can avoid through efficient and careful performance of the work, taking into account the land rights you have. If you damage any property, you must at once notify the owner or custodian and make or arrange to make prompt and full restitution.

(e) Maps and specifications FAA (we, us) provides may not give the location of all water supply, drainage, irrigation, and other underground facilities. Before entering a tract of land for contract purposes, you must find out from the property owner (or other reasonably available source) the location of any irrigation system, domestic water system, source of water, and drainage system existing on the property, whether serving that property or other property. You must avoid damaging or obstructing these facilities or polluting water supplies.

(f) You must hold us harmless from any and all suits, actions, and claims for damages, including environmental impairment, to property arising from any of your acts or omissions, your subcontractors, or any of your employees or subcontractor employees, in any way related to the work or operations under this contract.

(g) You must indemnify and hold harmless the property owners or parties lawfully in possession against all claims or liabilities asserted by third parties, including all governmental agencies, resulting directly or indirectly from your wrongful or negligent acts or omissions.

(h) Managing and disposing of hazardous wastes and materials may expose the Contractor (you) and FAA (we) to short- and long-term liabilities. To reduce these possible liabilities you must be fully aware of the hazards and regulatory requirements associated with the hazardous materials involved in this project. You must use qualified personnel to handle and transport hazardous materials.

(i) Before commencing work, you must:

(1) Do an environmental assessment of the work the contract requires, identifying tasks which involve using, handling or transporting hazardous materials or wastes. The following work items are known to involve such substances: [Contracting Officer (CO) list items here]

(2) Submit an environmental plan identifying and dealing with each specific task involving the wastes. The plan must be specific enough to demonstrate a thorough understanding of the environmental risks and the appropriate method for dealing with them. The plan must also list the required permits and reference the regulations that govern the activities needed to deal with the materials or wastes.

(3) Meet with the CO's representatives during the preconstruction conference to discuss and to develop a mutual understanding on implementing the plan.

(4) The CO may require other tasks to be added to the plan. If the CO considers your planned methods for dealing with the risks insufficient, the CO may require you to revise the plan. Work involving hazardous materials or wastes must not start until we have approved your plan. Our review of your plan does not relieve you of liability for environmental law and regulatory compliance.

(End of clause)

3.2.2.3-60 SPECIFICATIONS, DRAWINGS, AND MATERIAL OFFERS (MAR 2009) - ALTERNATE

II (JUL 2004)

(a) If either the specifications or the drawings (but not both) mention tasks, the Contractor (you) must assume that the tasks are in both. If the drawings and specifications differ, the specifications govern. If there is a discrepancy in the figures, in the drawings, or in the specifications, submit the matter promptly to the Contracting Officer (CO), who will promptly determine which governs, and notify you in writing. Any adjustment you make without the CO's determination is at your own risk and expense. From time to time the CO will provide necessary detailed drawings and other information, unless otherwise provided.

(b) Wherever in the specifications or the drawings FAA (we, our) uses "directed," "required," "ordered," "designated," "prescribed," or similar words, they refer to the CO's requirements. Similarly, "approved," "acceptable," "satisfactory," or similar words refer to the CO's approval, unless otherwise expressly stated. You must have a complete set of plans and specifications on site and available for our use.

(c) Where we use "as shown," "as indicated," "as detailed," or similar words, they refer to the drawings accompanying this contract, unless stated otherwise. The word "provided" means "provided and installed."

(d) Omissions from the drawings and specifications or the erroneous description of details of work which are necessary to carry out the intent of the drawings and specifications, or which are customarily performed, does not relieve you from performing those omitted or erroneously described details of the work. You must perform them as if fully and correctly set forth and described in the drawings and specifications.

(e) You must check all drawings we provide to you before starting work and must promptly notify the CO of any discrepancies. In general you should follow figures marked on drawings, rather than scale measurements. In general, large scale drawings have precedence over small scale drawings. You must compare all drawings and verify the figures before laying out the work. If you do not verify the figures, you will be responsible for any errors you might have avoided had you verified them.

(f) "Shop drawings" means drawings, you or any subcontractor submit to us under a construction contract, showing in detail the proposed fabrication and assembly of structural elements and the installation (that is, form, fit, and attachment details) of materials or equipment. It includes drawings, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data, and similar materials you provided to explain in detail specific portions of the work the contract requires.

FAA may duplicate, use, and disclose in any manner and for any purpose shop drawings you deliver under this contract.

(g) If this contract requires material offers (for example, shop drawings, catalog cuts, certificates of conformance), you must coordinate all of your offers, and review them for accuracy, completeness, and compliance with contract requirements. You must provide evidence that you approve the submittals. If you submit materials to us without this evidence, we may return them and ask you to resubmit them. The CO will indicate whether he or she approves or disapproves your offer, and if the CO does not approve it as submitted, will indicate our reasons for rejecting it. Any work done before the CO's approval is at your risk. The CO's approval does not relieve you from responsibility for any errors or omissions in the submittals, nor from responsibility for complying with the contract requirements, except as described under (h).

(h) If you submittals vary from the contract requirements, you must describe the variations in writing, separate from the submittal, when you submit them. Send this description, a copy of the offer, and a proposal to incorporate it into the contract directly to the CO. If the CO approves a variation, the CO must issue an appropriate contract modification, unless the variation is minor or does not involve a change in price or in time of performance.

(i) You must submit to the CO for approval four copies (unless otherwise indicated) of all shop drawings as called for under the various headings of these specifications. The CO will keep three sets (unless otherwise indicated) of all offers and will return one set to you.

(j) You must insert this clause, with appropriate changes in the designation of the parties, in all subcontracts.

(k) When you finish the work under this contract, you must provide two (2) complete sets of all shop drawings as we finally approve them. These drawings must show all changes and revisions made up to the time you finish the work and we accept it.

(End of clause)

3.2.2.3-68 SAFETY AND HEALTH (OCT 2014) - ALTERNATE I (JUL 2004)

(a) Before beginning work, the Contractor (you) must:

(1) Perform a hazards analysis of the work specified in this contract. Consider both the site and adjacent conditions.

Identify all significant hazards. Some of the hazards you might encounter are COVID-19 virus, tripping and falling hazards, etc.

(2) Submit a safety plan for dealing with each specific hazard identified, whether you or FAA identified it.

(3) Meet with the CO's representatives during the preconstruction conference to discuss and to develop a mutual understanding about the content and implementation of the plan.

(4) The CO or her or his representatives may require other hazards to be added to the plan. If the CO determines that your planned hazard avoidance measures are insufficient, the CO or a designated representative may require you to revise the plan. You may not begin work involving identified hazards unless you have submitted adequate plans to the CO and the CO has reviewed them. This approval does not relieve you of your liability for safe performance.

(End of clause)

3.2.2.3-71 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (JUL 2004)

The Contractor (you) must

(a) begin work under this contract within 5 calendar days after the date you receive the notice to proceed,

(b) perform the work diligently, and

(c) complete the entire work ready for use not later than 45. The time allowed for completion must include final cleanup of the premises.

(End of clause)

3.3.1-33 SYSTEM FOR AWARD MANAGEMENT (JUL 2018)

(a) Definitions. As used in this clause

"Data Universal Numbering System (DUNS) number" means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities.

"Data Universal Numbering System +4 (DUNS+4) number" means the DUNS number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.)

This 4-character suffix may be assigned at the discretion of the business concern to establish additional SAM records for identifying alternative Electronic Funds Transfer (EFT) accounts for the same parent concern.

"Registered in the SAM database" means that the Contractor has entered all mandatory information, including the DUNS number or the DUNS+4 number, into the SAM database.

"System for Award Management (SAM) Database" means the primary Government repository for Contractor information required for the conduct of business with the Government.

(b)(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee must be registered in the SAM database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.

(2) The offeror must enter, in Representations, Certifications and Other Statements of Offerors Section of the solicitation, the DUNS or DUNS +4 number that identifies the offeror's name and address exactly as stated in the offer. The DUNS number will be used by the Contracting Officer to verify that the offeror is registered in the SAM database.

(c) If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.

(1) An offeror may obtain a DUNS number

(i) If located within the United States, by calling Dun and Bradstreet at 1-866-705-5711 or via the Internet at http://fedgov.dnb.com/webform; or

(ii) If located outside the United States, by contacting the local Dun and Bradstreet office.

(2) The offeror should be prepared to provide the following information:

(i) Company legal business.

(ii) Tradestyle, doing business, or other name by which your entity is commonly recognized.

(iii) Company Physical Street Address, City, State, and ZIP Code.

(iv) Company Mailing Address, City, State and ZIP Code (if different from physical street address).

(v) Company Telephone Number.

(vi) Date the company was started.

(vii) Number of employees at your location.

(viii) Chief executive officer/key manager.

(ix) Line of business (industry).

(x) Company Headquarters name and address (reporting relationship within your entity).

(d) If the offeror does not become registered in the SAM database in the time prescribed by the Contracting Officer, the Contracting Officer may proceed to award to the next otherwise successful registered offeror.

(e) Processing time, which normally takes 48 hours, should be taken into consideration when registering. Offerors who are not registered should consider applying for registration immediately upon receipt of this solicitation.

(f) The Contractor is responsible for the accuracy and completeness of the data within the SAM database, and for any liability resulting from the Government's reliance on inaccurate or incomplete data. To remain registered in the SAM database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the SAM database to ensure it is current, accurate and complete. Updating information in the SAM does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document. If registered in SAM as a Service-Disabled Veteran-Owned Small Business (SDVOSB), by submission of an offer, the offeror acknowledges that they are designated as a SDVOSB by the Department of Veterans Affairs, and this designation appears as such on the Veteran Affairs website, https://www.vip.vetbiz.gov.

(g)(1)(i) If a Contractor has legally changed its business name, "doing business as" name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in AMS Procurement Guidance, the Contractor must provide the responsible Contracting Officer a minimum of one business day's written notification of its intention to:

(A) change the name in the SAM database;

(B) comply with the requirements of AMS regarding novation and change-of-name agreements; and

(C) agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor must provide the Contracting Officer with the notification, sufficient documentation to support the legally changed name.

(ii) If the Contractor fails to comply with the requirements of paragraph (g)(1)(i) of this clause, or fails to perform the agreement at paragraph (g)(1)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the SAM information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the "Suspension of Payment" paragraph of the electronic funds transfer (EFT) clause of this contract.

(2) The Contractor must not change the name or address for EFT payments or manual payments, as appropriate, in the SAM record to reflect an assignee for the purpose of assignment of claims. Assignees must be separately registered in the SAM database. Information provided to the Contractor's SAM record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the "Suspension of payment" paragraph of the EFT clause of this contract.

(h) Offerors and Contractors may obtain information on registration and annual confirmation requirements via the internet at http://www.sam.gov.

(End of Clause)

3.3.1-40 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (JAN 2021)

(a) Definitions. As used in this clause-

(1) "Contract financing" is a contractual authorization for payments to a contractor prior to acceptance of products or services by FAA.

(2) "Payment request" means a bill, voucher, invoice, or request for contract financing payment or invoice payment with associated supporting documentation. The payment request must comply with the requirements identified in this clause, and the applicable Payment clause and invoicing requirements included in this contract

(3) "Electronic form" means an automated system transmitting information electronically according to the accepted electronic data transmission methods and formats identified in paragraph (c) of this clause. Facsimile, email, and scanned documents are not acceptable electronic forms for submission of payment requests.

(4) "Invoice payment" means a Government disbursement of monies to a Contractor under a contract or other authorization for supplies or services accepted by the Government. This includes payments for partial deliveries that have been accepted by the Government, final payments under T&M and labor-hour contracts, and final cost or fee payments where amounts owed have been settled between the Government and the Contractor.

(b) Electronic payment requests. Except as provided in paragraph (f) of this clause, the contractor must submit payment requests in electronic form. Purchases paid with a Government purchase card are considered to be an electronic transaction for purposes of this rule, and therefore no additional electronic invoice submission is required.

(c) The Federal Aviation Administration utilizes the Delphi eInvoicing web-portal for processing invoices.

Contractors submitting invoices are required to submit invoices via the Delphi eInvoicing web portal which is accessed and authenticated via www.login.gov

(d) In order to receive payment and in accordance with prompt payment standards, contractors must submit a proper invoice. All invoices submitted as attachments in the Delphi eInvoicing web-portal must contain the following:

(1) Invoice number and invoice date.

(2) Period of performance covered by invoice.

(3) Contract number and title.

(4) Task/Delivery Order number and title (if applicable).

(5) Amount billed (by CLIN), current and cumulative.

(6) Total ($) of billing.

(7) Cumulative total billed for all contract work to date.

(8) Name, title, phone number, mailing address, and email address (if available) of person to be contacted in the event of a defective invoice.

If the contract includes allowances for travel, all invoices which include charges pertaining to travel expenses will catalog a breakdown of reimbursable expenses with the appropriate receipts to substantiate the travel expenses.

(e) Payment system registration. All persons accessing the Delphi eInvoicing web-portal will be required to have their own unique user Delphi eInvoicing ID and password and be credentialed through login.gov.

(1) Electronic authentication. See www.login.gov for instructions. Click on the following link for instructions on establishing a login.gov account: https://login.gov/help/creating-an-account/how-do-i-create-an-account-with-logingov/.

(2) To create a login.gov account, the user will need a valid email address and a working phone number. The user will create a password and then login.gov will reply with an email confirming the email address.

(3) DELPHI registration instructions. New users should navigate to http://einvoice.esc.gov to establish an account.

Users are required to log in every 45 days to keep it active.

(4) Training on DELPHI. To facilitate use of DELPHI, comprehensive user information is available at http://einvoice.esc.gov

(5) Account Management. Contractors are responsible to contact the DELPHI Help Desk when their firm's points of contacts will no longer be submitting invoices so they can be removed from the system. Instructions for contacting the DELPHI Help D can be found at http://einvoice.esc.gov

(f) Waivers: If the contractor does not believe electronic invoicing can be used if they are awarded this contract, the contractor must respond accordingly to 3.3.1-41 "Electronic Invoicing-Representation". Waiver requests must be approved by the FAA and DOT and will be processed expeditiously upon contract award. If the waiver request is not approved, the contractor must use electronic invoicing consistent with this clause. If the waiver request is approved, conversion to electronic invoicing at a later date may be required. While the waiver is in effect, the current invoicing process must be used per AMS Guidance T3.3.1A.14 and the terms of the contract. The decision regarding a waiver request is not subject to the "Contract Disputes" clause AMS 3.9.1-1.

3.4.1-4 PERFORMANCE BOND REQUIREMENTS (JAN 2017)

(a) The contractor is required to submit a performance bond in a penal amount equal to 100 percent of the contract price, but for this contract the amount required by the Contracting Officer is [ ].

(b) The bond must be executed on specified forms, and sureties must be acceptable to the Federal Aviation Administration. Corporate sureties must appear on the list in Treasury Circular 570, and the amount of the bond may not exceed the underwriting limit stated for the surety on that list.

(c)…