RFB927930-02 - WRC Phase 3 Issuance 2 - Drawings.pdf

PDF 28 MB Posted

Attached to
WRC Phase 3 Issuance 2
Solicitation number
RFB927930-02
Issued by
Dallas County, Woodbine City, Iowa

About this file

The document is a Request for Bid (RFB) for the Woodward Resource Center Phase 3 Issuance 2 project, issued by the Department of Administrative Services for the state of Iowa. The project is located in Dallas County and Woodbine City, Iowa. The RFB requests bids for various construction-related work at the Woodward Resource Center facility. No further details about the specific products or services requested are provided in the document summary.

The RFB does not include any information about pricing terms, set asides, incumbents, funding requirements or sources, or other salient details about the contract opportunity.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL:

PRINTED OR TYPED NAME

SIGNATURE

MY LICENSE RENEWAL DATE IS DECEMBER 31,

DATE

LICENSE NUMBER

I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT WAS

PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I

AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS

OF THE STATE OF IOWA.

Tyson L. Scheidecker

M, P, & FP SHEETS

21691

MECHANICAL ENGINEER

PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL:

PRINTED OR TYPED NAME

SIGNATURE

MY LICENSE RENEWAL DATE IS DECEMBER 31,

DATE

LICENSE NUMBER

I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT WAS

PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I

AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS

OF THE STATE OF IOWA.

Kevin J. Bruxvoort

E SHEETS

19927

ELECTRICAL ENGINEER

W

E S

T O

W N

P K

W Y

S

U

IT

E

W E

S T

D E

S M

O

IN

E S

IA

.2

.8

S

H

IV

E -H

A T

T E

R Y

.C O

M

BA D E

FC G

SHEET INDEX CERTIFICATIONS

H

BA D E FC G H

.3

W R

C D e c e n tr a liz a ti o n

P h a s e

.0

W R

C F ir e

A la rm P h a s e

.3

C h a p e l S p ri n k le r

/8

/2

:0 :3

A

M

A u to d e s k D o c s /I A

D A

S

W R

C P ro je c ts

/F ir e P u m p H o u s e -M

E P

-C e n t.

rv t

WRC Decentralization Phase 3 (#9279.30), Fire Alarm Phase 2 (#9294.01) & Chapel Sprinkler (#9279.31)

Iowa Department of Administrative Services 1251 334th St, Woodward, IA 50276

00-G000

Io w a D e p a rt m e n t o f

A d m in is tr a ti v e S e rv ic e s th

S t, W o o d w a rd

IA

P R

O J E

C T

N U

M B

E R

B

ID

D

IN

G

IS

S U

E D

A T

E

-0

-1

SHEET NUMBER ADMIN BUILDING INDEX

ARCHITECTURAL

02-A101 FIRST FLOOR PLANS AND SECOND FLOOR RCP'S

PLUMBING

02-P100 PLUMBING PLANS

MECHANICAL

02-MD100 BASEMENT MECHANICAL PIPING DEMOLITION PLAN

02-MD101 MECHANICAL DEMOLITION PLANS

02-M100 BASEMENT MECHANICAL PIPING PLAN

02-M101 MECHANICAL PLANS

02-M300 THERMOSTAT ZONING PLAN

02-M400 ENLARGED MECHANICAL PLANS & SECTIONS

02-M500 MECHANICAL DETAILS

02-M501 CONTROLS

02-M502 CONTROLS

02-M600 MECHANICAL SCHEDULES

ELECTRICAL

02-ED200 BASEMENT LEVEL POWER DEMOLITION PLAN

02-ED300 BASEMENT LEVEL SYSTEMS DEMOLITION PLAN

02-ED301 FIRST FLOOR, SECOND FLOOR, AND THIRD FLOOR SYSTEMS

DEMOLITION PLAN

02-E200 BASEMENT LEVEL POWER PLAN

02-E201 FIRST FLOOR POWER PLAN

02-E202 SECOND FLOOR AND THIRD FLOOR POWER PLAN

02-E300 BASEMENT LEVEL SYSTEMS PLAN

02-E301 FIRST FLOOR, SECOND FLOOR, AND THIRD FLOOR SYSTEMS

PLAN

SHEET NUMBER ELMCREST BUILDING INDEX

ARCHITECTURAL

10-AD01 BASEMENT AND SECOND DEMOLITION AND FLOOR PLANS

10-AD11 FIRST FLOOR REFLECTED CEILING DEMOLITION PLAN

10-AD12 SECOND FLOOR REFLECTED CEILING DEMOLITION PLAN

10-A111 FIRST FLOOR REFLECTED CEILING PLAN

10-A112 SECOND FLOOR REFLECTED CEILING PLAN

PLUMBING

10-P100 BASEMENT PLUMBING PLAN

10-P101 FIRST AND SECOND FLOOR PLUMBING PLAN

MECHANICAL

10-MD100 BASEMENT MECHANICAL PIPING DEMOLITION PLAN

10-MD101 FIRST FLOOR MECHANICAL PIPING DEMOLITION PLAN

10-MD102 SECOND AND THIRD FLOOR MECHANICAL PIPING DEMOLITION

PLAN

10-M100 BASEMENT MECHANICAL PIPING PLAN

10-M101 FIRST FLOOR MECHANICAL PIPING PLAN

10-M102 SECOND AND THIRD FLOOR MECHANICAL PLAN

10-M300 THERMOSTAT PLANS

10-M400 ENLARGED MECHANICAL PLANS

10-M500 MECHANICAL DETAILS

10-M501 CONTROLS

10-M502 CONTROLS

10-M600 MECHANICAL SCHEDULES

ELECTRICAL

10-ED200 BASEMENT LEVEL POWER DEMOLITION PLAN

10-ED201 FIRST FLOOR POWER DEMOLITION PLAN

10-ED202 SECOND AND THIRD FLOOR POWER DEMOLITION PLAN

10-ED300 BASEMENT LEVEL SYSTEMS DEMOLITION PLAN

10-ED301 FIRST FLOOR SYSTEM DEMOLITION PLAN

10-ED302 SECOND AND THIRD FLOOR SYSTEM DEMOLITION PLAN

10-E200 BASEMENT LEVEL POWER PLAN

10-E201 FIRST FLOOR POWER PLAN

10-E202 SECOND FLOOR POWER PLAN

10-E300 BASEMENT LEVEL SYSTEMS PLAN

10-E301 FIRST FLOOR SYSTEMS PLAN

10-E302 SECOND AND THIRD FLOOR SYSTEMS PLAN

SHEET NUMBER CAMPUS FOOD SERVICES BUILDING INDEX

PLUMBING

11-P100 BASEMENT PLUMBING PLANS

MECHANICAL

11-MD100 BASEMENT MECHANICAL PIPING DEMOLITION PLAN

11-MD101 FIRST FLOOR MECHANICAL PIPING DEMOLITION PLAN

11-M100 BASEMENT MECHANICAL PIPING PLAN

11-M101 FIRST FLOOR MECHANICAL PIPING PLAN

11-M500 MECHANICAL DETAILS

11-M501 CONTROLS

11-M600 MECHANICAL SCHEDULES

ELECTRICAL

11-ED300 BASEMENT LEVEL SYSTEMS DEMOLITION PLAN

11-ED301 FIRST FLOOR SYSTEMS DEMOLITION PLAN

11-E200 BASEMENT LEVEL POWER PLAN

11-E300 BASEMENT LEVEL SYSTEM PLAN

11-E301 FIRST FLOOR SYSTEMS PLAN

SHEET NUMBER MEDICAL CENTER INDEX

ARCHITECTURAL

12-AD11 FIRST FLOOR REFLECTED CEILING DEMOLITION PLAN

12-AD12 SECOND FLOOR REFLECTED CEILING DEMOLITION PLAN

12-A100 BASEMENT AND FIRST FLOOR PLANS

12-A111 FIRST FLOOR REFLECTED CEILING PLAN

12-A112 SECOND FLOOR REFLECTED CEILING PLAN

PLUMBING

12-P100 BASEMENT PLUMBING PLANS

MECHANICAL

12-MD100 BASEMENT MECHANICAL PIPING DEMOLITION PLAN

12-MD101 FIRST FLOOR MECHANICAL PIPING DEMOLITION PLAN

12-MD102 SECOND FLOOR MECHANICAL PIPING DEMOLITION PLAN

12-M100 BASEMENT MECHANICAL PIPING PLAN

12-M101 FIRST FLOOR MECHANICAL PIPING PLAN

12-M102 SECOND AND THIRD FLOOR MECHANICAL PIPING PLAN

12-M300 THERMOSTAT PLANS

12-M400 ENLARGED MECHANICAL PLANS

12-M401 ENLARGED AIR REBALANCING PLANS

12-M500 MECHANICAL DETAILS

12-M501 CONTROLS

12-M502 CONTROLS

12-M600 MECHANICAL SCHEDULES

ELECTRICAL

12-ED200 BASEMENT LEVEL POWER DEMOLITION PLAN

12-ED201 FIRST FLOOR ELECTRICAL POWER DEMOLITION PLAN

12-ED202 SECOND AND THIRD FLOOR POWER DEMOLITION PLAN

12-ED300 BASEMENT LEVEL SYSTEMS DEMOLITION PLAN

12-ED301 FIRST FLOOR SYSTEMS DEMOLITION PLAN

12-ED302 SECOND AND THIRD FLOOR SYSTEMS DEMOLITION PLAN

12-E200 BASEMENT LEVEL POWER PLAN

12-E201 FIRST FLOOR POWER PLAN

12-E202 SECOND AND THIRD FLOOR POWER PLAN

12-E300 BASEMENT LEVEL SYSTEMS PLAN

12-E301 FIRST FLOOR SYSTEMS PLAN

12-E302 SECOND AND THIRD FLOOR SYSTEMS PLAN

SHEET NUMBER CHAPEL BUILDING INDEX

CIVIL

05-C001 CONSTRUCTION NOTES

05-CD01 DEMOLITION PLAN

05-C101 SITE PLAN

05-C301 UTILITY PLAN

05-C501 CONSTRUCTION DETAILS

SHEET NUMBER DISPATCH GARAGE INDEX

MECHANICAL

15-MD101 MECHANICAL DEMOLITION PLANS

15-M100 MECHANICAL PLANS

15-M600 MECHANICAL SCHEDULES & DETAILS

ELECTRICAL

15-ED201 FIRST FLOOR AND MEZZANINE LEVEL POWER DEMOLITION PLAN

15-ED301 FIRST FLOOR SYSTEMS DEMOLITION PLAN

15-E201 FIRST FLOOR AND MEZZANINE LEVEL POWER PLAN

15-E301 FIRST FLOOR AND MEZZANINE LEVEL SYSTEMS PLAN

15-E600 ELECTRICAL SCHEDULES

SHEET NUMBER GENERAL SHEET INDEX

GENERAL

00-G000 COVER SHEET

00-G001 CAMPUS MAP

MECHANICAL & PLUMBING

00-MP00 MECHANICAL & PLUMBING GENERAL INFORMATION

ELECTRICAL

00-E000 ELECTRICAL GENERAL INFORMATION

I HEREBY CERTIFY THAT THE PORTION OF THIS TECHNICAL

SUBMISSION DESCRIBED BELOW WAS PREPARED BY ME OR UNDER

MY DIRECT SUPERVISION AND RESPONSIBLE CHARGE. I AM A DULY

LICENSED ARCHITECT UNDER THE LAWS OF THE STATE OF IOWA.

PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL

PRINTED OR TYPED NAME

SIGNATURE

MY LICENSE RENEWAL DATE IS JUNE 30,

DATE

ARCHITECT

LICENSE NUMBER

Cameron L. Manley

A SHEETS

06716

Applicable Codes

2015 International Building Code as adopted by Iowa Administrative Rule 661-201 and 661-301 2015 International Fire Code as adopted by Iowa Administrative Rule 661-201 2012 International Energy Conservation Code as adopted by Iowa Administrative Rule 661-303 2015 International Existing Building Code as adopted by Iowa Administrative Rule 661-301 and 661-350 2012 NFPA 101 Life Safety Code as adopted by Iowa Administrative Rule 661-205 2010 Americans with Disabilities Act as adopted by Iowa Administrative Rule 661-302 Smoke Alarms/Detectors as adopted by Iowa Administrative Rule 661-210 (effective July 1, 2021) Carbon Monoxide Alarms as adopted by Iowa Administrative Rule 661-211 State Mechanical Code as adopted by the Department of Public Health Iowa Administrative Rule 641-61 State Plumbing Code as adopted by the Department of Public Health Iowa Administrative Rule 641-25 State Electrical Code as adopted by the State Electrical Licensing Board Iowa Administrative Rule 661-504

Administration Building Occupancy: B (IBC); Business (LSC)

Per CMS licensing, Admin falls under ICF/MR. Although LSC Chapter 19 – Existing Health Care Occupancies includes Intermediate Care Facilities (ICF), section 19.1.1.1.9 states that “Facilities that do not provide housing on a 24-hour basis for their occupants shall be classified as other occupancies and shall be covered by other chapters of this Code.” It is our understanding that Admin does not provide sleeping accommodations for occupants, and therefore, it would be classified as an Existing Business Occupancy (Chapter 39 of LSC).

Per LSC 39.3.2.1 for existing Business occupancies: “Hazardous areas, including boiler or furnace rooms, shall be protected in accordance with Section 8.7.”

LSC 8.7.1.1 “Protection from any area having a degree of hazard greater than that normal to the general occupancy of the building or structure shall be provided by one of the following: (1) Enclosing the area with a fire barrier without windows that has a 1-hour fire-resistance rating in accordance with Section 8.3 or (2) Protecting the area with automatic extinguishing systems in accordance with Section 9.7.”

Admin is not sprinklered, so the Boiler room will be required to be fire rated.

Elmcrest Occupancy: B (IBC); Business (LSC)

Per CMS licensing, Elmcrest falls under ICF/MR. Although LSC Chapter 19 – Existing Health Care Occupancies includes Intermediate Care Facilities (ICF), section 19.1.1.1.9 states that “Facilities that do not provide housing on a 24-hour basis for their occupants shall be classified as other occupancies and shall be covered by other chapters of this Code.” It is our understanding that Elmcrest does not provide sleeping accommodations for occupants, and therefore, it would be classified as an Existing Business Occupancy (Chapter 39 of LSC).

Per LSC 39.3.2.1 for existing Business occupancies: “Hazardous areas, including boiler or furnace rooms, shall be protected in accordance with Section 8.7.”

LSC 8.7.1.1 “Protection from any area having a degree of hazard greater than that normal to the general occupancy of the building or structure shall be provided by one of the following: (1) Enclosing the area with a fire barrier without windows that has a 1-hour fire-resistance rating in accordance with Section 8.3 or (2) Protecting the area with automatic extinguishing systems in accordance with Section 9.7.”

Elmcrest is sprinklered, so the Boiler room will not be required to be fire rated.

Med Center Occupancy: I-2 (IBC); Healthcare (LSC)

Per CMS licensing, Med Center falls under ICF/MR. Per LSC section 19.1.1.1.5, “health care facilities regulated by this chapter shall be those that provide sleeping accommodations for their occupants.” Because some occupants may need to stay overnight in Med Center, it would be classified as an Existing Health Care Occupancy (Chapter 19 of LSC).

Per LSC 19.3.2.1, “any hazardous areas shall be safe guarded by a fire barrier having a 1-hour fire resistance rating or shall be provided with an automatic extinguishing system in accordance with 8.7.1.” However, per LSC 19.3.2.1.2: “where the sprinkler option is used, the areas shall be separated from other spaces by smoke partitions in accordance with Section 8.4.”

Med Center is sprinklered, so the boiler room would not need to have a 1-hour fire resistance rating; however, it will need to be separated from other spaces by smoke partitions.

Food Service Occupancy: A-2 (IBC); Assembly (LSC)

Chapel Occupancy: A-3 (IBC): Assembly (LSC)

Dispatch Occupancy: S-2 (IBC); Storage (LSC)

PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL:

PRINTED OR TYPED NAME

SIGNATURE

MY LICENSE RENEWAL DATE IS DECEMBER 31,

DATE

LICENSE NUMBER

I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT WAS

PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I

AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS

OF THE STATE OF IOWA.

Kyle A. Lawson

C SHEETS

26414

CIVIL ENGINEER

ARCHITECTURAL

05-A110 FIRST FLOOR DEMO AND REFLECTED CEILING PLAN

FIRE PROTECTION

05-FP000 FIRE PROTECTION GENERAL INFORMATION

05-FP101 FIRE PROTECTION PLAN

FP1.0 SPRINKLER ELEVATIONS, NOTES & DESIGN CRITERIA

FP1.1 FIRE SPRINKLER PIPING DRAWINGS

ELECTRICAL

05-ED301 FIRST FLOOR SYSTEMS DEMOLITION PLAN

05-E301 FIRST FLOOR SYSTEMS PLAN

1-10-2024

1-10-2024

1-10-2024

1-10-2024

DO NOT PARK

TRUCKS OR

EQUIPMENT OVER

TUNNELS.

DO NOT PARK

TRUCKS OR

EQUIPMENT OVER

TUNNELS.

DO NOT PARK

TRUCKS OR

EQUIPMENT OVER

TUNNELS.

DO NOT PARK

TRUCKS OR

EQUIPMENT OVER

TUNNELS.

2-ADMINISTRATION

BUILDING

12-MEDICAL CENTER

10-ELMCREST

15-DISPATCH GARAGE

11-FOOD SERVICE

5-CHAPEL

A P

P R

O V

E D

B Y

D R

A W

N B

Y

IS

S

U E

D F

O R

IS

S

U E

D A

T E

P R

O J E

C T

N U

M B

E R

F

IE

L D

B O

O K

W

E S

T O

W N

P K

W Y

S

U

IT

E

W E

S T

D E

S M

O

IN

E S

IA

.2

.8

S

H

IV

E -H

A T

T E

R Y

.C O

M

BA D E

FC G

H

BA D E FC G H

Autodesk Revit 2022

.3

W R

C D e c e n tr a liz a ti o n

P h a s e

.0

W R

C F ir e

A la rm P h a s e

.3

C h a p e l S p ri n k le r

/8

/2

:0 :1

A

M

A u to d e s k D o c s /I A

D A

S

W R

C P ro je c ts

/F ir e P u m p H o u s e -M

E P

-C e n t.

rv t

C A

M P

U S

M A

P

B

ID

D

IN

G

T L S

L D

F

-0

-1

00-G001

Io w a D e p a rt m e n t o f

A d m in is tr a ti v e S e rv ic e s th

S t, W o o d w a rd

IA

GENERAL MECHANICAL ABBREVIATIONS

SYMBOLS

& AND

@ AT

# NUMBER or POUND

A

A/E ARCHITECT/ENGINEER

AD ACCESS DOOR

ADJ ADJUSTABLE/ADJACENT

AFF ABOVE FINISHED FLOOR

AHU AIR HANDLING UNIT

ALT ALTERNATE

AP ACCESS PANEL

APPROX APPROXIMATE(LY)

AS AIR SEPARATOR

AVG AVERAGE

B

BAS BUILDING AUTOMATION SYSTEM

BFF BELOW FINISHED FLOOR

BFBP BOILER FEED BOOSTER PUMP

BHP BRAKE HORSEPOWER

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNITS PER HOUR

C

CAP CAPACITY

CFM CUBIC FEET PER MINUTE

CFH CUBIC FEET PER HOUR

CH CHILLER

CHP CHILLED WATER PUMP

CHSP CHILLED WATER SECONDARY PUMP

CIRC CIRCULATING

CLG CEILING

CONT CONTINUATION

CONTR CONTRACTOR

CONV CONVECTOR

COORD COORDINATE

CTRL CONTROL

CU COPPER

CUH CABINET UNIT HEATER

D

°/DEG DEGREE

°C DEGREES CELSIUS

°F DEGREES FAHRENHEIT

DB DRY BULB

DDC DIRECT DIGITAL CONTROLS

DEMO DEMOLITION

DIA DIAMETER

DIAG DIAGRAM

DWG DRAWING

E

EAT ENTERING AIR TEMPERATURE

ELEC ELECTRICAL

EQ EQUAL

EQUIP EQUIPMENT

EQUIV EQUIVALENT

ET EXPANSION TANK

EWB ENTERING WET BULB

EWT ENTERING WATER TEMPERATURE

EX EXISTING

F

FS FLOW SWITCH

FT FINNED TUBE RADIATION

FTHD FOOT HEAD OR PRESSURE DROP

G

GA GAUGE

GAL GALLON

GC GENERAL CONTRACTOR

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

H

HP HORSEPOWER

HPR HIGH PRESSURE STEAM RETURN

HPS HIGH PRESSURE STEAM SUPPLY

HTG HEATING

HVAC HEATING, VENTILATION, AIR CONDITIONING

HX HEAT EXCHANGER

HZ HERTZ (FREQUENCY)

I

ID INSIDE DIAMETER

IN INCHES

IN WC INCHES (WATER COLUMN)

INS INSULATION

INSTR INSTRUMENT

ISO ISOMETRIC

K

KW KILOWATT

KWH KILOWATT HOUR

L

LAT LEAVING AIR TEMPERATURE

LB(S) POUND(S)

LDB LEAVING DRY BULB (TEMP)

LWB LEAVING WET BULB (TEMP)

LWT LEAVING WATER TEMPERATURE

M

MAINT MAINTENANCE

MAX MAXIMUM

MBH BRITISH THERMAL UNIT (1000/HR)

MC MECHANICAL CONTRACTOR

MCC MOTOR CONTROL CENTER

MCA MINIMUM CIRCUIT AMPS

MECH MECHANICAL

MFR MANUFACTURER

MIN MINIMUM OR MINUTE

MISC MISCELLANEOUS

N

NA NOT APPLICABLE

NC NORMALLY CLOSED OR NOISE CRITERIA

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NOM NOMINAL

O

OD OUTER DIAMETER

OFCI OWNER FURNISHED CONTRACTOR INSTALLED

OFOI OWNER FURNISHED OWNER INSTALLED

P

PG PRESSURE GAUGE

PH PHASE

PSIG POUNDS PER SQUARE INCH GAUGE

R

RH RELATIVE HUMIDITY

RHC REHEAT COIL

RPM REVOLUTIONS PER MINUTE

S

SCH SCHEDULE

SCHM SCHEMATIC

SHT SHEET

SPEC SPECIFICATION(S)

SQ IN SQUARE INCH

SV SAFETY VALVE

SYS SYSTEM

SRV SAFETY RELIEF VALVE

T

T THERMOSTAT

TCC TEMPERATURE CONTROL CONTRACTOR

TEMP TEMPERATURE OR TEMPORARY

THRU THROUGH

TP TOTAL PRESSURE

TYP TYPICAL

U

UNO UNLESS NOTED OTHERWISE

UTIL UTILITY

V

VEL VELOCITY

VERT VERTICAL

VFD VARIABLE FREQUENCY DRIVE

W

W/ WITH

W/O WITHOUT

WB WET BULB

WPD WATER PRESSURE DROP

WT WEIGHT

WTR WATER

GENERAL PLUMBING ABBREVIATIONS

SYMBOLS

& AND

@ AT

# NUMBER or POUND

A

ADJ ADJUSTABLE/ADJACENT

AFF ABOVE FINISHED FLOOR

ALT ALTERNATE

AMB AMBIENT

AP ACCESS PANEL

APPROX APPROXIMATE(LY)

AS AIR SEPARATOR

ASSY ASSEMBLY

ATM ATMOSPHERE

AUX AUXILIARY

AVG AVERAGE

B

BAS BUILDING AUTOMATION SYSTEM

BFP BACKFLOW PREVENTER

BHP BRAKE HORSEPOWER

BLDG BUILDING

BMS BUILDING MANAGEMENT SYSTEM

BOP BOTTOM OF PIPE

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNITS PER HOUR

C

C COMPRESSOR (AIR)

CAL CALIBRATE

CAP CAPACITY

CCW COUNTER CLOCKWISE

CIP CAST IRON PUMP

CIRC CIRCULATING

CL CENTER LINE

CLG CEILING

CLR CLEAR(ANCE)

CLW CLOCKWISE

CO CLEANOUT

COND CONDENSATE

CONSTR CONSTRUCTION

CONT CONTINUATION

CONTR CONTRACTOR

COORD COORDINATE

CTRL CONTROL

CU COPPER

CU FT CUBIC FEET

CU IN CUBIC INCH

D

°/DEG DEGREE

°F DEGREES FAHRENHEIT

DB DRY BULB

DDC DIRECT DIGITAL CONTROLS

DEMO DEMOLITION

DIA DIAMETER

DIAG DIAGRAM

DN DOWN

DR DRAIN

DV DRAIN VALVE

DWG DRAWING

E

EA EACH

EER ENERGY EFFICIENCY RATIO

EF ENERGY FACTOR

ELEV ELEVATION

ELEC ELECTRICAL

EQ EQUAL

EQUIP EQUIPMENT

EQUIV EQUIVALENT

ET EXPANSION TANK

EWH ELECTRIC WATER HEATER

EWT ENTERING WATER TEMPERATURE

EX EXISTING

F

FCO FLOOR CLEANOUT

FD FLOOR DRAIN

FPT FEMALE PIPE THREAD

FS FLOOR SINK

G

G GAS

GA GAUGE

GAL GALLON

GC GENERAL CONTRACTOR

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GWH GAS FIRED WATER HEATER

H

H&CW HOT AND COLD WATER

HORIZ HORIZONTAL

HP HORSEPOWER

HVAC HEATING, VENTILATION, AIR CONDITIONING

HZ HERTZ (FREQUENCY)

I

ID INSIDE DIAMETER

IN INCHES

IN WC INCHES (WATER COLUMN)

INS INSULATION

INSTR INSTRUMENT

IP IRON PIPE

IPS IRON PIPE SIZE

ISO ISOMETRIC

K

KW KILOWATT

KWH KILOWATT HOUR

L

LAV LAVATORY

LB(S) POUND(S)

LWT LEAVING WATER TEMPERATURE

M

MAINT MAINTENANCE

MAX MAXIMUM

MBH BRITISH THERMAL UNIT (1000/HR)

MC MECHANICAL CONTRACTOR

MCA MINIMUM CIRCUIT AMPS

MECH MECHANICAL

MFR MANUFACTURER

MIN MINIMUM OR MINUTE

MISC MISCELLANEOUS

MPT MALE PIPE THREAD

N

NA NOT APPLICABLE

NC NORMALLY CLOSED

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NOM NOMINAL

NPT NATIONAL PIPE THREAD

NTS NOT TO SCALE

O

OD OUTER DIAMETER

OFCI OWNER FURNISHED CONTRACTOR INSTALLED

OFOI OWNER FURNISHED OWNER INSTALLED

P

PG PRESSURE GAUGE OR PROPYLENE GLYCOL

PH PHASE

PLBG PLUMBING

PRV PRESSURE RELIEF VALVE OR PRESSURE

REGULATING VALVE

PSIA POUNDS PER SQUARE INCH ABSOLUTE

PSIG POUNDS PER SQUARE INCH GAUGE

R

RD ROOF DRAIN

RECIRC RECIRCULATE(ING)

REQD REQUIRED

RHC REHEAT COIL

RPM REVOLUTIONS PER MINUTE

S

SCH SCHEDULE

SCHM SCHEMATIC

SF SQUARE FEET

SHT SHEET

SK SINK

SP SUMP PUMP OR STATIC PRESSURE

SPEC SPECIFICATION(S)

SQ IN SQUARE INCH

SS STAINLESS STEEL

STBY STANDBY

STD STANDARD

STL STEEL

SUCT SUCTION

SV SAFETY VALVE

SYS SYSTEM

SRV SAFETY RELIEF VALVE

T

T THERMOSTAT

TD TRENCH DRAIN

TEMP TEMPERATURE OR TEMPORARY

THRU THROUGH

TOP TOP OF PIPE

TYP TYPICAL

U

UL UNDERWRITERS LABORATORIES

UNO UNLESS NOTED OTHERWISE

UR URINAL

UTIL UTILITY

V

VAC VACUUM

VBX VALVE BOX

VEL VELOCITY

VERT VERTICAL

VFD VARIABLE FREQUENCY DRIVE

VTR VENT THRU ROOF

W

W/ WITH

W/O WITHOUT

WB WET BULB

WC WATER CLOSET

WH WATER HEATER OR WALL HYDRANT

WHA WATER HAMMER ARRESTOR

WPD WATER PRESSURE DROP

WT WEIGHT

WTR WATER

►8" CHWS PIPE SIZE, SYSTEM, AND FLOW TAG (DIAMETER)

EXISTING TO REMAIN

TO BE DEMOLISHED

HEATING WATER RETURN

HEATING WATER SUPPLY

HIGH PRESSURE CONDENSATE

HIGH PRESSURE STEAM

LOW PRESSURE CONDENSATE

LOW PRESSURE STEAM

BALANCING VALVE

BALL VALVE

CHECK VALVE

THREE WAY VALVE

MOTORIZED CONTROL VALVE

THREE WAY MOTORIZED CONTROL VALVE

PRESSURE REDUCING VALVE

SOLENOID VALVE

BUTTERFLY VALVE

MECHANICAL SYMBOLS LIST

ELBOW UP

ELBOW DOWN

PIPE OFFSET UP

PIPE OFFSET DOWN

PIPE TEE TURNED UP

PIPE TEE TURNED DOWN

PIPE TEE

PIPE CAP

PIPE UNION

PIPE TRANSITION

KEYNOTE

CAP EXISTING PIPE OR DUCT

NEW CONNECTION INTO EXISTING PIPE OR DUCT

DETAIL NUMBER

SHEET NUMBER ON

WHICH THE DETAIL

RESIDES

LPS

LPC

HPS

HPC

HWS

HWR

CHWS

CHWS

THERMOSTAT T

BOILER FEED WATERFW

RETURN DUCT (RA)

SUPPLY DUCT (SA)

DUCT SIZE TAG (SQ. OR RECT.)

EXISTING TO REMAIN

TO BE DEMOLISHED

DUCT SIZE TAG (ROUND)

SQ. OR RECT. ELBOW TURNED DOWN

W/ TAG

SQ. OR RECT. ELBOW TURNED UP

W/ TAG

ROUND ELBOW TURNED UP

W/ TAG

ROUND ELBOW TURNED DOWN

FLEXIBLE DUCT

45° TAP BRANCH TAKE-OFF

CONICAL TAP ROUND BRANCH TAKE-OFF

DOUBLE SIDED TRANSITION

SINGLE SIDED TRANSITION

SQ. OR RECT. ELBOW WITH TURNING VANES

(45° AND 90°)

CONICAL TAP ROUND BRANCH TAKE-OFF

W/ MANUAL VOLUME DAMPER

RADIUS ELBOW (45° AND 90°)

MANUAL VOLUME DAMPER

DIFFUSER, GRILLE, REGISTER NOTATIONS

CD = CEILING DIFFUSER

EG = EXHAUST DIFFUSER

ER = EXHAUST REGISTER

LD = LINEAR DIFFUSER

RG = RETURN GRILLE

RR = RETURN REGISTER

SG = SUPPLY GRILLE

SR = SUPPLY REGISTER

TG = TRANSFER GRILLE

NECK SIZE IN INCHES (ROUND SHOWN)

TYPE - SEE BELOW

ID. NO. - SEE SCHEDULE

AIR FLOW (CFM)

REFRIGERANT-HOT GASRHG

REFRIGERANT-LIQUIDRL

12x12

12ø

12x12 SA UP

12ø SA UP

12x12 SA DN

12ø SA DN

EXISTING TO REMAIN

TO BE DEMOLISHED

DOMESTIC COLD WATER

DOMESTIC HOT WATER

DOMESTIC HOT WATER-CIRCULATING

NATURAL GAS

SANITARY SEWER

SANITARY VENT

BALANCING VALVE

BALL VALVE

PLUMBING SYMBOLS LIST

V

SAN

NG

HWC

HW

CW

SAN

SAN

ELBOW UP

ELBOW DOWN

PIPE OFFSET UP

PIPE OFFSET DOWN

PIPE TEE TURNED UP

PIPE TEE TURNED DOWN

PIPE TEE

PIPE CAP

PIPE UNION

PIPE TRANSITION

KEYNOTE

CAP EXISTING PIPE

NEW CONNECTION INTO EXISTING PIPE

DETAIL NUMBER

SHEET NUMBER ON

WHICH THE DETAIL

RESIDES

6" CW UP

6" HW DN

GENERAL PLUMBING NOTES

1. UNLESS NOTED OTHERWISE: LIGHT LINES DENOTE EXISTING

PIPING, OR EQUIPMENT WHICH IS TO REMAIN. BOLD LINES

INDICATE NEW WORK TO BE INSTALLED UNDER THIS CONTRACT.

2. PLUMBING SHOWN IS IN SCHEMATIC FORM. NOT ALL RISERS AND

DROPS ARE SHOWN. PROVIDE OFFSETS AS REQUIRED TO MEET

SPACE REQUIREMENTS AND TO AVOID INTERFERENCE WITH

OTHER TRADES. THE CONTRACTOR SHALL PROVIDE COMPLETE

FULLY FUNCTIONAL SYSTEMS.

3. ALL EQUIPMENT AND ACCESSORIES SHALL BE INSTALLED TO BE

EASILY ACCESSIBLE.

4. PLUMBING WORK SHALL BE COORDINATED WITH OTHER TRADES,

INCLUDING BUT NOT LIMITED TO DUCTWORK, ELECTRICAL

EQUIPMENT, PIPING AND FIRE PROTECTION. SPACE ABOVE

CEILING IS LIMITED AND SHALL BE COORDINATED WITH OTHER

TRADES.

5. ALL WORK WITHIN THE CONTRACT DOCUMENTS, WHICH INCLUDE

THIS DRAWING, SHALL BE COMPLETED IN A SAFE WORKMANLIKE

MANNER AND IN ACCORDANCE WITH ALL APPLICABLE STATE AND

NATIONAL CODES, REGULATIONS AND ORDINANCES. IF ANY

CONFLICTS ARISE BETWEEN THE CONTRACT DOCUMENTS AND

THE APPLICABLE CODES, REGULATIONS OR ORDINANCE, THE

CONTRACTOR SHALL BE RESPONSIBLE TO HAVE ALL WORK

CONFORM TO THE STRICTER OF SAID REQUIREMENTS.

6. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS

AND INSPECTIONS AS REQUIRED FOR ELECTRICAL, FIRE

PROTECTION, PLUMBING, MECHANICAL AND BACKFLOW

PREVENTION INSTALLATIONS. IT SHALL BE THE CONTRACTOR'S

RESPONSIBILITY TO PROVIDE BOTH A COMPLETE AND COMPLIANT

INSTALLATION AS MAY BE DETERMINED BY THE AUTHORITY(S)

HAVING JURISDICTION.

7. CONTRACTOR SHALL NOT PROCURE OR FABRICATE ANY PIPING,

DUCTWORK OR OTHER EQUIPMENT WITHOUT FIRST VERIFYING

ALL DIMENSIONS AND CONDITIONS WHETHER CURRENTLY

EXISTING OR NOT. THE CONTRACTOR SHALL BE RESPONSIBLE

FOR ALL WORK, INCLUDING ANY REQUIRED REWORK.

8. MAINTAIN ALL MANUFACTURER RECOMMENDED EQUIPMENT

SERVICE AND SAFETY CLEARANCES. DO NOT LOCATE ANY

EQUIPMENT OR RUN MATERIALS ABOVE ANY ELECTRICAL PANELS

OR SWITCHGEAR. MAINTAIN ALL NFPA/NEC CODE REQUIRED

CLEARANCES.

9. EACH CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING,

SCHEDULING AND SEQUENCING OF THEIR WORK WITH ALL OTHER

TRADES. PROVIDE OFFSETS, EASEMENTS, OR RELOCATE TO

AVOID CONFLICTS WITH WORK OF OTHER TRADES. FURNISH

SUFFICIENT RESOURCES TO MEET ALL PROJECT MILESTONES

AND DEADLINES.

10. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THE

WATERTIGHT AND WEATHER-PROOF INTEGRITY OF ROOFS,

WALLS AND FLOORS DURING CONSTRUCTION. EACH TRADE SHALL

LOCATE/DIMENSION/COORDINATE THEIR ROOF, FLOOR AND WALL

OPENINGS WITH THE GENERAL CONTRACTOR (GC) OR

CONSTRUCTION MANAGER.

11. PROTECT NEW WORK FROM DAMAGE OR DECONTAMINATION.

PROVIDE TEMPORARY PROTECTIVE CAPPING OR TAPED

POLYETHYLENE ENCLOSURES OVER OPEN DUCTWORK AND

PIPING ENDS AND EQUIPMENT. CONTRACTOR SHALL BE

RESPONSIBLE FOR CLEANING MECHANICAL SYSTEMS PRIOR TO

PLACING THEM IN SERVICE.

12. IN A NEAT AND WORKMANLIKE MANNER: PATCH ANY REMAINING

OPENINGS AND FILL EXCESSIVE GAPS; REWORK AND REFINISH TO

MATCH ADJACENT STRUCTURES; FLASH AND SEAL ALL

MECHANICAL AND ELECTRICAL PENETRATIONS THRU WALLS,

CEILINGS AND FLOORS WITH METAL FRAMEWORK OR

ESCUTCHEONS. ALL OPENINGS SHALL BE PROPERLY SEALED SO

AS TO MEET FIRE RATING NEEDS.

GENERAL PLUMBING DEMOLITION NOTES

1. THIS DRAWING DIAGRAMMATICALLY REPRESENTS THE LAYOUT OF

EXISTING CONDITIONS WITH MAJOR PLUMBING COMPONENTS.

THEY ARE NOT INTENDED TO SHOW ACCESSORIES OR

INCIDENTALS COMMON TO EQUIPMENT INDICATED, THOUGH

THESE ITEMS ARE TO BE REMOVED, ACCESSIBILITY TO

DEMOLITION ITEMS SHALL NOT BE INFERRED. THE CONTRACTOR

SHALL BE RESPONSIBLE FOR FIELD VERIFICATION OF BUILDING

AND EXISTING CONDITIONS, PRIOR TO BID SUBMISSION.

2. EXISTING PIPING PENETRATIONS VACATED/REVEALED DURING

DEMOLITION AND REMODEL SHALL BE INFILLED AND FINISHED TO

MATCH EXISTING. IF MATERIALS FOR REPAIR TO MATCH EXISTING

ARE NOT AVAILABLE (IE GLAZED WALL TILE), GROUT ABANDONED

PENETRATION FULL AND FINISH FLUSH. PRIOR APPROVAL OF THE

OWNER MUST BE OBTAINED BEFORE ANY PROPOSED NON-

SIMILAR FINISH WORK BEGINS.

3. DISCONNECT AND REMOVE ALL PREVIOUSLY ABANDONED PIPING

WITHIN THE PROJECT AREA. REMOVE EXISTING/ABANDONED

HANGERS AND SUPPORTS IF DEEMED NOT REUSABLE.

4. ALL PIPING SHOWN IS BASED ON ORIGINAL DRAWINGS AND

LIMITED SITE OBSERVATIONS. THE CONTRACTOR SHALL BE

RESPONSIBLE FOR VERIFYING ALL EXISTING CONDITIONS PRIOR

TO COMMENCING WORK.

5. ALL PIPING ASSOCIATED WITH EXISTING SYSTEMS SHALL BE

DEMOLISHED. NO PIPING SHALL BE ABANDONED.

6. CONTRACTOR SHALL BE RESPONSIBLE FOR DRAINING PIPING

SYSTEMS TO BE CUT, CAPPED OR REMOVED. DISCHARGE FROM

SUCH SYSTEMS SHALL BE APPROPRIATELY DISPOSED OF PER

FEDERAL, STATE AND LOCAL REQUIREMENTS.

7. COORDINATE WITH CONSTRUCTION MANAGER FOR FLOOR, WALL

AND ROOF PATCHING REQUIRED DUE TO PENETRATIONS

RESULTING FROM DEMOLITION OF EXISTING AND INSTALLATION

OF NEW EQUIPMENT AND COMPONENTS.

8. CONTRACTOR IS RESPONSIBLE TO VERIFY ACTUAL NUMBER AND

LOCATION OF SYSTEMS AND COMPONENTS TO BE DEMOLISHED

AND REMOVED.

9. TO MINIMIZE DISRUPTIONS, COORDINATE ALL DEMOLITION WITH

CONSTRUCTION MANAGER BEFORE SHUTTING DOWN ANY UTILITY

OR SIMILAR SYSTEM. SHUTDOWNS FOR UTILITIES OR SIMILAR

SYSTEMS SHALL BE REQUESTED WELL IN ADVANCE PER THE

SPECIFICATION.

10. ALL WORK WITHIN THE CONTRACT DOCUMENTS, WHICH INCLUDE

THIS DRAWING, SHALL BE COMPLETED IN A SAFE WORKMANLIKE

MANNER AND IN ACCORDANCE WITH ALL APPLICABLE STATE AND

NATIONAL CODES, REGULATIONS AND ORDINANCES. IF ANY

CONFLICTS ARISE BETWEEN THE CONTRACT DOCUMENTS AND

THE APPLICABLE CODES, REGULATIONS OR ORDINANCE, THE

CONTRACTOR SHALL BE RESPONSIBLE TO HAVE ALL WORK

CONFORM TO THE STRICTER OF SAID REQUIREMENTS.

11. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS

AND INSPECTIONS AS REQUIRED. IT SHALL BE THE CONTRACTOR'S

RESPONSIBILITY TO PROVIDE BOTH A COMPLETE AND COMPLIANT

INSTALLATION AS MAY BE DETERMINED BY THE AUTHORITY(S)

HAVING JURISDICTION.

12. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THE

WATERTIGHT AND WEATHER-PROOF INTEGRITY OF ROOFS,

WALLS AND FLOORS DURING CONSTRUCTION. EACH TRADE SHALL

LOCATE/DIMENSION/COORDINATE THEIR ROOF, FLOOR AND WALL

OPENINGS WITH THE CONSTRUCTION MANAGER.

GENERAL MECHANICAL NOTES

1. LIGHT LINES INDICATE EXISTING PIPING, DUCTWORK, EQUIPMENT,

ETC. TO REMAIN. BOLD LINES INDICATE PIPING, DUCTWORK,

EQUIPMENT, ETC. TO BE INSTALLED BY THIS CONTRACT UNLESS

NOTED OTHERWISE.

2. COORDINATE ROUGH-IN AND FINAL LOCATION OF DUCTWORK AND

PIPING WITH LIGHTING, STRUCTURE, SPRINKLERS, ETC. PROVIDE

OFFSETS AND/OR EASEMENTS, OR RELOCATE AS REQUIRED

AVOIDING CONFLICTS WITH WORK OF OTHER TRADES.

3. PROVIDE TEMPORARY FILTRATION ON RETURNS DURING

CONSTRUCTION TO PREVENT DUST FROM SPREADING TO

DUCTWORK, HVAC EQUIPMENT, AND NON-CONSTRUCTION AREAS.

4. PIPING IS SHOWN IN SCHEMATIC FORM. ROUTE AS REQUIRED FOR

CLEARANCE. VERIFY ROUTING AND CLEARANCES AND

COORDINATE WITH OTHER TRADES PRIOR TO FABRICATION.

5. BREAK CONNECTIONS ARE REQUIRED AT ALL MAJOR EQUIPMENT

AND PIPING ITEMS THAT REQUIRE REMOVAL FOR MAINTENANCE.

6. PIPE REDUCTIONS ON HORIZONTAL PIPING GOING FROM LARGER

TO SMALLER SHALL BE MADE WITH ECCENTRIC REDUCERS: TOP

FLAT FOR LIQUID SYSTEMS, CONCENTRIC REDUCERS MAY BE

USED FOR FLOW GOING FROM SMALL TO LARGER SIZE PIPE.

7. FIRE SAFE ALL PIPE PENETRATIONS PER UL AT RATED WALLS.

8. THERMOSTATS SHALL BE MOUNTED 4'-0" ABOVE FINISHED FLOOR.

9. NEW FLOOR/WALL/CEILING PENETRATIONS REQUIRED FOR

MECHANICAL PIPING INSTALLATION SHALL BE CLEANLY BORED AT

RIGHT ANGLES. AS NEW PIPING IS INSTALLED, NEW PIPING

PENETRATIONS SHALL BE NEATLY CAULKED TO FILL VOID.

EXPOSED WALL PENETRATIONS SHALL BE FINISHED WITH

ESCUTCHEONS.

10. ALL NEW PIPING EXPOSED IN OCCUPIED SPACES SHALL HAVE PVC

JACKETS INSTALLED OVER THE PIPING INSULATION. ANY PIPING

REQUIRED TO BE EXPOSED SHALL BE INSTALLED VERTICALLY OR

HORIZONTALLY IN LEAST VISIBLE LOCATIONS.

11. ALL NEW EQUIPMENT AND ACCESSORIES (CIRCUIT SETTERS,

CIRCULATION PUMPS, EXPANSION TANKS, ETC.) SHALL BE

INSTALLED TO BE EASILY ACCESSIBLE.

12. ALL CONDENSATE PIPING SHALL BE SLOPED 1/8" PER FOOT

MINIMUM.

13. CONTRACTOR SHALL PATCH/REPAIR ALL UNUSED OPENINGS AND

MODIFIED FINISH SURFACES. PATCHING SHALL MATCH

MATERIALS, FINISH, AND TEXTURE OF ADJACENT SURFACES.

14. PATCH ANY REMAINING OPENINGS AND FILL EXCESSIVE GAPS.

REWORK AND REFINISH TO MATCH ADJACENT STRUCTURES.

FLASH AND SEAL ALL MECHANICAL AND ELECTRICAL

PENETRATIONS THRU WALLS, CEILINGS, AND FLOORS WITH METAL

FRAMEWORK OR ESCUTCHEONS. ALL OPENINGS SHALL BE

PROPERLY SEALED TO MEET FIRE RATING NEEDS.

15. HEATING AND WATER BRANCH PIPING TO TERMINAL HEATING

DEVICES SHALL BE 3/4" PIPE SIZE UNLESS OTHERWISE NOTED.

16. NEW WORK HAS BEEN SHOWN DIAGRAMMATICALLY AND DUE TO

THE LIMITED SCALE OF THESE DRAWINGS, THE PLACEMENT AND

ROUTING OF ALL DUCTWORK, PIPING, ETC. IS CONSIDERED

SCHEMATIC IN NATURE. THEREFORE, THE DRAWINGS MAY NOT

SHOW ALL OFFSETS AND TRASITIONS, WHICH MAY BE REQUIRED.

THE CONTRACTOR SHALL PROVIDE COMPLETE FULLY

FUNCTIONAL SYSTEMS.

17. ALL WORK WITHIN THE CONTRACT DOCUMENTS SHALL BE

COMPLETED IN A SAFE MANNER AND IN ACCORDANCE WITH ALL

APPLICABLE STATE AND NATIONAL CODES, REGULATIONS, AND

ORDINANCES. IF ANY CONFLICTS ARISE BETWEEN THE CONTRACT

DOCUMENTS AND THE APPLICABLE CODES, REGULATIONS, OR

ORDINANCES, THE CONTRACTOR SHALL BE RESPONSIBLE TO

HAVE ALL WORK CONFORM TO THE STRICTER OF SAID

REQUIREMENTS.

18. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS

AND INSPECTIONS AS REQUIRED FOR ELECTRICAL, FIRE

PROTECTION, PLUMBING, MECHANICAL, AND BACKFLOW

PREVENTION INSTALLATIONS. IT SHALL BE THE CONTRACTOR'S

RESPONSIBILITY TO PROVIDE BOTH A COMPLETE AND COMPLIANT

INSTALLATION AS MAY BE DETERMINED BY THE

AUTHORITY/AUTHORITIES HAVING JURISDICTION.

19. CONTRACTOR SHALL NOT PROCURE OR FABRICATE ANY PIPING,

DUCTWORK, OR OTHER EQUIPMENT WITHOUT FIRST VERIFYING

ALL DIMENSIONS AND CONDITIONS WHETHER CURRENTLY

EXISTING OR NOT. THE CONTRACTOR SHALL BE RESPONSIBLE

FOR ALL WORK, INCLUDING ANY REQUIRED REWORK.

20. MAINTAIN ALL MANUFACTURER RECOMMENDED EQUIPMENT

SERVICE AND SAFETY CLEARANCES. DO NOT LOCATE ANY

EQUIPMENT OR RUN MATERIALS ABOVE ANY ELECTRICAL PANELS

OR SWITCHGEAR. MAINTAIN ALL NFPA/NEC/CODE REQUIRED

CLEARANCES.

21. EACH CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING,

SCHEDULING, AND SEQUENCING OF THEIR WORK WITH ALL OTHER

TRADES. PROVDE OFFSETS, EASEMENTS, OR RELOCATE AS

REQUIRED AVOIDING CONFLICTS WITH WORK OF OTHER TRADES.

FURNISH SUFFICIENT RESOURCES TO MEET ALL PROJECT

MILESTONES AND DEADLINES.

22. PROTECT WORK FROM DAMAGE OR CONTAMINATION. PROVIDE

TEMPORARY PROTECTIVE CAPPING OR TAPED POLYETHYLENE

ENCLOSURES OVER OPEN DUCTWORK AND PIPING ENDS AND

EQUIPMENT. CONTRACTOR SHALL BE RESPONSIBLE FOR

CLEANING MECHANICAL SYSTEMS PRIOR TO PLACING THEM IN

SERVICE.

23. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THE

WATERTIGHT AND WEATHER-PROOF INTEGRITY OF ROOFS,

WALLS, AND FLOORS DURING CONSTRUCTION. EACH TRADE

SHALL LOCATE/DIMENSION/COORDINATE THEIR ROOF, FLOOR,

AND WALL OPENINGS AS NEEDED WITH THE GENERAL

CONTRACTOR OR CONSTRUCTION MANGER.

GENERAL MECHANICAL DEMOLITION NOTES

1. THESE DRAWINGS REPRESENT THE LAYOUT OF EXISTING

CONDITIONS OF MAJOR COMPONENTS. THEY ARE NOT INTENDED

TO SHOW ACCESSORIES OR INCIDENTALS COMMON TO THE

COMPONENTS INDICATED, THOUGH THESE ITEMS ARE TO BE

REMOVED. ACCESSIBILITY TO DEMOLITION ITEMS SHALL NOT BE

INFERRED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD

VERIFICATION OF BUILDING AND EXISTING CONDITIONS PRIOR TO

BID SUBMISSION.

2. DEMOLITION WORK SHOWN IS BASED ON LIMITED SITE

OBSERVATIONS AND CONSTRUCTION/RECORD DOCUMENTS.

CONTRACTOR SHALL NOT DEMOLISH ANY MECHANICAL PIPING,

DUCTWORK, EQUPIMENT, OR OTHER ITEMS WITHOUT FIRST

VERIFYING EXISTING CONDITIONS. CONSULT OWNER'S

REPRESENTATIVE OR CONSTRUCTION MANAGER BEFORE START

OF WORK.

3. DEMOLITION OF MECHANICAL PIPING, DUCTWORK, AND

EQUIPMENT SHALL INCLUDE ALL HANGERS, FITTINGS, DAMPERS,

VALVES, ETC.

4. REPAIR ANY INSULATION DAMAGED DURING REMOVAL. REPAIR

WORK TO MATCH EXISTING.

5. COORDINATE WALL AND FLOOR PATCHING REQUIREMENTS.

PATCHWORK SHALL MATCH MATERIALS, FINISH, AND TEXTURE OF

ADJACENT SURFACES.

6. CONTRACTOR SHALL PATCH/REPAIR ALL UNUSED OPENINGS AND

MODIFIED FINISH SURFACES. PATCH SHALL MATCH MATERIALS,

FINISH, AND TEXTURE OF ADJACENT SURFACES.

7. CONTRACTOR SHALL BE RESPONSIBLE FOR PROPER AND TIMELY

DISPOSAL OF ALL CONSTRUCTION DEBRIS INCLUDING BUT NOT

LIMITED TO EQUIPMENT AND MATERIALS NOT CLAIMED BY OWNER.

8. IT IS ESSENTIAL TO MINIMIZE DISRUPTIONS. COORDINATE ALL

DEMOLITION WITH THE OWNER OR CONSTRUCTION MANAGER

BEFORE SHUTTING DOWN ANY UTILITY OR SIMILAR SYSTEM.

SHUTDOWN OF UTILITIES OR SIMILAR SYSTEMS SHALL BE

REQUESTED WELL IN ADVANCE AND PRE-APPROVED BY THE

PROPER AUTHORITY AND/OR AUTHORITIES HAVING JURISDICTION

BEFORE WORK BEGINS.

9. ALL WORK WITHIN THE CONTRACT DOCUMENTS SHALL BE

COMPLETED IN A SAFE MANNER AND IN ACCORDANCE WITH ALL

APPLICABLE STATE AND NATIONAL CODES, REGULATIONS, AND

ORDINANCES. IF ANY CONFLICTS ARISE BETWEEN THE CONTRACT

DOCUMENTS AND THE APPLICABLE CODES, REGULATIONS, OR

ORDINANCES, THE CONTRACTOR SHALL BE RESPONSIBLE TO

HAVE ALL WORK CONFORM TO THE STRICTER OF SAID

REQUIREMENTS.

10. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THE

WATERTIGHT AND WEATHERPROOF INTEGRITY OF ROOFS, WALLS,

AND FLOORS DURING CONSTRUCTION. EACH TRADE SHALL

LOCATE/DIMENSION/COORDINATE THEIR ROOF, FLOOR, AND WALL

OPENINGS AS NEEDED WITH THE CONSTRUCTION MANAGER.

11. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS

AND INSPECTIONS AS REQUIRED FOR ELECTRICAL, FIRE

PROTECTION, PLUMBING, MECHANICAL, AND BACKFLOW

PREVENTION INSTALLATIONS. IT SHALL BE THE CONTRACTOR'S

RESPONSIBILITY TO PROVIDE BOTH A COMPLETE AND COMPLIANT

INSTALLATION AS MAY BE DETERMINED BY THE AUTHORITY

AND/OR AUTHORITIES HAVING JURISDICTION.

STATE HISTORICAL PRESERVATION OFFICE REQUIREMENTS

1. FOR FINISHED SPACES (OFFICES, RECEPTION, ETC.) PAINT

EXPOSED PIPING WHITE.

2. FOR UNFINISHED SPACES (BASEMENTS, ATTICS, WORKSHOPS,

ETC.) PIPING CAN REMAIN UNPAINTED.

3. FOR SPACES WITH WOOD CEILINGS (NATURAL COLOR) PAINT

EXPOSED PIPING NEXT TO WOOD CEILINGS BROWN. FOR

EXPOSED PIPING IN THE REST OF THE ROOM, PAINT AS

DESCRIBED IN FINISHED SPACES

NOTE:

BUILDING CONTAINS HAZARDOUS MATERIAL SUCH AS

ASBESTOS AND LEAD PAINT. SUPPLEMENTAL HAZARDOUS

MATERIAL REPORT IS PROVIDED IN THE BID DOCUMENTS AS

A SEPARATE ATTACHMENT. REFER TO HAZARDOUS

MATERIAL REPORT FOR EXTENTS OF TESTING AND RESULTS.

A P

P R

O V

E D

B Y

D R

A W

N B

Y

IS

S

U E

D F

O R

IS

S

U E

D A

T E

P R

O J E

C T

N U

M B

E R

F

IE

L D

B O

O K

W

E S

T O

W N

P K

W Y

S

U

IT

E

W E

S T

D E

S M

O

IN

E S

IA

.2

.8

S

H

IV

E -H

A T

T E

R Y

.C O

M

BA D E

FC G

H

BA D E FC G H

Autodesk Revit 2022

.3

W R

C D e c e n tr a liz a ti o n

P h a s e

.0

W R

C F ir e

A la rm P h a s e

.3

C h a p e l S p ri n k le r

/5

/2

:0 :3

P

M

A u to d e s k D o c s /I

A D

A S

W

R C

P ro je c ts

/2 -M

E P

-A d m in R

.r v t

M E

C H

A N

IC

A

L

P L U

M B

IN

G

G E

N E

R A

L

IN

F O

R M

A T

IO

N

B

ID

D

IN

G

T L S

C A

S

-0

-1

00-MP00

Io w a D e p a rt m e n t o f

A d m in is tr a ti v e S e rv ic e s th

S t, W o o d w a rd

IA

UNIT PRICING

1) PROVIDE UNIT PRICING TO DEMO GROUT AROUND EXISTING PIPE PENETRATIONS GOING TO EXISTING STEAM RADIATORS.

DEMOLITION OF GROUT IS REQUIRED TO REMOVE THE EXISTING PIPING AND INSTALL NEW HEATING WATER PIPE. ASSUME THE FOLLOWING QUANTITY OF LOCATIONS WHERE GROUT IS TO BE REMOVED AND PROVIDE A UNIT PRICE TO ADD OR REMOVE

LOCATIONS.

• ADMIN BUILDING: 100

• ELMCREST: 75

• MEDICAL CENTER: 50

HT AFF SYMBOL DESCRIPTION

EM

E E

K

D

OS

MS

T

SP

M

UC

CLG

A

A

P

E

J J

T

25 KVA

1 SF-1

M

R

OS IR

LS A

PC

W

X

TV

SS

S S

S

V

IC

FS

TS

P P

R/F135 R/F135

DH

CH

FR

N

N 1

NCM

NC ANNUN

FB 1

ASD

DR

TV

TRACK AND TRACK LIGHT (TYPE DENOTED)AS NOTED

EMERGENCY BATTER LIGHT (TYPE DENOTED)96"

EXIT SIGN (TYPE DENOTED)

LIGHT FIXTURE ON EMERGENCY CIRCUITAS NOTED

SINGLE POLE SWITCH

3-WAY SWITCH

48"

48"

4-WAY SWITCH48"

KEYED SWITCH48"

DIMMER SWITCH48"

OCCUPANCY SENSOR SWITCH48"

MOMENTARY CONTACT SWITCH48"

TIMER SWITCH48"

FAN SPEED CONTROL48"

MOTOR HORSEPOWER RATED SWITCH48"

PUSH BUTTON48"

DURESS PUSH BUTTON, UNDER COUNTER48"

DUPLEX RECEPTACLE18" UNO

FOURPLEX RECEPTACLE18" UNO

FLOOR BOX (TYPE DENOTED)

CEILING MOUNTED DUPLEX RECEPTACLE

HT AFF SYMBOL DESCRIPTION

SURFACE RACEWAY (TYPE DENOTED)18"

CLOCK (TYPE DENOTED)

POWER POLE (OPEN OFFICE STYLE)

ELECTRICAL CONNECTION (SEE SCHEDULE)

JUNCTION BOXAS NOTED

CIRCUIT BREAKER PANEL72"**

POWER OR DISTRIBUTION PANEL72"**

SPECIAL CABINET (TYPE DENOTED)72"**

TRANSFORMER (TYPE DENOTED)

GENERATOR (KVA DENOTED)

MOTOR (SEE SCHEDULE)

MOTORIZED DAMPER

SAFETY DISCONNECTION SWITCH72"**

ADJUSTABLE SPEED DRIVE

RELAY72"**

OCCUPANCY SENSOR (TYPE DENOTED)

LIGHT LEVEL SENSOR (TYPE DENOTED)

SM

PHOTOCELLAS NOTED

CCTV CAMERA (TYPE DENOTED)AS NOTED

SURVEILLANCE MONITOR

HT AFF SYMBOL DESCRIPTION HT AFF SYMBOL DESCRIPTION

CONDUIT CONCEALED IN WALL OR OVERHEAD

CONDUIT CONCEALED BELOW FLOOR

CONDUIT TRANSITION UP

CONDUIT TRANSITION DOWN

CONDUIT STUBBED OUT

BRANCH CIRCUIT HOME RUN

CABLE TRAY (TYPE DENOTED)

CONDUIT SLEEVE (SIZE DENOTED)

WALL TELEPHONE OUTLET (TYPE DENOTED)48"***

TELEPHONE OUTLET (TYPE DENOTED)18" UNO

DATA OUTLET (INDICATED QTY CABLES)18" UNO

VOICE/DATA OUTLET (TYPE DENOTED)18" UNO

WIRELESS ACCESS POINT

TELEVISION OUTLET18" UNO

CEILING MOUNTED TELEVISION OUTLET

SPEAKER (WALL OR CEILING MOUNT)84"

HORN TYPE SPEAKER84"

SURFACE MOUNT SPEAKER SUSPENDED FROM CEILING

VOLUME CONTROL48"

INTERCOM STATION48"

ICM INTERCOM MASTER

KEYED NOTE (SEE SCHEDULE)E#

SPRINKLER FLOW SWITCH

SPRINKLER VALVE TAMPER SWITCH

MANUAL PULL STATION (46" ABOVE FLOOR)

AUDIO NOTIFICATION DEVICE - CEILING MOUNTED

B = BELL

C = CHIME

H = HORN

S = SPEAKER

VISUAL NOTIFICATION DEVICE - CEILING MOUNTED

FIRE ALARM REMOTE ANNUNCIATOR 72"**

FIRE ALARM CONTROL PANEL72"**

FIRE ALARM RELAY PANEL72"**

SMOKE DETECTOR (TYPE DENOTED)8"****

HEAT DETECTOR (TYPE AND TEMP DENOTED)

DUCT SMOKE DETECTOR (TYPE DENOTED)

LINEAR HEAT DETECTOR

DOOR HOLDER

DOOR CLOSER/HOLD OPEN

SMOKE DAMPER RELEASE

FIRE ALARM SHUT DOWN RELAY

NURSE CALL SINGLE PATIENT STATION60"

37 PIN BED INTERFACE RECEPTACLE60"

AUXILIARY ALARM STATION, TWO JACK60"

EMERGENCY PULL CORD STATION36" UNO

STAFF TERMINAL, TOUCHSCREEN60"

60" DUTY STATION

12"* NURSE CALL DOME LIGHT

48"*** NURSE CALL MASTER STATION

NCC48"*** NURSE CALL EQUIPMENT CABINET

72"*** NURSE CALL ANNUNCIATOR PANEL

ELECTRICAL SYMBOL LEGEND

ALL DISTANCES ARE TO CENTER OF DEVICE OR EQUIPMENT UNLESS OTHERWISE NOTED. DEVICES INDICATED AT 48" MAY NOT BE INSTALLED WITH ANY OPERABLE PART HIGHER THAN 48". DEVICES MAY BE INSTALLED IN CONCRETE MASONRY UNITS WITH THE TOP OF THE DEVICE AT 48".

* DISTANCE ABOVE DOOR FRAME ** DISTANCE TO TOP OF EQUIPMENT OR DEVICE *** DISTANCE TO HIGHEST OPERABLE POINT OF EQUIPMENT **** DISTANCE BELOW CEILING ***** DISTANCE TO BOTTOM OF DEVICE

1 LIGHTING CONTROL DENOTATION

P

J

E

T

D

B

STAFF ASSIST60"

CODE BLUE STATION48"

A

NURSE CALL STAFF STATION60" S

SURFACE LIGHT (TYPE DENOTED)X

X RECESSED LIGHT (TYPE DENOTED)

X

X

X

WALL MOUNTED LIGHT (TYPE DENOTED)PER SCHED

WALL MOUNTED FLOOD LIGHT (TYPE DENOTED)PER SCHED

SITE POLE MOUNTED LIGHT (TYPE DENOTED)PER SCHED

SURFACE LIGHT (TYPE DENOTED)

SUSPENDED OR PENDANT LIGHT (TYPE DENOTED)

RECESSED LIGHT (TYPE DENOTED)

SITE BOLLARD LIGHT (TYPE DENOTED)XPER SCHED

L S

B

L

L S

B

L

F

AUDIO NOTIFICATION DEVICE - CEILING MOUNTED

80" ABOVE FLOOR OR AS NOTED

B = BELL

C = CHIME

H = HORN

S = SPEAKER

VISUAL NOTIFICATION DEVICE - WALL MOUNTED

80" ABOVE FLOOR OR AS NOTED

AUDIO/VISUAL NOTIFICATION DEVICE - CEILING MOUNTED

B = BELL

C = CHIME

H = HORN

S = SPEAKER

AUDIO/VISUAL NOTIFICATION DEVICE - WALL MOUNTED

80" ABOVE FLOOR OR AS NOTED

B = BELL

C = CHIME

H = HORN

S = SPEAKER

CT CONTACT SENSING CONTROL MODULE

CR RELAY OUTPUT CONTROL MODULE

FACP

FARP

ANN

VFD

DDC

VARIABLE FREQUENCY DRIVE

DIRECT DIGITAL CONTROL PANEL

1P 1 POLE (2P, 3P, 4P, ETC.)

A AMPERE

AC ABOVE COUNTER

ACLG ABOVE CEILING

ADO AUTOMATIC DOOR OPENER

AF AMP FRAME

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AFI ARC FAULT CIRCUIT

INTERRUPTER

AHU AIR HANDLING UNIT

AL ALUMINUM

ALT ALTERNATE

AMP AMPERE

AMPL AMPLIFIER

ANNUN ANNUNCIATOR

APPROX APPROXIMATELY

AQ-STAT AQUASTAT

ARCH ARCHITECT, ARCHITECTURAL

AS AMP SWITCH

AT AMP TRIP

ATS AUTOMATIC TRANSFER SWITCH

AUTO AUTOMATIC

AUX AUXILIARY

AV AUDIO VISUAL

AWG AMERICAN WIRE GAUGE

BATT BATTERY

BD BOARD

BLDG BUILDING

BMS BUILDING MANAGEMENT

SYSTEM

C CONDUIT

CAB CABINET

CAT CATALOG

CATV CABLE TELEVISION

CB CIRCUIT BREAKER

CCTV CLOSED CIRCUIT TELEVISION

CKT CIRCUIT

CLG CEILING

COMB COMBINATION

CMPR COMPRESSOR

CONN CONNECTION

CONST CONSTRUCTION

CONT CONTINUATION OR

CONTINUOUS

CONTR CONTRACTOR

CONV CONVECTOR

CP CIRCULATING PUMP

CRT CATHODE-RAY TUBE

CT CURRENT TRANSFORMER

CTR CENTER

CU COPPER

DCP DOMESTIC WATER

CIRCULATING PUMP

DEPT DEPARTMENT

DET DETAIL

DIA DIAMETER

DISC DISCONNECT

DIST DISTRIBUTION

DN DOWN

DPR DAMPER

DS SAFETY DISCONNECT SWITCH

DT DOUBLE THROW

DWG DRAWING

EC ELECTRICAL CONTRACTOR

ELEC ELECTRIC, ELECTRICAL

ELEV ELEVATOR

EM EMERGENCY

EMS ENERGY MANAGEMENT SYSTEM

EMT ELECTRICAL METALLIC TUBING

EP ELECTRIC PNEUMATIC

EQUIP EQUIPMENT

EWC ELECTRIC WATER COOLER

EXIST EXISTING

EXH EXHAUST

EXP EXPLOSION PROOF

FA FIRE ALARM

FABP FIRE ALARM BOOSTER POWER

SUPPLY PANEL

FACP FIRE ALARM CONTROL PANEL

FCU FAN COIL UNIT

FIXT FIXTURE

FLR FLOOR

FLUOR FLUORESCENT

FU FUSE

FUDS FUSED SAFETY DISCONNECT

SWITCH

GA GAUGE

GAL GALLON

GALV GALVANIZED

GC GENERAL CONTRACTOR

GEN GENERATOR

GFI GROUND FAULT CIRCUIT

INTERRUPTER

GFP GROUND FAULT PROTECTOR

GND GROUND

GRS GALVANIZED RIGID STEEL

(CONDUIT)

GYP BD GYPSUM BOARD

HOA HANDS-OFF-AUTOMATIC

SWITCH

HORIZ HORIZONTAL

HP HORSEPOWER

HPF HIGH POWER FACTOR

HT HEIGHT

HTG HEATING

HTR HEATER

HV HIGH VOLTAGE

HVAC HEATING, VENTILATING AND

AIR CONDITIONING

HWP HYDRONIC WATER PUMP

IC INTERRUPTING CAPACITY

IG ISOLATED GROUND

IMC INTERMEDIATE METAL CONDUIT

INCAND INCANDESCENT

IR INFRARED

I/W INTERLOCK WITH

J-BOX JUNCTION BOX

KV KILOVOLT

KVA KILOVOLT-AMPERE

KVAR KILOVOLT-AMPERE REACTIVE

KW KILOWATT

KWH KILOWATT HOUR

LOC LOCATE OR LOCATION

LT LIGHT

LTG LIGHTING

LTNG LIGHTNING

LV LOW VOLTAGE

MAX MAXIMUM

MAG.S MAGNETIC STARTER

M/C MOMENTARY CONTACT

MC MECHANICAL CONTRACTOR

MCB MAIN CIRCUIT BREAKER

MCC MOTOR CONTROL CENTER

MDC MAIN DISTRIBUTION CENTER

MDP MAIN DISTRIBUTION PANEL

MFR MANUFACTURER

MFS MAIN FUSED DISCONNECT

SWITCH

MH MANHOLE

MIC MICROPHONE

MIN MINIMUM

MISC MISCELLANEOUS

MLO MAIN LUGS ONLY

MMS MANUAL MOTOR STARTER

MOA MULTIOUTLET ASSEMBLY

MSP MOTOR STARTER PANELBOARD

MSBD MAIN SWITCHBOARD

MT MOUNT

MT.C EMPTY CONDUIT

MTS MANUAL TRANSFER SWITCH

MTR MOTOR, MOTORIZED

N.C. NORMALLY CLOSED

NEC NATIONAL ELECTRICAL CODE

NEMA NATIONAL ELECTRICAL

MANUFACTURER'S

ASSOCIATION

NFDS NON-FUSED SAFETY

DISCONNECT SWITCH

NIC NOT IN CONTRACT

NL NIGHT LIGHT

N.O. NORMALLY OPEN

NPF NORMAL POWER FACTOR

NTS NOT TO SCALE

OH OVERHEAD

OL OVERLOADS

PA PUBLIC ADDRESS

PB PULL BOX OR PUSHBUTTON

PE PNEUMATIC ELECTRIC

PED PEDESTAL

PF POWER FACTOR

PH PHASE

PIV POST INDICATING VALVE

PNL PANEL

PP POWER POLE

PR PAIR

PRI PRIMARY

PROJ PROJECTION

PRV POWER ROOF VENTILATOR

PT POTENTIAL TRANSFORMER

PVC POLYVINYL CHLORIDE

(CONDUIT)

PWR POWER

QUAN QUANTITY

RCPT RECEPTACLE

REQD REQUIRED

RM ROOM

RSC RIGID STEEL CONDUIT

RTU ROOF TOP UNIT

SC SURFACE CONDUIT

SEC SECONDARY

SHT SHEET

SIM SIMILAR

S/N SOLID NEUTRAL

SPEC SPECIFICATION

SPKR SPEAKER

SP SPARE

SR SURFACE RACEWAY

SS STAINLESS STEEL

SSW SELECTOR SWITCH

S/S STOP/START PUSHBUTTONS

STA STATION

STD STANDARD

SURF SURFACE MOUNTED

SW SWITCH

SWBD SWITCHBOARD

SYM SYMMETRICAL

SYS SYSTEM

TEL TELEPHONE

TEL/DATA TELEPHONE/DATA

TERM TERMINAL

TL TWIST LOCK

TR TAMPER RESISTANT

T-STAT THERMOSTAT

TTC TELEPHONE TERMINAL

CABINET

TV TELEVISION

TVTC TELEVISION TERMINAL

CABINET

TYP TYPICAL

UC UNDER COUNTER

UE UNDERGROUND ELECTRICAL

UG UNDERGROUND

UH UNIT HEATER

UNO UNLESS NOTED OTHERWISE

UT UNDERGROUND TELEPHONE

UTIL UTILITY

UV UNIT VENTILATOR OR

ULTRAVIOLET

V VOLT

VA VOLT-AMPERES

VDT VIDEO DISPLAY TERMINAL

VERT VERTICAL

VFD VARIABLE FREQUENCY DRIVE

VOL VOLUME

W WATT

W/ WITH

WG WIRE GUARD

WH WATER HEATER

W/O WITHOUT

WP WEATHERPROOF

XFMR TRANSFORMER

XFR TRANSFER

L L

ELECTRICAL ABBREVIATIONS LIST

ANGLE

@ AT

DELTA

' FEET

" INCHES

# NUMBER

Ø PHASE

C CENTER LINE

P PLATE

1. LIGHT LINES INDICATE EXISTING WALLS AND EQUIPMENT

TO REMAIN. DASHED LINES INDICATE WALLS, EQUIPMENT,

AND ELECTRICAL ITEMS TO BE REMOVED.

2. COORDINATE PATCHING REQUIREMENTS FOR UNUSED

OPENINGS WITH THE CONSTRUCTION MANAGER.

3. FIRE ALARM - REMOVE EXISTING CEILING MOUNTED

DEVICES TO PERMIT REMOVAL OF CEILING. WALL

MOUNTED NOTIFICATION DEVICES SHALL BE DEMOLISHED.

COORDINATE WORK WITH PROJECT PHASING TO MAINTAIN

FIRE ALARM SYSTEM PROTECTION OF SPACES AT ALL

TIMES.

4. COORDINATE DISPOSAL OF ALL ITEMS NOT REQUESTED

AS SALVAGE BY THE OWNER.

5. DISCONNECT OUTLETS, WIRING, AND OTHER NOTED

EQUIPMENT TO PERMIT DEMOLITION OF WALLS. VERIFY

AND MAINTAIN CONNECTION TO EXISTING OUTLETS THAT

WILL NOT BE REMOVED BUT ARE ON COMMON CIRCUITS

WITH ITEMS TO BE REMOVED.

6. DRAWINGS DO NOT IDENTIFY ALL OUTLETS, SWITCHES,

CABLING, OR EQUIPMENT TO BE REMOVED. CONTRACTOR

SHALL BECOME FAMILIAR WITH THE SITE PRIOR TO

BIDDING AND INCLUDE LABOR AND MATERIAL NECESSARY

FOR REQUIRED DEMOLITION IN THEIR BID.

7. WIRING SHALL BE REMOVED BACK TO SERVING PANEL.

INSTALLATION OF NEW CONDUCTORS IN EXISTING

CONDUITS WILL BE PERMITTED AS DESCRIBED IN THE

DIVISION 26 SPECIFICATIONS.

8. HVAC EQUIPMENT NOTED FOR REMOVAL IS FOR

REFERENCE ONLY. THE ELECTRICAL CONTRACTOR SHALL

REVIEW THE MECHANICAL SYSTEMS DEMOLITION PLANS

AND INCLUDE ALL LABOR AND MATERIAL NECESSARY TO

FACILITATE REMOVAL OF EQUIPMENT AS SHOWN ON

THOSE DRAWINGS. THIS SHALL INCLUDE ALL ITEMS

NOTED ON EITHER THE PLUMBING OR MECHANICAL

SERIES OF DRAWINGS.

9. CONTRACTOR TO CONTACT PAT ASTOR AT SIEMENS FOR

DECOMMISSIONING AND REPROGRAMMING OF EXISTING

SIEMENS SYSTEM. pat.astor-iii@siemens.com 515-661-9688.

DEMOLITION GENERAL NOTES

1. FOR FINISHED SPACES (OFFICES, RECEPTION, ETC.), PAINT EXPOSED

CONDUIT WHITE.

2. FOR UNFINISHED SPACES (BASEMENTS, ATTICS, WORKSHOPS, ETC.)

CONDUIT CAN REMAIN UNPAINTED.

3. FOR SPACES WITH WOOD CEILINGS (NATURAL COLOR) PAINT

EXPOSED CONDUIT THAT IS NEXT TO WOOD CEILINGS BROWN. FOR

EXPOSED CONDUIT IN THE REST OF THE ROOM, PAINT AS DESCRIBED

IN FINISHED SPACES.

STATE HISTORICAL PRESERVATION OFFICE REQUIREMENTS

1. ALL WORK SHALL BE IN CONFORMANCE WITH THE NATIONAL

ELECTRICAL CODE - LATEST EDITION ADOPTED BY THE STATE,

THE STATE AMENDMENTS, AND THE AUTHORITY HAVING

JURISDICTION. THE COMPLETE INSTALLATION SHALL BE IN

ACCORDANCE WITH THE ADAAG (AMERICANS WITH DISABILITIES

ACT ACCESSIBILITY GUIDELINES).

2. IT IS THE INTENT OF THESE DOCUMENTS TO COMPLY WITH THE

APPLICABLE CODES. WHERE DISCREPANCIES OCCUR, NOTIFY THE

ENGINEER/ARCHITECT IN WRITING FOR INTERPRETATION.

CORRECT ANY INSTALLATION THAT FAILS TO COMPLY WITH THE

CODES AND STANDARDS AT NO ADDITIONAL COST TO THE

OWNER.

3. CONTRACTOR SHALL PROVIDE ALL WORK NECESSARY INCLUDING

ALL LABOR, MATERIALS, PERMITS, TAXES, FEES, INSPECTIONS,

HARDWARE, AND COST FOR INSTALLATION FOR A COMPLETE AND

OPERATIONAL SYSTEM.

4. ALL MATERIALS FURNISHED BY THE CONTRACTOR SHALL BE NEW,

COMPLETE WITH MANUFACTURER’S GUARANTEE OR WARRANTY

AND SHALL BE LISTED BY A NATIONALLY RECOGNIZED TESTING

LABORATORY (NRTL).

5. COORDINATE ELECTRICAL INSTALLATION WITH ALL TRADES PRIOR

TO INSTALLATION. IF ELECTRICAL WORK INSTALLED INTERFERES

WITH OTHER TRADES AFTER INSTALLATION, THE CONTRACTOR

SHALL MAKE ALL NECESSARY CHANGES TO CORRECT THE

CONDITION AT NO ADDITIONAL COST TO THE OWNER.

6. DRAWINGS ARE DIAGRAMMATIC. ALL DIMENSIONS SHOWN ARE

APPROXIMATE. CONTRACTOR SHALL VERIFY ALL FURNITURE,

MODULAR FURNITURE, AND EQUIPMENT LOCATIONS WITH

ARCHITECTURAL PLANS, ELEVATIONS AND REVIEWED SHOP

DRAWINGS. PRIOR TO MAKING THE ACTUAL ELECTRICAL

INSTALLATION THIS CONTRACTOR SHALL ADJUST CONNECTION

LOCATIONS TO ACCOMMODATE FURNITURE AND/OR EQUIPMENT.

7. ALL ELECTRICAL PANELS WITH ANY BRANCH CIRCUIT/LOAD

REVISIONS (DEMOLITION OR NEW WORK) SHALL HAVE A NEW

TYPED UPDATED CIRCUIT DIRECTORY CARD INSTALLED INSIDE

THE DOOR OF THE ELECTRICAL PANEL. THE CONTRACTOR SHALL

VERIFY THAT ALL UNUSED CIRCUIT BREAKERS ARE TURNED ‘OFF’

AND PROPERLY INDICATED AS ‘SPARE’ ON THE NEW CIRCUIT

DIRECTORY CARD. THE CONTRACTOR SHALL INSTALL FILLER

PLATES WHERE BREAKERS ARE REMOVED AS PART OF THIS

PROJECT OR HAVE BEEN REMOVED PREVIOUSLY.

8. NO ENERGIZED CONDUCTORS SHALL BE EXPOSED AT ANYTIME

EXCEPT WHEN THE IMMEDIATE AREA IS UNDER THE SUPERVISION

OF A QUALIFIED ELECTRICIAN.

9. WHERE CONDUIT IS SURFACE MOUNTED TO A WALL AND RUN

VERTICALLY DOWN TO A SWITCH/OUTLET BOX, UTILIZE 1-HOLE OR

2-HOLE CONDUIT STRAPS.

10. PENETRATIONS THROUGH FIRE RATED WALLS BY OR FOR

DIVISION 26 CONTRACTOR SHALL BE SEALED WITH APPROPRIATE

FIRE PROOFING MATERIAL TO RESTORE FIRE RATING.

11. THE CONTRACTOR SHALL KEEP THE WORK AREA CLEAN OF ALL

DEBRIS ON A DAILY BASIS. ALL NEW MATERIALS AWAITING

INSTALLATION SHALL BE KEPT IN AREAS DESIGNATED BY THE

OWNER.

12. PERIODIC SITE OBSERVATION BY THE ENGINEER IS SOLELY FOR

THE PURPOSE OF DETERMINING IF THE WORK OF THE

CONTRACTOR IS PROCEEDING IN ACCORDANCE WITH THE

CONTRACT DOCUMENTS. THIS LIMITED SITE OBSERVATION

SHOULD NOT BE CONSTRUED AS EXHAUSTIVE OR CONTINUOUS

TO CHECK THE QUALITY OR QUANTITY OF THE WORK, BUT

RATHER PERIODIC IN AN EFFORT TO GUARD THE OWNER AGAINST

DEFECTS OR DEFICIENCIES IN THE WORK OF THE CONTRACTOR.

13. THE INFORMATION CONTAINED ON THE ELECTRICAL DRAWINGS IS

IN ITSELF INCOMPLETE AND VOID UNLESS USED IN CONJUNCTION

WITH ALL OTHER DISCIPLINE DRAWINGS, THE SPECIFICATIONS,

TRADE PRACTICES, OR APPLICABLE STANDARDS, CODES, ETC.,

AND SHALL BE CONSIDERED THE CONTRACT DOCUMENTS AND

WITH ALL THEREIN BY REFERENCE, WHICH THE CONTRACTOR

CERTIFIES KNOWLEDGE OF BY SIGNING THE CONTRACT.

14. CONTRACTOR IS TO ASSUME FULL RESPONSIBILITY, UNRELIEVED

BY REVIEW OF SHOP DRAWINGS OR PERIODIC OBSERVATION OF

CONSTRUCTION, FOR COMPLIANCE WITH THE CONTRACT

DOCUMENTS, FOR DIMENSIONS TO BE CONFIRMED AND

CORRELATED ON THE JOB SITE AND BETWEEN INDIVIDUAL

DRAWINGS OR SETS OF DRAWINGS FOR FABRICATION

PROCESSES AND CONSTRUCTION TECHNIQUES (INCLUDING

EXCAVATION, SHORING, SCAFFOLDING, BRACING, ERECTION,

FORM WORK, ETC.), FOR COORDINATION OF THE VARIOUS

TRADES, AND FOR SAFE CONDITIONS ON THE JOB SITE.

VARIATIONS IN FIELD CONDITIONS RELATIVE TO THE CONTRACT

DOCUMENTS SHALL BE REPORTED TO THE ENGINEER AS SOON

AS THEY ARE FOUND. WORK SHALL NOT PROGRESS UNTIL

WRITTEN PERMISSION FROM THE ENGINEER IS OBTAINED.

ELECTRICAL GENERAL NOTES

NOTE:

BUILDING CONTAINS HAZARDOUS MATERIAL SUCH AS

ASBESTOS AND LEAD PAINT. SUPPLEMENTAL HAZARDOUS

MATERIAL REPORT IS PROVIDED IN THE BID DOCUMENTS AS

A SEPARATE ATTACHMENT. REFER TO HAZARDOUS

MATERIAL REPORT FOR EXTENTS OF TESTING AND RESULTS.

A P

P R

O V

E D

B Y

D R

A W

N B

Y

IS

S

U E

D F

O R

IS

S

U E

D A

T E

P R

O J E

C T

N U

M B

E R

F

IE

L D

B O

O K

W

E S

T O

W N

P K

W Y

S

U

IT

E

W E

S T

D E

S M

O

IN

E S

IA

.2

.8

S

H

IV

E -H

A T

T E

R Y

.C O

M

BA D E

FC G

H

BA D E FC G H

Autodesk Revit 2022

KEY PLAN

.3

W R

C D e c e n tr a liz a ti o n

P h a s e

.0

W R

C F ir e

A la rm P h a s e

.3

C h a p e l S p ri n k le r

/9

/2

:2 :5

P

M

A u to d e s k D o c s /I

A D

A S

W

R C

P ro je c ts

/2 -M

E P

-A d m in R

.r v t

E L E

C T

R

IC

A L

G E

N E

R A

L

IN

F O

R M

A T

IO

N

B

ID

D

IN

G

K J B

P J D

-0

-1

00-E000