About this file
This is a comprehensive construction drawings package for the DOM-IT Jessie Parker South Building Renovation project in Des Moines, Iowa, prepared by the Department of Administrative Services. The project consists of Level 2 alterations to an existing 2-story reinforced concrete framed building with basement, involving renovation of office spaces, conference rooms, restrooms, and support areas across the lower level, Level 1, and Level 2. The building is classified as Type III-A construction with B occupancy (business), totaling approximately 53,729 square feet with a maximum building height of 25'-9" and 2 stories plus basement. The renovation includes demolition of existing walls, flooring, ceilings, and MEP systems; installation of new finishes including carpet tile and LVP flooring, gypsum board walls, acoustic ceiling tiles, and paint; modernization of HVAC systems with refurbishment of existing VAV boxes; replacement of plumbing fixtures including lavatories, sinks, and water closets; and complete electrical system upgrades including lighting, power distribution, fire alarm, and data/communications infrastructure.
The construction documents are 100% complete as of April 10, 2026, prepared by Substance Architecture (architecture) and IMEG Corp. (MEP engineering), with professional engineer licenses for mechanical, electrical, and plumbing work included. The project applies the 2024 International Building Code, 2024 International Existing Building Code, 2012 IECC, and state-specific mechanical, plumbing, and electrical codes. Total occupant load calculations indicate 475 persons across all levels (Lower: 96, Level 1: 413 including assembly spaces, Level 2: 86). The drawings establish strict compliance with accessibility requirements per ADA standards, fire-resistance ratings for walls and shafts, plumbing fixture requirements per code calculations, and HVAC specifications including ductwork sizing and control sequences. Phased construction is planned with Phase 1 prioritizing completion of the southeast corner to allow tenant occupancy while work continues in other areas, requiring coordination between demolition and new construction activities.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DAS PROJECT #: 9518.00
RFB #: 951800-01
DOM-IT
DOM-IT Jessie Parker South Renovation
510 East 12th Street Des Moines, IA 50319
0719-01
100% Documents April 10, 2026
E N
G
IN
E R
E
PR
OFESSIONAL
L
IC
E N
S E
D
AWOI
(Signature)
(Printed or Type Name) (License Num.)
I hereby certify that this engineering document was prepared by me or under my direct personal supervision and that I am a duly licensed Professional Engineer under the laws of the State of Iowa.
My license renewal date is
Sheets covered by this seal
TONY
DELOUIS
23167
E N
G
IN
E R
E
PR
OFESSIONAL
L
IC
E N
S E
D
AWOI
(Signature)
(Printed or Type Name) (License Num.)
I hereby certify that this engineering document was prepared by me or under my direct personal supervision and that I am a duly licensed Professional Engineer under the laws of the State of Iowa.
My license renewal date is
Sheets covered by this seal
NATE
JACQUES
21686
PR
OFESSIONAL
A R
C H
I T
E C
T
LI
C
E N
S E
D
AWOI
I hereby certify that the portion of this technical submission described below was prepared by me or under my direct supervision and responsible charge. I am a duly licensed architect under the laws of the State of Iowa.
(Signature)
(Printed or Type Name) (License Num.)
My license renewal date is
Sheets covered by this seal
MATTHEW D.
RODEKAMP
05456
2882 106th Street Des Moines, IA 50322
MECHANICAL ENGINEER
IMEG Corp.
1300 Walnut Street, Suite 201 Des Moines, Iowa 50309
MATTHEW D. RODEKAMP 05456
G - Series, A - Series
20-JUN-27
NATE JACQUES 21686
M - Series
31-DEC-26
2882 106th Street Des Moines, IA 50322
ELECTRICAL ENGINEER
IMEG Corp.
TONY DELOUIS 23167
E - Series
31-DEC-26
SHEET INDEX
0 - GENERAL
G0.00 COVER
G0.01 ABBREVIATIONS, SYMBOLS, TYPICAL MOUNTING HEIGHTS
G1.01 CODE PLANS
G1.02 CODE SHEET
4 - ARCHITECTURAL
A0.80 DEMOLITION PLAN - LOWER LEVEL
A0.81 DEMOLITION PLAN - LEVEL 1
A0.82 DEMOLITION PLAN - LEVEL 2
A0.90 REFLECTED CEILING DEMO PLAN - LOWER LEVEL
A0.91 REFLECTED CEILING DEMO PLAN - LEVEL 1
A0.92 REFLECTED CEILING DEMO PLAN - LEVEL 2
A1.00 FLOOR PLAN - LOWER LEVEL
A1.01 FLOOR PLAN - LEVEL 1
A1.02 FLOOR PLAN - LEVEL 2
A3.00 REFLECTED CEILING PLAN - LOWER LEVEL
A3.01 REFLECTED CEILING PLAN - LEVEL 1
A3.02 REFLECTED CEILING PLAN - LEVEL 2
A4.01 ENLARGED PLANS / ELEVATIONS
A7.02 SCHEDULES
7 - PLUMBING
P000 PLUMBING COVERSHEET
P101 LEVEL 1 DEMOLITION PLAN - PLUMBING
P102 LEVEL 2 DEMOLITION PLAN - PLUMBING
P201 LEVEL 1 FLOOR PLAN - PLUMBING
P202 LEVEL 2 FLOOR PLAN - PLUMBING
P300 PLUMBING DETAILS, DIAGRAMS, AND SCHEDULES
8 - MECHANICAL
M000 HVAC COVERSHEET
M100 LOWER LEVEL DEMOLITION PLAN - HVAC
M101 LEVEL 1 DEMOLITION PLAN - HVAC
M102 LEVEL 2 DEMOLITION PLAN - HVAC
M200 LOWER LEVEL FLOOR PLAN - HVAC
M201 LEVEL 1 FLOOR PLAN - HVAC
M202 LEVEL 2 FLOOR PLAN - HVAC
M300 HVAC DETAILS, DIAGRAMS, AND SCHEDULES
9 - ELECTRICAL
E000 ELECTRICAL COVERSHEET
E100 LOWER LEVEL DEMOLITION PLAN - ELECTRICAL
E101 LEVEL 1 DEMOLITION PLAN - ELECTRICAL
E102 LEVEL 2 DEMOLITION PLAN - ELECTRICAL
E211 LEVEL 1 FLOOR PLAN - LIGHTING
E212 LEVEL 2 FLOOR PLAN - LIGHTING
E220 LOWER LEVEL FLOOR PLAN - POWER
E221 LEVEL 1 FLOOR PLAN - POWER
E222 LEVEL 2 FLOOR PLAN - POWER
E230 LOWER LEVEL FLOOR PLAN - SYSTEMS
E231 LEVEL 1 FLOOR PLAN - SYSTEMS
E232 LEVEL 2 FLOOR PLAN - SYSTEMS
E400 ELECTRICAL DETAILS
E600 ELECTRICAL SCHEDULES
E700 ELECTRICAL PANEL SCHEDULES
G0.00
12" MAX
48"
40"
M
IN
8"
TT
25" 11"
17"
T O
G B
TOILET / GRAB BARS / ACCESSORIES
CONCEALED BLOCKING TO EXTEND
6" MIN BEYOND EACH END AND 6"
ABV AND BLW ALL ACCESSORY
ITEMS
FLUSH CONTROL
TO BE LOCATED
ON OPEN SIDE
OF WATER
CLOSET
PLAN
ELEVATION
CLEAR
AREA
52" MIN
M
IN
M A
X
ACCESSIBLE URINAL
SEE INTERIOR ELEVATIONS
FOR LOCATIONS
TYPICAL URINAL
LAVATORY
CLEAR
AREA
52" MIN
M
IN
M A
X
M
IN
9" M
IN
11" MIN
8" MINACC UR UR
" 36
" 48
" 48
ACC HD SD
SN
VN
SHARPS RB HK
BCS
SHLF
HAND DRYER SOAP
DISPENSER
S. NAPKIN
DISPOSAL
VENDING
MACHINE
SHARPS
CONTAINER
ROBE HOOK BABY
CHANGING
STATION
SHELF
6" UNO
S DC PS
E DV
T
PB
LINE OF
DOOR
FRAME
SWITCH /
CONTROL
DIMMER
CONTROL
PROJECTOR
SCREEN
CONTROL
ELECTRICAL
OUTLET
DATA / VOICE
OUTLET
THERMOSTAT DOOR OPERATOR
PUSH BUTTON
FAS
FA
FEC
KB
HB
FIRE ALARM
PULL STATION
FIRE ALARM
HORN /
STROBE
FIRE
EXTINGUISHER
CABINET
KNOX BOX
HOSE BIB
NOTE: DEVICE CENTERLINES TO ALIGN, TYP
TV
<66" TV @ 66"
66"-75" TV @ 69"
>75" TV @ 72"
WALL BLOCKING
(45"x6" MIN)
1t
ROOM NAME
150 SF
1t
GLAZING / WINDOW IDENTIFICATION
ROOM IDENTIFICATION
DETAIL / ENLARGED PLAN REFERENCE
SPOT ELEVATION
VERTICAL ELEVATION
FLOOR F1
0' - 0"
D2
A-512
SIM
1t
A1
VIEW NAME
SCALE:1/8" = 1'-0"
MILLWORK / FURNITURE / EQUIPMENT IDENTIFICATION
WALL TYPE IDENTIFICATION
SECTION REFERENCE
DRAWING IDENTIFICATION
STRUCTURAL GRID
1t1t
A-303
SIM
PLAN
NORTH
INTERIOR ELEVATION REFERENCE
BUILDING ELEVATION REFERENCE
DOOR / SIGNAGE IDENTIFICATION
PLAN NORTH REFERENCE
DRAWING REVISION
A2-02
1 SIM
A2-02
SIM
DENOTES REFERENCE
DENOTES ELEVATION
DETAIL NUMBER
SHEET NUMBER
ROOM NAME
ROOM NUMBER
AREA
GLAZING / WINDOW TYPE
REFERENCE
A
B
GRID REFERENCE
DETAIL NUMBER
DRAWING TITLE
DRAWING SCALE AND
REFERENCING
DETAIL
DARKENED AREA
DENOTES SECTION
DRAWN
DETAIL NUMBER
SHEET NUMBER
WALL TYPE
REFERENCE
TYPE REFERENCE
REVISION ISSUANCE
DASHED LINE
INDICATES TRUE
NORTH
DOOR NUMBER
DETAIL NUMBER
SHEET NUMBER
DETAIL NUMBER
SHEET NUMBER
TOS EL 0'-0"
DENOTES ELEVATION
DENOTES OBJECT
REFERENCED
KEYNOTE IDENTIFICATION
04 20 00.A1
DESCRIPTION
SHEET KEYNOTE - REFER
TO LEGEND ON SHEET
REFERENCE KEYNOTE -
REFER TO LEGEND ON SHEET
AND ASSOCIATED SPEC
SECTION
ROOM FINISH IDENTIFICATION FLOOR PLAN SYMBOLS
ROOM NAME
F B W C
ROOM NAME
ROOM NUMBER
FINISHES: FLOOR,
BASE, WALL, CELING
1t
CPT-1
CG
SIGN NUMBER
CPT-1
CT-1
FLOOR FINISH
FLOOR FINISH
TRANSITION
CORNER GUARD
▲ITC-1
A101
ALUMINUM
BATT INSULATION
BRICK & CLAY MASONRY
CERAMIC TILE
CONCRETE UNIT MASONRY
COMPACTED OR ENGINEERED FILL
CONCRETE
CONTINUOUS BLOCKING
DISCONTINUOUS BLOCKING
EARTH
GLAZING
GYPSUM WALL BOARD
RIGID INSULATION
SAND
SHEATHING
SPRAY INSULATION
WOOD - FINISH GRADE
STEEL
PROJECT SITE
JESSIE PARKER BUILDING - SOUTH
PHASE 01: WORK TO BE COMPLETED FIRST SO TENANT
CAN OCCUPY SOUTHEAST CORNER OF FLOOR.
PROVIDE PROTECTION FROM CONSTRUCTION AREAS
AFTER OCCUPANCY.
PHASE 01: WORK TO BE COMPLETED FIRST SO TENANT
CAN OCCUPY SOUTHEAST CORNER OF FLOOR.
PROVIDE PROTECTION FROM CONSTRUCTION AREAS
AFTER OCCUPANCY.
Ph.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
B
A
C
D
E
F
G
H
J
K
L www.imegcorp.com
Des Moines, IA 50322
2822 106th Street
MEP Engineer
IMEG Corp.
515 334 9906
C op yr ig ht
S ub st an ce , L
LC
1300 Walnut Street, Suite 201 Des Moines, Iowa 50309 Ph. 515 243 4407 www.substancearchitecture.com
Revisions
Substance No.:
#9518
16 17 18
M
N
P
Date:
/1
/2
:4
:5
A M
A u to d e s k D o c s /0
-0
D
O M
-I T
J e s s ie
P a rk e r S o u th B u ild in g
R e n o v a ti o n
/D O
M -I
T J e s s ie
P a rk e r S o u th B ld g
R e n o
A R
C H
R
.r v t
D O
M -I
T D
O M
-I T
J e s s ie P a rk e r
S o u th
R e n o v a ti o n
D o c u m e n ts
G0.01
ABBREVIATIONS, SYMBOLS, TYPICAL
MOUNTING HEIGHTS
DOM-IT No.:
0719-01
April 10, 2026
ABBREVIATIONS
@ AT
ABV ABOVE
ACC ACCESSIBLE
ACT ACOUSTICAL CEILING TILE
ADA AMERICANS WITH DISABILITIES
ACT
ADJ ADJUSTABLE
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AHJ AUTHORITY HAVING
JURISDICTION
AL ALUMINUM
ALT ALTERNATE
ALUM ALUMINUM
APC ACOUSTICAL PANEL CEILING
ARCH ARCHITECT
AV AUDIO-VISUAL
AWP ACOUSTICAL WALL PANEL
BCKR BACKER
BCS BABY CHANGING STATION
BD BOARD
BLDG BUILDING
BLW BELOW
BO BOTTOM OF
BOS BOTTOM OF STRUCTURE
BTW BETWEEN
CAB CABINET
CG CORNER GUARD
CH COAT HOOK
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CL CENTERLINE
CLG CEILING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CNTR COUNTERTOP
COL COLUMN
CONC CONCRETE
COORD COORDINATE
CPT CARPET
CR CARD READER
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTR CENTER
CW CURTAIN WALL
DBL DOUBLE
DC DIMMER CONTORL
DEMO DEMOLITION (DEMOLISH)
DF DRINKING FOUNTAIN
DIA DIAMETER
DIM(S) DIMENSION(S)
DO DOOR OPENING
DPTN DEMOUNTABLE PARTITION
DR DOOR
DS DOWNSPOUT
DV DATA / VOICE OUTLET
DW DISHWASHER
DWG(S) DRAWING(S)
E ELECTRICAL OUTLET
EA EACH
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRIC (ELECTRICAL)
ELEV ELEVATOR
EMER EMERGENCY
ENCL ENCLOSURE
ENGR ENGINEER
EOS EDGE OF SLAB
EPS EXPANDED POLYSTYRENE
BOARD
EQ EQUAL
EQUIP EQUIPMENT
EWS EYE WASH STATION
EXCL EXCLUDE (EXCLUDING)
EXP EXPANSION
EXST EXISTING
EXT EXTERIOR
F FEMALE
FA FIRE ALARM HORN / STROBE
FAS FIRE ALARM PULL STATION
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FIN FINISH
FLEX FLEXIBLE
FLG FLOORING
FLR FLOOR
FO FACE OF
FOC FACE OF CONCRETE
FOF FACE OF FINISH
FOW FACE OF WALL
FRP FIBER-REINFORCED PLASTIC
FRT FIRE-RETARDANT-TREATED
FRZ FREEZER
STANDARD MOUNTING HEIGHTS
TYPICAL SYMBOLS
MATERIAL KEY
ABBREVIATIONS
FTG FOOTING
FURN FURNITURE
GA GAUGE
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR
GFRC GLASS-FIBER REINFORCED
CONCRETE
GL GLASS
GLZ GLAZING
GRID GRIDLINE
GYP GYPSUM
HB HOSE BIB
HD HAND DRYER
HDW HARDWARE
HDWD HARDWOOD
HM HOLLOW METAL
HORIZ HORIZONTAL
HPC HIGH PERFORMANCE COATING
HS HAND SINK
HT HEIGHT
HVAC HEATING, VENTILATING, AND AIR
CONDITIONING
ID INSIDE DIAMETER
IIC IMPACT ISOLATION CLASS
INCL INCLUDE (INCLUDING)
INFO INFORMATION
INSUL INSULATION
INT INTERIOR
IT(S) INFORMATION TECHNOLOGY
(SERVICES)
JAN JANITOR
JT JOINT
KB KNOX BOX
LAM LAMINATE (LAMINATED)
LAV LAVATORY
LINO LINOLEUM
LKR LOCKER
LOC LOCATION
LT LIGHT
LVR LOUVER
MAINT MAINTENANCE
MATL MATERIAL
MAX MAXIMUM
MBH MOP / BROOM HOLDER
MECH MECHANICAL
MEL MELAMINE
MEMB MEMBRANE
MFD MANUFACTURED
MFR MANUFACTURER
MIN MINIMUM
MIR MIRROR
MISC MISCELLANEOUS
MLWK MILLWORK
MR MOISTURE RESISTANT
MTL METAL
MW MICROWAVE
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NRC NOISE REDUCTION COEFF.
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OFCI OWNER FURNISHED,
CONTRACTOR INSTALLED
OH OVERHEAD
OPNG OPENING
OPP OPPOSITE
ORIG ORIGINAL
ORN ORNAMENTAL
OVFL OVERFLOW
PART PARTIAL
PAT PATTERN
PB PUSH BUTTON
PERF PERFORATED
PERIM PERIMETER
PERM PERMANENT
PLAM PLASTIC LAMINATE
PLUMB PLUMBING
PLYWD PLYWOOD
PNL PANEL
PNT PAINT
PREFAB PREFABRICATE
PREFIN PREFINISHED
PRELIM PRELIMINARY
PS PROJECTOR SCREEN CTRL
PT POST-TENSIONED
PTD PAPER TOWEL DISPENSER
PTDR COMBINATION PAPER TOWEL
DISPENSER AND RECEPTACLE
PTN PARTITION
PTR PAPER TOWEL RECEPTACLE
PV PHOTOVOLTAIC
QT QUARRY TILE
ABBREVIATIONS
QTR QUARTER
QTY QUANTITY
QTZ QUARTZ
R RADIUS
RA RETURN AIR
RB RESILIENT BASE
RB HK ROBE HOOK
RBR RUBBER
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
RECPT RECEPTACLE
REF REFRIGERATOR
REINF REINFORCE(D)
REM REMAINDER
REQD REQUIRED
RESIL RESILIENT
REST RESTROOM
RFG ROOFING
RM ROOM
RND ROUND
RO ROUGH OPENING
RR RESTROOM
RTF RUBBER TILE FLOORING
RTG RATING (RATED)
RTU ROOFTOP UNIT
RVL REVEAL
S SWITCH
SA SUPPLY AIR
SALV SALVAGE
SAMP SAMPLE
SAN SANITARY
SC SEALED CONCRETE
SCD SEAT COVER DISPENSER
SCHED SCHEDULE
SD SOAP DISPENSER
SECT SECTION
SF SQUARE FOOT (FEET)
SGL SINGLE
SHLF SHELF
SHR SHOWER
SHR HD SHOWERHEAD
SHT SHEET
SHV SHELVING
SIM SIMILAR
SLNT SEALANT
SN SANITARY NAPKIN DISPOSAL
SNK SINK
SNSR SENSOR
SP STANDPIPE
SPKLR SPRINKLER
SPKR SPEAKER
SQ SQUARE
SSF SOLID SURFACE
SST STAINLESS STEEL
STC SOUND TRANSMISSION CLASS
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SURF SURFACE
SUSP SUSPEND (SUSPENDED)
SYS SYSTEM
T THERMOSTAT
T&G TONGUE AND GROOVE
TB TOWEL BAR
TC TERRACOTTA
TD TRENCH DRAIN
TEMP TEMPORARY
TERM TERMINATION
THK THICKNESS
THRES THRESHOLD
TKSF TACK-SURFACE / TACK-BOARD
TO TOP OF
TOS TOP OF SLAB
TOW TOP OF WALL
TT TOILET TISSUE DISPENSER
TV TELEVISION
TYP TYPICAL
TZ TERRAZZO
UNO UNLESS NOTED OTHERWISE
UR URINAL
URS URINAL SCREEN
VB VINYL BASE
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
VN VENDING MACHINE
VOC VOLATILE ORGANIC COMPOUND
W WIDTH
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WD WOOD
WH WATER HEATER
WO WINDOW OPENING
WT WEIGHT
XPS EXTRUDED POLYSTYRENE
BOARD
VICINITY MAP
MARK DESCRIPTION DATE
PHASING PLANS
LOWER LEVEL LEVEL 1 LEVEL 2
SP
146 / 29.2"
36.0"
EGRESS PATH
A 50.0'
STAIR 2
48.0"
83 16.6"
1 HR
RATING 1C
1 HR
OCCUPANT LOADOCCUPANT LOAD FACTOR
AREA
ROOM NUMBER
EXITS REQUIRED
PANIC HARDWARE
OCCUPANCY CLASSIFICATION
ROOM NAME
EXITS PROVIDED
ACCESSORY OR INCIDENTAL USE
AREA / ROOM TAG
STAIR NUMBER
OCCUPANT LOAD SERVED
ACTUAL WIDTH IF OPEN STAIR, LIST EXCEPTION
USED
FIRE-RESISTANCE RATING
REQUIRED WIDTH
STAIR TAG
PANIC HARDWARE
DOOR NUMBER
ACTUAL WIDTH
REQUIRED WIDTH
OCCUPANT LOAD SERVED
DOOR TAG
ASSEMBLY TYPE
RATED WALL TAG
SYMBOL DESCRIPTION
FIRE WALL (# OF DIAMONDS INDICATES HOURS OF FIRE RESISTANCE), IBC 706
A fire-resistance-rated wall having protected openings, which restricts the spread of fire and extends continuously from the foundation to or through the roof, with sufficient structural stability under fire conditions to allow collapse of construction on either side without collapse of the wall.
FIRE BARRIER (# OF DIAMONDS INDICATES HOURS OF FIRE RESISTANCE), IBC
A fire-resistance-rated wall assembly of materials designed to restrict the spread of fire in which continuity is maintained.
FIRE PARTITION (# OF DIAMONDS INDICATES HOURS OF FIRE RESISTANCE), IBC
A vertical assembly of materials designed to restrict the spread of fire in which openings are protected.
SMOKE PARTITION, IBC 710
A non-fire-resistance-rated partition designed to limit the movement of smoke, which extends from the top of the foundation or floor below to the underside of the floor or roof sheathing, deck or slab above, or to the underside of the ceiling above where the ceiling membrane is constructed to limit the trasfer of smoke.
EXIT - EXTERIOR
EXIT - INTERIOR
EGRESS TRAVEL PATH, REFER TO SCHEDULE FOR LENGTH TABULATION
OCCUPANTS / REQUIRED
WIDTH
PROVIDED WIDTH
ACCUMULATED EXIT WIDTH AT REQUIRED EXIT:
TRAVEL PATH: A
1tFEC
1tFDC FIRE DEPARTMENT CONNECTION
FIRE EXTINGUISHER / FIRE EXTINGUISHER CABINET
EXIT SIGN & DIRECTIONAL INDICATOR
EGRESS PATH TAG
SEGMENT LENGTH, REFER TO
SCHEDULE FOR LENGTH TABULATIONPATH IDENTIFIER
FIRE-RESISTANCE RATING
DR# 101
3.8"
33.6"
Yes
CODE PLAN LEGEND
OFFICE
150 SF
B - BUSINESS
ACCESSORY
100 SF
Yes
PLAN
NORTH
14,332 SF
No
LOWER LEVEL
B - BUSINESS
N/A
150 SF
STAIR (JS021)
48 14.4"
41.0" 1 HR
N/A
STAIR (JS032)
48 14.4"
41.0" 1 HR
N/A
DR#
42.8"
Yes
EXJS032
9.6"
169.6'
[ >84.8' REQ'D ]
105.1'
97'-9" ACCESS TRAVEL DISTANCE
(200'-0" MAX)
FEC
F E
C
FEC
PLAN
NORTH
16,289 SF
No
LEVEL 1
B - BUSINESS
N/A
150 SF
939 SF
Yes
CONFERENCE RM
A - ASSEMBLY
N/A
15 SF
883 SF
Yes
CONFERENCE RM
A - ASSEMBLY
N/A
15 SF
STAIR (JS127)
117 35.1"
41.0" 1 HR
N/A
STAIR (JS140)
117 35.1"
41.0" 1 HR
N/A
DR#
42.9"
Yes
EXJS127A
11.8"
169.6'
[ >84.8' REQ'D ]
90.4'
ROOF
DR#
40.6"
Yes
EXJS124
11.8"
'-0
A C
C E
S S
T R
A V
E L
D
IS
T A
N C
E (2
'-0
M
A X
F E
C
FEC
FEC
FEC
932 SF
Yes
CONFERENCE RM0
A - ASSE,BLY
N/A
15 SF
OCCUPANCY LIMITED TO 49 DUE TO ONE EXIT
A4.01
G12
PLAN
NORTH
12,850 SF
No
LEVEL 2
B - BUSINESS
N/A
150 SF
STAIR (JS214)
43 12.9"
41.0" 1
N/A
STAIR (JS230)
43 12.9"
41.0" 1
N/A
169.6'
[ >84.8' REQ'D ]
90.4'
122'-4"
65'-9"
ROOF
162'-0" ACCESS TRAVEL DISTANCE
(200'-0" MAX)
FEC
F E
C
FEC
F E
C
PLUMBING CALCULATIONS
LOWER
(OCC: 96)
LEVEL 1
(OCC: 293)
LEVEL 2
(OCC: 86)
CLASSIFICATION:
WATER CLOSETS:
1 PER 25 FOR FIRST
50, 1 PER 50 AFTER
THAT
URINALS:
SUBSTITUTED FOR
NOT MORE THAN
50% OF W.C.
LAVTORIES:
1 PER 40 FOR FIRST
80, 1 PER 80 AFTER
THAT
DRINK FOUNTAINS:
1 PER 100
SERVICE SINK:
1 PER BUILDING
BUSINESS: B
BUSINESS: B
BUSINESS: B
REQUIRED: PROPOSED: REQUIRED: PROPOSED: REQUIRED: PROPOSED: REQUIRED: PROPOSED:
5 (2M / 3W)
8 (3M / 5W)
5 (2M / 3W)
1M
1M
1M
TOTAL OCC: 475
TOTAL: TOTAL: TOTAL: TOTAL: 3VERIFY16
4 (2M / 2W)
8 (4M / 4W)
4 (2M / 2W)
VERIFY 1
VERIFY 1
VERIFY 1
Ph.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
B
A
C
D
E
F
G
H
J
K
L www.imegcorp.com
Des Moines, IA 50322
2822 106th Street
MEP Engineer
IMEG Corp.
515 334 9906
C op yr ig ht
S ub st an ce , L
LC
1300 Walnut Street, Suite 201 Des Moines, Iowa 50309 Ph. 515 243 4407 www.substancearchitecture.com
Revisions
Substance No.:
#9518
16 17 18
M
N
P
Date:
/1
/2
:0
:5
A M
A u to d e s k D o c s /0
-0
D
O M
-I T
J e s s ie
P a rk e r S o u th B u ild in g
R e n o v a ti o n
/D O
M -I
T J e s s ie
P a rk e r S o u th B ld g
R e n o
A R
C H
R
.r v t
D O
M -I
T D
O M
-I T
J e s s ie P a rk e r
S o u th
R e n o v a ti o n
D o c u m e n ts
G1.01
CODE PLANS
DOM-IT No.:
0719-01
April 10, 2026
SCALE: 1/16" = 1'-0"1
LOWER LEVEL CODE ANALYSIS
SCALE: 1/16" = 1'-0"2
LEVEL 1 CODE ANALYSIS
SCALE: 1/16" = 1'-0"3
LEVEL 2 CODE ANALYSIS
OCCUPANCY LOAD CALCULATIONS
Name Area Occupancy
Classification Occupant Load
Factor Occupant Load
LOWER LEVEL 14,332 SF B - BUSINESS 150 SF 96
LEVEL 1 16,289 SF B - BUSINESS 150 SF 109
CONFERENCE RM 939 SF A - ASSEMBLY 15 SF 63
CONFERENCE RM 883 SF A - ASSEMBLY 15 SF 59
LEVEL 2 12,850 SF B - BUSINESS 150 SF 86
MARK DESCRIPTION DATE
M
IN
M
IN
12" MIN
M
IN
36" MIN
M
IN
24" MIN 24" MIN 48
M
IN
M
IN
24" MIN 48
M
IN
24" MIN
FRONT APPROACH, PUSH SIDE
(W/ CLOSER + LATCH)
LATCH APPROACH, PULL SIDE
(W/ CLOSER)
LATCH APPROACH, PUSH SIDE
LATCH APPROACH, PULL SIDE
LATCH APPROACH, PUSH SIDE
(W/ CLOSER)
HINGE APPROACH, PULL SIDE
FRONT APPROACH, PUSH SIDE
M
IN
18" MIN
FRONT APPROACH, PULL SIDE
M
IN
42" MIN
HINGE APPROACH, PULL SIDE
M
IN
22" MIN
HINGE APPROACH, PUSH SIDE
M
IN
22" MIN
HINGE APPROACH, PUSH SIDE
(W/ CLOSER + LATCH)
30" ø 5'-
0"
UNOBSTRUCTED
SIDE REACH
OBSTRUCTED
HIGH SIDE REACH
UNOBSTRUCTED
FORWARD REACH
OBSTRUCTED HIGH
FORWARD REACH
OBSTRUCTED HIGH
FORWARD REACH
M A
X
M
IN
M A
X
20" MAX
M A
X
20"-25" MAX 10" MAX
M
IN
M A
X
OBSTRUCTED
HIGH SIDE REACH
10" MAX
M A
X
M A
X
24" 10"-24" MAX
M A
X
M A
X
WHEELCHAIR
FLOOR AREA
WHEELCHAIR
TURNING AREA
UNOBSTRUCTED
FORWARD REACH
M
IN
M
IN
4" MAX
KNEE CLEARANCE
M A
X
7" M
A X
M
IN
9" M
IN
17"-25"
8" MIN
11" MIN 6" MIN
APPLICABLE CODES:
2024 International Building Code (IBC) 2024 International Existing Building Code (IEBC) 2024 International Fire Code (IFC) 2012 International Energy Conservation Code (IECC) 2012 NFPA 101 Life Safety Code 2010 Americans with Disabilities Act (ADA) State Mechanical Code (Based on 2024 International Mechanical Code) State Plumbing Code (Based on 2024 Uniform Plumbing Code) State Electrical Code (Based on 2023 National Electrical Code)
SITE CONDITIONS:
GROUND SNOW LOAD: 30psf WIND SPEED: 115mph
SEISMIC DESIGN CATEGORY: A
WEATHERING: Severe FROST LINE DEPTH: 42in TERMITE: Moderate to Heavy DECAY: Slight to Moderate WINTER DESIGN TEMP: 0oF ICE SHIELD REQUIRED: Yes FLOOD HAZARD: March 1984
AIR FREEZING INDEX: 1833
MEAN ANNUAL TEMP: 48.6oF
PROJECT CONDITIONS:
The project consists renivation of an existing 2-story reinforced concrete framed, concrete pan joist floor and roof building with a basement. The building is part of another building complex that is seperated by a fire barrier. The occupancy will is Type B-Buisness with assembly and storage spaces, no occupancy change is being proposed. The building is considered a Type III- A construction (based on a previous code review, sighting Type III 1-hr of the 1994 UBC). The work will be a Level 2 Alteration. The building is seperated from the north building (which has a sprinkler system) by 2-hr rated walls and doors (only 1-hr is required). Shafts are 2-hr rated, but only need to be 1-hr.
2024 INTERNATIONAL EXISTING BUILDING CODE:
CHAPTER 2 - DEFINITIONS
200 - GENERAL DEFINITIONS:
• WORK AREA: That portion or portions of a building consisting of all reconfigured spaces as indicated on the construction documents, work areas excludes other portions of the building where incidental work entailed by the intended work must be performed and portions of the building where not initially intended by the Owner is specifically required by this code.
CHAPTER 3 - PROVISIONS FOR ALL COMPLIANCE METHODS
301.1 APPLICABILITY: The repair, alteration, change of occupancy, addition or relocation of all existing buildings shall comply with Section 301.2, 301.3, or 301.4.
301.3 ALTERATION, ADDITION, OR CHANGE OF OCCUPANCY: The alteration, addition or change of occupancy of all existing buildings shall comply with one of the methods listed in Section 301.3.1, 301.3.2, or 301.3.3 as selected by the applicant. Sections 301.3.1 through
301.3.3 shall not be applied in combination with each other.
Exception: Subject to the approval of the code offical, alterations complying with the laws in existence at the time the building or the affected portion of the building was built shall be considered in compliance with the provisions of this code. New structural members added as part of the alteration shall comply with the International Building Code. This exception shall not apply to the following:
1. Alterations for accessibility required by Section 306.
2. Alterations that constitute substantial improvement in flood hazard areas, which shall comply with Sections 503.2, 701.3 or 1303.1.3.
3. Structural provisions of Section 304, Chapter 5 or to the structural provisions of Sections 703, 805 and 906.
301.3.1 PRESCRIPTIVE COMPLIANCE METHOD: Alterations, additions, and changes of occupancy complying with Chapter 5 of this code in buildings complying with the International Fire Code shall be considered in compliance with the provisions of this code.
301.3.2 WORK AREA COMPLIANCE METHOD: Alterations, additions, and changes of occupancy complying with applicable requirements of Chapter 6 through 12 of this code shall be considered in compliance with the provisions of this code.
301.3.3 PERFORMANCE COMPLIANCE METHOD: Alterations, additions, and changes of occupancy complying with Chapter 13 of this code shall be considered in compliance with the previsions of this code.
302.3 EXISTING MATERIALS: Materials already in use in a building in compliance with requirements or approvals in effect at the time of their erection or installation shall be permitted to remain in use unless determined by the building official to be unsafe.
306.1 ACCESSIBILITY FOR EXISTING BUILDINGS, SCOPE: The provisions of Sections
306.1 through 306.7.16 apply to maintenance and reppair, change of occupancy, additions and alterations to existing buildings, including those identified as historic buildings.
306.7 ALTERATIONS: A facility that is altered shall comply with the applicable provisions in Chapter 11 of the IBC, ICC A117.1 and the provisions of Sections 306.7.1 through 306.7.18, unless technically infeasible. Where compliance with this section is technically infeasible, the alteration shall provide access to the maximum extent techincally feasible.
306.7.2 ACCESSIBLE MEANS OF EGRESS: Accessible means of egress required by Chapter 10 of the IBC are not required to be added in existing facilities.
CHAPTER 5 - PERSCRIPTIVE COMPLIANCE METHOD
SECTION 503 - ALTERATIONS
503.1 GENERAL: Alterations to any building or structure shall comply with the requirments of the IBC for new consturstion, alterations shall be such that the existing building or structure is not less complying with the provisions of the IBC than the existing building or structure was prior to the alteration, except that the structural elements need only comply with Sections 503.2 through 503.12.
Exceptions:
1. An existing stairway shall not be required to comply with the requirments of Section 1011 of the IBC where the existing space and construction does not allow a reduction in pitch or slope.
2. Handrails otherwise required to comply with Section 1011.11 of the IBC shall not be required to comply with the requiremnets of Section 1014.7 of the IBC regarding full extension of the handrails where such extensions would be hazardous because of plan configuration.
3. Where provided in below-grade transportation stations, existing and new escalators shall be permitted to have a clear width of less than 32 inches.
SECTION 506 – BUILDING AREA
506.1 GENERAL: The floor area of a building shall be determined based on the type of construction, occupancy classification, whether there is an automatic sprinkler system installed throughout the building and the amount of building frontage on public way or open space.
506.1.3 BASEMENTS: Basements need not be included in the total allowable floor area of a building provided the total area of such basements does not exceed the area permitted for a one-story above grade plane building.
- Grade Plane Definition from Section 202: A reference plane representing the average of finished ground level adjoining the building at exterior walls. Where the finished ground level slopes away from the exterior walls, the refereence plane shall be established by the lowest points within the area between the building and the lot line or, where the lot line is more than 6 feet from the building. between the building and a point 6 feet from the building.
- Story Above Grade Plan Definition from Section 202: Any story having it's finished floor surface entirely above grade plane, or in which the finished surface of the floor next above is:
1. More than 6 feet above grade plan, or
2. More than 12 feet above the finished ground level at any point.
506.2 ALLOWABLE AREA DETERMINATION: The allowable area of a building shall be determined in accordance with the applicable provisions of Sections 506.2.1 through 506.2.4 and Section 506.3.
-28,500sf per Table 506.2 for B occupancy, Type III-A Construction, Non-Sprinkled -Existing building area is 53,729sf (117,567sf when seperated, sprinkled portion is added)
506.2.1 SINGLE-OCCUPANCY BUILDINGS: The allowable area per story of a single-occupancy building with a maximum of three stroies above grade plane shall be determined by Equation 5-1:
South Building:
Aa = At + (NS x If) (Equation 5-1)
Aa = [28,500sf + (28,500sf x 0.75)] Aa = 49,875sf (existing building exceeds area: 53,729sf - 49,875sf = 3,854sf, 2024 IEBC Section
503.1 allows this, as long as the existing building is not less complying than prior to the alteration)
North Building:
Aa = At + (NS x If) (Equation 5-1)
Aa = [85,500sf + (28,500sf x 0.75)] Aa = 106,875sf (eisting building is less than maximum area (63,838sf))
Based on Equation 5-2 for a B Occupancy and Type III-B Construction for a Fully Sprinkled building the maximum area for a multiple story building is 285,000sf (Actual Building Area = 59,605sf)
506.3 FRONTAGE INCREASE: Every building shall adjoin or have access to a public way to receive an area factor increase based on frontage. Area factor increase shall be determined in accordance with Sections 506.3.1 through 506.3.3.
506.3.1 MINIMUM PERCENTAGE OF PERIMETER: To qualify for an area factor increase based on frontage, a building shall have not less than 25 percent of its perimeter on a public way or open space. Such open space shall be either on the same lot ot dedicated for public used and shall be accessed from a street or approved fire lane.
506.3.2 MINIMUM FRONTAGE DISTANCE: To qualify for an area factor increase based on frontage, the public way or open space adjacent to the building perimeter shall have a minimum distance of 20 feet measured at right angles from the building face to any of the following:
1. The closest interior lot line.
2. The entire width of a street, alley or public way.
3. The exterior face of an adjacent building on the same property.
The frontage increase shall be based on the smallest public way or open space that is 20 feet or greater, and the percentage of building perimeter having a minum 20 feet public way or open space.
506.3.3 AMOUNT OF INCREASE: The area factor increase based on frontage shall be determined in accordance with Table 506.3.3.
Percentage of Building Perimeter Frontage = 75% Open Space = 30 feet or Greater
If = 0.75 (Table 506.3.3)
CHAPTER 6 - TYPES OF CONSTRUCTION
602.3 TYPE III: Type III construction is that type of construction in which the exterior walls are of noncombustible materials and the interior building elements are of any material permitted by this code. Fire-retardant-treated wood framing and sheathing complying with Section 2303.2 shall be permitted within exterior wall assemblies of a 2-hour rating or less.
TABLE 601: The building is Type III-A and the Building Elements are as follows:
• Primary Structure: 1hr 3hr existing
• Bearing Walls, Exterior: 2hr n/a existing
• Bearing Walls, Interior: 1hr n/a existing
• Nonbearing Walls and Partitions, Exterior: See Table 705.5
• Nonbearing Walls and Partitions, Interior: 0hr 0hr existing
• Floor Construction + Assy 2nd Members: 1hr 1hr existing
• Roof Construction + Assy 2nd Members: 1hr 1hr exisintg
TABLE 705.5: Fire Seperation Distances Greater than 30ft don't need to have a Fire- Resistance Rating, closer than 5ft need a 1hr Rating, therefore Nonbearing Walls and Partitions, Exterior have a fire rating of 0hr with the exception of the dividing walls between the south building and the north building.
CHAPTER 7 - FIRE AND SMOKE PROTECTION FEATURES
SECTION 706 - FIRE WALLS:
707.3.1 SHAFT ENCLOSURES: The fire-resistance rating of the fire barrier seperating building areas from a shaft shall comply with Section 713.4.
707.3.2 INTERIOR EXIT STAIRWAY AND RAMP CONSTRUCTION: The fire-resistance rating of the fire barrier separating building areas for an interior exit stairway or ramp shall comply with Section 1023.1.
707.3.3 ENCLOSURES FOR EXIT ACCESS STAIRWAYS: The fire-resistance rating of the fire barrier seperating building areas from an exit access stairway or ramp shall comply with Section 713.4.
SECTION 713 - SHAFT ENCLOSURES
713.4 FIRE-RESISTANCE RATING: Shaft enclosures haveing a fire-resistance rating of not less that 2 hours where connecting four stories or more, and not less than 1 hour where connecting less than four stories. The number of stories connected by the shaft enclosure shall include any basement but nor any mezzanines. Shaft enclosures shall have a fire-resistance rating not less than the floor assembly penetrated, but need not exceed 2 hours. Shaft enclosures shall meet the requiremnts of Section 703.2.1.
SECTION 714 - PENETRATIONS
714.6 NONFIRE-RESISTANCE-RATED ASSEMBLIES: Penetrations of nonfire-resistance-rated-floor or floor/ceiling assemblies or the ceiling membrane of a nonfire-resistance-rated roof/ceiling assembly shall meet the requirments of Section 713 or shall comply with Section
716.6.1 or 714.6.2.
714.6.1 NONCOMBUSTIBLE PENETRATION ITEMS: Noncombustible penetrating items that connect not more than five stories are permitted, provided that the annular space is filled to resist the free passage of flame and the products of combustion with an approved noncombustible material or with a fill, void or cavity material that is tested and classified for use in through-penetration firestop systems.
2024 INTERNATIONAL BUILDING CODE:
CHAPTER 3 - OCCUPANCY CLASSIFICATION AND USE
SECTION 302 - OCCUPANCY CLASSIFICATION
302.1 OCCUPANCY CLASSIFICATION: Occupancy classification is the formal designation of the primary purpose of the building, structure or portion thereof. Structures shall be classified into one or more of the occupancy groups listed in this section based on the nature of the hazard and risks to building occupants generally associated with the intended purpose of the building or structure. An area, room or space that is intended to be occupied at different times for different purposes shall comply with all applicable requirements associated with such potential multipurpose. Structures containing multiple occupancy groups shall comply with Section 508. Where a structure is proposed for a purpose that is not specifically listed in this section, such structure shall be classified in the occupancy it most nearly resembles based on the fire safety and relative hazard. Occupied roofs shall be classified in the group that the occupancy most nearly resembles, according to the fire safety and relative hazard, and shall comply with Section 503.1.4.
SECTION 303 – ASSEMBLY GROUP A
303.1.1 SMALL BUILDINGS AND TENANT SPACES: A building or tenant space used for assembly purposes with an occupant load of less than 50 persons shall be classified as a Group B occupancy.
303.1.2 Small assembly spaces. The following rooms and spaces shall not be classified as Assembly occupancies:
1. A room or space used for assembly purposes with an occupant load of less than 50 persons and accessory to another occupancy shall be classified as a Group B occupancy or as part of that occupancy.
2. A room or space used for assembly purposes that is less than 750 square feet (70 m2) in area and accessory to another occupancy shall be classified as a Group B occupancy or as part of that occupancy.
SECTION 304 – BUSINESS GROUP B
304.1 BUSINESS GROUP B: Business Group B occupancy includes, among others, the use of a building or structure, or a portion thereof, for office, professional or service-type transactions, including storage of records and accounts.
CHAPTER 5 - GENERAL BUILDING HEIGHTS AND AREAS
SECTION 502 - BUILDING ADDRESS
502.1 ADDRESS IDENTIFICATION: New and existing buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 1/2 inch (12.7 mm). Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other approved sign or means shall be used to identify the structure. Address identification shall be maintained.
SECTION 503 - GENERAL BUILDING HEIGHT AND AREA LIMITATIONS
503.1 GENERAL: Unless otherwise specifically modified in Chapter 4 and this chapter, building height, number of stories and building area shall not exceed the limits specified in Sections 504 and 506 based on the type of construction as determined by Section 602 and the occupancies as determined by Section 302 except as modified hereafter. Building height, number of stories and building area provisions shall be applied independently. For the purposes of determining area limitations, height limitations and type of construction, each portion of a building separated by one or more fire walls complying with Section 706 shall be considered to be a separate building.
503.1.2 BUILDINGS ON SAME LOT: Two or more buildings on the same lot shall be regulated as separate buildings or shall be considered as portions of one building where the building height, number of stories of each building and the aggregate building area of the buildings are within the limitations specified in Sections 504 and 506. The preovisions of this code applicable to the aggregate building shall be applicable to each building.
SECTION 504 - BIILDING HEIGHT AND NUMBER OF STORIES
504.1 General. The height, in feet, and the number of stories of a building shall be determined based on the type of construction, occupancy classification and whether there is an automatic sprinkler system installed throughout the building.
504.2 MIXED OCCUPANCY: In a building containing mixed occupancies in accordance with Section 508, no individual occupancy shall exceed the height and number of story limits specified in this section for the applicable occupancies.
504.3 HEIGHT IN FEET: The maximum height, in feet, of a building shall not exceed the limits specified in Table 504.3.
Based on Table 504.3, for a B Occupancy and Type III-A Construction for a Non-Sprinkled building the maximum height is 65'-0" (Actual Height = 25'-9")
504.4 NUMBER OF STORIES. The maximum number of stories of a building shall not exceed the limits specified in Table 504.4.
Based on Table 504.4, for a B Occupancy and Type III-A Construction for a Non-Sprinkled building the maximum number of stories is 3 (Actual Number of Stories = 2 plus basement)
CHAPTER 9 - FIRE PROTECTION AND LIFE SAFETY SYSTEMS
SECTION 903 - AUTOMATIC SPRINKLER SYSTEMS
903.2 WHERE REQUIRED: Approved automatic sprinkler systemsin new buildings and structures shall be provided in the locations described in Sections 903.2.1 through 903.2.12.
(This is an existing building that is not going through a Change of Occupancy)
903.2.2 GROUP B: An automatice sprinkler system shall be provided for Group B occupancies as required in Sections 903.2.2.1 and 903.2.2.2.
(The building doesn't have areas described in Sections 903.2.2.1 or 903.2.2.2)
SECTION 906 - PORTABLE FIRE EXTINGUISHERS
906.1 WHERE REQUIRED: Portable fire extinguishers shall be installed in all of the following locations:
1. In Group A, B, E, F, H, I, M, R-1, R-2 and S occupanciares.
906.3 SIZE AND DISTRIBUTION: The size and distribution of portable fire extinguishers shall be in accordance with Sections 906.3.1 through 906.3.4.
906.3.1 CLASS A FIRE HAZARDS: The minimum sizes and distribution of portable fire extinguishers for occupancies that involve primarily Class A fire hazards shall comply with Table 906.3(1).
Light (Low) Hazard Occupancy:
-Min-Rated Extinguisher: 2-A -Max Floor Area per Unit of A: 3,000sf -Max Floor Area per Extinguisher: 11,250sf -Max Travel Distance: 75ft
SECTION 907 - FIRE ALARM AND DETECTION SYSTEMS
907.2.2 GROUP B: A manual fire alarm system, which activates the occupant notification system in accordance with Section 907.5, shall be installed in Group B occupancies where one of the following conditions exists:
1. The combined Group B occupant of all floors is 500 or more.
(The occupant load is 475 in the south building)
2. The Group B occupant load is more than 100 persons above or below the lowest level of exit discharge.
(The main level of exit discharge has less than 100 persons above and below)
3. The fire are contains an ambulatory care facility. (It does not contain this).
A manual fire alarm system is installed throughout the building.
CHAPTER 10 - MEANS OF EGRESS
SECTION 1005 - MEANS OF EGRESS SIZING:
1005.3 REQUIRED CAPACITY BASED ON OCCUPANT LOAD: The required capacity, in inches (mm), of the means of egress for any room, area, space or story shall be not less than that determined in accordance with Sections 1005.3.1 and 1005.3.2:
1005.3.1 STAIRWAYS. The capacity, in inches, of means of egress stairways shall be calculated by multiplying the occupant load served by such stairways by a means of egress capacity factor of 0.3 inch per occupant. Where stairways serve more than one story, only the occupant load of each story considered individually shall be used in calculating the required capacity of the stairways serving that story.
1005.3.2 OTHER EGRESS COMPONENTS. The capacity, in inches, of means of egress components other than stairways shall be calculated by multiplying the occupant load served by such component by a means of egress capacity factor of 0.2 inch per occupant.
SECTION 1006 - NUMBER OF EXITS AND EXIT ACCESS DOORWAYS
1006.2.1 EGRESS BASED ON OCCUPANT LOAD AND COMMON PATH OF EGRESS
TRAVEL DISTANCE: Two exits or exit access doorways from any space shall be provided where the design occupant load or the common path of egress travel distance exceeds the values listed in Table 1006.2.1. The cumulative occupant load from adjacent rooms, areas or spaces shall be determined in accordance with Section 1004.2.
Occupancy B:
Max Occupant Load: 48 Max Common Path w/o Sprinkler </= 30: 100ft Max Common Path w/o Sprinkler >30: 75ft
SECTION 1007 - EXIT AND EXIT ACCESS DOORWAY CONFIGURATION
1007.1.1 TWO EXITS OR EXIT ACCESS DOORWAYS: Where two exits, exit access doorways, exit access stairways or ramps, or any combination thereof, are required from any portion of the exit access, they shall be places a distance apart equal to not less than one-half the length of the maximum overall diagonal dimension of the building or area to be served in a straight line between them.
SECTION 1011 – STAIRWAYS:
1011.2 WIDTH AND CAPACITY. The required capacity of stairways shall be determined as specified in Section 1005.1, but the minimum width shall be not less than 44 inches. See Section 1009.3 for accessible means of egress stairways.
Exceptions:
1. Stairways serving an occupant load of less than 50 shall have a width of not less than 36 inches.
SECTION 1017 - EXIT ACCESS TRAVEL DISTANCE
1017.2 LIMITATIONS: Exit access travel distance shall not exceed the calues given in Table 1017.2
Occupancy B w/o Sprinkler: 200ft
SECTION 1023 - INTERIOR EXIT STAIRWAYS AND RAMPS
1023.1 GENERAL. Interior exit stairways and ramps serving as an exit component in a means of egress system shall comply with the requirements of this section. Interior exit stairways and ramps shall be enclosed and lead directly to the exterior of the building or shall be extended to the exterior of the building with an exit passageway conforming to the requirements of Section 1024, except as permitted in Section 1028.2. An interior exit stairway or ramp shall not be used for any purpose other than as a means of egress and a circulation path.
SECTION 1024 – EXIT PASSAGEWAYS
1024.1 EXIT PASSAGEWAYS. Exit passageways serving as an exit component in a means of egress system shall comply with the requirements of this section. An exit passageway shall not be used for any purpose other than as a means of egress and a circulation path.
1024.3 CONSTRUCTION. Exit passageway enclosures shall have walls, floors and ceilings of not less than a 1-hour fire-resistance rating, and not less than that required for any connecting interior exit stairway or ramp. Exit passageways shall be constructed as fire barriers in accordance with Section 707 or horizontal assemblies constructed in accordance with Section 711, or both.
BUILDING CONDITIONS:
BUILDING HEIGHT: 25'-9"
NUMBER OF SOTIES: 2 + Basement BUILDING AREA: 14,967sf (2nd Level)
22,342sf (1st Level) 16,420sf (Basement) 53,729sf
TOTAL BUILDING AREA: 63,838sf (North Building) 116,567 (Total)
JESSIE PARKER - SOUTH BUILDING
JESSIE PARKER - NORTH BUILDING
OLA BABCOCK MILLER BUILDING
DES MOINES STREET
EAST GRAND STREET
E A
S T
T H
S T
R E
E T
'-4
/2
49'-1"
9'
-2
/2
103'-0"
Ph.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
B
A
C
D
E
F
G
H
J
K
L www.imegcorp.com
Des Moines, IA 50322
2822 106th Street
MEP Engineer
IMEG Corp.
515 334 9906
C op yr ig ht
S ub st an ce , L
LC
1300 Walnut Street, Suite 201 Des Moines, Iowa 50309 Ph. 515 243 4407 www.substancearchitecture.com
Revisions
Substance No.:
#9518
16 17 18
M
N
P
Date:
/1
/2
:4
:0
A M
A u to d e s k D o c s /0
-0
D
O M
-I T
J e s s ie
P a rk e r S o u th B u ild in g
R e n o v a ti o n
/D O
M -I
T J e s s ie
P a rk e r S o u th B ld g
R e n o
A R
C H
R
.r v t
D O
M -I
T D
O M
-I T
J e s s ie P a rk e r
S o u th
R e n o v a ti o n
D o c u m e n ts
G1.02
CODE SHEET
DOM-IT No.:
0719-01
April 10, 2026
STANDARD ACCESSIBILITY GUIDELINES
SCALE: 1" = 50'-0"1
Site Plan - Code
SC
SD
SE
SF
SG
SH
SB
S3S2S1 S5 S6 S7 S9 S12S11S10 S13
SA
S15
PLAN
NORTH
ELEVELEV
RECORDS
RECORDS
MOTHERS ROOM
STUD PARTITION OR EXTERIOR CAVITY WALL -
REFER TO WALL TYPE SHEET FOR ADDITIONAL INFO
CMU WALL
EXISTING WALLS AND BUILDING ELEMENTS TO
REMAIN ARE DRAWN IN HALFTONE
CAST-IN-PLACE WALL
WALLS AND BUILDING ELEMENTS TO BE
DEMOLISHED ARE DRAWN WITH DASHED LINES
1t
PARTITION GRAPHICS / PHASING LEGEND
O P
N G
4' -0
F
LR
OPNG
4'-0" FLR
DEMOLISHED ELEMENTS SHOWN IN
PROJECTION ARE SURROUNDED BY DASHED
LINES AND FILLED WITH A DIAGONAL HATCH
Ph.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
B
A
C
D
E
F
G
H
J
K
L www.imegcorp.com
Des Moines, IA 50322
2822 106th Street
MEP Engineer
IMEG Corp.
515 334 9906
C op yr ig ht
S ub st an ce , L
LC
1300 Walnut Street, Suite 201 Des Moines, Iowa 50309 Ph. 515 243 4407 www.substancearchitecture.com
Revisions
Substance No.:
#9518
16 17 18
M
N
P
Date:
/1
/2
:4
:3
A M
A u to d e s k D o c s /0
-0
D
O M
-I T
J e s s ie
P a rk e r S o u th B u ild in g
R e n o v a ti o n
/D O
M -I
T J e s s ie
P a rk e r S o u th B ld g
R e n o
A R
C H
R
.r v t
D O
M -I
T D
O M
-I T
J e s s ie P a rk e r
S o u th
R e n o v a ti o n
D o c u m e n ts
A0.80
DEMOLITION PLAN - LOWER LEVEL
DOM-IT No.:
0719-01
April 10, 2026
SCALE: 1/8" = 1'-0"A1
LOWER LEVEL DEMOLITION PLAN
DEMOLITION KEYNOTES
KEY NOTE
1 DEMO WALL BASE. (FLOORING TO BE DEMO'D W/ ABATEMENT NIC)
2 DEMO CARPET TILE AND WALL BASE. PREP FOR NEW FLOORING AND
BASE.
3 DEMO WALL AS NEEDED FOR NEW DOOR AND FRAME. VERIFY NO MEPT
CONFLICTS.
4 DEMO FLOORING AND WALL BASE. PREP FOR NEW FLOORING AND
BASE.
5 DEMO WINDOW COVERING
6 DEMO WALL, WALL BASE, DOOR/WINDOW/FRAME, AND ALL DEVICES
(DEMO CABELING BACK TO NEAREST J-BOX TO REMAIN). SALVAGE
DOOR/WINDOW/FRAME AS NEEDED FOR BUILD-BACK. TYP.
7 DEMO HANDRAIL (CUT FLUSH W/ FLOOR), GRIND TO BE BELOW FLOOR
SURFACE, PATCH FLOOR SLAB TO BE FLUSH AND SMOOTH WITH
SURROUNDING SURFACE.
8 DEMO CASEWORK AND COUNTER TOP. IF WALL TO REMAIN PREP/PATCH
FOR REPAINTING.
9 DEMO GLASS WALL AND FRAMING. SALVAGE END CAPS FOR
REINSTALLATION.
10 DEMO COUNTER AND PLUMBING FIXTURE. PREP FOR NEW.
11 DEMO GLASS WALL AND DOOR
12 DEMO WINDOW
13 DEMO WALL, WALL BASE, DOOR/WINDOW/FRAME, AND ALL DEVICES
(DEMO CABELING BACK TO NEAREST J-BOX TO REMAIN). SALVAGE
DOOR/WINDOW/FRAME AS NEEDED FOR BUILD-BACK. LEAVE 12"
BULKHEAD
14 DEMO/SALVAGE FOR REUSE FLOOR MOUNTED FIXTURES AND TOILET
PARTITIONS. DEMO CERAMIC TILE (MAINTAIN COVE WALL BASE), PREP
FOR NEW FLOORING.
15 DEMO WALL, WALL BASE, DOOR/WINDOW/FRAME, AND ALL DEVICES
(DEMO CABELING BACK TO NEAREST J-BOX TO REMAIN). SALVAGE
DOOR/WINDOW/FRAME AS NEEDED FOR BUILD-BACK. TYP. WALL TO BE
REBUILT W/ CLERESTROY WINDOWS AND ADDITIONAL FRAMING
SUPPORT ABOVE CEILING
16 SALVAGE DOOR AND TURN OVER TO OWNER.
17 SALVAGE DOOR AND FRAME FOR REUSE, MARK DOOR NUMBER W/ TAPE
AND COORDINATE W/ OWNER/CONTRACTOR FOR STORAGE LOCATION
18 DEMO RECEPTION DESK TO THE WEST OF COLUMN, DEMO COUNTER
UNDER GLASS TRANSACTION WINDOW (REMOVE/SALVAGE
TRANSACTION WINDOW LEAVING TRANSUM GLASS IN PLACE)
19 DEMO BASE CABINET, counter, AND SINK
20 DEMO WALL FOR NEW OPENING OR DOOR
21 DEMO DOOR, FRAME, AND SIDELIGHT (IF APPLICABLE)
DEMOLITION GENERAL NOTES
1 DEMO ANY ITEMS ON WALLS LEFT BY PREVIOUS TENANTS (IE.
SIGNANGE, VINYL GRAPHICS...)
2 DEMO/SALVAGE ALL FLOOR MOUNTED POWER/DATA "TOMBSTONES"
(GIVE TO OWNER FOR STORAGE), REMOVE WIRE, CAP ALL OPENINGS IN
FLOOR.
3 DEMO ALL VINYL WALL BASE THROUGHOUT.
4 DEMO ALL ROOM, DOOR SIGNS
SE
SF
SG
SH
SB
S3S2S1 S5 S6 S7 S9 S12S11S10 S13
SA
S15
PLAN
NORTH
ELEVELEV
CONFERENCE
BREAK ROOM
WORK ROOM
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
STORAGE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
STORAGE
OPEN OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
TRAINING
133132
1B
DISPLAY
LOBBY
STORAGE
5'-2"
10 10
5 5 555
555555555555
5 5 5 5 5 5
5 5 5 5
2 2
2 2
2 2
2 2 2 2
2 2 2 2
MEN
WOMEN
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CONFERENCE ROOM
HALLWAY
HALLWAY
STORAGE
HALLWAY
OPEN OFFICE
WORK ROOM
HALLWAY
HALLWAY
HALLWAY
HALLWAY
CONFERENCE RM
HALLWAY
OFFICE
OFFICE
2 158
OFFICE
2 159
OFFICE
2 160
OFFICE
HALLWAY
CONFERENCE ROOM
HALLWAY
RECEPTION / LOBBY
WAITING
VEST
MEN
WOMEN
14 14
A
A
A
B
104 103
102 101 100
A
B
A
143A
143B
ROOF
NIC NIC
+/- 13'-11 1/2" REM
1/
2"3' -4
'-8
3' -4
5'
-8
/2
3' -4
4"
2'-8"
3'-5" 7'-2 1/2" VIF
STUD PARTITION OR EXTERIOR CAVITY WALL -
REFER TO WALL TYPE SHEET FOR ADDITIONAL INFO
CMU WALL
EXISTING WALLS AND BUILDING ELEMENTS TO
REMAIN ARE DRAWN IN HALFTONE
CAST-IN-PLACE WALL
WALLS AND BUILDING ELEMENTS TO BE
DEMOLISHED ARE DRAWN WITH DASHED LINES
1t
PARTITION GRAPHICS / PHASING LEGEND
O P
N G
4' -0
F
LR
OPNG
4'-0" FLR
DEMOLISHED ELEMENTS SHOWN IN
PROJECTION ARE SURROUNDED BY DASHED
LINES AND FILLED WITH A DIAGONAL HATCH
Ph.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
B
A
C
D
E
F
G
H
J
K
L www.imegcorp.com
Des Moines, IA 50322
2822 106th Street
MEP Engineer
IMEG Corp.
515 334 9906
C op yr ig ht
S ub st an ce , L
LC
1300 Walnut Street, Suite 201 Des Moines, Iowa 50309 Ph. 515 243 4407 www.substancearchitecture.com
Revisions
Substance No.:
#9518
16 17 18
M
N
P
Date:
/1
/2
:4
:3
A M
A u to d e s k D o c s /0
-0
D
O M
-I T
J e s s ie
P a rk e r S o u th B u ild in g
R e n o v a ti o n
/D O
M -I
T J e s s ie
P a rk e r S o u th B ld g
R e n o
A R
C H
R
.r v t
D O
M -I
T D
O M
-I T
J e s s ie P a rk e r
S o u th
R e n o v a ti o n
D o c u m e n ts
A0.81
DEMOLITION PLAN - LEVEL 1
DOM-IT No.:
0719-01
April 10, 2026
SCALE: 1/8" = 1'-0"A1
LEVEL 1 DEMOLITION PLAN
DEMOLITION KEYNOTES
KEY NOTE
1 DEMO WALL BASE. (FLOORING TO BE DEMO'D W/ ABATEMENT NIC)
2 DEMO CARPET TILE AND WALL BASE. PREP FOR NEW FLOORING AND
BASE.
3 DEMO WALL AS NEEDED FOR NEW DOOR AND FRAME. VERIFY NO MEPT
CONFLICTS.
4 DEMO FLOORING AND WALL BASE. PREP FOR NEW FLOORING AND
BASE.
5 DEMO WINDOW COVERING
6 DEMO WALL, WALL BASE, DOOR/WINDOW/FRAME, AND ALL DEVICES
(DEMO CABELING BACK TO NEAREST J-BOX TO REMAIN). SALVAGE
DOOR/WINDOW/FRAME AS NEEDED FOR BUILD-BACK. TYP.
7 DEMO HANDRAIL (CUT FLUSH W/ FLOOR), GRIND TO BE BELOW FLOOR
SURFACE, PATCH FLOOR SLAB TO BE FLUSH AND SMOOTH WITH
SURROUNDING SURFACE.
8 DEMO CASEWORK AND COUNTER TOP. IF WALL TO REMAIN PREP/PATCH
FOR REPAINTING.
9 DEMO GLASS WALL AND FRAMING. SALVAGE END CAPS FOR
REINSTALLATION.
10 DEMO COUNTER AND PLUMBING FIXTURE. PREP FOR NEW.
11 DEMO GLASS WALL AND DOOR
12 DEMO WINDOW
13 DEMO WALL, WALL BASE, DOOR/WINDOW/FRAME, AND ALL DEVICES
(DEMO CABELING BACK TO NEAREST J-BOX TO REMAIN). SALVAGE
DOOR/WINDOW/FRAME AS NEEDED FOR BUILD-BACK. LEAVE 12"
BULKHEAD
14 DEMO/SALVAGE FOR REUSE FLOOR MOUNTED FIXTURES AND TOILET
PARTITIONS. DEMO CERAMIC TILE (MAINTAIN COVE WALL BASE), PREP
FOR NEW FLOORING.
15 DEMO WALL, WALL BASE, DOOR/WINDOW/FRAME, AND ALL DEVICES
(DEMO CABELING BACK TO NEAREST J-BOX TO REMAIN). SALVAGE
DOOR/WINDOW/FRAME AS NEEDED FOR BUILD-BACK. TYP. WALL TO BE
REBUILT W/ CLERESTROY WINDOWS AND ADDITIONAL FRAMING
SUPPORT ABOVE CEILING
16 SALVAGE DOOR AND TURN OVER TO OWNER.
17 SALVAGE DOOR AND FRAME FOR REUSE, MARK DOOR NUMBER W/ TAPE
AND COORDINATE W/ OWNER/CONTRACTOR FOR STORAGE LOCATION
18 DEMO RECEPTION DESK TO THE WEST OF COLUMN, DEMO COUNTER
UNDER GLASS TRANSACTION WINDOW (REMOVE/SALVAGE
TRANSACTION WINDOW LEAVING TRANSUM GLASS IN PLACE)
19 DEMO BASE CABINET, counter, AND SINK
20 DEMO WALL FOR NEW OPENING OR DOOR
21 DEMO DOOR, FRAME, AND SIDELIGHT (IF APPLICABLE)
DEMOLITION GENERAL NOTES
1 DEMO ANY ITEMS ON WALLS LEFT BY PREVIOUS TENANTS (IE.
SIGNANGE, VINYL GRAPHICS...)
2 DEMO/SALVAGE ALL FLOOR MOUNTED POWER/DATA "TOMBSTONES"
(GIVE TO OWNER FOR STORAGE), REMOVE WIRE, CAP ALL OPENINGS IN
FLOOR.
3 DEMO ALL VINYL WALL BASE THROUGHOUT.
SE
SF
SG
SH
SB
S3S2
S1
S1 S5 S6 S7 S9 S12S11S10 S13
SA
S15
PLAN
NORTH
ELEVELEV
STAIR
JS214
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
STORAGE
CONFERENCE
WORK ROOM
STORAGE
STORAGE
OFFICE
OFFICE
STORAGE
STORAGE 209
OPEN OFFICE
CONFERENCE
CONFERENCE
2A
2B
7A
7B
OPEN OFFICE
7 7 7
3'-3 1/2"9
55555555555
5 5 5 5 5 5
MEN
WOMEN
CONFERENCE RM
OFFICE
LOBBY
OPEN OFFFICE
HALLWAY
WORK ROOM
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
HALLWAY
OPEN OFFICE 2
HALLWAY
OFFICE
2 240
OFFICE
2 239
OFFICE
2 238
OFFICE
2 237
OFFICE
2 236
OFFICE
HALLWAY
RECEPTION
2 234
OFFICE
CONFERENCE RM
OFFICE
CONFERENCE RM
B
A
ROOF
A
STUD PARTITION OR EXTERIOR CAVITY WALL -
REFER TO WALL TYPE SHEET FOR ADDITIONAL INFO
CMU WALL
EXISTING WALLS AND BUILDING ELEMENTS TO
REMAIN ARE DRAWN IN HALFTONE
CAST-IN-PLACE WALL
WALLS AND BUILDING ELEMENTS TO BE
DEMOLISHED ARE DRAWN WITH DASHED LINES
1t
PARTITION GRAPHICS / PHASING LEGEND
O P
N G
F L R
OPNG
4'-0" FLR
DEMOLISHED ELEMENTS SHOWN IN
PROJECTION ARE SURROUNDED BY DASHED
LINES AND FILLED WITH A DIAGONAL HATCH
Ph.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
B
A
C
D
E
F
G
H
J
K
L www.imegcorp.com
Des Moines, IA 50322
2822 106th Street
MEP Engineer
IMEG Corp.
515 334 9906
C op yr ig ht
S ub st an ce , L
LC
1300 Walnut Street, Suite 201 Des Moines, Iowa 50309 Ph. 515 243 4407 www.substancearchitecture.com
Revisions
Substance No.:
#9518
16 17 18
M
N
P
Date:
/1
/2
:0
:0
A M
A u to d e s k D o c s /0
-0
D
O M
-I T
J e s s ie
P a rk e r S o u th B u ild in g
R e n o v a ti o n
/D O
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .