RFP 697DCK‐21‐R‐00184 SEATTLE ARTCC BOILER PROJECT
RFP QUESTIONS & ANSWERS
1) Question: Are the boiler stacks asbestos free?
Answer: The manufacturer has confirmed that they are asbestos free.
2) Question: Do the boiler stacks and pumps need to be replaced one at a time?
Answer: Yes, the heating plant must be operational at all times.
3) Question: Where is the main shutoff for facility water?
Answer: Main shutoff is located at the road. Coordination with the city will be required.
4) Question: Is badging required?
Answer: Yes, key personnel must be badged and will have access to the main gate and building. All other workers will have visitor badges and will be required to check in at the security building (guard shack) on a daily basis. The contractor is required to escort their workers with visitor badges.
5) Question: Are photos of the project walk or work area available to share with contractors?
Answer: No photos are available.
6) Question: Can you confirm the correct reference drawing for Attachment 1(c) was provided on SAM.gov? Section J of the RFO lists Attachment 1(c) as reference drawing SEA-E-5893-S4R, however, the sheet provided is numbered SEA-E-5896-S4R.
Answer: Yes, it is the correct drawing. Section J has been corrected to read SEA-E- 5896-S4R.