RFB927930-02 - WRC Phase 3 Issuance 2 - Project Manual (4 of 4).pdf
PDF 1 MB Posted
- Attached to
- WRC Phase 3 Issuance 2
- Solicitation number
- RFB927930-02
- Issued by
- Dallas County, Woodbine City, Iowa
About this file
The provided document is a project manual for the WRC Decentralization Phase 3 IDAS Project #9279.30, which is being issued by the Department of Administrative Services for work at the Woodward Resource Center located in Woodward, Iowa. The project involves the installation of a direct-digital control system for the HVAC system, with specifications provided for various components such as relays, controllers, and network interfaces. The project is located in Dallas County and the city of Woodbine, within the state of Iowa.
The document outlines the technical requirements for the HVAC control system, including accuracy, housing, and other performance specifications. Bids for this project are being solicited, with a bid submission deadline of January 11, 2024. The contract term and any renewal options are not explicitly stated in the provided information.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WRC Decentralization Phase 3 IDAS Project # 9279.30 SH Project # 2142203394
Direct-Digital Control System for
HVAC
23 0923 - 24
Issued for Bid 01-11-2024
e. Relay shall be in a dustproof housing.
f. 6. Accuracy to be <2% of full-scale max.
g. Temperature rating of 5˚F to 140˚F.
h. Whenever the status of a single speed motor is monitored it shall be done via a current sensing relay.
i. The BMS contractor shall provide current sensing relays at the MCC starters.
j. The BMS contractor shall provide the current sensing relays for motors with local starters and no MCC starter.
H. Override Timers:
1. Unless implemented in control software, override timers shall be spring-wound line voltage, UL Listed, with contact rating and configuration required by application. Provide 0–6 hour calibrated dial unless otherwise specified. Flush mount timer on local control panel face or where shown.
I. Current Transmitters:
1. AC current transmitters shall be self-powered, combination split-core current transformer type with built-in rectifier and high-gain servo amplifier with 4–20 mA two-wire output. Full-scale unit ranges shall be 10 A, 20 A, 50 A, 100 A, 150 A, and 200 A, with internal zero and span adjustment. Unit accuracy shall be ±1% full-scale at 500 ohm maximum burden.
2. Transmitter shall meet or exceed ANSI/ISA S50.1 requirements and shall be UL/CSA recognized.
3. Unit shall be split-core type for clamp-on installation on existing wiring.
J. Current Transformers:
1. Control transformers shall be UL listed, Class 2 current-limiting type, or shall be furnished with over-current protection in both primary and secondary circuits for Class 2 service.
2. Unit output shall match the required output current and voltage requirements. Current output shall allow for a 50% safety factor. Output ripple shall be 3.0 mV maximum Peak-to-Peak. Regulation shall be 0.10% line and load combined, with 50 microsecond response time for 50% load changes. Unit shall have built-in over-voltage protection.
3. Unit shall operate between 32 °F to 122 °F (0° C and 50° C).
4. Transformers shall be available in various current ratios and shall be selected for ±1% accuracy at 5 A full-scale output.
5. Use fixed-core transformers for new wiring installation and split-core transformers for existing wiring installation.
K. Voltage Transmitters:
1. AC voltage transmitters shall be self-powered single-loop (two-wire) type, 4–20 mA output with zero and span adjustment.
2. Adjustable full-scale unit ranges shall be 100–130 Vac, 200–250 Vac, 250–330 Vac, and 400–600 Vac. Unit accuracy shall be ±1% full-scale at 500 ohm maximum burden.
3. Transmitters shall meet or exceed ANSI/ISA S50.1 requirements and shall be UL/CSA recognized at 600 Vac rating.
Issued for Bid 01-11-2024
Direct-Digital Control System for
HVAC
23 0923 - 25
L. Voltage Transformers:
1. AC voltage transformers shall be UL/CSA recognized, 600 Vac rated, and shall have built-in fuse protection.
2. Transformers shall be suitable for ambient temperatures of 4°C–55°C (40°F–130°F) and shall provide ±0.5% accuracy at 24 Vac and 5 VA load.
3. Windings (except for terminals) shall be completely enclosed with metal or plastic.
M. Power Monitors:
1. Selectable rate pulse output for kWh reading, 4–20 mA output for kW reading, N.O. alarm contact, and ability to operate with 5.0 amp current inputs or 0–0.33 volt inputs.
2. 1.0% full-scale true RMS power accuracy, +0.5 Hz, voltage input range 120–600 V, and auto range select.
3. Under voltage/phase monitor circuitry.
4. NEMA 1 enclosure.
5. Current transformers having a 0.5% FS accuracy, 600 VAC isolation voltage with 0–0.33
V output. If 0–5 A current transformers are provided, a three-phase disconnect/shorting switch assembly is required.
N. Current Switches:
1. Current-operated switches shall be self-powered, solid-state with adjustable trip current.
Select switches to match application current and DDC system output requirements.
O. Pressure Transducers:
1. Transducers shall have linear output signal and field-adjustable zero and span.
2. Transducer sensing elements shall withstand continuous operating conditions of positive or negative pressure 50% greater than calibrated span without damage.
3. Water pressure transducer diaphragm shall be stainless steel with minimum proof pressure of 1000 kPa (150 psi). Transducer shall have 4–20 mA output, suitable mounting provisions, and block and bleed valves.
4. Water differential pressure transducer diaphragm shall be stainless steel with minimum proof pressure of 1000 kPa (150 psi). Over-range limit (differential pressure) and maximum static pressure shall be 2000 kPa (300psi). Transducer shall have 4–20 mA output, suitable mounting provisions, and 5-valve manifold.
P. Local Control Panels:
1. All indoor control cabinets shall be fully enclosed NEMA 1 construction with (hinged door) key-lock latch and removable subpanels. A single key shall be common to all field panels and subpanels.
2. Interconnections between internal and face-mounted devices shall be prewired with color-coded stranded conductors neatly installed in plastic troughs and/or tie-wrapped.
Terminals for field connections shall be UL listed for 600 volt service, individually identified per control/ interlock drawings, with adequate clearance for field wiring. Control terminations for field connection shall be individually identified per control drawings.
3. Provide ON/OFF power switch with overcurrent protection for control power sources to each local panel.
23 0923 - 26
Issued for Bid 01-11-2024
Q. Combination Room Temperature Sensor:
1. Occupant-focused, communicating room sensor, providing precise temperature sensing for an all-in-one room device.
2. Device shall be a combination temperature sensor and input array that communicates with field controller.
a. On board temperature sensor:
1) Range of 41˚F to 104˚F.
2) Accuracy of 0.9˚F.
3) Resolution of 0.18˚F.
3. Dual connector ports for field controller connection shall support both power and communication, with provision for “daisy-chain” connection, so that more than one communicating sensor can be used with a single field controller. Dual connector ports shall be female RJ45 ports, and shall be compatible with standard Ethernet pinout T568B.
4. Hardware options in combinations in any and all of the following:
a. Temperature Setpoint Offset Adjustment:
1) “Infinite” Rotary Knob for setpoint offset.
R. Discrete Combination Sensor:
1. Discrete communicating sensor combining precise environmental sensing – temperature and humidity for applications requiring no occupant driven overrides.
2. Dual connector ports for connection to field controller shall support both power and communication, with provision for “daisy-chain” connection, so that more than one communicating sensor can be used with a single field controller. Dual connector ports shall be female RJ45 ports, and shall be compatible with standard Ethernet pinout T568B.
3. Hardware options in combinations of any and all of the following:
a. On board temperature sensor:
1) Range of 41˚F to 104˚F.
2) Accuracy of 0.9˚F.
3) Resolution of 0.18˚F.
b. On-board humidity sensor:
1) Accuracy of 3% RH
2) Resolution of 1% RH
S. Variable Frequency Drives:
1. All VFDs shall be provided, mounted and installed by the Division 26 Contractor. Refer to 26 2923 - Variable-Frequency Motor Controllers for requirements.
2.12 WIRING AND RACEWAYS
A. General. Provide copper wiring, plenum cable, and raceways as specified in applicable sections of Division 26.
B. Insulated wire shall use copper conductors and shall be UL listed for 90°C (200°F) minimum service.
Direct-Digital Control System for
HVAC
23 0923 - 27
C. Wire shall be a minimum of #18 gauge, color coded, stranded wire for all low voltage, electronic circuit with "spares" installed (one for every group of 10 wires) in conduit.
D. Coordinate the requirements for 120V circuits for the ASC's. All control transformers shall be the responsibility of this contractor. Reference the electrical drawings for circuit locations.
E. All BACNet IP and/or Ethernet cabling based connections shall be the responsibility of the Temperature Controls Contractor. Coordinate cable type, termination location, and cable routing with owner’s IT personnel.
PART 3 EXECUTION
3.1 GENERAL
A. All HVAC equipment control points recognized by the controllers, both factory and field installed, shall be integrated into the new BAS for full control and manipulation via the operator's interface/workstation.
1. The BAS personnel must utilize their own license while on site and not use the Owner's license to access the control system.
B. Each piece of equipment with potential of being automatically locked out of operation due to unit fault(s) shall be capable of being reset remotely from the Owner's workstation. Specific procedures to do so shall be demonstrated for each type of equipment installed on this project.
C. Owner's requirements for graphics:
1. Nomenclature used must be consistent throughout all graphics.
2. All graphics to be adjusted accordingly to reduce clutter. Additional page(s) must be added in required. Boxes shall not be used unless necessary.
3. HVAC equipment to have animated fans, pumps, water flow, air flow, etc. to indicate actual conditions (status not commanded state).
4. Home page should include links for each major piece of equipment (air handling unit, chiller, boiler, lighting, utilities, exhaust fans, etc.).
5. Display the fire alarm activation point on the home page.
6. Display outside air temperature and humidity at top of each graphics page.
7. Floor plan graphics should indicate location of duct static sensors, outside air reference sensor, building static sensor, differential pressure transmitter (water), gas meter, water meter, GPM meters, etc.
8. Graphics must exactly match the equipment and components to reflect the actual items installed.
9. Each graphics page shall contain a link to the control diagram and sequence for that particular piece of equipment.
10. The 'effective set point' shall be displayed on each graphic.
11. Thermostat adjustment shall be displayed on each graphic.
12. Provide floor plan graphics with accurate room numbers in large print with a selectable box displaying the room temperature. Selecting the temperature box will open that specific room's unit graphic.
23 0923 - 28
Issued for Bid 01-11-2024
13. Provide direct link to sequence of operation from the graphic page for each piece of equipment.
14. Show run time hours for each piece of equipment (i.e., pumps) that has a rotation schedule.
15. Provide summary page to show current data for all heat pump/terminal units.
16. All major equipment home page shall have a descriptor of area(s) served and associated terminal boxes/units if applicable.
17. Labels shown on graphic shall be intuitive (i.e., dampers and valves should show percent open or open/closed if two position, heat pump reversing valves should read heat/cool).
3.2 EXAMINATION
A. Verify existing conditions before starting work. Any discrepancies, conflicts, or omissions shall be reported to the engineer for resolution before rough-in work is started.
B. Verify that conditioned power supply is available to the control units and to the operator workstation. Verify that field end devices, wiring, and pneumatic tubing is installed prior to installation proceeding.
C. The project plans shall be thoroughly examined for control device and equipment locations.
Any discrepancies, conflicts, or omissions shall be reported to the architect/engineer for resolution before rough-in work is started.
D. The contractor shall examine the drawings and specifications for other parts of the work. If head room or space conditions appear inadequate—or if any discrepancies occur between the plans and the contractor’s work and the plans and the work of others—the contractor shall report these discrepancies to the engineer and shall obtain written instructions for any changes necessary to accommodate the contractor’s work with the work of others. Any changes in the work covered by this specification made necessary by the failure or neglect of the contractor to report such discrepancies shall be made by—and at the expense of—this contractor.
3.3 PROTECTION
A. The contractor shall protect all work and material from damage by his/her work or employees and shall be liable for all damage thus caused.
B. The contractor shall be responsible for his/her work and equipment until finally inspected, tested, and accepted. The contractor shall protect any material that is not immediately installed. The contractor shall close all open ends of work with temporary covers or plugs during storage and construction to prevent entry of foreign objects.
3.4 COORDINATION
A. Site:
1. Where the mechanical work will be installed in close proximity to, or will interfere with, work of other trades, the contractor shall assist in working out space conditions to make a satisfactory adjustment. If the contractor installs his/her work before coordinating with other trades, so as to cause any interference with work of other trades, the contractor shall make the necessary changes in his/her work to correct the condition without extra charge.
2. Coordinate and schedule work with other work in the same area and with work dependent upon other work to facilitate mutual progress.
Direct-Digital Control System for
HVAC
23 0923 - 29
B. Test and Balance:
1. The contractor shall furnish a single set of all tools necessary to interface to the control system for test and balance purposes.
2. The contractor shall provide training in the use of these tools. This training will be planned for a minimum of 4 hours.
3. In addition, the contractor shall provide a qualified technician to assist in the test and balance process, until the first 20 terminal units are balanced.
4. The tools used during the test and balance process will be returned at the completion of the testing and balancing.
C. Coordination with controls specified in other sections or divisions: Other sections and/or divisions of this specification include controls and control devices that are to be part of or interfaced to the control system specified in this section. These controls shall be integrated into the system and coordinated by the contractor as follows:
1. All communication media and equipment shall be provided as specified in this Section.
2. Each supplier of a controls product is responsible for the configuration, programming, start up, and testing of that product to meet the sequences of operation described on the plans.
3. The contractor shall coordinate and resolve any incompatibility issues that arise between control products provided under this section and those provided under other sections or divisions of this specification.
4. The contractor is responsible for providing all controls described in the contract documents regardless of where within the contract documents these controls are described.
5. The contractor is responsible for the interface of control products provided by multiple suppliers regardless of where this interface is described within the contract documents.
3.5 GENERAL WORKMANSHIP
A. Install equipment, piping, and wiring/raceway parallel to building lines (i.e., horizontal, vertical, and parallel to walls) wherever possible.
B. Provide sufficient slack and flexible connections to allow for vibration of piping and equipment.
C. Install equipment in readily accessible locations as defined by Chapter 1 Article 100 Part A of the National Electrical Code (NEC).
D. Verify integrity of all wiring to ensure continuity and freedom from shorts and grounds.
E. All equipment, installation, and wiring shall comply with industry specifications and standards for performance, reliability, and compatibility and be executed in strict adherence to local codes and standard practices.
3.6 FIELD QUALITY CONTROL
A. All work, materials, and equipment shall comply with rules and regulations of applicable local, state, and federal codes and ordinances as identified in Part 1 of this Section.
B. Contractor shall continually monitor the field installation for code compliance and quality of workmanship.
23 0923 - 30
Issued for Bid 01-11-2024
C. Contractor shall have work inspection by local and/or state authorities having jurisdiction over the work.
3.7 ELECTRICAL POWER
A. The contractor is responsible for providing all required electrical power to the temperature control system.
3.8 WIRING:
A. All control and interlock wiring shall comply with national and local electrical codes, and Division 26 of this specification. Where the requirements of this section differ from Division 26, the requirements of this section shall take precedence.
B. All NEC Class 1 (line voltage) wiring shall be UL listed in approved raceway according to NEC and Division 26 requirements.
C. All low-voltage wiring shall meet NEC Class 2 requirements. Low-voltage power circuits shall be subfused when required to meet Class 2 current limit.
D. Where NEC Class 2 (current-limited) wires are in concealed and accessible locations, including ceiling return air plenums, approved cables not in raceway may be used provided that cables are UL listed for the intended application.
E. All wiring in mechanical, electrical, or service rooms – or where subject to mechanical damage
– shall be installed in raceway (conduit).
F. Do not install Class 2 wiring in raceways containing Class 1 wiring. Boxes and panels containing high-voltage wiring and equipment may not be used for low-voltage wiring except for the purpose of interfacing the two (e.g., relays and transformers).
G. Do not install wiring in raceway containing tubing.
H. Where Class 2 wiring is run exposed, wiring is to be run parallel along a surface or perpendicular to it and neatly tied at 3 m (10 ft) intervals.
I. Where plenum cables are used without raceway, they shall be supported from or anchored to structural members. Cables shall not be supported by or anchored to ductwork, electrical raceways, piping, or ceiling suspension systems.
J. All wire-to-device connections shall be made at a terminal block or terminal strip. All wire-to-wire connections shall be at a terminal block.
K. All wiring within enclosures shall be neatly bundled and anchored to permit access and prevent restriction to devices and terminals.
L. Maximum allowable voltage for control wiring shall be 120 V. If only higher voltages are available, the contractor shall provide step-down transformers.
M. All wiring shall be installed as continuous lengths, with no splices permitted between termination points.
N. Install plenum wiring in sleeves where it passes through walls and floors. Maintain fire rating at all penetrations.
O. All exposed wiring shall be plenum rated.
P. Size of raceway and size and type of wire type shall be the responsibility of the contractor in keeping with the manufacturer’s recommendations and NEC requirements, except as noted elsewhere.
Direct-Digital Control System for
HVAC
23 0923 - 31
Q. Include one pull string in each raceway 2.5 cm (1 in.) or larger.
R. Use color-coded conductors throughout with conductors of different colors.
S. Control and status relays are to be located in designated enclosures only. These enclosures include packaged equipment control panel enclosures unless they also contain Class 1 starters.
T. Conceal all raceways except within mechanical, electrical, or service rooms. Install raceway to maintain a minimum clearance of 15 cm (6 in.) from high-temperature equipment (e.g., steam pipes or flues).
U. Secure raceways with raceway clamps fastened to the structure and spaced according to code requirements. Raceways and pull boxes may not be hung on flexible duct strap or tie rods.
Raceways may not be run on or attached to ductwork.
V. Adhere to this specification's Division 26 requirements where raceway crosses building expansion joints.
W. Install insulated bushings on all raceway ends and openings to enclosures. Seal top end of vertical raceways.
X. The contractor shall terminate all control and/or interlock wiring and shall maintain updated (as-built) wiring diagrams with terminations identified at the job site.
Y. Flexible metal raceways and liquid-tight flexible metal raceways shall not exceed 1 m (3 ft) in length and shall be supported at each end. Flexible metal raceway less than ½ in. electrical trade size shall not be used. In areas exposed to moisture, including chiller and boiler rooms, liquid-tight, flexible metal raceways shall be used.
Z. Raceway must be rigidly installed, adequately supported, properly reamed at both ends, and left clean and free of obstructions. Raceway sections shall be joined with couplings (according to code). Terminations must be made with fittings at boxes, and ends not terminating in boxes shall have bushings installed.
3.9 COMMUNICATION WIRING
A. The contractor shall adhere to the items listed in the "Wiring" article in Part 3 of the specification.
B. All cabling shall be installed in a neat and workmanlike manner. Follow manufacturer's installation recommendations for all communication cabling.
C. Do not install communication wiring in raceways and enclosures containing Class 1 or other Class 2 wiring.
D. Maximum pulling, tension, and bend radius for the cable installation, as specified by the cable manufacturer, shall not be exceeded during installation.
E. Contractor shall verify the integrity of the entire network following cable installation. Use appropriate test measures for each particular cable.
F. When a cable enters or exits a building, a lightning arrestor must be installed between the lines and ground. The lighting arrestor shall be installed according to manufacturer’s instructions.
G. All runs of communication wiring shall be unspliced length when that length is commercially available.
H. All communication wiring shall be labeled to indicate origination and destination data.
23 0923 - 32
Issued for Bid 01-11-2024
I. Grounding of coaxial cable shall be in accordance with NEC regulations article on "Communications Circuits, Cable, and Protector Grounding."
J. BACnet MS/TP communications wiring shall be installed in accordance with ASHRAE/ANSI Standard 135. This includes but is not limited to:
1. The network shall use shielded, twisted-pair cable with characteristic impedance between 100 and 120 ohms. Distributed capacitance between conductors shall be less than 100 pF per meter (30 pF per foot.)
2. The maximum length of an MS/TP segment is 1200 meters (4000 ft) with AWG 18 cable.
The use of greater distances and/or different wire gauges shall comply with the electrical specifications of EIA-485.
3. The maximum number of nodes per segment shall be 32, as specified in the EIA 485 standard. Additional nodes may be accommodated by the use of repeaters.
4. An MS/TP EIA-485 network shall have no T connections.
3.10 INSTALLATION OF SENSORS
A. Install sensors in accordance with the manufacturer's recommendations.
B. Mount sensors rigidly and adequately for environment within which the sensor operates.
C. Room temperature sensors shall be installed on concealed junction boxes properly supported by wall framing.
D. Check and verify location of thermostats with plans and room details before installation. Install thermostats 48 inches above floor to meet the Americans with Disabilities Act (ADA). Align with lighting switches and humidistats.
E. All wires attached to sensors shall be sealed in their raceways or in the wall to stop air transmitted from other areas from affecting sensor readings.
F. All pipe-mounted temperature sensors shall be installed in wells. Install liquid temperature sensors with heat-conducting fluid in thermal wells.
G. Install outdoor air temperature sensors on north wall, complete with sun shield at designated location.
H. Install humidity sensors for duct mounted humidifiers at least 3 m (10 ft) downstream of the humidifier. Do not install filters between the humidifier and the sensor.
3.11 FLOW SWITCH INSTALLATION
A. Use correct paddle for pipe diameter.
B. Adjust flow switch according to manufacturer's instructions.
3.12 ACTUATORS
A. General: Mount and link control damper actuators according to manufacturer's instructions.
1. To compress seals when spring-return actuators are used on normally closed dampers, power actuator to approximately 5° open position, manually close the damper, and then tighten the linkage.
2. Check operation of damper/actuator combination to confirm that actuator modulates damper smoothly throughout stroke to both open and closed positions.
Direct-Digital Control System for
HVAC
23 0923 - 33
3. Provide all mounting hardware and linkages for actuator installation.
B. Electric/Electronic:
1. Dampers: Actuators shall be direct mounted on damper shaft or jackshaft unless shown as a linkage installation. For low-leakage dampers with seals, the actuator shall be mounted with a minimum 5° travel available for tightening the damper seal. Actuators shall be mounted following manufacturer’s recommendations.
2. Valves: Actuators shall be connected to valves with adapters approved by the actuator manufacturer. Actuators and adapters shall be mounted following the actuator manufacturer's recommendations.
3.13 CONTROL VALVE INSTALLATION
A. Valve submittals shall be coordinated for type, quantity, size, and piping configuration to ensure compatibility with pipe design.
B. Slip-stem control valves shall be installed so that the stem position is not more than 60 degrees from the vertical up position. Ball type control valves shall be installed with the stem in the horizontal position.
C. Valves shall be installed in accordance with the manufacturer's recommendations.
D. Control valves shall be installed so that they are accessible and serviceable and so that actuators may be serviced and removed without interference from structure or other pipes and/or equipment.
E. Isolation valves shall be installed so that the control valve body may be serviced without draining the supply/return side piping system. Unions shall be installed at all connections to screw-type control valves.
F. Provide tags for all control valves indicating service and number. Tags shall be brass, 1-1/2 inch in diameter, with 1/4 inch high letters. Securely fasten with chain and hook. Match identification numbers as shown on approved controls shop drawings.
3.14 CONTROL DAMPER INSTALLATION
A. Damper submittals shall be coordinated for type, quantity, and size to ensure compatibility with sheet metal design.
B. Duct openings shall be free of any obstruction or irregularities that might interfere with blade or linkage rotation or actuator mounting. Duct openings shall measure 1/4 inch larger than damper dimensions and shall be square, straight, and level.
C. Individual damper sections, as well as entire multiple section assemblies, must be completely square and free from racking, twisting, or bending. Measure diagonally from upper corners to opposite lower corners of each damper section. Both dimensions must be within 0.3 cm (1/8 in.) of each other.
D. Follow the manufacturer's instructions for field installation of control dampers. Unless specifically designed for vertical blade application, dampers must be mounted with blade axis horizontal.
E. Install extended shaft or jackshaft according to manufacturer’s instructions. (Typically, a sticker on the damper face shows recommended extended shaft location. Attach shaft on labeled side of damper to that blade.)
23 0923 - 34
Issued for Bid 01-11-2024
F. Damper blades, axles, and linkage must operate without binding. Before system operation, cycle damper after installation to ensure proper operation. On multiple section assemblies, all sections must open and close simultaneously.
G. Provide a visible and accessible indication of damper position on the drive shaft end.
H. Support ductwork in area of damper when required to prevent sagging due to damper weight.
I. After installation of low-leakage dampers with seals, caulk between frame and duct or opening to prevent leakage around perimeter of damper.
3.15 PACKAGED EQUIPMENT CONTROLS
A. General: The electronic controls packaged with any equipment furnished under this contract shall communicate with the building direct digital control (DDC) system. The DDC system shall communicate with these controls to read the information and change the control setpoints as shown in the points list, sequences of operation, and control schematics. The information to be communicated between the DDC system and these controls shall be in the standard object format as defined in ANSI/ASHRAE Standard 135 (BACnet). Controllers shall communicate with other BACnet objects on the internetwork using the Read (Execute) Property service as defined in Clause 15.5 of Standard 135.
B. Distributed Processing: The controller shall be capable of stand-alone operation and shall continue to provide control functions if the network connection is lost.
C. I/O Capacity: The controller shall contain sufficient I/ O capacity to control the target system.
D. The Controller shall have a physical connection for a laptop computer or a portable operator’s tool.
E. Environment: The hardware shall be suitable for the anticipated ambient conditions.
1. Controllers used outdoors and/or in wet ambient conditions shall be mounted within waterproof enclosures and shall be rated for operation at 40°C to 60°C (40°F to 140°F).
2. Controllers used in conditioned space shall be mounted in dust-proof enclosures and shall be rated for operation at 0°C to 50°C (32°F to 120°F).
F. Serviceability: Provide diagnostic LEDs for power, communication, and processor. All wiring connections shall be made to field removable, modular terminal strips or to a termination card connected by a ribbon cable.
G. Memory: The Controller shall maintain all BIOS and programming information in the event of a power loss for at least 30 days.
H. Power: Controller shall be able to operate at 90% to 110% of nominal voltage rating.
I. Transformer: Power supply for the Controller must be rated at minimum of 125% of ASC power consumption and shall be fused or current limiting type.
3.16 WARNING LABELS
A. Permanent warning labels shall be affixed to all equipment that can be automatically started by the control system.
1. Labels shall use white lettering (12-point type or larger) on a red background.
Direct-Digital Control System for
HVAC
23 0923 - 35
2. Warning labels shall read as follows:
C A U T I O N
This equipment is operating under automatic control and may start or stop at any time without warning. Switch disconnect to "Off" position before servicing.
B. Permanent warning labels shall be affixed to all motor starters and control panels that are connected to multiple power sources utilizing separate disconnects.
1. Labels shall use white lettering (12-point type or larger) on a red background.
2. Warning labels shall read as follows:
C A U T I O N This equipment is fed from more than one power source with separate disconnects. Disconnect all power sources before servicing.
3.17 IDENTIFICATION OF HARDWARE AND WIRING
A. All wiring and cabling, including that within factory-fabricated panels shall be labeled at each end within 5 cm (2 in.) of termination with control system address or termination number.
B. All pneumatic tubing shall be labeled at each end within 5 cm (2 in.) of termination with a descriptive identifier.
C. Permanently label or code each point of field terminal strips to show the instrument or item served.
D. Identify control panels with minimum 1 cm (½ in.) letters on laminated plastic nameplates.
E. Identify all other control components with permanent labels. All plug-in components shall be labeled such that label removal of the component does not remove the label.
F. Identify room sensors related to terminal boxes or valves with nameplates.
G. Manufacturers' nameplates and UL or CSA labels shall be visible and legible after equipment is installed.
H. Identifiers shall match record documents.
3.18 CONTROLLERS
A. Provide a separate controller for each HVAC system. A DDC controller may control more than one system provided that all points associated with the system are assigned to the same DDC controller. Points used for control loop reset, such as outside air or space temperature, are exempt from this requirement.
B. Building Controllers and Custom Application Controllers shall be selected to provide the required I/O point capacity required to monitor all of the hardware points.
3.19 PROGRAMMING
A. Provide sufficient internal memory for the specified sequences of operation and trend logging.
B. Point Naming: Name points as shown on the equipment points list provided with each sequence of operation. If character limitations or space restrictions make it advisable to shorten the name, provide a list of abbreviations in the submittals. Where multiple points with the same name reside in the same controller, each point name may be customized with its associated Program Object number. For example, "Zone Temp 1" for Zone 1, "Zone Temp 2" for Zone 2.
23 0923 - 36
Issued for Bid 01-11-2024
C. Software Programming:
1. Provide programming for the system and adhere to the sequences of operation provided.
All other system programming necessary for the operation of the system, but not specified in this document, also shall be provided by the contractor. Embed into the control program sufficient comment statements to clearly describe each section of the program.
The comment statements shall reflect the language used in the sequences of operation.
Use the appropriate technique based on the following programming types:
a. Text-based:
1) Must provide actions for all possible situations.
2) Must be modular and structured.
3) Must be commented.
b. Graphic-based:
1) Must provide actions for all possible situations.
2) Must be documented.
c. Parameter-based:
1) Must provide actions for all possible situations.
2) Must be documented.
D. Operator Interface:
1. Standard Graphics. Provide graphics for all mechanical systems and floor plans of the building. This includes each chilled water system, hot water system, chiller, boiler, air handler, and all terminal equipment. Point information on the graphic displays shall dynamically update. Show on each graphic all relevant input and output points for that equipment. Also show relevant calculated points such as setpoints. As a minimum, show on each equipment graphic the input and output points and relevant calculated points as indicated on the drawings.
2. The contractor shall provide all the labor necessary to install, initialize, start up, and troubleshoot all operator interface software and its functions as described in this section.
This includes any operating system software, the operator interface database, and any third-party software installation and integration required for successful operation of the operator interface.
3.20 CONTROL SYSTEM CHECKOUT AND TESTING
A. Startup Testing. All testing listed in this article shall be performed by the contractor and shall make up part of the necessary verification of an operating control system. This testing shall be completed before the owner’s representative is notified of the system demonstration.
1. The contractor shall furnish all labor and test apparatus required to calibrate and prepare for service of all instruments, controls, and accessory equipment furnished under this specification.
2. Verify that all control wiring is properly connected and free of all shorts and ground faults.
Verify that terminations are tight.
3. Enable the control systems and verify calibration of all input devices individually. Perform calibration procedures according to manufacturers’ recommendations.
Direct-Digital Control System for
HVAC
23 0923 - 37
4. Verify that all binary output devices (relays, solenoid valves, two-position actuators and control valves, magnetic starters, etc.) operate properly and that the normal positions are correct.
5. Verify that all analog output devices (I/Ps, actuators, etc.) are functional, that start and span are correct, and that direction and normal positions are correct. The contractor shall check all control valves and automatic dampers to ensure proper action and closure. The contractor shall make any necessary adjustments to valve stem and damper blade travel.
6. Verify that the system operation adheres to the sequences of operation. Simulate and observe all modes of operation by overriding and varying inputs and schedules. Tune all DDC loops.
7. Alarms and Interlocks:
a. Check each alarm separately by including an appropriate signal at a value that will trip the alarm.
b. Interlocks shall be tripped using field contacts to check the logic, as well as to ensure that the fail-safe condition for all actuators is in the proper direction.
c. Interlock actions shall be tested by simulating alarm conditions to check the initiating value of the variable and interlock action.
3.21 CLEANING
A. The contractor shall clean up all debris resulting from his/her activities daily. The contractor shall remove all cartons, containers, crates, etc., under his/her control as soon as their contents have been removed. Waste shall be collected and placed in a designated location.
B. At the completion of work in any area, the contractor shall clean all work, equipment, etc., keeping it free from dust, dirt, and debris, etc.
C. At the completion of work, all equipment furnished under this section shall be checked for paint damage, and any factory-finished paint that has been damaged shall be repaired to match the adjacent areas. Any cabinet or enclosure that has been deformed shall be replaced with new material and repainted to match the adjacent areas.
3.22 MANUFACTURER'S FIELD SERVICES
A. Start and commission systems. Allow sufficient time for start-up and commissioning prior to placing control systems in permanent operation.
B. Start up, check out, and test all hardware and software and verify communication between all components.
1. Verify that all control wiring is properly connected and free of all shorts and ground faults.
Verify that terminations are tight.
2. Verify that all analog and binary input/output points read properly.
3. Verify alarms and interlocks.
4. Verify operation of the integrated system.
23 0923 - 38
Issued for Bid 01-11-2024
C. Provide basic operator training for 2 persons on data display, alarm and status descriptors, requesting data, execution of commands and request of logs. Include a minimum of 8 hours dedicated instructor time. Provide training on site. Training shall take place at the project site during the normal work hours of 8 a.m. to 5 p.m. weekdays. Training shall include:
1. Explanation of drawings, operations and maintenance manuals.
2. Walk-through of the job to locate control components.
3. Operator workstation and peripherals.
4. DDC custom application controllers, ASC, TEC, SAC operation and function.
5. Operator control functions including graphic generation and field panel programming.
6. Explanation of adjustment, calibration and replacement procedures.
7. More detailed training listed below.
3.23 SERVICE AND GUARANTEE
A. General Requirements: Provide all services, materials and equipment necessary for the successful operation of the entire BAS System for a period of one year after completion of successful performance test. Provide necessary material required for the work. Minimize impacts on facility operations when performing scheduled adjustments and non-scheduled work.
B. Description of Work: The adjustment and repair of the system includes all computer equipment, software updates, transmission equipment and all sensors and control devices.
Provide the manufacturer’s required adjustment and all other work necessary.
C. Personnel: Provide qualified personnel to accomplish all work promptly and satisfactorily.
Owner shall be advised in writing of the name of the designated service representative, and of any changes in personnel.
D. Schedule of Work: Provide two minor inspections at 6 month intervals and two major inspections offset equally between the minor inspections to effect quarterly inspection of alternating magnitude, and all work required as specified. Schedule major inspections in July and January. Minor inspections shall include visual checks and operational test of all equipment delivered. Major inspections shall include all work described for minor inspections and the following work:
1. Clean all equipment, including interior and exterior surfaces.
2. Perform signal, voltage and system isolation checks of system workstations and peripherals.
3. Check and calibrate each field device. Check all analog points and digital points.
4. Run all diagnostics and correct all previously diagnosed problems.
5. Resolve and correct any previous outstanding problems.
E. Emergency Service: Owner shall initiate service calls when the system is not functioning properly. Qualified personnel shall be available to provide service to the complete system.
Furnish Owner with a telephone number where service representative can be reached at all times. Service personnel shall be at the site within 4 hours after receiving a request for service.
Restore the control system to proper operating condition within 24 hours.
F. Operation: Performance of scheduled adjustment and repair shall verify operation of the system as demonstrated by the initial performance test.
Direct-Digital Control System for
HVAC
23 0923 - 39
G. Systems Modifications: Provide any recommendations for system modification in writing to Owner. Do not make any system modifications, including operating parameters and control settings, without prior approval of Owner. Any modifications made to the system shall be incorporated into the operations and maintenance manuals, and other documentation affected.
H. Software: Provide all software updates and verify operation in the system. These updates shall be accomplished in a timely manner, fully coordinated with the system operators, and shall be incorporated into the operations and maintenance manuals, and software documentation.
3.24 PREPARATION FOR BALANCING
A. Check the calibration and setpoints of all controllers.
B. Check the locations of all thermostats and humidistats for potential erratic operation from outside influences such as sunlight, drafts, or cold walls.
C. Check that all sequences operate as specified. Verify that no simultaneous heating and cooling occurs, unless specified. Observe that heating cannot begin at TAB reheat terminals until the unit is at the minimum airflow.
D. Verify the operation of all interlock systems.
3.25 TEST AND BALANCE COORDINATION
A. The Contractor shall furnish a single set of all tools necessary to interface to the control system for test and balance purposes.
B. The Contractor shall provide a minimum of four (4) hours training for the Balancing Contractor in the use of these tools.
C. In addition, the Contractor shall provide a qualified technician to assist in the test and balance process until the first 20 terminal units are balanced.
D. The tools used during the test and balance process shall be returned at the completion of the testing and balancing.
3.26 CONTROL SYSTEM DEMONSTRATION AND ACCEPTANCE
A. Demonstration:
1. Prior to acceptance, the control system shall undergo a series of performance tests to verify operation and compliance with this specification. These tests shall occur after the Contractor has completed the installation, started up the system, and performed his/her own tests.
2. The tests described in this section are to be performed in addition to the tests that the contractor performs as a necessary part of the installation, start-up, and debugging process and as specified in the "Control System Checkout and Testing" article in Part 3 of this specification. The engineer will be present to observe and review these tests. The engineer shall be notified at least 10 days in advance of the start of the testing procedures.
3. The demonstration process shall follow that approved in Part 1, "Submittals." The approved checklists and forms shall be completed for all systems as part of the demonstration.
23 0923 - 40
Issued for Bid 01-11-2024
4. The contractor shall provide at least two persons equipped with two-way communication and shall demonstrate actual field operation of each control and sensing point for all modes of operation including day, night, occupied, unoccupied, fire/smoke alarm, seasonal changeover, and power failure modes. The purpose is to demonstrate the calibration, response, and action of every point and system. Any test equipment required to prove the proper operation shall be provided by and operated by the contractor.
5. As each control input and output is checked, a log shall be completed showing the date, technician’s initials, and any corrective action taken or needed.
6. Demonstrate compliance with Part 1, "System Performance."
7. Demonstrate compliance with sequences of operation through all modes of operation.
8. Demonstrate complete operation of operator interface.
9. Additionally, the following items shall be demonstrated:
a. DDC loop response. The contractor shall supply trend data output in a graphical form showing the step response of each DDC loop. The test shall show the loop’s response to a change in set point, which represents a change of actuator position of at least 25% of its full range. The sampling rate of the trend shall be from 10 seconds to 3 minutes, depending on the speed of the loop. The trend data shall show for each sample the set point, actuator position, and controlled variable values. Any loop that yields unreasonably under-damped or over-damped control shall require further tuning by the Contractor.
b. Demand limiting. The contractor shall supply a trend data output showing the action of the demand limiting algorithm. The data shall document the action on a minute-by-minute basis over at least a 30-minute period. Included in the trend shall be building kW, demand limiting set point, and the status of sheddable equipment outputs.
c. Optimum start/stop. The contractor shall supply a trend data output showing the capability of the algorithm. The change-of-value or change-of-state trends shall include the output status of all optimally started and stopped equipment, as well as temperature sensor inputs of affected areas.
d. Interface to the building fire alarm system.
e. Operational logs for each system that indicate all set points, operating points, valve positions, mode, and equipment status shall be submitted to the architect/engineer.
These logs shall cover three 48-hour periods and have a sample frequency of not more than 10 minutes. The logs shall be provided in both printed and disk formats.
10. Any tests that fail to demonstrate the operation of the system shall be repeated at a later date. The contractor shall be responsible for any necessary repairs or revisions to the hardware or software to successfully complete all tests.
Direct-Digital Control System for
HVAC
23 0923 - 41
B. Acceptance:
1. All tests described in this specification shall have been performed to the satisfaction of both the engineer and owner prior to the acceptance of the control system as meeting the requirements of completion. Any tests that cannot be performed due to circumstances beyond the control of the contractor may be exempt from the completion requirements if stated as such in writing by the engineer. Such tests shall then be performed as part of the warranty.
2. The system shall not be accepted until all forms and checklists completed as part of the demonstration are submitted and approved as required in Part 1, "Submittals."
END OF SECTION
23 0923 - 42
SH Project # 2142203394
Issued for Bid 01-11-2024
Facility Natural Gas Piping 23 1123 - 1
SECTION 23 1123
FACILITY NATURAL GAS PIPING
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Provide equipment, materials, tools, labor, and supervision necessary to furnish, fabricate, and install a complete Natural Gas piping system.
1.2 STANDARDS AND CODES
A. Pipe materials specified in this Section shall apply to technical sections of Division 23 of the Project Manual where applicable. Special requirements as may be called for in the technical sections, or shown on the Drawings, shall take precedence over General Requirements herein. Piping located in plenums shall be plenum rated for fire and smoke.
B. Gas piping and connections to equipment shall be in accordance with NFPA-54 and the local utility company.
1.3 PRODUCT HANDLING
A. Provide factory-applied plastic end-caps on each length of pipe and tube. Maintain end-caps through shipping, storage, and handling as required to prevent pipe-end damage and eliminate dirt and moisture from inside of pipe and tube.
B. Where possible, store pipe and tube inside and protected from weather. Where necessary to store outside, elevate well above grade and enclose with durable, waterproof wrapping.
C. Protect flanges and fittings from moisture and dirt by inside storage and enclosure, or by packaging with durable, waterproof wrapping.
1.4 SUBMITTALS
A. Submit piping schedule listing each pipe material used and systems served.
PART 2 PRODUCTS
2.1 MATERIAL
A. Aboveground natural gas.
1. Black steel pipe seamless, Schedule 40, ASTM A53.
B. Gas piping underground, 5'-0" outside of building, to 59 psig operating pressure.
1. Polyethylene plastic pipe and fittings, medium density ASTM D2513, 1248 and 3350. Resin classified as Type II, Class B, Category 5, Grade P24. Cell classified as PE 235333 E or PE 234333E. Verify requirements with local utility.
C. Gas vents and underground gas piping within 5'-0" of building.
1. Welded black steel Schedule 40, coated with asphalt and wrapped, ASTM A120.
D. Fittings
1. Threaded pipe - malleable iron fittings, 125-pound standard flat band water pattern.
23 1123 - 2
Issued for Bid 01-11-2024
2. Welded pipe - welded neck fittings and welded neck flanges, same material and strength as pipe.
3. Carbon steel pipe - material and strength shall correspond to pipe specifications. ANSI B31.5.
4. Plastic underground natural gas piping - all fittings shall be manufactured (tee's, elbows, reducers and transitions to steel pipe), by the…