View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

5. PROJECT NO. (If applicable)2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.NO.

PAGE OF PAGES

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6)

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

Items 8 and 15, and returning is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required.)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO THE AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14.

E. IMPORTANT: Contractor is not, is required to sign this document and return

ORDER NO. IN ITEM 10A.

1 3

0001 10/26/2021

FEDERAL AVIATION ADMINISTRATION

AAQ-500 - REGIONAL ACQUISITIONS

2200 S. 216TH STREET

DES MOINES WA 98198-6547

AAQ530ANM-AFN

x

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By ___________ 1 x x

697DCK-22-R-00004

1 copies to the issuing office.

10/01/2021

(x)

Amendment 0001 is to incorporate the following questions received and their applicable answers into this RFO and resultant contract.

Amendment 0001 is also to incorporate AMS Contract Clause 3.2.1.5-5 Ensuring Adequate COVID

Safety Protocols for Federal Contractors (Oct 2021) regarding the vaccine mandate into this

RFO and resultant contract via the following RFO Attachments:

Attachment 5 - AMS Contract Clause 3.2.1.5-5

Attachment 6 - Safer Federal Workforce Guidance Q&A

The vaccine mandate will apply to the prime contractor and all tier subcontractors, Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. CONTRACT AUTHORITY 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Cynthia A. Tjelde

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

697DCK-22-R-00004/0001

regardless of contract or subcontract value.

The offer deadline date is being extended to

Tuesday, November 2, 2021, 5:00PM Pacific Time.

No other changes.

697DCK‐22‐R‐00004 SEATTLE ARTCC BOILER PROJECT

RFO QUESTIONS & ANSWERS

1) Question: Are the boiler stacks asbestos free?

Answer: The manufacturer has confirmed that they are asbestos free.

2) Question: Do the boiler stacks and pumps need to be replaced one at a time?

Answer: Yes, the heating plant must be operational at all times.

3) Question: Where is the main shutoff for facility water?

Answer: Main shutoff is located at the road. Coordination with the city will be required.

4) Question: Is badging required?

Answer: Yes, key personnel must be badged and will have access to the main gate and building. All other workers will have visitor badges and will be required to check in at the security building (guard shack) on a daily basis. The contractor is required to escort their workers with visitor badges. Additional badges may be authorized to ensure a smooth-running project, depending on the number of workers onsite at any given time.

5) Question: Are photos of the project walk or work area available to share with contractors?

Answer: No photos are available.

6) Question: Can you confirm the correct reference drawing for Attachment 1(c) was provided on SAM.gov? Section J of the RFO lists Attachment 1(c) as reference drawing SEA-E-5893-S4R, however, the sheet provided is numbered SEA-E-5896-S4R.

Answer: Yes, it is the correct drawing. Section J has been corrected to read SEA-E- 5896-S4R.