Attachment 1(a) - Drawings-Final 100pct 9-29-2021.pdf

PDF 2 MB Posted

Attached to
Amendment 0001: Boiler Stack Replacement Project at FAA's Seattle Air Route Traffic Control Center (ARTCC) Facility in Auburn, Washington
Solicitation number
697DCK-22-R-00004
Issued by

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

z s e -1

-m

.d g n

/2

/2

:4

:2

A

M L o ri

D iV o n a

A

B

C

D

E

F

G

H

8 7 6 5 4 3 2 1

H

G

F

E

D

C

12345678

REVDRAWING NO

DATE JCN

APPROVED BY

ISSUED BY

CHECKED

DRAWN

DESIGNED

SUBMITTED BY

REVIEWED BY

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV

DATE

APPROVED

DESCRIPTION JCN

DATE

REDLINE

APVD

A

NO.

PUMP

MANUFACTURER MODEL SERVICE

GPM

FLOW

FT H20

HEAD

RPM HP ELECTRICAL REMARKS

-P-2A

WATER

HOT

HEATING

335 105 1750 480/3/60Hz

15 -P-2B

WATER

HOT

HEATING

335 105 1750 480/3/60Hz

MIN EFF.

70%

70%

BASE PLATE

MOTOR

EQUIPMENT PAD

SUCTION DIFFUSER

ELBOW W/

BUILT-IN STRAINER

(TYP)

PUMP SCHEDULE

FLEX

CONNECTOR

(TYP)

FLR ONE ROOF

FLR ONE

BASEMENT

12" DIA12" DIA

TACO

TACO

SUCTION

END

FI SERIES

SUCTION

END

FI SERIES

MAINTENANCE PAD

CHECK

VALVE (TYP)

1'-0"

1'-6"

MASONRY FACE

x x x x x x3

E

X

IS

T

M A

T C

H

C L

R

CLR

2"

1"

CHIMNEY EQUIPMENT SUPPLIED

COORD PAD SIZE W/

P O

W E

R S

E R

V

IC

E B

U

IL

D

IN

G

ADMINISTRATION

WING

AUTOMATION

CONTROL WING

WING

INTERIM

WING

SUPPORT

OPERATIONS

KEY PLAN

BUILDING

SUPPORT

GENERAL NOTES:

SHEET NOTES:

A.

PRODUCTS OR BEGINNING CONSTRUCTION.

POTENTIAL BUILDING INTERFERENCES BEFORE ORDERING

FIELD VERIFY DIMENSIONS, CONNECTIONS, AND ANY

2 2

STORM COLLAR/FLASHING

SCREEN

RAIN CAP W/ BIRD

WIND RESISTANT

ANCHORS

FLOOR

C

M005

ATTACHED TO MASONRY WALL

RING SUPPORTS

C

M005 SCALE: 1/4" = 1' - 0"

EXISTING CHIMNEY COVER

B

M005 SCALE: 1/4" = 1' - 0"

BOILER ROOM ELEVATIONS

DRAIN

DOOR W/

CLEANOUT

AND PUMP TRIM.

PROVIDE NEW PIPING, GAUGES, VALVES, CONNECTIONS

AND SUPPORTS.

MAINTENANCE PAD AND ALL NECESSARY ANCHORS

CLEANOUT DOORS WITH DRAINS IN ASSEMBLY OR

ASSEMBLY TO INCLUDE RAIN CAPS, FLASHINGS,

FACILITY BOILER COMBUSTION REQUIREMENTS.

PROVIDE NEW CHIMNEY ASSEMBLIES BASED ON

AND FLASHING FOR CEILING PENETRATIONS.

PROVIDE MANUFACTURER RECOMMENDED FIRESTOPPING

D

M005 SCALE: NTS

MAINTENANCE PAD DETAIL

COVER TO FIT NEW CHIMNEY ASSEMBLY.

PROVIDE NEW OR RECONFIGURE EXISTING CHIMNEY

HIT-HY 200 ADHESIVE OR APPROVED EQUAL.

(TYP) EPOXIED INTO EXISTING SLAB W/ HILTI

BOND. #3 REBAR AT 12" OC AROUND PERIMETER

ROUGHEN PAD SURFACE TO 1/4" AMPLITUDE FOR

PROVIDE NEW MAINTENANCE PAD FOR CHIMNEYS.

D

M005

E D

M

IS

S

U E

D F

O R

ENGINEERING SERVICES

ENROUTE/FSS

ARTCC

ELEVATIONS AND SCHEDULE

MERGED HYDRONIC SYSTEMS REPLACEMENT

ADMINISTRATION WING BASEMENT

WAAUBURNSEATTLE

CALLEN R. COLLINSDOMINICK HUDSON

DH

DH

PROJECT ENGINEER MGR: ENGINEERING - SEATTLE

03/22/2021 1704390

ZSE-1704390-M005 A

DH 1704390PROJECT DRAWING UPDATE04/27/2021A

z s e -1

-m

.d g n

DRAWING PRODUCED ON WSA MICROSTATION SYSTEM

ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA

C O

N S

T R

U C

T

IO

N

H

W S

H

W S

ZSE-1704390-G002
ZSE-1704390-G003
ZSE-1704390-G004
zse-1704390-m001
zse-1704390-m002
ZSE-1704390-M005

File details come from the government source that posted it. Updated .